Untitled

You might also like

Download as pdf
Download as pdf
You are on page 1of 3
TEST CERTIFICATE for PRESSED STEEL RAI SKY RADIATORS Plot no 10, S th cross, Muneshwaranagar, Bommanahalli, Bangalore-560068 Customer's Name & Addres: 16.03.23 IM/s Kalpa Electrikal Pvt Ltd Unit-6, No 133/4, Site no 29, [Chikka Hanumanthaiah Indl Area [Machohalli, Magadi Main Road, Bangalore-91 Customer's PO No. & Date Description Size Sl. Nos. KEPL/PO/22-23/3317 dtd 09.03.23 16.03.23 Pressed Steel Radiators 300 W 500 x 6x75 PE 13822-13823 Pressure 2 Kgs /Sq.Cm = 2 Kgs / Sq.Cm - 2 Kgs / Sq.Cm Nil Vacuum Test conducted on one Radiator selected at randem. |Vacuum Test Permanent deflection measured after release of Vacuum was |0.1mm (with in specified Parameters). Varnishing Internal Surface Coated with almoluft 1A FO Varnish of Or BECK. One Radiator for Leak proof against Hot Transformer Oil at |Hot Oil Test Temperature of 105" C & at a Pressure of 1Kg / Sq.Cm for 12 Hrs. Found no Leaks or Seepage at welded joints. [Dimensional check as per IEMA Stds : ‘Specified + ‘Measured ‘Acc 300 mm 300mm Yes [Centre Distance ‘500 mm. ‘500 mm Yes [Number of Sections Sec 6 Sec Yes 50 mm 50mm Yes 75 mm 75mm Yes til il no. Pressure Test under water with Compressed Air @ 2 Kgs / Sq. Cm Pressure for 30 Mins = Epoxy / Enamel / PU Epoxy Primer [Final Paint : Epoxy / Enamel / PU Nit Date of Testing : 14.02.23 Plot no 10, 5 th cross, Customer's Name & Address TEST CERTIFICATE for PRESSED STEEL RADIATORS SKY RADIATORS Muneshwaranagar, Bommanahalli, Bangalore-560068 + [16.03.23 [M/s Kalpa Electrikal Pvt Ltd Unit -6, No 133/4, Site no 29, [Chikka Hanumanthaiah ind! Area IMachohall, Magadi Main Road, Bangalore-91 KEPL/PO/22-23/3317 ded 09.03.23 Pressed Steel Radiators Test Details : ‘Time {in Applied Pr - Drop in Pressure Test under water with Compressed 1 pi ioc: 0-10 2 Kgs / Sq.Cm Air @ 2 Kgs / Sq. Cm Pressure for 30 Mins a yee = Ox 20-30 | 2 Kes /S9.cm Nil 2. |Vacuum Test | Vacuum Test conducted on one Radiator selected at randem. |Permanent deflection measured after release of Vacuum was [0.1mm (with in specified Parameters). 3. |Varnishing internal Surface Coated with almoluft 1A FO Varnish of Dr.BECK, [One Radiator for Leak proof against Hot Transformer Oil at a 4 |Hot oil Test [Temperature of 105° C & at a Pressure of 1Kg / Sq.Cm for 12 Hrs. Found no Leaks or Seepage at welded joints. Dimensional check as per IEMA Stas Specified Measured ‘Accepted [Section Width 300 mm 300 mm Yes ‘600 mm (600 mm Yes [Number of Sections 5 Sec Sec Yes Pitch ‘50mm 30mm f Yes ¢)| Header Pipe Extension 7mm 75mm Yes [Flanges nil nil no 6 [Paint Details al[Primer = Epoxy/ Enamel 7PU Epoxy Primer bi|Final Paint : Epoxy / Enamel / PU NIL Date of Testing : 14.01.23 Rajesha Saravana Koti TEST CERTIFICATE for PRESSED STEEL RADIATORS SKY RADIATORS Plot no 10, 5 th cross, Muneshwaranagar, Bommanahalli, Bangalore-560068 Customer's Name & Address : T.C.No. | 904 [M/s Kalpa Electrikal Pvt Ltd Unit -6, INo 133/4, Site no 29, [Chika Hanumanthaiah Indl Area 16.03.23 SI. Nos. 300 W 500x 3x75 PE ino 13826-13826 1 [Pressure Test under water with Compressed ssh 2 Kes /Sq.Cm air cm Pre: 30 Min: - @ 2 kgs / Sq. Cm Pressure for 3s = aes sac = a 720-30 2 Kgs / Sq.cm Nil | Vacuum Test conducted on one Radiator selected at randem, 2. |Vacuurn Test [Permanent deflection measured after release of Vacuum was [0.1mm (with in specified Parameters). Internal Surface Coated with almoluft 1A FD Varnish of Dr.BECK. JOne Radiator for Leak proof against Hot Transformer Oil at a Hot Oil Test [Temperature of 105° C & at a Pressure of 1Kg / Sq.Cm for 12 Hrs. Found no Leaks or Seepage at welded joints. Dimensional check as per IEEMA Stds = Specified Measured ‘Accepted [Section Width '300 mm: 300mm Yes b)| Centre Distance 500 mm 500 mm: Yes c)| Number of Sections 3 Sec 3Sec Yes @))pitch 50mm 50mm Yes e)|Header Pipe Extension 7mm 75mm. Yes ‘fl Flanges nil ail no [Paint Details Primer: Epoxy /Enamel 7PU Epoxy Primer b)|Final Paint: Epoxy / Enamel / PU NIL 14.01.23,

You might also like