Checklist For Bathroom Waterproofing
Checklist For Bathroom Waterproofing
Project: _______________________________________________________________
S.
Description S NS N.A Remarks
No.
Completion of 12 – 15mm thk. Ratio of Internal plaster:
internal plaster (with integral
waterproofing compound) of walls
leaving margin of 1m from FFL
1
(The proportion of Integral
waterproofing compound shall be as
per the technical specification & as
per the item description of BOQ)
Chasing on wall for the concealed
2 plumbing line as per the approved
shop drawing of plumbing
3 Cleaning of RCC bare sunk slab
waterproofing chemical
Sunk filling by Brick bat coba (brick Date & Time
21 bat shall be done as per the item
description of BOQ) to the slope
Brick bats ponding & testing for
22
minimum of 72 Hrs. of ponding
23 Testing / checking for leakage Date & Time
NOTE:
1 The drain pipes shall be completely embedded inside the brick bat & top finishing
2 If specified the escape pipe shall be preferably kept on top of base coat