African Development Bank Group

African Development Bank's Field Office in Abuja,


Nigeria

LOT 4: VOL 3 - BILLS OF QUANTITIES: ELEVATOR


WORKS
Prepared by
Interstate Architects Ltd.
In Conjunction with: IAA Associates Ltd. KOA Associates Ltd. &
Construction Economists Partnership Ltd.

ITEM BILL No. 1 - ELECTRICAL SERVICES: LIFTS INSTALLATION.


DESCRIPTION QTY UNIT BASIC FIXED
RATE RATE
Supply, erect and connect the following:

Lifts
1 Light Passenger Panoramic lift with the following data:
Rated load - 13 passengers, 1000kg
Rated speed - 1.0m/s
No of stops – 5
Travel – 24176mm
Drive - 2speed a/c, Variable a/c drive
Car landing door - Automatic Two Panel centre Opening
Entrance – One entrance
Machine roomless
Control System - Micro computer control for full collective
operation, simplex full collective
Control options - Emergency light, fan in car, 2-way intercom, Telephone
recess overload signal & buzzer unit complete with
emergency battery back-up to ensure continous operation to the
the ground floor in the event of power failure.
- Module for possible integration with BMS System
- Floor front facial Cabin location Indicator/ Sensor units
- Floor landing directional indicator buttons
Car finish - To architects specifications (based on installers proposal)
Car flooring - To Architects specifications
Door sills - To Architects specifications
Refer to the Lift drawing for details. 1 No

2 Service/Fireman's Lift with the following data:


Rated load - 1000kg
Rated speed – 1.0m/s
No of stops – 5
Travel – 24176mm
Drive - 2speed a/c, Variable a/c drive
Car landing door - Automatic two panel centre opening
Machine roomless
Control System – Micro processor based control Simplex/Duplex, all floors.
Control option - Fireman's lift duty, unit complete with emergency light, fan in car.
2-way intercom, telephone, recessed overload signal & buzzer.
Unit complete with emergency battery back-up to ensure
continous operation to the ground floor in the event of power failure.
- Module for possible integration with BMS System
- Floor front facial Cabin location Indicator/ Sensor units
- Floor landing directional indicator buttons
Car finish - To architects specifications (based on installers proposal)
Car flooring - To Architects specifications
Door sills - To Architects specifications
Refer to the Lift drawing for details. 1 "

Page 1/1 To Collection


ITEM BILL No. 2(Contn'd) - ELECTRICAL SERVICES: LIFTS INSTALLATION.
DESCRIPTION QTY UNIT BASIC FIXED
RATE RATE

UPS EQUIPMENT

1 20KVA, 3-Phase in/out, 50Hz, 415V UPS with the following:


- Integral by-pass switch
- Battery Cabinet with Battery CCT Breaker
-15-minute Autonomy Battery String -3-yr life
- operating softwares for remote monitoring
- all items required for complete installation
(UPS : Located in the Electrical Room at the last floor)
e.g APC or approved equivalent 2 Nos.
STABILIZER EQUIPMENT

2 Suitable 20kVA automatic voltage regulator with resettable time delay


and integral circuit breaker and LCD display e.g. Claude Lyons 2 ,,

3 Installations & Configurations Lot

Page 1/2 To Collection

COLLECTION

Page 1/1

Page 1/2
Page 2 TO SUMMARY

SUMMARY

1 Bill No 1 - Lift installation


Sub-Total

Total