Professional Documents
Culture Documents
Fire Dampers
Fire Dampers
Fire Dampers
Contents
A R O U T E M A P T O N AVI GAT E THR OUG H T HE PR ODU CTS
1 COMPANY PROFILE
2 TRADE LICENSE
3 TECHNICAL CATALOGUE
5 CERTIFICATES
6 PROJECT REFERENCE
7 PROJECT APPROVAL
COMPANY PROFILE
Company Profile
Introduction
A complete Flow Control Solution
NAFFCO Flow control provides a complete solution for HVAC and construction projects along
with the customized system design and supply for unique projects with all the relevant
industry standards and approvals.
Since its inception, NAFFCO Flow Control has been continuously striving through its research
and development to find out the ever changing needs of the market and cater to the same,
with the help of its carefully selected Principals. The product portfolio offers a wide, unique
and exclusive range of innovative, cost effective and eco-friendly products.
We are committed to provide The FM approved HDPE Pipes With representation in Middle
the highest quality products manufactured here in the UAE, East & North Africa (MENA)
and solutions therefore, we with its full range from SDR7.4, region, we simultaneously
only supply globally SDR9 & SDR11. We also supply work on opportunities to
recognized and approved the fusion machines along explore new markets.
products such as UL, FM, BSI with technicians for on-site
Kitemark, LPCB, CE, WRAS, operations. We believe in total customer
Applus & AMCA and more. The satisfaction thus, ensure
product portfolio ranged from THE HDPE fitting category qualified and well-experienced
steel & HDPE piping systems to includes segmented and support team to better
complete robust system for moulded fittings with an understand your concerns and
industrial ventilation. option of custom fittings. solve them in time.
Company Profile
Our Portfolio
We provide complete system design, supply
and maintenance services from pipes to
fasteners and claddings sourced from
globally renowned brands and
manufactures.
Address ﺍﻟﻌﻨﻮﺍﻥ
Premises No. Plot No. S30903 & S30904 Jebel Ali ﺟﺒﻞ ﻋﻠﻲ ﺩﺑﻲ٣٠٩٠٤ ﻭ٣٠٩٠٣ ﺍﺭﺽ ﺭﻗﻢ ﺍﺱ ﺍﻟﻤﻘﺮ ﺭﻗﻢ
Dubai United Arab Emirates ﺍﻻﻣﺎﺭﺍﺕ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﻤﺘﺤﺪﺓ
Floor Number ﺭﻗﻢ ﺍﻟﻄﺎﺑﻖ
Building Name ﺇﺳﻢ ﺍﻟﻤﺒﻨﻰ
Area Name ﺇﺳﻢ ﺍﻟﻤﻨﻄﻘﺔ
Activities ﺍﻟﻨﺸﺎﻃﺎﺕ
General Trading ﺗﺠﺎﺭﺓ ﻋﺎﻣﺔ
001-0130813-120312
CN:105907 (O)
- For Verification: Visit https://edv.ezw.com and enter the EDV No. -14843480 Issued On: 18-MAY-21
ﻭﺛﻴﻘﺔ ﺇﻟﻜﺘﺮﻭﻧﻴﺔ ﻣﻌﺘﻤﺪﺓ ﻭ ﺻﺎﺩﺭﺓ ﺑﺪﻭﻥ ﺗﻮﻗﻴﻊ ﻣﻦ ﺳﻠﻄﺔ ﺍﻟﻤﻨﻄﻘﺔ ﺍﻟﺤﺮﺓ ﻟﺠﺒﻞ ﻋﻠﻲ
Approved electronic document issued without signature by JEBEL ALI FREE ZONE AUTHORITY
TECHNICAL
CATALOGUE
Curtain Fire Damper
NFC FD 4000 Series
Models:
NFC FD 4000 A: Blades inside air Stream
NFC FD 4000 B: Blades Partially inside air Stream
NFC FD 4000 C: Blades completely out of air Stream
NAFFCO Fire Dampers are fire rated for 1.5 hrs and approved by
Page 2 NAFFCOFlow.com
Curtain Fire Damper
NFC FD 4000 Series
Models:
NFC FD 4000 A: Blades inside air stream
NFC FD 4000 B: Blades partially inside air stream
Curtain Fire Damper
NFC FD 4000 C: Blades completely out of air stream with Installation Frame (HVAC)
STANDARD CONSTRUCTION
FRAME: Frame is welded construction of GI sheet 1.2mm
(18G) z-27
BLADE: High quality roll formed GI blades 0.8mm thick ribbed
NFC FD 4000C
for extra strength. Blades Interlocked
Blades completely
FUSIBLE LINK: Standard Fusible Link fuses at 72°C (165°F) UL Listed
out of air Stream
SPRINGS: Constant Force Coil Springs of stainless steel
RAMP BRACKET: Ramp Bracket to hold spring and for positive latching
FIRE RATING: 1.5 hour firerated - V/H
FINISH: Galvanized Mill Finish.
OPTIONAL:
SLEEVE: GI Steel as per NFPA Table 3.4.6.3
FUSIBLE LINK: Other rating of 95°C (202°F), 124°C (260°F)
RETAINING ANGLE: Minimum 40mm x 40mm x 1.6mm thick
INSTALLATION FRAME: HVAC or as Required
MICRO SWITCH: For BMS open-close indication
INDICATOR: Externally mounted open, close visible NFC FD 4110C (0)
MATERIAL: Can be stainless steel if specified.
AVAILABLE OPTIONS
NFC FD 4000 A - Blades inside air stream Roll Form Frame
NFC FD 4000 B - Blades partially inside air stream
NFC FD 4110 C (o/v) - Circular oval spigot
NFC FD 4003 C - Firerated 3 hrs Dynamic V/H.
Blades out
of air Stream
NAFFCOFlow.com Page 3
LIST PROPOSED
MATERIAL
LIST PROPOSED MATERIAL
SIZE
S. No. ITEM DESCRIPTION Qty(No) BRAND
MM
1 FIRE DAMPER 200 x 150 1 NAFFCO
2 FIRE DAMPER 250 x 200 1 NAFFCO
3 FIRE DAMPER 250 x 250 2 NAFFCO
4 FIRE DAMPER 350 x 350 2 NAFFCO
5 FIRE DAMPER 400 x 400 2 NAFFCO
6 FIRE DAMPER 450 x 400 4 NAFFCO
7 FIRE DAMPER 700 x 400 2 NAFFCO
8 FIRE DAMPER 500 x 250 2 NAFFCO
9 FIRE DAMPER 700 x 500 1 NAFFCO
10 FIRE DAMPER 750 x 700 1 NAFFCO
11 FIRE DAMPER 750 x 750 1 NAFFCO
12 FIRE DAMPER 800 x 400 3 NAFFCO
13 FIRE DAMPER 850 x 700 1 NAFFCO
14 FIRE DAMPER 900 x 550 1 NAFFCO
15 FIRE DAMPER 900 x 650 1 NAFFCO
16 FIRE DAMPER 900 x 1150 1 NAFFCO
17 FIRE DAMPER 1000 x 650 2 NAFFCO
18 FIRE DAMPER 1000 x 750 2 NAFFCO
19 FIRE DAMPER 1050 x 750 1 NAFFCO
20 FIRE DAMPER 1100 x 1150 1 NAFFCO
21 FIRE DAMPER 1300 x 1000 2 NAFFCO
22 FIRE DAMPER 1500 x 900 2 NAFFCO
CERTIFICATE (ISO)
CERTIFICATE
This is to certify that
Scope:
Manufacture and Supply of Pipes and Fittings (Steel & HDPE), Valves, Ducts,
Dampers, Ventilation Equipment & Claddings. Design of Ventilation Equipment's, Passive Fire
Systems & Cladding. Installation of Pipes and Fittings, Ventilation Equipment, Passive Fire
Systems & Cladding. Supply of Passive Fire Systems.
Through an audit, documented in a report, it was verified that the management system
fulfills the requirements of the following standard:
DQS Inc.
Brad McGuire
Managing Director
Accredited Body: DQS Inc., 1130 West Lake Cook Road, Suite 340, Buffalo Grove, IL 60089 USA
Administrative Office: Deutsch Quality Systems (India) Pvt. Ltd., 5th Floor, Anjaneya Techno Park,
147, HAL Airport Road, Kodihalli, Bangalore - 560 017 - India
PROJECT
REFERENCE
Dampers and Ducts Division
S. NO. Proj No Project Reference Name Consultant Remarks Year
1 349661 B+G+8+GYM COMMERCIAL Bldg PLOT# SC-B-002 & SC-B-005 @ Dubai Studio City, Dubai EDMAC ENGINEERING CONSUTANT Dampers 2016
2 350407 LAND MARK LOGISTICS OMEGA PLT# S60323 JEBEL ALI Dynamic Engineering Consulting AIROUTLETS 2016
3 350930 B+G+8+1HC Residential Bldg SC-B-003- 004 @ Dubai Studio City, Dubai EDMAC ENGINEERING CONSUTANT Dampers 2016
4 1356116 PROPOSED CONSTRUCTION OF WAREHOUSE & OFFICE BLOCK, PLOT# S60201 JAFZA ORION ENGINEERING CONSULTANT Dampers 2016
5 349209 544 (R-1065 RESIDENTIAL DEV. PLOT#359-0963, ALQUOZ-4) ARKIPLAN CONSULTING ARCHITECH & ENGINEER Dampers 2017
6 354714 R- 1064 STAFF ACCOMMODATION AL QUOZ PLOT# 359-0713 ALTHURATH ENGINEERING CONSULTANT Dampers 2017
7 352500 DOG KENNELS & FACILITIES PLOT#814-917 LANDMARK ENGINEERING Dampers 2017
8 354811 THE EMERALD PALACE, KEMPENSKE HOTEL AND VILLAS NATIONAL ENGINEERING BUREAU(NEB) Dampers 2017
9 348301 PINNACLE GYM CHAWLA ARCHITECTURAL & COSULTING ENGINEERS Dampers 2018
10 357033 3B+G+P+15 RES.BLDGN. @ JABEL ALI 1st, Dubai DESIGN CENTER ARTCH&ENGINEERING Dampers 2018
11 353235 PROPOSED 3B+G+P+15 RES.BLDGN. PLOT#AFMU030B AT AL FURJAN@ JABEL ALI 1st, Dubai DESIGN CENTER ARTCH&ENGINEERING Sound Attenuators 2018
12 430335 JUMEIRAH LIVING GATE MARINA ENGINEERING CONSORTIUM CONSULTING ENGINEERS Dampers 2018
13 175695 PROPOSED G+R+4+ROOF BLDG PLOt#JVC12GMRP002&004 @ AL BARSHA ATRIUM ARCHITECTURAL & ENGINEERING CONSULTANT DAMPER 2018
16 30919 R1081-RAS AL KHOR DEVELOPMNT (MAIN WORKS) ENGINEERING CONSORTIUM CONSULTING ENGINEERS DAMPER 2019
17 318859 G+P+7TYPE+H.C+R RESIDENTIAL BUILDING PLOT#3347635 AT AL SATWA GOLDEN SQUARE ENGINEERING CONSULTANT DAMPER 2019
18 81019 PROPOSED CONSTRUCTION OF WAREHOUSE & OFFICE BLOCK PLOT S60201V JAFZA ORION ENGINEERING CONSULTANT DAMPER 2019
19 337971 R1081-556 P-RAS AL KHOR DEVELOPMNT (MAIN WORKS) ENGINEERING CONSORTIUM CONSULTING ENGINEERS DAMPER 2019
20 321845 AL DANA GATE BUILDING SECTOR NO. RBW9 POT#15, AL RAHA BEACH ZEN DESIGN CONSULTING ENGINEERS & PROJECT MANAGERS DAMPER 2020
21 638330 CHAMBER OF COMERCE TOWER PROJECTDAMMAM / KHOBAR HIGHWAY PROJAS DAMPER 2020
22 311793 PROPOSED FOUR (G+11+R) RES. & COMM. BLDGS ON PLOT#3190310 AT OUD METHA, DUBAI GOLDEN SQUARE ENGINEERING CONSULTANT DAMPER 2020
PROJECT
APPROVAL
wx
I ComPliance Stat€ment
U Test Results
I SamPles
done
Ej Lisr ot PreYious Projects
Contral DamPer & Fire DamPer
(signature &
Relresentallve;
ffi T$'1:t*-liin";:*?ff
.toitr"Jorr,o*responsibrlityiorall"a"":;;;;;*;"-oteclyanagerhasgrvenwrltenapprovaltr€rstoanqIUttr''"''-'-'
-- 'ln
;J .
:: ^s^s
LJTJJ t--JJrl
tl *.,,rr *rr.ilL A-l;L*;trc1, N.rii,lnsi I r,,Ji,rerifr'l l:,ureii!
tt
Material Submittal
p Compliance Statement
l*A
"t1*lli*; ;
g.to vt]/"rt b ,P^ G.*n\.u-v)
U
;#ffi:l[}il"1ji,;iiffi7ilil;il#f f i ,r"i""i*r.-rs* hrs siven wrtien approvar rhererc and ro time andror cost implication shall be sranted
due
NFR-SF4B Rev 03