The document provides a checklist of pictures needed to document the installation of a Micro-FAST system, including pictures of the site before and after installation, pictures of the unit and electrical components, pictures showing the placement and installation of piping and tanks, and a completed installation check off list.
The document provides a checklist of pictures needed to document the installation of a Micro-FAST system, including pictures of the site before and after installation, pictures of the unit and electrical components, pictures showing the placement and installation of piping and tanks, and a completed installation check off list.
The document provides a checklist of pictures needed to document the installation of a Micro-FAST system, including pictures of the site before and after installation, pictures of the unit and electrical components, pictures showing the placement and installation of piping and tanks, and a completed installation check off list.
o General site before install- all angles (6 pics)
o Unit #, Blower # and Panel with serial number- numbers should be clear o Inside of finished panel with timer set, sensor set and wiring correct and secure o The electrical ground box wiring for re-circ pump o Panel site on the house to show placement o Open trench after piping before back fill showing the pipe is supported and wire is deep enough o To show length of 2” pipe used o View from the house out to the tanks o Blower to show final location is level and the template was used o The unit sealed and bolted o The riser is sealed, and level, no gaps o Pics of the inlet and outlet baffles in the septic tank o Pic of the Sanitee filter installed in the riser o Pic on inside tank risers and collar adapter o Screws installed to 6” observation port o Concrete tank gallons/name painted on o Drain field with orientation of placement o The pipe coming out of the house and the green sticker o Orientation of tanks to the house o Air break drill hole o Pump and floats (down the riser) o Any materials used if job is billed on time and materials o All openings are siliconed/mastic o Pipes insulated if shallow install o General site after trim and backfill o Completed installation check off list