10 December 2020
A) Status: Level II
B) Moored starboard side to berth nr 1, Pier 13, South harbor, Manila.
C) Personnel:
LD601 - Ships Crew
Total Assigned-117 (Officer-16; EP-101)
D) Machinery status: All machineries are operational, except SSDG no.3 - on going
repair.
• LCU no. 1 and RHIB no. 1- On-going repair.
• LCU no. 2 and RHIB no. 2- Operational
E) Significant Activities:
• Thirty-four (34) personnel of this unit conducted swab test at MOA Arena.
• Repair of ventilation at auxiliary room – 15% in progress.
• Two (2) personnel from KEPPEL Batangas Shipyard was assisted by Engineering
personnel during the conduct of inspection of steering pump nr 2.
• Conducted changed oil and replaced reduction gear filter of starboard main engine of
LCU nr 2.
• Cleaned coolant cooler of SSDG nr 2 of LCU nr 2.
• Removed sky light cover hatches of LCU nr 1.
• Cleaned air filter of AHU nr 1, nr 2 and nr 3.
• Fabrication of lube oil pump foundation base – 20% in progress.
• Servicing of anchor winch of LCU nr 1 – 40% in progress.
• Attended Philippines-Korean war virtual conference.
• Conducted daily monitoring of body temperature and blood pressure of personnel
aboard ship and observed COVID19 precautionary measures.
• Conducted disinfection of contact spaces.
• Observed Blue Alert status and ECQ ICOW Declaration of State of Public Health
Emergency.
• Maintained cleanliness and tight security measures aboard ship.
F) CMAV activities:
• OVERALL PROGRESS of CMAV - 88%
H) Weather: Cloudy skies, NE’ly winds with rainshowers prevailing from 1-3 knots, sea
smooth and visibility poor.