Professional Documents
Culture Documents
Proposal Solar Solution: 10.2 KW For Ashiq Hussain House No 336/5 Street 17 Nishter Extension Block BAHRIA Town Lahore
Proposal Solar Solution: 10.2 KW For Ashiq Hussain House No 336/5 Street 17 Nishter Extension Block BAHRIA Town Lahore
Proposal Solar Solution: 10.2 KW For Ashiq Hussain House No 336/5 Street 17 Nishter Extension Block BAHRIA Town Lahore
DATE: 07-05-2022
GENERAL TERMS
Price Validity Prices are in PKR and are valid for 30 days only
Installation In 15 days from advance payment, net metering in two months max
Production Solution production given in this offer is predictive, grid tied solution
doesn’t produce when grid is not present
WARRANTY TERMS
January 924.12
Feburary 1193.40
March 1343.34
April 1392.30
May 1410.66
June 1456.56
July 1294.38
August 1352.52
September 1407.60
October 1175.04
November 1000.62
December 908.82
Total Units Generated per Year 14859.36
PAYBACK ANAYLSIS
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
COST
2,000,000
1,000,000
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
-1,000,000
-2,000,000
Year
Return of Invesment
Notes:
Calculations above have been done @ PKR 23 / unit.
` PROJECT REFERENCES
Sr.
Name of Project Name of Client Status Rating
No
Aitchison Housing Colony
1 Aitchison College Lahore Completed 67.5 KWp
(135
Houses)
Aitchison College Two blocks
2 Aitchison College Lahore Completed 600 KWp
Aitchison College
3 Aitchison College Lahore Completed 27 KWp
Nestle 2 Milk Collection Sites
4 (Phase 1) Nestle Pakistan Ltd Completed 11 KWp
Nestle 8 Milk Collection Sites
5 (Phase 2) Nestle Pakistan Ltd Completed 50 KWp
Nestle 20 Milk Collection Sites
6 (Phase 3) Nestle Pakistan Ltd Completed 105 KWp
Nestle 14 Milk Collection Sites
7 (Phase 4) Nestle Pakistan Ltd Completed 95 KWp
20 Ufone BTS sites
8 Sagemcom Completed 250 KWp
National Bank Branches (40
9 sites) NBP Completed 120 KWp
National College of Arts
10 NCA Lahore Completed 50 KWp
Lahore
National College of Arts RWP
11 NCA Rawalpindi Completed 50 KWp
SA Farm (Interloop),
12 SA Farms Completed 450 KWp
Faisalabad
Integrated Energy and University of Agriculture 100KWp (Solar)
13 Agriculture Concept (PV- Faisalabad In Progress 125KW (Bio Gas)
Installation of Solar System
for Operating High Efficiency Agriculture Department 100 Systems of 980
14 Irrigation System Agriculture Punjab Completed KWp
(Water Management) Punjab,
Energy Solution Using
500KWP (Solar)
15 Indigenous Resources (Vehari Energy Department In Progress
200KW (BioGas)
& Samundri villages) Punjab
5KW, 10KW &
16 Domestic/
Offices
Households / Small Numerous Sites Completed
20KW
* More than 3 MWp Hybrid / Grid Tied with backup solutions installed on thousands of sites experience,
DGL has done largest and landmark hybrid solutions Off Grid / On Grid modes in Pakistan
Net Metering
After installing the system, we will start application of net metering for your home. The
procedure takes between 1-2 months and after that your net meter will start operating. During
the procedure, all processes will be handled by our team. Following are the items included in
the net metering package:
1. Bidirectional Meter
2. AC/DC Ground Lighting
3. Arrester Copper Wire
4. Earthing Powder
5. Earthing Rod
1. Real time system monitoring like Energy Generation, Current, Voltage, Frequency etc.
2. Detects Alerts, Faults, and Warning Data with your solar home systems when they occur by sending you
an alert and performance is nose-diving.
3. Compute and quantify your savings on electricity
4. Compute and measure your carbon reduction or off-set
5. Increase performance
6. Ensure regular maintenance
7. Save time and increase efficiency
8. Andriod application available for your own mobile for real time monitoring
9. System works your in house WiFi connectivity to internet