KEY PLAN

350
15,000 85 180 85

85 150 150@100=14,830 150 84

UPPER LOWER
UPPER LOWER

A
-
75

85
150
NOTES :

1. ALL DIMENSIONS ARE IN MILLIMETER(mm).


UNLESS INDICATED OTHERWISE.
2. NOMINAL MIX PROPORTION OF CEMENT
CONCRETE SHALL BE (1:1.5:3) ENSURING
MINIMUM f’c=30 MPa WITH A SLUMP OF 150-
200 MM (USING APPROPRIATE ADMIXTURE),

150-20φ-VB1
WATER CEMENT RATIO=0.40 (MAX).

150-20φ-VT1
3. CONCRETE CLEAR COVER IS MIN. 75MM.
150-20φ-VT1 4. THE CONSTRUCTOR SHALL PLACE ORDER
FOR REINFORCINGS BARS AFTER HAVING
B APPROVAL FROM THE ENGINEER/CONSULTANTS.
-
5. LAP LOCATIONS FOR REBARS OF BEAM
AND SLAB SHALL BE PROPOSED BY THE
20φ@100 C/C-HB1 CONTRACTOR.
150@100=14,850

6. TO MINIMIZE SHRINKAGE THE CONTRACTOR


SHALL PREPARE SHOP DRAWINGS FOR

150@100=14,830
APPROVAL OF THE ENGINEER/CONSULTANT.
15,000

15,000
20φ@100 C/C-HT1 REFERENCE DRAWINGS :
150-20φ-HT1 150-20φ-HB1

KUNHWA, DY, KUNHWA, DY,


0 FIRST ISSUES PPA 10.2019.
HEERIM, SAA HEERIM, SAA
150-20φ-VB1
REV. DESCRIPTION OF REVISION DESIG. CHEC. APPRO. DATE
CLIENT

PAYRA PORTS AUTHORITY

12φ@450 C/C-ST2

PROJECT TITLE

150
Construction of Yard with Ancillary Facilities
and Utility Services Under PPFT Project

85
75

PLAN SECTION A
DRAWING TITLE

-
REBAR DETAIL OF E-RTG
CRANE FOUNDATION(13/17)
15,000
85 150 150@100=14,830 150 85 DRAWN DESIGNED CHECKED APPROVED
SCALE
- KUNHWA, DY, KUNHWA, DY, KUNHWA, DY,
PPA
85

DATEISSUED HEERIM, SAA HEERIM, SAA HEERIM, SAA


150-20φ-HT1 20φ@100 C/C-VT1 10 . 2019. 10 . 2019. 10 . 2019. 10 . 2019. 10 . 2019.

12φ@450 C/C-ST1 KUNHWA ENGINEERING AND


350
180

CONSULTING CO., LTD.


150-20φ-HB1 20φ@100 C/C-VB1
85

SECTION B
-

TYPE-C1 (15.0M X 15.0M) symbiotic architects & associates

REBAR DETAIL OF E-RTG CRANE FOUNDATION(13/17)


A3(420x297mm)

PPA-CT-CY-032 0