Professional Documents
Culture Documents
Section C-C Section D-D: Side Walk Side Walk
Section C-C Section D-D: Side Walk Side Walk
T METER
FENCE ELEVATION
SCALE 1:200 M.
3rd Industrial city- at Dammam
1 2,867,427.85 395,665.25
2 2,867,629.84 395,667.02
3 2,867,628.13 395,862.01
4 2,867,426.14 395,860.24
C
B
SLIDING DOOR
A A
SCECO ROOM
NORTH
( 11.30x3.80 CLEAR )
SLIDING DOOR SLIDING DOOR
M M
B ROAD 46 M/W
C
sidewalk 3
2
KEY PLAN
C
B ROOF OF ROOF OF
GUARD ROOM ELEC. RM LOCATION : 3rd Industrial city- at Dammam
SLIDING DOOR TOTAL AREA : 39390.00 M2
A A
SCHEDULE OF SET BACK
NORTH EAST WEST SOUTH
LENGTH 195.00 M 202.00 M 202.00 M 195.00 M
M
B
M
ROOF PLAN LAND UTILITY SCHEDULE
C
SCALE 1:100 M. DESCRIPTION AREA BLDG. HEIGHTS
PERCENTAGE
TOTAL AREA
PROPOSED BUILT UP AREA 12.95 M 38.84 %
FUTURE EXTENSION AREA 12.95 M 21.15 %
FENCE PLAN CT KWH-METER SIDE WALK AREA: -- 1.38 %
CAR PARKING AREA: -- 2.00 %
STREET WIDE 46.00 MTS. SCALE 1:100 M. LOADING / UNLOADING AREA -- -- -- %
GREEN AREA: -- 2.52 %
SET BACKS/ASPHALT ROAD AREA : -- 34.11 %
PRODUCTION BUILDING 12.95 -
LEGEND:
C.T METER SYMBOL DESCRIPTION:
FENCE ELEVATION
SCALE 1:100 M.
STAMP HERE:
SECTION D-D
SCALE 1:50 M.
SECTION C-C
SCALE 1:50 M.
SECTION A-A
SCALE 1:50 M.
PROJECT TITEL :
SECTION B-B
FENCE DETAIL
SCALE 1:50 M.
MODON/ TECHNICAL SUPPORT ENGINEERING DEPARTMENT ESD 301 D:\ASHRAF\2019\11 NOV\MODON\PIPE FACTORY\FOR FINAL\7-11-2019\FENCE .dwg