A) Status: Level lI
B) Moored Starboard side to Pier 13, South Harbor, Manila
C) Personnel:
D) Machinery status: All machineries are operational, except SSDG no.3 - on going
repair.
• LCU no. 1 and RHIB no. 1- On-going repair.
• LCU no. 2 and RHIB no. 2- Operational
E) Significant Activities:
• Servicing and painting of vent/exhaust blower motor of LCU no.1 and LCU no.2 – 70% in
progress.
• Re - installation of cooling SW pipings of MPDE no.1 and no.2 and SSDG no.1 and no.2
of LCU no.1 – 75% in progress.
• Cleaning of MPDE no.1 and no.2 flowmeter fuel strainers and basket strainer of SSDG
no.4 – completed.
• Changed oil service compressor and main compressor no.1 and no.2.
• Warmed - up emergency compressor and FW generator no.1 and no.2.
• Re-watering - in progress.
• Conducted daily monitoring of body temperature and blood pressure of personnel
aboard ship and observed COVID19 precautionary measures.
• Conducted disinfection of contact spaces.
• Observed Blue Alert status and ECQ ICOW Declaration of State of Public Health
Emergency.
• Maintained cleanliness and tight security measures aboard ship.
F) CMAV activities:
• OVERALL PROGRESS of CMAV - 88%
H) Weather: Cloudy skies, NE’ly winds prevailing from 1-3 knots, sea calm and visibility
poor.