Equipment Rental Rate 19.26 0.33: Operating Cost Rate /HR Rental Rate /HR A B C A+B D E F G
Equipment Rental Rate 19.26 0.33: Operating Cost Rate /HR Rental Rate /HR A B C A+B D E F G
19.26 0.33
Gas oil 15.77 Benzene 17.66
Owning Cost Operating Cost
Total
Total indexed
Make Model Delivery Price Salvage Value Depreciation Investment Maint.& Operating
Item Equipment Type Owning Fuel Cost Lub. Cost Tire Cost rate /hr Rental rate /hr Rate/Hr
or Supplier in Birr in Birr Cost Cost Rep. Cost Cost
Cost
A B C=A+B D E F G H=D+E+F+G I=C+H J=(0.05*C) + I J=1*I
I. Earth Work Equipment
1 Dozer D8R (305 hp) CAT - D8R 10,594,000.00 18,009,800.00 3,601,960.00 1,200.65 300.16 1,500.82 630.80 63.08 1,200.65 1,894.53 3,395.35 3,470.39 2,839.59 3,470.39
2 Dozer D7R (230 hp) CAT - D74 9,425,500.00 16,023,350.00 3,204,670.00 1,068.22 267.06 1,335.28 473.10 47.31 1,068.22 1,588.63 2,923.91 2,990.68 2,517.58 2,990.68
3 Grader 14 H CAT - 14G 5,762,000.00 9,795,400.00 1,959,080.00 653.03 163.26 816.28 346.94 34.69 653.03 130.61 1,165.27 1,981.55 2,022.36 1,675.42 2,022.36
4 Grader 140 H CAT - 140G 5,000,000.00 8,500,000.00 1,700,000.00 566.67 141.67 708.33 315.40 31.54 566.67 113.33 1,026.94 1,735.27 1,770.69 1,455.29 1,770.69
5 Track Type Loader 210 HP 4,600,000.00 7,820,000.00 1,564,000.00 521.33 130.33 651.67 346.94 34.69 521.33 902.97 1,554.63 1,587.22 1,240.28 1,587.22
6 Wheel Loader 950G 5,494,000.00 8,339,800.00 1,667,960.00 476.56 119.14 595.70 315.40 31.54 476.56 95.31 918.81 1,514.51 1,544.30 1,228.90 1,544.30
7 Wheel Loader 950GC 4,082,000.00 5,939,400.00 1,187,880.00 339.39 84.85 424.24 315.40 31.54 339.39 67.88 754.21 1,178.46 1,199.67 884.27 1,199.67
8 Dumper 1 m3 232,000.00 394,400.00 78,880.00 26.29 6.57 32.87 78.85 7.89 26.29 2.63 115.66 148.52 150.17 71.32 150.17
9 Track Type Excavator 222 HP CAT 330B 5,642,000.00 9,591,400.00 1,918,280.00 639.43 159.86 799.28 630.80 63.08 639.43 1,333.31 2,132.59 2,172.55 1,541.75 2,172.55
Track Type Excavator with rock 643.05
10 breaker 200 HP 5,674,000.00 9,645,800.00 1,929,160.00 160.76 803.82 630.80 63.08 643.05 1,336.93 2,140.75 2,180.94 1,550.14 2,180.94
11 Backhoe Excavator - 128 HP CAT 320B 4,100,000.00 6,970,000.00 1,394,000.00 464.67 116.17 580.83 283.86 28.39 464.67 776.91 1,357.75 1,386.79 1,102.93 1,386.79
11 Vibratory Compactor 2-4 ton 2,255,499.00 3,834,348.30 766,869.66 255.62 63.91 319.53 94.62 9.46 255.62 359.71 679.23 695.21 600.59 695.21
12 Vibratory Compactor 8-10 ton 3,255,500.00 5,534,350.00 1,106,870.00 368.96 92.24 461.20 157.70 15.77 368.96 542.43 1,003.62 1,026.68 868.98 1,026.68
13 Vibratory Compactor 10-12 ton 3,576,500.00 6,080,050.00 1,216,010.00 405.34 101.33 506.67 165.59 16.56 405.34 587.48 1,094.15 1,119.48 953.90 1,119.48
14 Hand Tamper 207,000.00 351,900.00 70,380.00 23.46 5.87 29.33 23.46 23.46 52.79 54.25 54.25 54.25
15 Crushing plant 75 ton 7,000,000.00 11,900,000.00 2,380,000.00 793.33 198.33 991.67 1,103.90 110.39 396.67 1,610.96 2,602.62 2,652.21 1,548.31 2,652.21
16 Crushing plant 120 ton 11,000,000.00 18,700,000.00 3,740,000.00 1,246.67 311.67 1,558.33 1,577.00 157.70 623.33 2,358.03 3,916.37 3,994.28 2,417.28 3,994.28
17 Generator 90 kw 730,250.00 1,241,425.00 248,285.00 82.76 20.69 103.45 315.40 31.54 82.76 429.70 533.15 538.33 222.93 538.33
18 Generator 45 kw 258,000.00 438,600.00 87,720.00 29.24 7.31 36.55 157.70 15.77 29.24 202.71 239.26 241.09 83.39 241.09
19 Driller 9,000,000.00 15,300,000.00 3,060,000.00 1,020.00 255.00 1,275.00 346.94 34.69 1,020.00 1,401.63 2,676.63 2,740.38 2,393.44 2,740.38
20 Jack Hammer 90,000.00 153,000.00 30,600.00 10.20 2.55 12.75 10.20 10.20 22.95 23.59 23.59 23.59
21 Sand Washing Machine 500,000.00 850,000.00 170,000.00 56.67 14.17 70.83 56.67 56.67 127.50 131.04 131.04 131.04
22 Air Compressor 281,000.00 477,700.00 95,540.00 31.85 7.96 39.81 315.40 31.54 31.85 378.79 418.60 420.59 105.19 420.59
23 Pneumatic tyred roller Estimate 2,693,500.00 4,578,950.00 915,790.00 305.26 76.32 381.58 315.40 31.54 305.26 652.20 1,033.78 1,052.86 737.46 1,052.86
24 Sheep's foot roller, 14Ton Estimate 3,578,500.00 6,083,450.00 1,216,690.00 405.56 101.39 506.95 315.40 31.54 405.56 752.50 1,259.46 1,284.81 969.41 1,284.81
Owning Cost Operating Cost indexed for
Total severe
Total Operating working
Depreciation Investment
Item Equipment Type
Make Model Delivery Price Salvage Value Cost Cost
Owning Fuel Cost Lub. Cost Main. Cost Tyre Cost Cost rate /hr Rental rate /hr conditionRate
or Supplier in Birr in Birr Cost /Hr
A B C=A+B D E F G
I=C+H J=1.05*I J=1.25*I
H=D+E+F+G
II. Hauling Equipment 0.00
1 Dump Truck 14m3 Nissan 1,200,000.00 2,040,000.00 408,000.00 136.00 34.00 170.00 283.86 28.39 136.00 108.80 557.05 727.05 735.55 451.69 735.55
2 Dump Truck 9m3 Nissan 1,000,000.00 1,700,000.00 340,000.00 113.33 28.33 141.67 252.32 25.23 113.33 90.67 481.55 623.22 630.30 377.98 630.30
3 Water Truck 13,000 Lit. Nissan 1,200,000.00 2,040,000.00 408,000.00 136.00 34.00 170.00 236.55 23.66 136.00 108.80 505.01 675.01 683.51 446.96 683.51
4 Truck with trailer 20t. Volvo 1,500,000.00 2,550,000.00 510,000.00 170.00 42.50 212.50 630.80 63.08 170.00 102.00 965.88 1,178.38 1,189.01 558.21 1,189.01
5 Lowbed, 40 ton .- 2,400,000.00 4,080,000.00 816,000.00 272.00 68.00 340.00 630.80 63.08 272.00 163.20 1,129.08 1,469.08 1,486.08 855.28 1,486.08
6 Station wagon 4 WD Toyota 2,200,000.00 3,740,000.00 748,000.00 249.33 62.33 311.67 110.39 11.04 249.33 24.93 395.70 707.36 722.95 612.56 722.95
7 Pick up 4 WD Toyota 1,300,000.00 2,210,000.00 442,000.00 147.33 36.83 184.17 94.62 9.46 147.33 14.73 266.15 450.32 459.52 364.90 459.52
8 Mobile Crane Estimate 2,600,000.00 4,420,000.00 884,000.00 294.67 73.67 368.33 536.18 53.62 294.67 58.93 943.40 1,311.73 1,330.15 793.97 1,330.15
III. Concrete Machine 0.00 0.00
1 Concrete mixer 750/500 lts Moenco 390,000.00 663,000.00 132,600.00 44.20 11.05 55.25 44.15 4.42 44.20 92.77 148.02 150.78 106.63 150.78
2 Concrete mixer 300lt lts Moenco 65,000.00 110,500.00 22,100.00 7.37 1.84 9.21 35.32 3.53 7.37 46.22 55.43 55.89 20.57 55.89
3 Concrete vibrator Moenco 48,000.00 81,600.00 16,320.00 5.44 1.36 6.80 15.77 1.58 5.44 22.79 29.59 29.93 14.16 29.93
4 Concrete vibrator (small) Moenco 16,000.00 27,200.00 5,440.00 1.81 0.45 2.27 17.66 1.77 1.81 21.24 23.51 23.62 5.96 23.62
5 Bar bend. & Cutting Estimate 14,000.00 23,800.00 4,760.00 3.81 0.95 4.76 3.81 3.81 8.57 8.81 8.81 8.81
IV. Other Equipments 0.00 0.00 0.00 0.00 0.00
1 Hand drill Estimate 26,000.00 44,200.00 8,840.00 2.95 0.74 3.68 2.95 2.95 6.63 6.81 6.81 6.81
2 Centrifugal W/Pump Estimate 47,200.00 80,240.00 16,048.00 5.35 1.34 6.69 47.31 4.73 5.35 57.39 64.08 64.41 17.10 64.41
3 Water Tanker 15,000.00 25,500.00 5,100.00 1.70 0.43 2.13 0.00 2.13 2.23 2.23 2.23
V. Pavement Equipment 0.00 0.00
1 Asphalt Plant (120 ton/hr) 34,500,000.00 58,650,000.00 11,730,000.00 3,910.00 977.50 4,887.50 3,974.04 3,910.00 7,884.04 12,771.54 13,015.92 9,041.88 13,015.92
2 Asphalt Kittle 593,400.00 1,008,780.00 201,756.00 67.25 16.81 84.07 394.25 67.25 461.50 545.57 549.77 155.52 549.77
3 Power Broom 404,030.00 686,851.00 137,370.20 45.79 11.45 57.24 78.85 7.89 45.79 11.45 143.97 201.21 204.07 125.22 204.07
4 Aspalt Paver 10,187,100.00 17,318,070.00 3,463,614.00 1,385.45 346.36 1,731.81 78.85 7.89 1,385.45 1,472.18 3,203.99 3,290.58 3,211.73 3,290.58
5 Asphalt Distributer 362,250.00 615,825.00 123,165.00 41.06 10.26 51.32 378.48 37.85 41.06 10.26 467.65 518.97 521.53 143.05 521.53
6 Aggregate Spreader 3,293,025.00 5,598,142.50 1,119,628.50 373.21 93.30 466.51 378.48 37.85 373.21 93.30 882.84 1,349.35 1,372.68 994.20 1,372.68
7 Stationary Asphalt Heater 2,750,800.00 4,676,360.00 935,272.00 311.76 77.94 389.70 157.70 157.70 547.40 566.88 409.18 566.88
8 Generator (500 KVA) 1,650,480.00 2,805,816.00 561,163.20 187.05 46.76 233.82 1,261.60 126.16 187.05 1,574.81 1,808.63 1,820.32 558.72 1,820.32
9 Gravel Paver 10,187,100.00 17,318,070.00 3,463,614.00 1,385.45 346.36 1,731.81 3,154.00 315.40 1,385.45 4,854.85 6,586.65 6,673.24 3,519.24 6,673.24
10 Concrete Plant 5,980,000.00 10,166,000.00 2,033,200.00 677.73 169.43 847.17 1,261.60 677.73 1,939.33 2,786.50 2,828.86 1,567.26 2,828.86
11 Painting Machine 1,725,000.00 2,932,500.00 586,500.00 195.50 48.88 244.38 189.50 195.50 385.00 629.38 641.59 452.09 641.59
III. Basic Material Price List for Cost Analysis
Avg. distance to the project centre from Addis
* Ababa 636.0 km
Unit Price at Addis Total Cost (Birr)
Transport cost
Item Material Description Unit Ababa (Before (Before
(Birr)
VAT), Birr VAT)
1 Cement Qut. 510.00 127.20 637.20
2 Gas Oil (NOC)-Fuel Lts. 20.27 1.27 21.54
4 Benzene Lts. 25.86 1.27 27.13
5 Lubricants Kg. 115.90 1.27 117.17
6 Mild Reinforcement Bar Kg. 62.00 1.27 63.27
7 High tensile steel Reinforcement Bar Kg. 62.00 1.27 63.27
8 Nails Kg. 140.00 1.27 141.27
9 Binding Wire Kg. 55.00 1.27 56.27
10 Eucalyptus Poles Ø12cm, 4 mts long Pcs. 80.00 20.00 100.00
11 Steel formwork m 2
120.00 2.54 122.54
12 Lumber 2.5cm m 3
2,000.00 184.44 2,184.44
13 Dynamite(Amonium Nitrate) Ton 93,500.00 1,272.00 94,772.00
14 Fuses Lm 50.00 2.50 52.50
15 Detonator Pcs. 80.00 4.00 84.00
16 Detonator chord LM 25.00 1.25 26.25
17 Anfo(super Power 90) Kg. 80.00 4.00 84.00
18 Asphlat Cement 60/70 MT 47,046.50 1,272.00 48,318.50
19 Bitumen grade MC-30 Lt. 46.86 1.27 48.13
20 Bitumen grade MC-3000 Lt. 52.44 1.27 53.71
21 Gabion Box m3 1000 11.45 1,011.45
22 Elasomeric Bridge bearing No 36,783.00 31.80 36,814.80
23 PVC Pipe 110mm Lm 70.00 4.77 74.77
24 Steel Guard rail (w-beam) lm 1,000.00 19.08 1,019.08
25 Steel Post for Guard rail lm 800.00 12.72 812.72
26 Sign faces m 2
4,500.00 6.36 4,506.36
27 Theormoplastic Road Paint(White) lit 770.00 3.18 773.18
28 Theormoplastic Road Paint(Yellow) lit 700.00 3.18 703.18
29 Glass beads Kg. 110.00 3.18 113.18
30 Thinner lit 90.00 3.18 93.18
31 Paint lit 87.27 3.18 90.45
32 Cleaning materials lt 76.00 3.18 79.18
___________________________________________________
____________________________________________________
____________________________________________________
I. Manpower Index Factor
Number of
No. Description Calculations Index
Days
A. Basic Salary 1.00
B. Index Factors
B1 Annual Leave 30 days
B2 Sick Leave 5 days
B3 Mourning Leave 3 days
(Total) 38 days =38/365 0.10
B4 Public Holiday =(13+2)/365 0.04
B5 Compensation (1year) =50%(1/12) 0.04
B6 Accident Compensation, insurance 0.02
B7 Labour Affairs 0.01
B8 Idle Time Pay (Rain and Others) for skilled personnel =50%(1/12) 0.04
B9 Idle Time Pay (Rain and Others) for day-labourers =25%(1/12) 0.02
B10 Desert Allowance 0.25
B11 Perdiem 0.30
B12 Company Cost Related to Travel 0.05
B13 allowance made or salary inflation 0.08
B14 Overtime Payment 0.25
Total IF (A+B) 2.20
Take IF (for skilled personnel)= 2.19
Take IF (for day-labourers) = 1.87
___________________________________________________
____________________________________________________
____________________________________________________
II. INDEXED HOURLY WAGE
Workers, Technicians, Crafts Men & Others
___________________________________________________
____________________________________________________
____________________________________________________
0
ANALYSIS OF DIRECT COSTS
VCT Services
Number of persons deserving the service 1,500.00
VCT Services Cost per person (ETB) 25.00
Total VCT Services Cost (ETB/Month) (Service to be given
6,250.00
once in 6 months for each person)
HIV/AIDS and STD Treatment
Numberof Worker living with HIV/AIDS (no.) 30.00
HIV/AIDS and STD Treatment Cost per person (ETB) 150.00
Total HIV/AIDS and STD Treatment Cost (ETB/Month) 4,500.00
Total 10,750.00
Overhead and Profit (%) 26% 2,795.00
Grand Total 13,545.00
Summary
A.1 Laboratory
1 Laboratory Area
2 Furniture
Summary
Total 2,394,156.90
0
Summary
1,000,000.00
120,000.00
1,000.00
14,032.50
1,800.00
3,120.00
1,800.00
200.00
240.00
500.00
64,000.00
2,000.00
500.00
2,000.00
2,000.00
10,000.00
3,000.00
1,500.00
2,000.00
1,229,692.50
0
A2 OFFICES
2 Supplies and Equipment
I) Office
Item
Description Unit Quantity Unit Price Total Price
No.
4 Waste Paper Baskets Each 22 97.50 2,145.00
5 2.4x1.2m Wall board Each 3 1,800.00 5,400.00
8 Plan Chest Each 5 2,415.00 12,075.00
9 Heavy Duty Shelving in Stores Lin. M. 120 450.00 54,000.00
10 Portable fans Each 12 1,800.00 21,600.00
12 Computer Type A (Desktop) Each 25 40,500.00 1,012,500.00
13 Computer Type B (Laptop) Each 4 52,500.00 210,000.00
14 External CD Driver/Recorder CD-RW Each 5 1,800.00 9,000.00
15 Computer Printer & stand - Deskjet (A3/A4) Each 2 25,500.00 51,000.00
16 Computer Printer & stand - Laserjet (A3/A4) Each 10 18,000.00 180,000.00
17 Computer Printer - Laserjet (A4) Each 17 18,000.00 306,000.00
18 Photocopy machine A4/A3 size Administration Office Each 1 120,000.00 120,000.00
19 Photocopy machine A4/A3 size Employer's Representative Drawings Each 3 120,000.00 360,000.00
20 Digital Camera Each 2 7,500.00 15,000.00
21 Electronic Calculating machine for surveyors Each 12 1,050.00 12,600.00
22 Electronic Calculating machine (desk top) Each 5 675.00 3,375.00
23 Box of railways curves Each 2 1,350.00 2,700.00
24 Protractor Each 5 225.00 1,125.00
25 Set squares (45) Each 5 60.00 300.00
26 Set squares (30/60) Each 5 60.00 300.00
27 Planimeter Each 2 2,700.00 5,400.00
28 Triangular scales Each 12 225.00 2,700.00
29 Staple Machine (normal) Each 22 67.50 1,485.00
30 Staple Machine (large - heavy duty) Each 2 375.00 750.00
1 Laboratory Equipment
Summary
Rate/hr
Item No. Description Quantity or /unit No. days amount
1 Generator for power supply 1 1,030.71 30 123,684.65
2 Water truck for water supply 1 683.51 30 20,505.15
3 Supply of bottled water for Employer rep. 45 12.00 30 16,200.00
4 Supply of gas 5 700 3,500.00
5 Messing facilities LS 2,000.00
6 Attendance LS 5,000.00
7 photograph LS 500.00
8 Assistants LS 5,000.00
9 Emergency equipments LS 2,000.00
Total 178,389.80
over head and profit margin 26.00% 46,381.35
Total cost of engineers service 224,771.15
40% share for laboratory and office 89,908.46
60% share for houses 134,862.69
0
Note It is assumed that the vehciles will be reverted to the CONTRACTOR upon
completion of the project
0
Type B
Fuel, service and maintain Vehicle Type B Month 1 27,093.75 27,093.75
Sub Total 27,093.75
Indirect Cost including profit 7,044.38
Total 34,138.13
Vehicle Type B
Item Birr/month
Driver
Insurance 3,000.00
Fuel 12,875.00
Lubricant 3,218.75
Services 4,000.00
Maintenance & Repair 4,000.00
Total 27,093.75
0
Type A Senior Staff Houses
BEDROOMS
Item No. Description Type B
1 Built-in Wardrobes with 20 hangers 3
2 Built-in cupboard with shelves 3
3 Bedside table 6
4 Dressing table with mirror 2
5 Dressing table stool 3
6 Beds double 1.5 m + mattress 1
7 Beds single 1.0m + mattress 2
8 Chest of drawers 2
9 Reading lamps 8
10 Standard lamps 8
11 Bath Towels 12
12 Hand Towels 12
13 Sheets for Double Bed (Set of 2) 2
14 Sheets for Single Bed (Set of 2) 4
15 Pillows 8
16 Pillow cases 16
17 Blankets Double (Wool) 2
18 Blankets Single (Wool) 4
19 Fitted carpets in bedrooms 3
20 Telephone extensions and telephones 3
21 Curtains and rails to all windows 1
0
Type B
Dormitory Building (Each block contains 6 houses)
BEDROOMS (ADJUSTED)
Item No. Description Type B
1 Built-in Wardrobes with 20 hangers 3
2 Built-in cupboard with shelves 3
3 Bedside table 6
4 Dressing table with mirror 2
5 Dressing table stool 3
6 Beds double 1.5 m + mattress 1
7 Beds single 1.0m + mattress 2
8 Chest of drawers 2
9 Reading lamps 8
10 Standard lamps 8
11 Bath Towels 12
12 Hand Towels 12
13 Sheets for Double Bed (Set of 2) 2
14 Sheets for Single Bed (Set of 2) 4
15 Pillows 8
16 Pillow cases 16
17 Blankets Double (Wool) 2
18 Blankets Single (Wool) 4
19 Fitted carpets in bedrooms 3
20 Telephone extensions and telephones 3
21 Curtains and rails to all windows 1
0
Kitchen
2 Laboratory
Item No. Description Unit Quantity Unit Price Total Price
Laboratory building 120 m2 floor area with
1 furniture, m2 120.00 800.00 96,000.00
2 Laboratory equipments LS 1.00 30,000.00
sub total 126,000.00
over head and profit 32,760.00
Sub Total 158,760.00
4 Transport
5 Surveying instrument
Summary
Date
Project: 0.00 Page No.
Work Item: Accommodating and maintaining temporary diversions, cost per km
Labour:
Equipment:
Resultant Taken: 0.384
0.05
1 Clearing and Grubbing (ha) 0.70 67,715.60 47,400.92 Safety officer 1 1.00 246.38 246.38 Hand Tools 10 1.00 2.00 20.00
2 Cut to fill (m3) - 220.86 - Flagmen 7 1.00 49.28 344.93
3 Capping layer (m3) 700.00 #REF! #REF!
4 Maintenance 35.00 #REF! #REF!
Sub Total (A) = #REF! Sub Total (B) = 344.93 Sub Total (C) = 20.00
Purchase+Fabic's+Transport+Waste+Store
Project: 0.00
Work Item: 21.01 Clearing and Grubbing
Sub Total (A) = 0 Sub Total (B) = 1,155.06 Sub Total (C) = 14,967.70
Purchase+Fabic's+Transport+Waste+Store
Project: 0.00
Work Item: 32.01(a) Excavating Soft Material irrespective of depth
Labor:
Equipment:
Resultant Taken: 259.20 m3/d
32.40 m3/h
Indexed Hourly
Hourly
No. D) Material Type E) Labor by Skills No. U.F. Hourly Hourly Cost F) Equipment Type No. U.F. Rental
Cost
Rate Rate
Construction Forman I 1 0.30 328.50 98.55 Excavator 1 1.00 1,386.79 1,386.79
H.D.E operator III 1 1.00 82.13 82.13 Dump Truck 1 1.00 630.30 630.30
L. Vehicle Driver I 1 1.00 32.85 32.85 Hand Tools 10 1.00 2.00 20.00
Helper 2 1 27.92 55.845
Surveyor 1 0.30 98.55 29.57
Chain man 1 0.30 49.28 14.78
Laborer 3 5.00 21.04 315.56
Sub Total (A) = 0 Sub Total (B) = 629.28 Sub Total (C) = 2,037.09
Purchase+Fabic's+Transport+Waste+Store
Date
Project: 0.00 Page No.
Work Item: 32.01(b) Excavating Hard Material irrespective of depth
Labor:
Equipment:
Resultant Taken: 77.76 m3/d
9.72 m3/h
Indexed Hourly
Hourly
No. D) Material Type E) Labor by Skills No. U.F. Hourly Hourly Cost F) Equipment Type No. U.F. Rental
Cost
Rate Rate
Excavator with Rock
Construction Forman I 1 0.50 82.13 41.06 Breaker 1 1.00 2,180.94 2,180.94
H.D.E operator III 1 1.00 82.13 82.13 Dump Truck 1 0.30 630.30 189.09
L. Vehicle Driver I 1 0.30 32.85 9.86 Hand Tools 1 1.00 2.00 2.00
Helper 2 1.00 27.92 55.85
Laborer 5 1.00 21.04 105.19
Sub Total (A) = 0 Sub Total (B) = 294.08 Sub Total (C) = 2,372.03
Purchase+Fabic's+Transport+Waste+Store
(D) Material (E) Manpower (F) Equipment
Unit Price=Sub Total (A) = 0.00 Sub Total(B) = 294.08 Sub Total(C) = 2,372.03
Unit Cost = 30.25 Unit Cost = 244.04
Hourly output 9.72 Hourly output 9.72
Direct Cost = D+E+F = 274.29 Birr/Hect.
Remarks: Considering O.H. and Profit margin = 1.26 x 274.29 = 345.61
Date
Project: 0.00 Page No.
Work Item: 32.02 (a) Backfill using excavated material
Monthly Output
Labour:
Equipment:
Resultant Taken: 43.00 m3/d
5.38 m3/h
Hourly
Qty. Per Cost Per Indexed
No. D) Material Type Unit Price E) Labour by Skills No. U.F. Hourly Cost F) Equipmrnt Type No. U.F. Rental Hourly Cost
Measure Measure Hourly Rate
Rate
Mason Forman 1 0.50 55.85 27.92 Smooth Roller 1 0.50 695.21 347.61
Gang chief 1 1.00 49.28 49.28 Loader 1 0.50 1,199.67 599.83
H.D.E operator III 2 0.50 82.13 82.13 Water Truck 1 0.25 683.51 170.88
L. Vehicle Driver I 1 0.25 32.85 8.21 Hand Tools 10 1.00 2.00 20.00
Laborers 5 1.00 21.04 105.19
Sub Total (A) = 0.00 Sub Total (B) = 272.72 Sub Total (C) = 1,138.32
Purchase+Fabic's+Transport+Waste+Store
Assumptions:
Smooth Roller 2 Ton
Each Layer 0.15 thick x 1.5m wide x 16m long 3.60 m3
6 Layers per day both sides 43.00 m3
___________________________________________________
____________________________________________________
____________________________________________________
0
Date
Project: 0.00 Page No.
Work Item: 34.01 (b)i Grouted stone pitching
Monthly Output
Labor:
Equipment:
Resultant Taken: 50.00 m2/d
6.25 m2/h
Indexed Hourly
Qty. Per Cost Per Hourly
No. D) Material Type Unit Price E) Labor by Skills No. U.F. Hourly Hourly Cost F) Equipment Type No. U.F. Rental
Measure Measure Cost
Rate Rate
Stone, m3 0.33 #REF! #REF! Construction Forman 1 1 0.13 246.38 30.80 Dumper 1 0.50 150.17 75.08
Cement, Qt 0.35 637.20 223.02 Heavy Truck Driver 1 0.50 49.28 24.64 Water Truck 1 0.50 683.51 341.75
Sand, m3 0.08 152.03 11.40 Mason II 2 1.00 55.85 111.69 Water Tanker 2 1.00 2.23 4.46
Mason I 4 1.00 49.28 197.10 Mixer 1 1.00 55.89 55.89
Laborers 10 1.00 21.04 210.38
Equipment Operoter II 1 0.75 41.06 30.80
Sub Total (A) = #REF! Sub Total (B) = 605.40 Sub Total (C) = 477.19
Purchase+Fabic's+Transport+Waste+Store
Date
Project: 0 42.01 (a) Cut and Borrow-to-fill, Page No.
Work Item: Ordinary fill
Monthly Output
Labor:
Equipment:
Resultant Taken: 900.48 m3./d
112.56 m3./H
Construction Forman III 2 1.00 328.50 657.00 Dozer 305 Hp 1 1.00 3,470.39 3,470.39
H.D.E operator III 7 1.00 82.13 574.88 Motor Grader 2 1.00 1,770.69 3,541.38
Truck Operator 9 0.50 49.28 221.74 Loader 2 0.60 1,199.67 1,439.60
Helper I 13 1.00 27.92 362.99 Roller 2 1.00 1,026.68 2,053.36
L. Vehicle Driver I 6 1.00 32.85 197.10 Water Truck 4 1.00 683.51 2,734.02
Surveyor 2 1.00 114.98 229.95 D. Truck 5 1.00 735.55 3,677.73
Chain man 4 1.00 27.92 111.69 Light vehicle 8 1.00 459.52 3,676.19
Daily Labourer 12 1.00 21.04 252.45
Sub Total (A) = - Sub Total (B) = 2,607.80 Sub Total (C) = 17,122.29
Purchase+Fabic's+Transport+Waste+Store
Monthly Output
Labor:
Equipment:
Resultant Taken: 444.00 m3./d
55.50 m3./H
Indexed
Qty. Per Cost Per Hourly Hourly
No. D) Material Type Unit Price E) Labor by Skills No. U.F. Hourly Hourly Cost F) Equipment Type No. U.F.
Measure Measure Rental Rate Cost
Rate
Select Mat. Production
Production 1.50 41.35 62.03 Construction Forman III 1 1.00 328.50 328.50 Motor Grader 1 1.00 2,022.36 2,022.36
Material Hauling 17km 1.50 69.22 103.83 Heavy Truck Driver 2 1.00 49.28 98.55 Vib. Compactor 1 1.00 1,119.48 1,119.48
Heavy Equip.Oper. IV 2 1.00 147.83 295.65 Water Truck 2 1.00 683.51 1,367.01
Laborer 12 1.00 21.04 252.45
Sub Total (A) = 165.86 Sub Total (B) = 975.15 Sub Total (C) = 4,508.86
Purchase+Fabic's+Transport+Waste+Store
(D) Material (E) Manpower (F) Equipment
Unit Price=Sub Total (A) = 165.86 Sub Total(B) = 975.15 Sub Total(C) = 4,508.86
Unit Cost = 17.57 Unit Cost = 81.24
Hourly output 55.50 Hourly output 55.50
Direct Cost = D+E+F = 264.67 Birr/M3
Remarks: Considering O.H. and Profit margin = 1.26 x 264.67 = 333.48
UF - Utilization Factor
Water Truck No. Computation
Grader Average Moisture content a 17%
Average Speed a 4 Km/hr Average speed b 30 km/hr
Blade length 4.27 m Average hauling distance c 10 km
Effective Blade length @30 degree b 3.7 m Loading unloading d 45 min
Length of Operation c 300 m Daily working hours e 8 hrs
No. of Passes d 8 times W/T capacity f 13000 lit
Efficiency e 50% Density of soil g 1500 kg/m3
Production (m2/hr) ** f=axbxcxe/d 277.50 m2/hr
Thickness of 20 cm 55.50 m3/hr Water for 1m3 soil h=axg 255.00 kg
444.00 m3/day 0.26 m3
round trip time i=cx2/b 0.67 hr
Loading unlaoding j = d/60 0.75
**International Research Journal of Engineering and Technology (IRJET) - Volume: 03 Issue: 07 July-2016 Total time k=i+j 1.42 Hr
Hourly production l = f/k/1000 9.18 m3/hr/wt
Daily production m=lx8 73.41 m3/day/wt
Daily water requirment n = m x Daily prodn 113.22 m3/day
No of Water truck required 2
0.00
Labor:
Equipment:
Resultant Taken: 583.20 m3/d
72.90 m3/h
Hourly
Qty. Per Cost Per Indexed Hourly
No. D) Material Type Unit Price E) Labor by Skills No. U.F. Hourly Cost F) Equipment Type No. U.F. Rental
Measure Measure Hourly Rate Cost
Rate
Dynamite 0.0005 94,772.00 47.39 Quarry Forman 1 0.50 41.06 20.53 Excavator 2 1.00 2,180.94 4,361.88
Detonetor 0.5 84.00 42 H.D.E operator III 2 1.00 82.13 164.25 Air Compressor 1 1.00 420.59 420.59
Fuses 1 52.50 52.5 Powder Man 1 1.00 49.28 49.28 Drill 1 1.00 2,740.38 2,740.38
Anfo 0.00025 84.00 0.0210 Heavy Truck Driver 2 1.00 49.28 98.55 dump truck 2.00 1.00 735.55 1,471.09
Equip. Oper. II 1 1.00 41.06 41.06
Sub Total (A) = 141.91 Sub Total (B) = 373.67 Sub Total (C) = 8,993.94
Purchase+Fabic's+Transport+Waste+Store
Remarks:
Date
Project: 0 Page No.
Work Item: 87.13(a)Expansion Joint, 20mm joint filler
Monthly
Output
Labour:
Equipment:
Resultant
Taken: 32.00 lm/d
4.00 lm/h
F) Hourly
No Qty. Per Unit Cost Per E) Labour by Indexed Hourly Hourly
D) Material Type No. U.F. Equipmrnt No. U.F. Rental
. Measure Price Measure Skills Hourly Rate Cost Cost
Type Rate
Compressible Joint Fille 1.00 100.00 100.00 Construction Forma 1 0.20 246.38 49.28 Hand tools 4 1.00 6.81 27.26
Heating paint 1.00 10.00 10.00 Carpenter II 1 1.00 55.85 55.85
labourer 2 1.00 21.04 42.08
Sub Total (A) = 110.00 Sub Total (B) = 147.20 Sub Total (C) = 27.26
Purchase+Fabic's+Transport+Waste+Store
Date
Project: 0 Page No.
Work Item: 87.16(a)Joint Sealant,
Monthly
Output
Labour:
Equipment:
Resultant
Taken: 14.00 lm/d
1.75 lm/h
Indexed Hourly
Qty. Per Unit Cost Per Hourly F) Equipmrnt Hourly
No. D) Material Type E) Labour by Skills No. U.F. Hourly No. U.F. Rental
Measure Price Measure Cost Type Cost
Rate Rate
20mm Polysulphate Sealant 1.00 75.00 75.00 Construction Forman I 1 0.20 246.38 49.28 Hand tools 4 1.00 6.81 27.26
Heating paint 1.00 10.00 10.00 Carpenter II 1 1.00 55.85 55.85
labourer 2 1.00 21.04 42.08
Sub Total (A) = 85.00 Sub Total (B) = 147.20 Sub Total (C) = 27.26
Purchase+Fabic's+Transport+Waste+Store
Date
Project: 0 Page No.
Work Item: Hauling , excavation to Waste
Total Qty. of Work Item: Monthly Output
Labor:
Hauling Distance 1 km Equipment:
Resultant Taken: 364.00 m3./d
45.50 m3./H
Sub Total (A) = 0.00 Sub Total (B) = 235.07 Sub Total (C) = 2,682.88
Purchase+Fabic's+Transport+Waste+Store
Remarks:
Date
Project: 0.00 Page No.
Work Item: Hauling Borrow Material
Labor:
Hauling Distance 16 km Equipment:
Resultant Taken: 800.00 m3./d
100.00 m3./S.P.H
Sub Total (A) = 0.00 Sub Total (B) = 721.13 Sub Total (C) = 8,555.13
Purchase+Fabic's+Transport+Waste+Store
Remarks:
Monthly Output
Labor:
Hauling Distance 10 km Equipment:
Resultant Taken: 800.00 m3./d
100.00 m3./S.P.H
Indexed
Qty. Per Unit Cost Per Hourly Hourly
No. D) Material Type E) Labor by Skills No. U.F. Hourly Hourly Cost F) Equipment Type No. U.F.
Measure Price Measure Rental Rate Cost
Rate
Construction Forman I 1 0.50 82.13 41.06 Loader 1 1.00 1,199.67 1,199.67
H.D.E operator III 1 1.00 82.13 82.13 Dump Trucks 7 1.00 735.55 5,148.82
D/ Truck Operator 7 1.00 49.28 344.93
Laborer 5 1.00 21.04 105.19
Sub Total (A) = 0.00 Sub Total (B) = 573.30 Sub Total (C) = 6,348.49
Purchase+Fabic's+Transport+Waste+Store
Remarks:
Date
Project: 0 Page No.
Work Item: Base course Hauling
Monthly Output
Labor:
Hauling Distance 16 km Equipment:
Resultant Taken: 720.00 m3./d
90.00 m3./H
Indexed Hourly
Qty. Per Unit Cost Per F) Equipment Hourly
No. D) Material Type E) Labor by Skills No. U.F. Hourly Hourly Cost No. U.F. Rental
Measure Price Measure Type Cost
Rate Rate
Construction Forman II 1 0.50 328.50 164.25 Loader 1 1.00 1,199.67 1,199.67
Heavy Equ. Operat V 1 1.00 114.98 114.98 Dump Trucks 7 1.00 735.55 5,148.82
Trucks Drivers 8 1.00 49.28 394.20 Water Truck 1 0.50 683.51 341.75
Load Counter 1 1.00 27.92 27.92
Sub Total (A) = 0.00 Sub Total (B) = 701.35 Sub Total (C) = 6,690.24
Purchase+Fabic's+Transport+Waste+Store
Remarks:
Monthly Output
Labor:
Hauling Distance 50 km Equipment:
Resultant Taken: 486.00 m3./d
60.75 m3./S.P.H
Indexed
Qty. Per Cost Per Hourly Hourly
No. D) Material Type Unit Price E) Labor by Skills No. U.F. Hourly Hourly Cost F) Equipment Type No. U.F.
Measure Measure Rental Rate Cost
Rate
Construction Forman II 1 0.00 82.13 0.00 Excavator 1 1.00 2,172.55 2,172.55
H.D.E operator III 1 0.50 82.13 41.06 Dump Trucks 12.00 1.00 735.55 8,826.55
D/ Truck Operator 24 1.00 49.28 1,182.60
Laborer 10 1.00 21.04 210.38
Sub Total (A) = 0.00 Sub Total (B) = 1,434.04 Sub Total (C) = 10,999.11
Purchase+Fabic's+Transport+Waste+Store
Remarks:
Sub Total (A) = 0 Sub Total (B) = 208.35 Sub Total (C) = 735.55
Purchase+Fabic's+Transport+Waste+Store
Remarks:
Sub Total (A) = 0 Sub Total (B) = 208.35 Sub Total (C) = 735.55
Purchase+Fabic's+Transport+Waste+Store
Remarks:
Purchase+Fabic's+Transport+Waste+Store
Unit Price=Sub Total (A) = 0.00 Unit Cost = Sub Total(B) = 328.64 46.95 Unit Cost = Sub Total(C) = 735.55 105.08
Hourly output 7.00 Hourly output 7.00
Direct Cost D+E+F = 152.03 Birr/m3.
Remarks:
Date
Remarks:
Assumptions:
Correction for:**
Average Operator 75%
Rock, Ripped or Blasted 60%
Visibility 80%
Job efficiency 40 min/hr 66%
Estimated Production 760.00 m3/day
Date
Project: 0 Page No.
Work Item: Aggregate Production
Monthly Output
Labor:
Equipment:
Resultant Taken: 1.00 m3./d
0.13 m3./H
Indexed Hourly
Qty. Per Cost Per Hourly
No. D) Material Type Unit Price E) Labor by Skills No. U.F. Hourly Hourly Cost F) Equipment Type No. U.F. Rental
Measure Measure Cost
Rate Rate
quarry rock
production 1 270.41 270.41
Gavel Aggregate
Crushing 1.2 #REF! #REF!
Gavel Aggregate
Hauling 1.5 82.13 123.19
Sub Total (A) = #REF! Sub Total (B) = 0.00 Sub Total (C) = 0.00