Date 25.03.23 -01.04.

23
Material /Component/ Equipment Job Start
S/L Model Plant No Job No PR No
Description Date

1 Engine assembly V-480 D13F Ex-00627 7258/22 10/23/2022 2300026074

2 Engine assembly V-480 D13F Ex-00629 7255/22 10/22/2022 2300028656

3 Engine assembly V-480 D13F Ex-00533 5483/21 3/14/2022 2300023684

4 Engine Assembly D-85(Insurance)  S6D125E-2 DZ-00852 8171/22 08.02.23 2300028474 

5 Engine Assembly L-150 H D13 F 8203/22 12.02.23 2300028326 


LP-01027
6 Engine Assembly BD 155 BS-6D170-1 7844/22 12/31/2022 2300027465
DZ-000943
7 Engine Assembly of Bobcat S-650 V3307T 7567/22 12/10/2022 2300026558
LS-00739
8 Engine Assy of Bobcat S-590 V2607T 6817/22
LS-00617 8/10/2022
9 Engine Assy of Bobcat S-250 V3800T 6422/22
LS-00275 6/21/2022
10 Engine Assy.of D-65 S6D125-1 DZ-00269 7806/22 2300027392
12/29/2022
11 Engine Assy.of FM-400 D13F Float 5746/22 11-Apr-22 2300020078

12 Engine Assy.of FM-400 D13F WT-00953 8512/22 12-Mar-23

Eng.Assy of Volvo Tipper FMX-440 PC-


13 24
D13F TP-00746 8556/22 17.03.23
WEEKLY ENGINE SECTION PLAN CUM PROGR
WORK IN PROGRESS (WIP)
Expected
Age Of Manpoer Job
PR Date Job Description Readiness
Job Deployed Status
Date

14-Dec-22 160 Job Completed. 3 Running 09.03.23

4-Mar-23 161 3 Running

8-Sep-22 383 Assy. Job U/P. 3 Running 28.03.23

27-Feb-23 - Accidental Case-Under Insurance. 3 Running

Lathe work Completed. 3 Running

91 Lathe work Completed. 3 Running

29-Dec-22 112 3 Running

234 3 Running

284 3 Running

93 Cyl Block ,Crank and Con-Rod send to lathe . 3 Running

Engg. Testing and Painting Job Completed. 3 Running

Cleaned materials kept in Box. 3 Running

Crankshaft and Con-Rod send to lathe . 3 Running


PLAN CUM PROGRESS REPORT

Actual
Delay (No
Ready
of days)
Date

09.03.23 -

0
OGRESS REPORT

Job Remarks

Engine Mounted on Chassis of Ex-627.

Engine will be Ready as Long Block.

Engine Ass.job Under Progress.

Indent Done on Dated-22.03.23

All materials received except pending Items-Fuel Pipe -02 nos ..Orderded on Suchita.

Pending items indented on dated-23.03.23 ..Waiting For Parts.

Waiting for parts.

One engine has Ordered for Purchase.

Decession Pending .

Parts received on dated-18.03.23 ,Lathe parts will be received on 27.03.23

Engine Testing and Painting Job Completed.

Waiting for Financial approval from Sarup sir end.

FIR has sent on dated-20.03.23


WORK PLANNED (WP)