TEST CERTIFICATE for PRESSED STEEL RAI
SKY RADIATORS
Plot no 10, S th cross, Muneshwaranagar, Bommanahalli, Bangalore-560068
Customer's Name & Addres: 16.03.23
IM/s Kalpa Electrikal Pvt Ltd Unit-6,
No 133/4, Site no 29,
[Chikka Hanumanthaiah Indl Area
[Machohalli, Magadi Main Road, Bangalore-91
Customer's
PO No. & Date
Description Size Sl. Nos.
KEPL/PO/22-23/3317 dtd 09.03.23 16.03.23
Pressed Steel Radiators 300 W 500 x 6x75 PE 13822-13823
Pressure
2 Kgs /Sq.Cm =
2 Kgs / Sq.Cm -
2 Kgs / Sq.Cm Nil
Vacuum Test conducted on one Radiator selected at randem.
|Vacuum Test Permanent deflection measured after release of Vacuum was
|0.1mm (with in specified Parameters).
Varnishing Internal Surface Coated with almoluft 1A FO Varnish of Or BECK.
One Radiator for Leak proof against Hot Transformer Oil at
|Hot Oil Test Temperature of 105" C & at a Pressure of 1Kg / Sq.Cm for 12 Hrs.
Found no Leaks or Seepage at welded joints.
[Dimensional check as per IEMA Stds : ‘Specified + ‘Measured ‘Acc
300 mm 300mm Yes
[Centre Distance ‘500 mm. ‘500 mm Yes
[Number of Sections Sec 6 Sec Yes
50 mm 50mm Yes
75 mm 75mm Yes
til il no.
Pressure Test under water with Compressed
Air @ 2 Kgs / Sq. Cm Pressure for 30 Mins
= Epoxy / Enamel / PU Epoxy Primer
[Final Paint : Epoxy / Enamel / PU Nit
Date of Testing : 14.02.23Plot no 10, 5 th cross,
Customer's Name & Address
TEST CERTIFICATE for PRESSED STEEL RADIATORS
SKY RADIATORS
Muneshwaranagar, Bommanahalli, Bangalore-560068
+ [16.03.23
[M/s Kalpa Electrikal Pvt Ltd Unit -6,
No 133/4, Site no 29,
[Chikka Hanumanthaiah ind! Area
IMachohall, Magadi Main Road, Bangalore-91
KEPL/PO/22-23/3317 ded 09.03.23
Pressed Steel Radiators
Test Details :
‘Time {in Applied Pr - Drop in
Pressure Test under water with Compressed
1 pi ioc: 0-10 2 Kgs / Sq.Cm
Air @ 2 Kgs / Sq. Cm Pressure for 30 Mins a yee = Ox
20-30 | 2 Kes /S9.cm Nil
2. |Vacuum Test
| Vacuum Test conducted on one Radiator selected at randem.
|Permanent deflection measured after release of Vacuum was
[0.1mm (with in specified Parameters).
3. |Varnishing internal Surface Coated with almoluft 1A FO Varnish of Dr.BECK,
[One Radiator for Leak proof against Hot Transformer Oil at a
4 |Hot oil Test [Temperature of 105° C & at a Pressure of 1Kg / Sq.Cm for 12 Hrs.
Found no Leaks or Seepage at welded joints.
Dimensional check as per IEMA Stas Specified Measured ‘Accepted
[Section Width 300 mm 300 mm Yes
‘600 mm (600 mm Yes
[Number of Sections 5 Sec Sec Yes
Pitch ‘50mm 30mm f Yes
¢)| Header Pipe Extension 7mm 75mm Yes
[Flanges nil nil no
6 [Paint Details
al[Primer = Epoxy/ Enamel 7PU Epoxy Primer
bi|Final Paint : Epoxy / Enamel / PU NIL
Date of Testing :
14.01.23
Rajesha
Saravana
KotiTEST CERTIFICATE for PRESSED STEEL RADIATORS
SKY RADIATORS
Plot no 10, 5 th cross, Muneshwaranagar, Bommanahalli, Bangalore-560068
Customer's Name & Address : T.C.No. | 904
[M/s Kalpa Electrikal Pvt Ltd Unit -6,
INo 133/4, Site no 29,
[Chika Hanumanthaiah Indl Area
16.03.23
SI. Nos.
300 W 500x 3x75 PE ino 13826-13826
1 [Pressure Test under water with Compressed ssh 2 Kes /Sq.Cm
air cm Pre: 30 Min: -
@ 2 kgs / Sq. Cm Pressure for 3s = aes sac = a
720-30 2 Kgs / Sq.cm Nil
| Vacuum Test conducted on one Radiator selected at randem,
2. |Vacuurn Test [Permanent deflection measured after release of Vacuum was
[0.1mm (with in specified Parameters).
Internal Surface Coated with almoluft 1A FD Varnish of Dr.BECK.
JOne Radiator for Leak proof against Hot Transformer Oil at a
Hot Oil Test [Temperature of 105° C & at a Pressure of 1Kg / Sq.Cm for 12 Hrs.
Found no Leaks or Seepage at welded joints.
Dimensional check as per IEEMA Stds = Specified Measured ‘Accepted
[Section Width '300 mm: 300mm Yes
b)| Centre Distance 500 mm 500 mm: Yes
c)| Number of Sections 3 Sec 3Sec Yes
@))pitch 50mm 50mm Yes
e)|Header Pipe Extension 7mm 75mm. Yes
‘fl Flanges nil ail no
[Paint Details
Primer: Epoxy /Enamel 7PU Epoxy Primer
b)|Final Paint: Epoxy / Enamel / PU NIL
14.01.23,