N. TECH POWER PVT. LTD.

Kathmandu-32, Kathmandu, Nepal


Estd: 2021
Email: ntechpower21@gmail.com
Phone No. +977-9843335550 Pan No. 610174676

Letter No: ntech-034/2022

August 2, 2022

Power China Sepco1 Electric Power Construction Co. Ltd

Kind Attn.: Mr. Naresh Kumar Sah


Proposal No: S/CNHMC/22-23/119 Kind Attn: Mr. Abinash Sah,

Mobile: +977 9803904344

SUB: Nupche Likhu Hydropower Project (57.5 MW) 132 kV Double Circuit Transmission Line Project
- Offer for Engineering services for the above mentioned 132kV Transmission Lines.

Dear Sirs,

We sincerely thank you for providing us the opportunity to quote for the Engineering work of the subject
project. Based on the information provided by you on 31.07.22, we are pleased to attach our techno-
commercial proposal (in Annexure- I) for the Engineering services for the 132 kV Transmission lines
associated with the Nupche Likhu Hydropower Project (57.5 MW) 132 kV Double Circuit Transmission Line.

We hope our proposal will be responsive to your requirement. If any clarification is required, we shall be
glad to furnish the same.

Thanking and assuring you of our best attention.

Very truly yours,

Hikmat Bahadur Ayer

Director

N-Tech Power Pvt. Ltd., Nepal

Reg. Address: Shuklaphanta-10, Jhalari, Kanchanpur, Nepal


Phone: +9779940178, M- +9779843335550, Email: ntechpower21@gmail.com

Page 1 of 1
ANNEXURE-I:
COMMERCIAL TERMS AND CONDITIONS

1.0 Scope of Services


1.1 Our scope of work shall include the Engineering services for the following transmission lines associated
with Nupche Likhu Hydropower Project (57.5 MW) 132 kV Double Circuit Transmission Line.

1.2 Detail Scope of Work:

Preparation of the following drawings, design and calculations for each route of the above-mentioned
Transmission lines:

a. Route Layout plan and Profile drawing using PLS CADD.


b. Preparation of the Tower Schedule
c. Sag & Tension calculation & Sag template sheet for Conductor & OPGW
d. Typical views of Line crossing with existing Lines and other obstacles, as applicable.
e. Tower’s Leg Profile with complete benching quantity.

1.3 Exclusions:
a. Check Survey/Detailed survey (wherever route change is required),
b. Route alignment, profiling, tower spotting, optimization of tower of whole route (to be done by the Survey
agency).
c. Conductor, OPGW Drum schedules (Appropriate assistance shall be provided during finalization with the
manufacturer)
d. Design of the protection work (Revetment & Gabion Work)
e. Submission of drawings in hard copy.
1.4 Mode of Submittals:
All the drawings, documents, calculations shall be submitted in PDF format only.

2.0 Price

Item Total Amount


Description of Item Quantity Unit
No. Unit Rate Amount
1.0 Design of Transmission Line Plan and Profile Works
Route Layout plan and Profile drawing using PLS
1.1 24.00 Km
CADD and Tower Schedule 10,000.00 240,000.00
1.2 Tower’s Leg Profile including the benching quantity. 84.00 No
2,500.00 210,000.00
TOTAL (Without Taxes)
450,000.00

2.1 Fee for the Engineering services for the 132kV Transmission Lines is NPR 450,000/- (in Words: Four
Lakh Fifty Thousand and Five Hundred only.)

2.2 Tax:
13% VAT will be charged extra as per the rules of Gov. Nepal.

Page 1 of 2 
2.3 Terms of Payment:
 50% of LS fee against submission of drawings and documents on pro-rata basis.
 40% of LS fee on pro-rata basis against submission of ‘Issued for approval’ drawings and documents.
 10% of above cost against the final approval of the documents accepted in the scope of works.

3.0 Validity of offer

The offer will be valid for a period of 15 day from the date of this offer.

4.0 Payment duration:

a. Not more than 15 (Fifteen) days from the date of submission of invoice.

5.0 Site visit / Inspection visit:

Outstation site visit to has not been included in the scope

********

Page 2 of 2 