Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 636

Kapal Pembanding

Arief Kurniawan - 1806202323


Teknik Perkapalan FTUI

Permintaan Owner
Jenis Kapal Kapasitas Daerah Pelayaran
Chemical Tanker 6000 DWT Cilacap - Gresik

Penentuan Rasio

ukuran kapal (m)


NO nama kapal Tipe kapal
panjang (L) lebar (B) tinggi (H)
1 Kakurei Maru LNG Carrier 80.3 15.1 7
2 Shinju Maru No.1 LNG Carrier 80.3 15.1 7
3 Shinju Maru No.2 LNG Carrier 80.3 15.1 7
4 MT TIRTASARI LNG Carrier 100 16.5 8.5
5 Kakuyu Maru LNG Carrier 82.56 15.3 7.2
6 Akebono maru LNG Carrier 93 17.2 7.8
7 Pioneer Knutsen LNG Carrier 63.4 11.83 5.5
8 LNG OIL COMBI LNG Carrier 95.04 15.4 9.6
9 JS Cougar LNG Carrier 92.5 17.4 11.7
Kapasitas Kapasitas Kapasitas L/B L/H L/T B/H B/T
sarat (T) (CBM) (DWT) (GRT)
4.312 2536 1801 2952 5.3178808 11.4714286 18.622449 2.1571429 3.5018553
4.183 2538 1781 2936 5.3178808 11.4714286 19.1967487 2.1571429 3.6098494
4.198 2536 1781 2930 5.3178808 11.4714286 19.1281563 2.1571429 3.5969509
6.67 5877 6.0606061 11.7647059 14.9925037 1.9411765 2.4737631
4.313 2539 1865 3031 5.3960784 11.4666667 19.1421284 2.125 3.5474148
4.613 3587 2528 4505 5.4069767 11.9230769 20.1604162 2.2051282 3.7285931
3.5 1500 817 1687 5.3592561 11.5272727 18.1142857 2.1509091 3.38
5.4 4517 3600 2500 6.1714286 9.9 17.6 1.6041667 2.8518519
7.2 5034 4900 5059 5.316092 7.90598291 12.8472222 1.4871795 2.4166667
Rasio Pembanding 5,3 - 6,1 7,9 - 11,92 12,8 - 20,1 1,4 - 2,2 2,4 - 3,7
T/H T/B

0.616 0.2855629
0.5975714 0.2770199
0.5997143 0.2780132
0.7847059 0.4042424
0.5990278 0.2818954
0.5914103 0.2681977
0.6363636 0.295858
0.5625 0.3506494
0.6153846 0.4137931
0,56 - 0,63 0,2 - 0,41
Preliminary ship design - ENGINE estimation
Arief Kurniawan - 1806202323
Teknik Perkapalan FTUI
Perhitungan awal mencar
Ship Specifications
LPP
Ship Name RASNAS V
Type Small LNG Carrier
GT 0.00 GT Fn
0.00 m^3 D (tons)
DWT 6000.00 tons ac
LWT 2972.00 tons SHP (HP)
Cargo 0.00 cbm
∆ 8972.00 tons Manufacturer
Loa 100.00 m Engine Name
Lwl 96.90 m Engine Type
Lpp 95.00 m Revolution Speed
B 17.00 m mep
H 8.50 m
Power Output
T 6.70 m
Speed 12.00 kts Bore
v 6.17 m/s Stroke
Cb 0.77 ∆/LBTγc Oversquare Ratio
Cm 0.992 Sabit Series 60 SFC
Cp 0.78 Cb/Cm
Cw 0.85 Posdunine 1 KW
Cp' 0.91 Cb/Cw 1 knot
Fn 0.20 Kapal Cepat g
Cruise Range 601.00 Naut. mi
1113.05 km
LCB 2.16 m (Fwd Mid)
LCG 0.51 m (Aft Mid)
Cba 0.75 Diagram
Cbf 0.85 Diagram
Perhitungan awal mencari mesin
95.00 m
12.00 kts
6.17 m/s
0.20
8972.00 tons
222.46794345
3333.5006833

MaK
M 25 C
8 M 25 C
720 rpm
23.5 bar
2534 kW
3445.28 HP
255 mm
400 mm
0.6375
186 g/HP

1.35962 HP
0.514444 m/s
9.80665 m/s^2
DANDY
LINESPLAN - Sectional Area Curve
Arief Kurniawan - 1806202323
Teknik perkapalan ftui
Ship Specifications
Lpp 95.00
Lwl 96.90 Frame No
B 17.00 0
H 8.50 1
T 6.70 2
Cb 0.80 3
Cm 0.990 4
Cp 0.79 5
Cp' 0.93 6
Area midship 113.90 7
Half Area midship 56.95 8
L per gading 4.75 9
L Cp diagram 14.57 10
11
12
13
14
Koreksi Displacement SAC
15
L per gading (m) 4.75 16
Ɐdata (m^3) 8771 4616.850258 17
Ddata (ton) 8972 18
DSAC (ton) 9026 19
((D1-D2)/D1)*100 0.60% 20
Kurang dari 1% MEMENUHI

LINESPLAN SAC
120

100
Frame Sectional Area (m2)

80

60

40

20

0
0 5 10 15 20 2
Section No.
40

Fram
20

0
0 5 10 15 20 2
Section No.
Kalkulasi Sectional Area Curve

Sectional Area (m^2) Faktor Simpson Hasil Ganda (m^2) Faktor Moment
1.8158 1 2 -10
25.0162 4 100 -9
52.7543 2 106 -8
76.7562 4 307 -7
97.9981 2 196 -6
105.7874 4 423 -5
112.2466 2 224 -4
113.2662 4 453 -3
113.9 2 228 -2
113.9 4 456 -1
113.9 2 228 S3
113.9 4 456 1
113.9 2 228 2
113.9 4 456 3
113.9 2 228 4
113.6881 4 455 5
112.5945 2 225 6
101.6179 4 406 7
81.176 2 162 8
48.8157 4 195 9
6.3042 1 6 10
S1 5539 S2

1/2 gading Full gading


0 0.9008 2 1.8158
1 9.0332 2 21.4699
2 15.000 2 50.1724
3 25.321 2 72.2464
4 29.195 2 93.6971
5 51.0287 2 102.0574
6 32.122 2 110.0932
7 32.579 2 111.6677
8 33.043 2 113.2134

20 25
9 33.043 2 113.2134
20 25
10 33.043 2 113.5865
11 33.142 2 113.5865
12 33.142 2 113.5865
13 33.142 2 113.5865
14 33.1 2 113.5865
15 32.768 2 112.7048
16 32.4692 2 111.8083
17 31.1678 2 99.1788
18 27.2229 2 81.176
19 15.5344 2 43.8193
20 0.0786 2 6.3042
Hasil Ganda
-18.158
-900.5832
-844.0688
-2149.1736
-1175.9772
-2115.748
-897.9728
-1359.1944
-455.6
-455.6
-10372.076
455.6
455.6
1366.8
911.2
2273.762
1351.134
2845.3012
1298.816
1757.3652
63.042
12778.6204

FULL
1.8158
25.0162
52.7543
76.7562
97.9981
105.7874
112.2466
113.2662
113.9
113.9
113.9
113.9
113.9
113.9
113.9
113.6881
112.5945
101.6179
81.176
48.8157
6.3042
DANDY
SATUAN
g (DENSITY) 1.025 Lpp : 95.00
Cw 0.85 H: 8.50
Go Gj (m) 4.7648238966 center of gravity 0.51
beban trim (P) 450 Δ (ton) : 8972.00
tanj = aj : 0.0242904629 MLK 98.080137639057
j 1.39

TABEL (data diambil dari Hydrostatic Curve)

WL MK GK MG tan MG
WL 2 19.5923396 0.5130000 19.0793396 0.0012731
WL 4 10.2317442 0.5130000 9.7187442 0.0024993
WL 6 7.9507005 0.5130000 7.4377005 0.0032659
WL 8 7.2156061 0.5130000 6.7026061 0.0036240
WL 10 7.0962408 0.5130000 6.5832408 0.0036897
TABEL

WL T MCT Bθ MID La'


t.m/m m m
m
1 2 3 = (Lpp/2)-2
WL 2 0.86 7973.24027830507 -0.2359573 47.73595734626
WL 4 1.72 8240.94652495815 -0.947590574906 48.44759057491
WL 6 2.59 8628.99669590385 -1.676499303359 49.17649930336
WL 8 3.45 9051.40158668782 -2.432303756523 49.93230375652
WL 10 4.31 9763.1644419524 -3.1807188 50.68071881848

WL T ΔT = P/(γ AWL) ΔTa ΔTf


(m) (m) (m)
m
11 10 + 11 = 12 9 - 11 = 13
WL 2 0.86 0.348536155569139 1.6989617156216 0.995197754809
WL 4 1.72 0.341883343613934 1.6778267885841 0.967672207518
WL 6 2.59 0.332750560574394 1.6376502741943 0.926891753851
WL 8 3.45 0.325408283355351 1.5984060867306 0.884031188341
WL 10 4.31 0.316219480028574 1.5233029 0.8126532
TRIM BELAKANG TRIM DEPAN
TRIM dTv=dTa Tv=Ta Th=Tf dTh=dTf
(m) (m) (m) (m)
WL 2 1.699 -0.989 -1.679 0.995
WL 4 1.678 -0.942 -1.600 0.968
WL 6 1.638 -0.883 -1.507 0.927
WL 8 1.598 -0.824 -1.417 0.884
WL 10 1.52330289 -0.7393509699 -1.30339620 0.81265320
DATA KAPAL RANCANGAN
ukuran utama
Lpp 95.0 meter
B 17.0 meter
T 6.7 meter
H 8.5 meter

Bo-Bθ Bo (FK) volume Bwl


0.5698585 0.8058158 1387.7742011 17.00
0.5233915 1.4709821 3093.5297769 17.00
0.4713544 2.1478537 4830.9628782 17.00
0.4040659 2.8363697 6622.9817282 17.00
0.3488672 3.5295860 8456.7952229 17.00

P . La' t Gθ MID Lf
t.m m m m
4 = P. 3 5 = 4/1 6 7 = (LPP/2)+6
21481.180805816 2.69415947043081 -0.117978673128916 47.3820213268711
21801.4157587079 2.6454989961021 -0.473795287453214 47.0262047125468
22129.4246865117 2.56454202804555 -0.83824965167962 46.6617503483204
22469.5366904355 2.48243727507154 -1.21615187826169 46.2838481217383
22806.3234683158 2.335956093 -1.59035940923978 45.9096405907602

Lf P . Lf t tf
(m) (t.m) (m) (m)
Lpp/2 + 2 = 14 P . 14 = 15 15 : 1 = 16 8 x 16 = 17
47.2640426537422 21268.819194184 2.66752517819584 1.33044984087622
46.5524094250936 20948.5842412921 2.54201191305491 1.25832813268477
45.8235006966408 20620.5753134883 2.38968399689814 1.17375619025934
45.0676962434766 20280.4633095645 2.24058816917278 1.09161097395112
44.3192811815205 19943.6765316842 2.042747169758 0.987176719804
0 TRIM BELAKANG
TRIM
AP (cm)
0 WL 1 1.699
95.0 WL 2 1.678
WL 3 1.638
WL 4 1.598
WL 5 1.52330289

Trim Diagra
2.000

1.500
Trim Diagra
2.000

1.500

1.000

0.500

0.000
1

-0.500

-1.000

-1.500

-2.000
TRIM DIAGRAM

Lwl IL Awl
80.40 621174.1353409 1259.6236667
81.13 647821.4451600 1284.1350667
83.39 697243.0004632 1319.3798667
84.19 738437.3732640 1349.1494000
84.52 799594.6534083 1388.3534000

Lf/Lpp tf ta
- m m
8 = (7/Lpp) 9 = 5.8 10 = 5-9
0.498758119230222 1.34373391037836 1.35042556005245
0.495012681184703 1.30955555113194 1.33594344497016
0.491176319456004 1.25964231442565 1.3048997136199
0.487198401281456 1.20943947169635 1.27299780337519
0.483259374639581 1.12887268 1.207083412

ta Tf Ta
(m) (m) (m)
16 - 17 = 18 17 + 11 = 19 18 - 11 = 20
1.33707533731962 1.67898599644536 -0.988539181750481
1.28368378037014 1.6002114762987 -0.94180043675621
1.2159278066388 1.50650675083373 -0.883177246064403
1.14897719522166 1.41701925730648 -0.823568911866307
1.055570449954 1.303396199833 -0.739350969926
TRIM BELAKANG TRIM DEPAN TRIM BELAKANG
FP (cm) AP (cm) FP (cm) AP (m)
-0.989 -1.679 0.995 0.01698961716
-0.942 -1.600 0.968 0.01677826789
-0.883 -1.507 0.927 0.01637650274
-0.824 -1.417 0.884 0.01598406087
-0.7393509699 -1.303396200 0.81265320 0.01523302893

Trim Diagram

WL 1 F
Trim Diagram

WL 1 F
WL 1 A
WL 2 F
WL 2 A
WL 3 F
WL 3 A
WL 4 F
2
WL 4 A
WL 5 F
WL 5 A
TRIM BELAKANG TRIM DEPAN
FP (m) AP (m) FP (m)
-0.00988539182 -0.01678985996 0.009951977548
-0.00941800437 -0.01600211476 0.009676722075
-0.00883177246 -0.01506506751 0.009268917539
-0.00823568912 -0.01417019257 0.008840311883
-0.0073935097 -0.013033962 0.008126532008

WL 1 F
WL 1 F
WL 1 A
WL 2 F
WL 2 A
WL 3 F
WL 3 A
WL 4 F
WL 4 A
WL 5 F
WL 5 A
Hydrostatic Curve

Data Kapal
Jenis Kapal passenger
Displacement 8972.00
Lpp 95.00
Lwl 96.90
Loa 100.00
B 17.00
T 6.70
H 8.50
Cb 0.769019050506772
Cp 0.775594913333751
Cm 0.991521524040542
Cw 0.846012700337848
L 4.75
tabel 2

1 2 1x2=3
No. WL Luas WL Faktor Kali HG

0 0 1 0
s6 1 1238.57266666667 4 4954.29066666667
2 1259.62366666667 1 1259.62366666667
S1 = 6213.91433333333
2 1259.62366666667 1 1259.62366666667
s43 3 1273.4882 4 5093.9528
4 1284.13506666667 1 1284.13506666667
S2 = 13851.6258666667
4 1284.13506666667 1 1284.13506666667
s80 5 1294.00906666667 4 5176.03626666667
ae80 6 1319.37986666667 1 1319.37986666667
S3 = 21631.1770666667
6 1319.37986666667 1 1319.37986666667
s117 7 1338.85893333333 4 5355.43573333333
8 1349.1494 1 1349.1494
S4 = 29655.1420666667
8 1349.1494 1 1349.1494
9 1368.4006 4 5473.6024
10 1388.3534 1 1388.3534
S4 = 37866.2472666667

t Antara 1/2 waterline

No. WL Volume
2 1387.77420111111
4 3093.52977688889
6 4830.96287822222
8 6622.98172822222
10 8456.79522288889
D HSC =
D Preliminery Design =

koreksi displacement =

tabel 3
1
No. WL Ix (m4)
2 26071.4529870556
4 27101.6784906756
6 28033.3375320356
8 29003.60296362
10 30162.4691621533
(2)x1.032 =
9
No. WL D(ton)
2 1432.18297554667
4 3192.52272974933
6 4985.55369032533
8 6834.91714352533
10 8727.41267002133
No. WL Twl
2 0.86
4 1.72
6 2.59
8 3.45
10 4.31

skala
1 2 3 4
No WL ∆ (ton) Volume (m3) Ix (m4) FK (m)
0 0 0 0 0
2 0.774 0.750 4.01 1.06
4 1.726 1.672 4.17 1.94
6 2.695 2.611 4.31 2.83
8 3.695 3.580 4.46 3.73
10 4.718 4.571 4.64 4.64
1850 1850 6500 0.76

0 0
2.68 2
5.36 4
8.04 6
10.72 8
13.4 10

3
4

0
0 0.5 1 1.5

Volume (m3)
MCT
l
Ton
m
m
m
m
m
m

m
4 3x4=5 6 1x2=3
Faktor Moment HG Titik Berat (FA) Hasil Ganda

0 0 0 0
1 4954.29066666667 2.4169338200585 4954.29066666667
2 2519.24733333333 2.38094322934019 1259.62366666667
S'1 = 7473.538 S''1 =
2 2519.24733333333 2.38094322934019 1259.62366666667
3 15281.8584 2.18427785615393 5093.9528
4 5136.54026666667 2.02570759379102 1284.13506666667
S'2 = 30411.184 S''2 =
4 5136.54026666667 2.02570759379102 1284.13506666667
5 25880.1813333333 1.77065531122502 5176.03626666667
6 7916.2792 1.88707105631141 1319.37986666667
S'3 = 69344.1848 S''3 =
6 7916.2792 1.88707105631141 1319.37986666667
7 37488.0501333333 1.57454384738766 5355.43573333333
8 10793.1952 1.62148927168481 1349.1494
S'4 = 125541.709333333 S''4 =
8 10793.1952 1.62148927168481 1349.1494
9 49262.4216 1.37752766404809 5473.6024
10 13883.534 1.19320613085016 1388.3534
S'4 = 199480.860133333 S''4 =

t 0.67

FK F F'
0.805815817759101 2.38094322934019 0.4150000677066
1.47098206926255 2.02570759379102 0.4369561123059
2.14785370545531 1.88707105631141 0.4706902395353
2.83636966109426 1.62148927168481 0.5020674403773
3.52958600169989 1.19320613085016 0.5374886876175
8668.21510346111
8972.00

3.38592171799923 %

tabel 3
2 1/2=3 4 4/2=5
Volume (m ) 3
MF (m) IL (m ) 4
MLF (m)
1387.77420111111 18.786523748735 621174.13534093 447.604613807917
3093.52977688889 8.76076212136263 647821.44516003 209.411737362207
4830.96287822222 5.80284681101746 697243.00046321 144.327956566661
6622.98172822222 4.37923644572779 738437.37326404 111.496211761745
8456.79522288889 3.56665478673488 799594.65340831 94.5505516373567
(4xg)/Lwl = (Awlxg)/100= AWL/ (B. LWL)= Vwl/(Lwl.Bwl.Twl)=
10
MCT (ton.m/m) TPC (ton/cm) Cw Cb
7973.24027830507 12.99931624 0.92 1.1779
8240.94652495815 13.252273888 0.93 1.3011
8628.99669590385 13.616000224 0.93 1.3178
9051.40158668782 13.923221808 0.94 1.3420
9763.1644419524 14.327807088 0.97 1.3656
Lwl Bwl Awl Amid simpson
80.400 17.00 1259.62366666667 18.9833333333333
81.126 17.00 1284.1350666667 41.7633333333333
83.388 17.00 1319.3798666667 63.0068
84.193 17.00 1349.1494 85.7868
84.520 17.00 1388.3534 108.5668

5 6 7 8
IL(m4) Awl (m2) MF (m) MLF (m)
0 0 0 0
3.65 4.20 4.70 4.48
3.81 4.28 2.19 2.09
4.10 4.40 1.45 1.44
4.34 4.50 1.09 1.11
4.70 4.63 0.89 0.95
170000 300 4 100
1 2 3 4
0,0 0,0 0,0 0,0
0.774152959754955,2.68 0.750148216816817,2.68
4.01099276723932,2.68
1.06028397073566,2.68
1.72568796202667,5.36 1.67217825777778,5.36
4.16948899856547,5.36
1.93550272271388,5.36
2.69489388666234,8.04 2.61133128552553,8.04
4.3128211587747,8.04
2.82612329665173,8.04
3.69454980731099,10.72 3.57999012336336,10.72
4.46209276363385,10.72
3.73206534354507,10.72
4.71752036217369,13.4 4.57124066102102,13.4
4.64037987110051,13.4
4.64419210749985,13.4

Hydrostatic Curve
1 1.5 2 2.5 3

Volume (m3) Ix (m4) FK (m) IL(m4) Awl (m2) MF (m) MLF (m) M
MCT TPC (ton/cm) Cw Cb Cm Cp Cp' FO
ok

No.Gading

ya
yb
3 1,3 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Yc
Yd
ok

No.Gading

ya
yb
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Yc
Yd

ok

No.Gading

ya
yb
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Yc
Yd

ok

No.Gading

ya
yb
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Yc
Yd

No.Gading
3x6=7
Hasil Ganda ya
+ - yb
0 1
11974.1926666667 2
2999.09244066667 3
14973.2851073333 4
2999.09244066667 5
11126.6083013333 6
2601.282156 7
31700.2680053333 8
2601.282156 9
9164.97610666667 10
2489.76355866667 11
45956.2898266667 12
2489.76355866667 13
8432.368384 14
2187.631278 15
59066.0530473333 16
2187.631278 17
7540.03872799999 18
1656.59178866667 19
70450.314842 Yc
Yd

6 3+6=7 5+6=8
FK (m) MK (m) MLK (m)
0.805815817759101 19.5923395664941 448.41042963
1.47098206926255 10.2317441906252 210.88271943
2.14785370545531 7.95070051647278 146.47581027
2.83636966109426 7.21560610682205 114.33258142
3.52958600169989 7.09624078843477 98.080137639
Amid/(Bwl.Twl)= Cb/Cm= Cb/Cw=

Cm Cp Cp'
1.295 0.91 1.28
1.425 0.91 1.40
1.433 0.92 1.42
1.464 0.92 1.42
1.482 0.92 1.41
9 10 11 12 13
MK (m) MLK(m) MCT TPC (ton/cm) Cw
0 0 0 0 0
4.35 4.48 3.62 4.06 4.19
2.27 2.11 3.75 4.14 4.23
1.77 1.46 3.92 4.26 4.23
1.60 1.14 4.11 4.35 4.28
1.58 0.98 4.44 4.48 4.39
4.5 100 2200 3.2 0.22
5 6 7 8 9
0,0 0,0 0,0 0,0 0,0
3.65396550200547,2.68 4.19874555555556,2.68
4.69663093718374,2.68
4.47604613807917,2.68
4.35385323699868,2.68
3.81071438329426,5.36 4.28045022222222,5.36
2.19019053034066,5.36
2.09411737362207,5.36
2.27372093125004,5.36
4.10142941448946,8.04 4.39793288888889,8.04
1.45071170275437,8.04
1.44327956566661,8.04
1.76682233699395,8.04
4.34374925449432,10.724.49716466666667,10.72
1.09480911143195,10.72
1.11496211761745,10.72
1.60346802373823,10.72
4.70349796122533,13.4 4.62784466666667,13.4
0.891663696683721,13.4
0.945505516373567,13.4
1.57694239742995,13.4

Curve
3 3.5 4 4.5 5

wl (m2) MF (m) MLF (m) MK (m) MLK(m)


m Cp Cp' FO FO'
tabel 1
WL 1

L' 1.15 AWL1 1238.57266666667


L'/L 0.242105263157895 FO1 2.41693382005846
L" 1.2 Ix 26070.8691338556
L"/L 0.252631578947368 Iy 604377.924388333
L 4.75 (FO)2.AWL= Z 7235.20780599068
IL 597142.716582343

1 2 1x2 = 3 4 3x4 = 5
Ord Fak.S HG F. Moment HG
0 0.242105263157895 0 -9.484210526 0
0.88 0.968421052631579 0.85221052631579 -9.242105263 -7.87621939058172
1.32 1.24210526315789 1.63957894736842 -9 -14.7562105263158
2.89 4 11.56 -8 -92.48
4.48 2 8.96 -7 -62.72
6.47 4 25.88 -6 -155.28
7.41 2 14.82 -5 -74.1
8.17 4 32.68 -4 -130.72
8.43 2 16.86 -3 -50.58
8.5 4 34 -2 -68
8.5 2 17 -1 -17
8.5 4 34 0 0
8.5 2 17 1 17
8.5 4 34 2 68
8.5 2 17 3 51
8.5 4 34 4 136
8.46 2 16.92 5 84.6
8.22 4 32.88 6 197.28
7.1 2 14.2 7 99.4
5.68 4 22.72 8 181.76
3.06 1.25263157894737 3.83305263157895 9 34.4974736842105
0.32 1.01052631578947 0.32336842105263 9.2526315789 2.99200886426593
0 0.252631578947368 0 9.5052631579 0
Σ1 = 391.128210526316 Σ2 = -673.512429916898
Σ3 = 872.529482548477

WL 3

L' 1.37 AWL1 1273.4882


L'/L 0.288421052631579 FO1 2.18427785615393
L" 1.22 Ix 26622.2591497133
L"/L 0.256842105263158 Iy 642855.92488986
L 4.75 (FO)2.AWL= Z 6075.90103167524
IL 636780.023858185

1 2 1x2 = 3 4 3x4 = 5
Ord Fak.S HG F. Moment HG
0 0.288421052631579 0 -9.576842105 0
1.02 1.15368421052632 1.17675789473684 -9.288421053 -10.9302228033241
1.4 1.28842105263158 1.80378947368421 -9 -16.2341052631579
3.27 4 13.08 -8 -104.64
5.04 2 10.08 -7 -70.56
7 4 27.96 -6 -167.76
7.73 2 15.46 -5 -77.3
8.42 4 33.68 -4 -134.72
8.5 2 17 -3 -51
8.5 4 34 -2 -68
8.5 2 17 -1 -17
8.5 4 34 0 0
8.5 2 17 1 17
8.5 4 34 2 68
8.5 2 17 3 51
8.5 4 34 4 136
8.5 2 17 5 85
8.44 4 33.76 6 202.56
7.42 2 14.84 7 103.88
6.09 4 24.36 8 194.88
3.41 1.25684210526316 4.28583157894737 9 38.5724842105263
0.65 1.02736842105263 0.66778947368421 9.2568421053 6.18162171745152
0 0.256842105263158 0 9.5136842105 0
Σ1 = 402.154168421053 Σ2 = -718.144328066482
Σ3 = 903.074105927978

WL 5

L' 1.18 AWL1 1294.00906666667


L'/L 0.248421052631579 FO1 1.77065531122502
L" 0.26 Ix 27545.6200740089
L"/L 0.0547368421052632 Iy 662619.730713387
L 4.75 (FO) .AWL=
2
Z 4057.00340512994
IL 658562.727308257

1 2 1x2 = 3 4 3x4 = 5
Ord Fak.S HG F. Moment HG
0 0.248421052631579 0 -9.496842105 0
1.07 0.993684210526316 1.06324210526316 -9.248421053 -9.83331067036011
1.5 1.24842105263158 1.87263157894737 -9 -16.8536842105263
3.71 4 14.84 -8 -118.72
5.69 2 11.38 -7 -79.66
7.44 4 29.76 -6 -178.56
8.02 2 16.04 -5 -80.2
8.48 4 33.92 -4 -135.68
8.5 2 17 -3 -51
8.5 4 34 -2 -68
8.5 2 17 -1 -17
8.5 4 34 0 0
8.5 2 17 1 17
8.5 4 34 2 68
8.5 2 17 3 51
8.5 4 34 4 136
8.5 2 17 5 85
8.5 4 34 6 204
7.63 2 15.26 7 106.82
6.37 4 25.48 8 203.84
3.7 1.05473684210526 3.90252631578947 9 35.1227368421053
0.53 0.218947368421053 0.11604210526316 9.0547368421 1.05073072576177
0 0.05473684210526 0 9.1094736842 0
Σ1 = 408.634442105263 Σ2 = -755.506994880886
Σ3 = 907.833467567867

WL 7

L' 1.75 AWL1 1338.85893333333


L'/L 0.368421052631579 FO1 1.57454384738766
L" 1.71 Ix 28496.8835004978
L"/L 0.36 Iy 730966.54401816
L 4.75 (FO)2.AWL= Z 3319.28343948335
IL 727647.260578677

1 2 1x2 = 3 4 3x4 = 5
Ord Fak.S HG F. Moment HG
0 0.368421052631579 0 -9.736842105 0
1.32 1.47368421052632 1.94526315789474 -9.368421053 -18.2240443213296
2.03 1.36842105263158 2.7778947368421 -9 -25.0010526315789
4.51 4 18.04 -8 -144.32
6.48 2 12.96 -7 -90.72
7.79 4 31.16 -6 -186.96
8.19 2 16.38 -5 -81.9
8.5 4 34 -4 -136
8.5 2 17 -3 -51
8.5 4 34 -2 -68
8.5 2 17 -1 -17
8.5 4 34 0 0
8.5 2 17 1 17
8.5 4 34 2 68
8.5 2 17 3 51
8.5 4 34 4 136
8.5 2 17 5 85
8.5 4 34 6 204
7.85 2 15.7 7 109.9
6.57 4 26.28 8 210.24
3.95 1.36 5.372 9 48.348
2.21 1.44 3.1824 9.36 29.787264
0 0.36 0 9.72 0
Σ1 = 422.797557894737 Σ2 = -819.125096952909
Σ3 = 959.275264

WL 9

L' 0.79 AWL1 1368.4006


L'/L 0.166315789473684 FO1 1.37752766404809
L" 2.16 Ix 29550.87447082

L"/L 0.454736842105263 Iy 770915.180923287

L 4.75 (FO)2.AWL= Z 2596.65298395348


IL 768318.527939333

1 2 1x2 = 3 4 3x4 = 5
Ord Fak.S HG F. Moment HG
0 0.166315789473684 0 -9.332631579 0
1.25 0.665263157894737 0.83157894736842 -9.166315789 -7.62251523545706
3.13 1.16631578947368 3.65056842105263 -9 -32.8551157894737
5.43 4 21.72 -8 -173.76
7.13 2 14.26 -7 -99.82
8.05 4 32.2 -6 -193.2
8.31 2 16.62 -5 -83.1
8.5 4 34 -4 -136
8.5 2 17 -3 -51
8.5 4 34 -2 -68
8.5 2 17 -1 -17
8.5 4 34 0 0
8.5 2 17 1 17
8.5 4 34 2 68
8.5 2 17 3 51
8.5 4 34 4 136
8.5 2 17 5 85
8.5 4 34 6 204
8.09 2 16.18 7 113.26
6.86 4 27.44 8 219.52
4.19 1.45473684210526 6.09534736842105 9 54.8581263157895
2.27 1.81894736842105 4.12901052631579 9.4547368421 39.0387079445983
0 0.454736842105263 0 9.9094736842 0
Σ1 = 432.126505263158 Σ2 = -862.357631024931
Σ3 = 987.676834260388

AMID
t (1/2 t wL) 0.67
WL I II I x II
Half Ordinat F.S Hasil Ganda
0 0 1 0
0.5 8.5 4 34
1 8.5 1 8.5
Σ1 42.5
1 8.5 1 8.5
1.5 8.5 4 34
2 8.5 1 8.5
Σ2 93.5
2 8.5 1 8.5

2.5 7.64 4 30.56

3 8.5 1 8.5
Σ3 141.06
3 8.5 1 8.5
3.5 8.5 4 34
4 8.5 1 8.5
Σ4 192.06
4 8.5 1 8.5
4.5 8.5 4 34
5 8.5 1 8.5
Σ5 243.06
14 15 16 17 18
Cb Cm Cp Cp' FO
0 0 0 0 0
3.93 3.89 4.55 4.22 4.33
4.34 4.27 4.565 4.61 3.68
4.39 4.30 4.5974 4.67 3.43
4.47 4.39 4.5849 4.70 2.95
4.55 4.45 4.61 4.66 2.17
0.3 3 0.2 3.3 0.55
10 11 12 13 14
0,0 0,0 0,0 0,0 0,0
4.48410429625676,2.68
3.62420012650231,2.684.062286325,2.68
4.18900617205893,2.68
3.9262970914846,2.68
2.1088271943147,5.36
3.74588478407189,5.364.14133559,5.36
4.23234616574037,5.36
4.33699519781504,5.36
1.46475810272116,8.04
3.92227122541084,8.044.25500007,8.04
4.23052915789916,8.04
4.39269900745959,8.04
1.14332581422839,10.72
4.11427344849446,10.72
4.351006815,10.72
4.28460618231902,10.72
4.47340883758036,10.72
0.980801376390565,13.4
4.43780201906927,13.44.477439715,13.4
4.39207200471151,13.4
4.55197002656739,13.4
4.5 5
WL 1

m2
m
m4
m4
m4
m4

6 5x6 = 7 13 = 8 2
F. Moment HG Ord 3 Fak.S
-9.48421052631579 0 0 0.2421052631579
-9.24210526315789 72.7928486834815 0.681472 0.9684210526316
-9 132.805894736842 2.744 1.24210526315789
-8 739.84 29.791 4
-7 439.04 108.531333 2
-6 931.68 302.111711 4
-5 370.5 437.245479 2
-4 522.88 575.930368 4
-3 151.74 611.960049 2
-2 136 614.125 4
-1 17 614.125 2
0 0 614.125 4
1 17 614.125 2
2 136 614.125 4
3 153 614.125 2
4 544 614.125 4
5 423 614.125 2
6 1183.68 588.480472 4
7 695.8 390.617891 2
8 1454.08 207.474688 4
9 310.477263157895 34.328125 1.25263157894737
9.25263157894737 27.6839557019974 0.778688 1.01052631578947
9.50526315789474 0 0 0.2526315789474
Σ4 = 8458.99996228022 Σ5 =

WL 3

m2
m

m4

m4
m4
m4

6 5x6 = 7 13 = 8 2
F. Moment HG Ord 3 Fak.S
-9.57684210526316 0 0 0.2884210526316
-9.28842105263158 101.524511596349 1.061208 1.15368421052632
-9 146.106947368421 2.744 1.28842105263158
-8 837.12 34.965783 4
-7 493.92 128.024064 2
-6 1006.56 341.532099 4
-5 386.5 461.889917 2
-4 538.88 596.947688 4
-3 153 614.125 2
-2 136 614.125 4
-1 17 614.125 2
0 0 614.125 4
1 17 614.125 2
2 136 614.125 4
3 153 614.125 2
4 544 614.125 4
5 425 614.125 2
6 1215.36 601.211584 4
7 727.16 408.518488 2
8 1559.04 225.866529 4
9 347.152357894737 39.651821 1.25684210526316
9.25684210526316 57.2222961929144 0.274625 1.02736842105263
9.51368421052632 0 0 0.2568421052632
Σ4 = 8997.54611305242 Σ5 =

WL 5

m2

m4

m4
m4
m4

6 5x6 = 7 13 = 8 2
F. Moment HG Ord 3 Fak.S
-9.49684210526316 0 0 0.2484210526316
-9.24842105263158 90.9425974208252 1.225043 0.9936842105263
-9 151.683157894737 3.375 1.24842105263158
-8 949.76 51.064811 4
-7 557.62 184.220009 2
-6 1071.36 411.830784 4
-5 401 515.849608 2
-4 542.72 609.800192 4
-3 153 614.125 2
-2 136 614.125 4
-1 17 614.125 2
0 0 614.125 4
1 17 614.125 2
2 136 614.125 4
3 153 614.125 2
4 544 614.125 4
5 425 614.125 2
6 1224 614.125 4
7 747.74 444.194947 2
8 1630.72 258.474853 4
9 316.104631578947 50.653 1.05473684210526
9.05473684210526 9.51409021368713 0.148877 0.2189473684211
9.10947368421053 0 0 0.0547368421053
Σ4 = 9274.1644771082 Σ5 =

WL 7

m2

m4

m4
m4
m4

6 5x6 = 7 13 = 8 2
F. Moment HG Ord 3 Fak.S
-9.73684210526316 0 0 0.3684210526316
-9.36842105263158 170.730520484036 2.299968 1.47368421052632
-9 225.00947368421 8.365427 1.36842105263158
-8 1154.56 91.733851 4
-7 635.04 272.097792 2
-6 1121.76 472.729139 4
-5 409.5 549.353259 2
-4 544 614.125 4
-3 153 614.125 2
-2 136 614.125 4
-1 17 614.125 2
0 0 614.125 4
1 17 614.125 2
2 136 614.125 4
3 153 614.125 2
4 544 614.125 4
5 425 614.125 2
6 1224 614.125 4
7 769.3 483.736625 2
8 1681.92 283.593393 4
9 435.132 61.629875 1.36
9.36 278.80879104 10.793861 1.44
9.72 0 0 0.36
Σ4 = 10230.7607852082 Σ5 =

WL 9

m2

m4

m4

m4
m4

6 5x6 = 7 13 = 8 2
F. Moment HG Ord 3 Fak.S
-9.33263157894737 0 0 0.1663157894737
-9.16631578947368 69.8703817582738 1.953125 0.6652631578947
-9 295.696042105263 30.664297 1.16631578947368
-8 1390.08 160.103007 4
-7 698.74 362.467097 2
-6 1159.2 521.660125 4
-5 415.5 573.856191 2
-4 544 614.125 4
-3 153 614.125 2
-2 136 614.125 4
-1 17 614.125 2
0 0 614.125 4
1 17 614.125 2
2 136 614.125 4
3 153 614.125 2
4 544 614.125 4
5 425 614.125 2
6 1224 614.125 4
7 792.82 529.475129 2
8 1756.16 322.828856 4
9 493.723136842105 73.560059 1.45473684210526
9.45473684210526 369.100710271981 11.697083 1.81894736842105
9.90947368421053 0 0 0.4547368421053
Σ4 = 10789.8902709776 Σ5 =
19
FO'
0
4.15
4.37
4.71
5.02
5.37
0.1
15 16 17 18
0,0 0,0 0,0 0,0
3.88631090487239,2.68 4.54630042324441,2.68 4.2177872712459,2.68
4.32898768970944,2.68
4.27494199535963,5.36 4.56532004676378,5.36 4.61126704335954,5.36
3.68310471598367,5.36
4.29963149993176,8.04 4.59740457615539,8.04 4.67249953747733,8.04
3.43103828420256,8.04
4.39061689641054,10.72 4.58485453048039,10.724.69829405843227,10.72
2.9481623121542,10.72
4.4452081342978,13.4 4.60807784488342,13.4 4.66382725455767,13.4
2.16946569245484,13.4
L' 1.14
L'/L 0.24
L" 1.24
L"/L 0.2610526315789
L 4.75 (FO)2.AWL=

ok
2x8 = 9 1 2 1x2 = 3
No.Gading
HG Ord Fak.S HG
0 ya 0 0.24 0
0.6599518315789 yb 0.98 0.96 0.9408
3.4083368421053 1 1.4 1.24 1.736
119.164 2 3.1 4 12.4
217.062666 3 4.77 2 9.54
1208.446844 4 6.71 4 26.84
874.490958 5 7.59 2 15.18
2303.721472 6 8.32 4 33.28
1223.920098 7 8.49 2 16.98
2456.5 8 8.5 4 34
1228.25 9 8.5 2 17
2456.5 10 8.5 4 34
1228.25 11 8.5 2 17
2456.5 12 8.5 4 34
1228.25 13 8.5 2 17
2456.5 14 8.5 4 34
1228.25 15 8.5 2 17
2353.921888 16 8.38 4 33.52
781.235782 17 7.31 2 14.62
829.898752 18 5.92 4 23.68
43.000493421053 19 3.25 1.261052631579 4.09842105263
0.7868847157895 Yc 0.92 1.044210526316 0.96067368421
0 Yd 0 0.261052631579 0
24698.718126811 Σ1 = 397.775894737

L' 1.28
L'/L 0.2694736842105

L" 1.06

L"/L 0.2231578947368
L 4.75 (FO)2.AWL=

2x8 = 9 1 2 1x2 = 3
No.Gading
HG Ord Fak.S HG
0 ya 0 0.269473684211 0
1.2242989136842 yb 1 1.077894736842 1.07789473684
3.5354273684211 1 1.42 1.269473684211 1.80265263158
139.863132 2 3.46 4 13.84
256.048128 3 5.34 2 10.68
1366.128396 4 7.22 4 28.88
923.779834 5 7.87 2 15.74
2387.790752 6 8.46 4 33.84
1228.25 7 8.5 2 17
2456.5 8 8.5 4 34
1228.25 9 8.5 2 17
2456.5 10 8.5 4 34
1228.25 11 8.5 2 17
2456.5 12 8.5 4 34
1228.25 13 8.5 2 17
2456.5 14 8.5 4 34
1228.25 15 8.5 2 17
2404.846336 16 8.5 4 34
817.036976 17 7.51 2 15.02
903.466116 18 6.24 4 24.96
49.836078183158 19 3.56 1.223157894737 4.35444210526
0.2821410526316 Yc 0.36 0.892631578947 0.32134736842
0 Yd 0 0.223157894737 0
25221.087615518 Σ1 = 405.516336842

L' 1.27

L'/L 0.2673684210526

L" 1.5

L"/L 0.3157894736842
L 4.75 (FO)2.AWL=

ok
2x8 = 9 1 2 1x2 = 3
No.Gading
HG Ord Fak.S HG
0 ya 0 0.267368421053 0
1.2173058863158 yb 1.07 1.069473684211 1.14433684211
4.2134210526316 1 1.71 1.267368421053 2.1672
204.259244 2 4.06 4 16.24
368.440018 3 6.08 2 12.16
1647.323136 4 7.64 4 30.56
1031.699216 5 8.12 2 16.24
2439.200768 6 8.5 4 34
1228.25 7 8.5 2 17
2456.5 8 8.5 4 34
1228.25 9 8.5 2 17
2456.5 10 8.5 4 34
1228.25 11 8.5 2 17
2456.5 12 8.5 4 34
1228.25 13 8.5 2 17
2456.5 14 8.5 4 34
1228.25 15 8.5 2 17
2456.5 16 8.5 4 34
888.389894 17 7.73 2 15.46
1033.899412 18 6.48 4 25.92
53.425585263158 19 3.82 1.315789473684 5.02631578947
0.0325962273684 Yc 2.16 1.263157894737 2.72842105263
0 Yd 0 0.315789473684 0
26095.85059643 Σ1 = 416.646273684

L' 0.54

L'/L 0.1136842105263

L" 1.94

L"/L 0.4084210526316
L 4.75 (FO)2.AWL=

2x8 = 9 1 2 1x2 = 3
No.Gading
HG Ord Fak.S HG
0 ya 0 0.113684210526 0
3.3894265263158 yb 0.72 0.454736842105 0.32741052632
11.447426421053 1 2.53 1.113684210526 2.81762105263
366.935404 2 4.96 4 19.84
544.195584 3 6.81 2 13.62
1890.916556 4 7.95 4 31.8
1098.706518 5 8.25 2 16.5
2456.5 6 8.5 4 34
1228.25 7 8.5 2 17
2456.5 8 8.5 4 34
1228.25 9 8.5 2 17
2456.5 10 8.5 4 34
1228.25 11 8.5 2 17
2456.5 12 8.5 4 34
1228.25 13 8.5 2 17
2456.5 14 8.5 4 34
1228.25 15 8.5 2 17
2456.5 16 8.5 4 34
967.47325 17 7.96 2 15.92
1134.373572 18 6.7 4 26.8
83.81663 19 4.08 1.408421052632 5.74635789474
15.54315984 Yc 2.25 1.633684210526 3.67578947368
0 Yd 0 0.408421052632 0
26997.047526787 Σ1 = 426.047178947

L' 0.95

L'/L 0.2

L" 2.38

L"/L 0.5010526315789

L 4.75 (FO)2.AWL=

ok
2x8 = 9 1 2 1x2 = 3
No.Gading
HG Ord Fak.S HG
0 ya 0 0.2 0
1.2993421052632 yb 1.68 0.8 1.344
35.764253764211 1 3.77 1.2 4.524
640.412028 2 5.9 4 23.6
724.934194 3 7.36 2 14.72
2086.6405 4 8.13 4 32.52
1147.712382 5 8.37 2 16.74
2456.5 6 8.5 4 34
1228.25 7 8.5 2 17
2456.5 8 8.5 4 34
1228.25 9 8.5 2 17
2456.5 10 8.5 4 34
1228.25 11 8.5 2 17
2456.5 12 8.5 4 34
1228.25 13 8.5 2 17
2456.5 14 8.5 4 34
1228.25 15 8.5 2 17
2456.5 16 8.5 4 34
1058.950258 17 8.25 2 16.5
1291.315424 18 7.07 4 28.28
107.01052793474 19 4.35 1.501052631579 6.52957894737
21.276378341053 Yc 2.33 2.004210526316 4.66981052632
0 Yd 0 0.501052631579 0
27995.565288145 Σ1 = 438.427389474
19
0,0
4.15000067706585,2.68
4.36956112305935,5.36
4.70690239535284,8.04
5.02067440377337,10.72
5.37488687617506,13.4
WL 2

AWL1 1259.62366666667 m2
FO1 2.38094322934019 m
Ix 26071.4529870556 m4
Iy 628314.8041817 m4
Z 7140.66884077066 m4
IL 621174.135340929 m4

4 3x4 = 5 6 5x6 = 7 13 = 8
F. Moment HG F. Moment HG Ord 3
-9.48 0 -9.48 0 0
-9.24 -8.692992 -9.24 80.32324608 0.941192
-9 -15.624 -9 140.616 2.744
-8 -99.2 -8 793.6 29.791
-7 -66.78 -7 467.46 108.531333
-6 -161.04 -6 966.24 302.111711
-5 -75.9 -5 379.5 437.245479
-4 -133.12 -4 532.48 575.930368
-3 -50.94 -3 152.82 611.960049
-2 -68 -2 136 614.125
-1 -17 -1 17 614.125
0 0 0 0 614.125
1 17 1 17 614.125
2 68 2 136 614.125
3 51 3 153 614.125
4 136 4 544 614.125
5 85 5 425 614.125
6 201.12 6 1206.72 588.480472
7 102.34 7 716.38 390.617891
8 189.44 8 1515.52 207.474688
9 36.8857894736842 9 331.972105263158 34.328125
9.2610526316 8.89684955124654 9.2610526 82.3941919493337 0.778688
9.5221052632 0 9.5221053 0 0
Σ2 = -696.296992 Σ4 = 8794.02554329249
Σ3 = 895.682639024931

WL 4

AWL1 1284.13506666667 m2
FO1 2.02570759379102 m

Ix 27101.6784906756 m4

Iy 653090.882177027 m4
Z 5269.43701700227 m4
IL 647821.445160024 m4

4 3x4 = 5 6 5x6 = 7 13 = 8
F. Moment HG F. Moment HG Ord 3
-9.538947368 0 -9.538947 0 0
-9.269473684 -9.99151689750692 -9.269474 92.6161029467852 1
-9 -16.2238736842105 -9 146.014863157895 2.863288
-8 -110.72 -8 885.76 41.421736
-7 -74.76 -7 523.32 152.273304
-6 -173.28 -6 1039.68 376.367048
-5 -78.7 -5 393.5 487.443403
-4 -135.36 -4 541.44 605.495736
-3 -51 -3 153 614.125
-2 -68 -2 136 614.125
-1 -17 -1 17 614.125
0 0 0 0 614.125
1 17 1 17 614.125
2 68 2 136 614.125
3 51 3 153 614.125
4 136 4 544 614.125
5 85 5 425 614.125
6 204 6 1224 614.125
7 105.14 7 735.98 423.564751
8 199.68 8 1597.44 242.970624
9 39.1899789473684 9 352.709810526316 45.118016
9.2231578947 2.96383751800554 9.2231579 27.33594140291 0.046656
9.4463157895 0 9.4463158 0 0
Σ2 = -735.035390581717 Σ4 = 9140.79671803391
Σ3 = 907.973816465374

WL 6

AWL1 1319.37986666667 m2

FO1 1.88707105631141 m

Ix 28033.3375320356 m4

Iy 701941.361211827 m4
Z 4698.36074861875 m4
IL 697243.000463208 m4

4 3x4 = 5 6 5x6 = 7 13 = 8
F. Moment HG F. Moment HG Ord 3
-9.534736842 0 -9.534737 0 0
-9.267368421 -10.6049911135734 -9.267368 98.280359751474 1.225043
-9 -19.5048 -9 175.5432 5.000211
-8 -129.92 -8 1039.36 66.923416
-7 -85.12 -7 595.84 224.755712
-6 -183.36 -6 1100.16 445.943744
-5 -81.2 -5 406 535.387328
-4 -136 -4 544 614.125
-3 -51 -3 153 614.125
-2 -68 -2 136 614.125
-1 -17 -1 17 614.125
0 0 0 0 614.125
1 17 1 17 614.125
2 68 2 136 614.125
3 51 3 153 614.125
4 136 4 544 614.125
5 85 5 425 614.125
6 204 6 1224 614.125
7 108.22 7 757.54 461.889917
8 207.36 8 1658.88 272.097792
9 45.2368421052632 9 407.131578947368 55.742968
9.3157894737 25.4173961218837 9.3157895 236.783111240706 10.077696
9.6315789474 0 9.6315789 0 0
Σ2 = -781.709791113573 Σ4 = 9824.51824993955
Σ3 = 947.234238227147

WL 8

AWL1 1349.1494 m2

FO1 1.62148927168481 m

Ix 29003.60296362 m4

Iy 741984.593911713 m4
Z 3547.22064767913 m4
IL 738437.373264034 m4

4 3x4 = 5 6 5x6 = 7 13 = 8
F. Moment HG F. Moment HG Ord 3
-9.227368421 0 -9.227368 0 0
-9.113684211 -2.98391614404432 -9.113684 27.1944694475113 0.373248
-9 -25.3585894736842 -9 228.227305263158 16.194277
-8 -158.72 -8 1269.76 122.023936
-7 -95.34 -7 667.38 315.821241
-6 -190.8 -6 1144.8 502.459875
-5 -82.5 -5 412.5 561.515625
-4 -136 -4 544 614.125
-3 -51 -3 153 614.125
-2 -68 -2 136 614.125
-1 -17 -1 17 614.125
0 0 0 0 614.125
1 17 1 17 614.125
2 68 2 136 614.125
3 51 3 153 614.125
4 136 4 544 614.125
5 85 5 425 614.125
6 204 6 1224 614.125
7 111.44 7 780.08 504.358336
8 214.4 8 1715.2 300.763
9 51.7172210526316 9 465.454989473684 67.917312
9.4084210526 34.5833750692521 9.4084211 325.374954072605 11.390625
9.8168421053 0 9.8168421 0 0
Σ2 = -827.702505617729 Σ4 = 10384.971718257
Σ3 = 973.140596121884

WL 10

AWL1 1388.3534 m2

FO1 1.19320613085016 m

Ix 30162.4691621533 m4

Iy 801571.30888686 m4

Z 1976.6554785531 m4
IL 799594.653408307 m4

4 3x4 = 5 6 5x6 = 7 13 = 8
F. Moment HG F. Moment HG Ord 3
-9.4 0 -9.4 0 0
-9.2 -12.3648 -9.2 113.75616 4.741632
-9 -40.716 -9 366.444 53.582633
-8 -188.8 -8 1510.4 205.379
-7 -103.04 -7 721.28 398.688256
-6 -195.12 -6 1170.72 537.367797
-5 -83.7 -5 418.5 586.376253
-4 -136 -4 544 614.125
-3 -51 -3 153 614.125
-2 -68 -2 136 614.125
-1 -17 -1 17 614.125
0 0 0 0 614.125
1 17 1 17 614.125
2 68 2 136 614.125
3 51 3 153 614.125
4 136 4 544 614.125
5 85 5 425 614.125
6 204 6 1224 614.125
7 115.5 7 808.5 561.515625
8 226.24 8 1809.92 353.393243
9 58.7662105263158 9 528.895894736842 82.312875
9.5010526316 44.3681155900277 9.5010526 421.543801384832 12.649337
10.002105263 0 10.002105 0 0
Σ2 = -895.7408 Σ4 = 11218.9598561217
Σ3 = 1005.87432611634
2 2x8 = 9
Fak.S HG
0.24 0
0.96 0.90354432
1.24 3.40256
4 119.164
2 217.062666
4 1208.446844
2 874.490958
4 2303.721472
2 1223.920098
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2353.921888
2 781.235782
4 829.898752
1.261052631579 43.2895723684211
1.044210526316 0.81311420631579
0.261052631579 0
Σ5 = 24699.2712508947
2 2x8 = 9
Fak.S HG
0.269473684211 0
1.077894736842 1.07789473684211
1.269473684211 3.63486876631579
4 165.686944
2 304.546608
4 1505.468192
2 974.886806
4 2421.982944
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 847.129502
4 971.882496
1.223157894737 55.1864574652632
0.892631578947 0.0416466189473684
0.223157894737 0
Σ5 = 25675.2743595874

2 2x8 = 9
Fak.S HG
0.267368421053 0
1.069473684211 1.31015125052632
1.267368421053 6.33710952
4 267.693664
2 449.511424
4 1783.774976
2 1070.774656
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 923.779834
4 1088.391168
1.315789473684 73.3460105263158
1.263157894737 12.7297212631579
0.315789473684 0
Σ5 = 26557.89871456

2 2x8 = 9
Fak.S HG
0.113684210526 0
0.454736842105 0.169729616842105
1.113684210526 18.0353105957895
4 488.095744
2 631.642482
4 2009.8395
2 1123.03125
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1008.716672
4 1203.052
1.408421052632 95.6561720589474
1.633684210526 18.6086842105263
0.408421052632 0
Σ5 = 27477.0975444821

2 2x8 = 9
Fak.S HG
0.2 0
0.8 3.7933056
1.2 64.2991596
4 821.516
2 797.376512
4 2149.471188
2 1172.752506
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1228.25
4 2456.5
2 1123.03125
4 1413.572972
1.501052631579 123.555957631579
2.004210526316 25.3519343663158
0.501052631579 0
Σ5 = 28574.9707851979
Bon
PERHITUNGAN LUAS

BASELINE - WATERLINE 2

t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 0 Gading 1
wl ord fs hg wl ord
0 1 0 0 0.35
1 4 0 1 1.32
2 1 0 2 1.4
Σ= 0
maka A0-1 = 0 maka A0-1 =
s/d WL 1 = 0 s/d WL 1 =
0

WATERLINE 2 - WATERLINE 4

t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 0 Gading 1
wl ord fs hg wl ord
2 1 0 2 1.4
3 4 0 3 1.4
4 1 0 4 1.42
Σ= 0
maka A0-1 = 0 ` maka A0-1 =
s/d WL 1 = 0 s/d WL 1 =
0

WATERLINE 4 - WATERLINE 6

t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 0 Gading 1
wl ord fs hg wl ord
4 1 0 4 1.42
5 4 0 5 1.5
6 1 0 6 1.71
Σ= 0
maka A0-1 = 0 maka A0-1 =
s/d WL 1 = 0 s/d WL 1 =
0

WATERLINE 6 - WATERLINE 8

t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 0 Gading 1
wl ord fs hg wl ord
6 1 0 6 1.71
7 4 0 7 2.03
8 1.18 1 1.18 8 2.53
Σ= 1.18
maka A0-1 = 0.5270667 maka A0-1 =
s/d WL 1 = 0.5270667 s/d WL 1 =
0.01054133

WATERLINE 8- WATERLINE 10

t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 0 Gading 1
wl ord fs hg wl ord
8 0 1 0 8 2.53
9 0 4 0 9 3.13
10 0 1 0 10 3.77
Σ= 0
maka A0-1 = 0 maka A0-1 =
s/d WL 1 = 0.5270667 s/d WL 1 =
0.01054133

L (antar 4.75 meter


gading)

No.Gading Faktor Hasil Faktor Hasil Faktor


ABonjean
Simpson Ganda Moment Ganda Moment
0 0.5 1 0.5 -10 -5.3 -10
1 24.9 4 99.6 -9 -896.6 -9
2 52.6 2 105.2 -8 -841.2 -8
3 76.5 4 306.0 -7 -2141.8 -7
4 97.6 2 195.1 -6 -1170.7 -6
5 105.3 4 421.2 -5 -2106.2 -5
6 111.9 2 223.7 -4 -894.9 -4
7 113.1 4 452.2 -3 -1356.6 -3
8 113.9 2 227.8 -2 -455.6 -2
9 113.9 4 455.6 -1 -455.6 -1
10 113.9 2 227.8 0 0.0 0
11 113.9 4 455.6 1 455.6 1
12 113.9 2 227.8 2 455.6 2
13 113.9 4 455.6 3 1366.8 3
14 113.6 2 227.2 4 908.8 4
15 113.6 4 454.4 5 2272.1 5
16 112.4 2 224.8 6 1349.0 6
17 101.4 4 405.4 7 2838.0 7
18 83.7 2 167.4 8 1339.1 8
19 48.2 4 193.0 9 1737.0 9
20 5.5 1 5.5 10 55.3 10
∑1= 5531.6 ∑2= -7161.8 ∑4=
∑3= 9614.6

VBonjean 8758.298 meter^3


FO 2.106 meter
Ix 32338688.856
Iy 4706177.102
(FO)2.AWL= Z 38855.165
IL 4667321.936

D Bonjean= 8977.26 ton


D Premlinary Design = 8972.00 ton
KOREKSI DISPLACEMENT = 0.059%
Bonjean Curve
RHITUNGAN LUAS GADING TIAP KENAIKAN WATERLINE

0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 1 Gading 2 Gading


fs hg wl ord fs hg wl
1 0.35 0 1.41 1 1.41 0
4 5.28 1 2.89 4 11.56 1
1 1.4 2 3.1 1 3.1 2
Σ= 7.03 Σ= 16.07
maka A0-1 = 3.1400667 maka A0-1 = 7.177933
s/d WL 1 = 3.1400667 s/d WL 1 = 7.177933
0.06280133 0.1435587

0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 1 Gading 2 Gading


fs hg wl ord fs hg wl
1 1.4 2 3.1 1 3.1 2
4 5.6 3 3.27 4 13.08 3
1 1.42 4 3.46 1 3.46 4
Σ= 8.42 Σ= 19.64
maka A0-1 = 3.7609333 maka A0-1 = 8.772533
s/d WL 1 = 6.901 s/d WL 1 = 15.95047
0.13802 0.3190093

0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 1 Gading 2 Gading


fs hg wl ord fs hg wl
1 1.42 4 3.46 1 3.46 4
4 6 5 3.71 4 14.84 5
1 1.71 6 4.06 1 4.06 6
Σ= 9.13 Σ= 22.36
maka A0-1 = 4.0780667 maka A0-1 = 9.987467
s/d WL 1 = 10.979067 s/d WL 1 = 25.93793
0.21958133 0.5187587

0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 1 Gading 2 Gading


fs hg wl ord fs hg wl
1 1.71 6 4.06 1 4.06 6
4 8.12 7 4.51 4 18.04 7
1 2.53 8 4.96 1 4.96 8
Σ= 12.36 Σ= 27.06
maka A0-1 = 5.5208 maka A0-1 = 12.0868
s/d WL 1 = 16.499867 s/d WL 1 = 38.02473
0.32999733 0.7604947

0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 1 Gading 2 Gading


fs hg wl ord fs hg wl
1 2.53 8 4.96 1 4.96 8
4 12.52 9 5.43 4 21.72 9
1 3.77 10 5.9 1 5.9 10
Σ= 18.82 Σ= 32.58
maka A0-1 = 8.4062667 maka A0-1 = 14.5524
s/d WL 1 = 24.906133 s/d WL 1 = 52.57713
0.49812267 1.0515427

Hasil Faktor
Ord 3 Hasil Ganda
Ganda Kali
No. WL
52.7 0.1 1 0.1
8069.6 15449.7 4 61798.6 2
6729.9 145341.9 2 290683.7 4
14992.4 447550.8 4 1790203.3 6
7024.1 928470.7 2 1856941.3 8
10531.1 1167928.5 4 4671714.1 10
3579.5 1399618.6 2 2799237.1
4069.8 1444864.3 4 5779457.3
No. WL
911.2 1477648.6 2 2955297.2
455.6 1477648.6 4 5910594.5 2
0.0 1477648.6 2 2955297.2 4
455.6 1477648.6 4 5910594.5 6
911.2 1477648.6 2 2955297.2 8
4100.4 1477648.6 4 5910594.5 10
3635.4 1466204.8 2 2932409.6 SKALA
11360.5 1466204.8 4 5864819.1
8094.0 1420681.6 2 2841363.1
19866.1 1041283.4 4 4165133.7
10712.6 586206.7 2 1172413.5
15632.7 112321.6 4 449286.3
553.1 169.2 1 169.2
131737.3 ∑5= 61273305.2
0
0
Lpp 95 m
B 17 m
H 8,5 m
T 6.7 m

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 3 Gading 4
ord fs hg wl ord fs hg
2.61 1 2.61 0 4.28 1 4.28
4.48 4 17.92 1 6.47 4 25.88
4.77 1 4.77 2 6.71 1 6.71
Σ= 25.3 Σ= 36.87
maka A0-1 = 11.30067 maka A0-1 = 16.4686
s/d WL 1 = 11.30067 s/d WL 1 = 16.4686
0.2260133 0.329372

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 3 Gading 4
ord fs hg wl ord fs hg
4.77 1 4.77 2 6.71 1 6.71
5.04 4 20.16 3 6.99 4 27.96
5.34 1 5.34 4 7.22 1 7.22
Σ= 30.27 Σ= 41.89
maka A0-1 = 13.5206 maka A0-1 = 18.71087
s/d WL 1 = 24.82127 s/d WL 1 = 35.17947
0.4964253 0.7035893

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 3 Gading 4
ord fs hg wl ord fs hg
5.34 1 5.34 4 7.22 1 7.22
5.69 4 22.76 5 7.44 4 29.76
6.08 1 6.08 6 7.64 1 7.64
Σ= 34.18 Σ= 44.62
maka A0-1 = 15.26707 maka A0-1 = 19.93027
s/d WL 1 = 40.08833 s/d WL 1 = 55.10973
0.8017667 1.1021947

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 3 Gading 4
ord fs hg wl ord fs hg
6.08 1 6.08 6 7.64 1 7.64
6.48 4 25.92 7 7.79 4 31.16
6.81 1 6.81 8 7.95 1 7.95
Σ= 38.81 Σ= 46.75
maka A0-1 = 17.33513 maka A0-1 = 20.88167
s/d WL 1 = 57.42347 s/d WL 1 = 75.9914
1.1484693 1.519828

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 3 Gading 4
ord fs hg wl ord fs hg
6.81 1 6.81 8 7.95 1 7.95
7.13 4 28.52 9 8.05 4 32.2
7.36 1 7.36 10 8.13 1 8.13
Σ= 42.69 Σ= 48.28
maka A0-1 = 19.0682 maka A0-1 = 21.56507
s/d WL 1 = 76.49167 s/d WL 1 = 97.55647
1.5298333 1.9511293

TABEL 3
Nomor G
0 1 2 3 4 5 6 7 8
0 3.1400667 7.1779333 11.300667 16.4686 18.9074 21.033533 21.9358 22.78
0 6.901 15.950467 24.821267 35.179467 39.6238 43.572333 44.711333 45.56
0 10.979067 25.937933 40.088333 55.109733 61.095067 66.298733 67.491333 68.34
0.5270667 16.499867 38.024733 57.423467 75.9914 83.0398 89.078733 90.271333 91.12
0.5270667 24.906133 52.577133 76.491667 97.556467 105.3106 111.85873 113.05133 113.9

Nomor G
0 1 2 3 4 5 6 7 8
0 0.1308361 0.2990806 0.4708611 0.6861917
0.7878083 0.8763972 0.9139917 0.94916667
0 0.2875417 0.6646028 1.0342194 1.4658111
1.6509917 1.8155139 1.8629722 1.89833333
0 0.4574611 1.0807472 1.6703472 2.2962389
2.5456278 2.7624472 2.8121389 2.8475
0.0219611 0.6874944 1.5843639 2.3926444 3.1663083
3.4599917 3.7116139 3.7613056 3.79666667
0.0219611 1.0377556 2.1907139 3.1871528 4.0648528
4.3879417 4.6607806 4.7104722 4.74583333
1 : 24 28
0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0
0,1.7 0.130836110.299080550.470861110.686191660.787808330.876397220.913991660.9491666666
0,3.4 0.287541660.664602771.034219441.465811111.650991661.815513881.862972221.8983333333
0,5.1 0.457461111.080747221.670347222.296238882.545627772.762447222.812138882.8475,5.1
0.021961110.687494441.584363882.392644443.166308333.459991663.711613883.761305553.7966666666
0.021961111.037755552.190713883.187152774.064852774.387941664.660780554.710472224.7458333333
t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 5 Gading 6
wl ord fs hg wl ord fs hg
0 5.1 1 5.1 0 6.09 1 6.09
1 7.41 4 29.64 1 8.17 4 32.68
2 7.59 1 7.59 2 8.32 1 8.32
Σ= 42.33 Σ= 47.09
maka A0-1 = 18.9074 maka A0-1 = 21.03353
s/d WL 1 = 18.9074 s/d WL 1 = 21.03353
0.378148 0.4206707

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 5 Gading 6
wl ord fs hg wl ord fs hg
2 7.59 1 7.59 2 8.32 1 8.32
3 7.73 4 30.92 3 8.42 4 33.68
4 7.87 1 7.87 4 8.46 1 8.46
Σ= 46.38 Σ= 50.46
maka A0-1 = 20.7164 maka A0-1 = 22.5388
s/d WL 1 = 39.6238 s/d WL 1 = 43.57233
0.792476 0.8714467

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 5 Gading 6
wl ord fs hg wl ord fs hg
4 7.87 1 7.87 4 8.46 1 8.46
5 8.02 4 32.08 5 8.48 4 33.92
6 8.12 1 8.12 6 8.5 1 8.5
Σ= 48.07 Σ= 50.88
maka A0-1 = 21.47127 maka A0-1 = 22.7264
s/d WL 1 = 61.09507 s/d WL 1 = 66.29873
1.2219013 1.3259747

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 5 Gading 6
wl ord fs hg wl ord fs hg
6 8.12 1 8.12 6 8.5 1 8.5
7 8.19 4 32.76 7 8.5 4 34
8 8.25 1 8.25 8 8.5 1 8.5
Σ= 49.13 Σ= 51
maka A0-1 = 21.94473 maka A0-1 = 22.78
s/d WL 1 = 83.0398 s/d WL 1 = 89.07873
1.660796 1.7815747

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 5 Gading 6
wl ord fs hg wl ord fs hg
8 8.25 1 8.25 8 8.5 1 8.5
9 8.31 4 33.24 9 8.5 4 34
10 8.37 1 8.37 10 8.5 1 8.5
Σ= 49.86 Σ= 51
maka A0-1 = 22.2708 maka A0-1 = 22.78
s/d WL 1 = 105.3106 s/d WL 1 = 111.8587
2.106212 2.2371747

Nomor Gading
9 10 11 12 13 14 15 16 17
22.78 22.78 22.78 22.78 22.78 22.4852 22.4852 21.457867 18.313333
45.56 45.56 45.56 45.56 45.56 45.2652 45.2652 44.077067 38.19
68.34 68.34 68.34 68.34 68.34 68.0452 68.0452 66.857067 58.629467
91.12 91.12 91.12 91.12 91.12 90.8252 90.8252 89.637067 79.663
113.9 113.9 113.9 113.9 113.9 113.6052 113.6052 112.41707 101.3576

Nomor Gading
9 10 11 12 13 14 15 16 17
0.9491667 0.9491667 0.9491667 0.9491667 0.9491667 0.9368833 0.9368833 0.8940778 0.7630556
1.8983333 1.8983333 1.8983333 1.8983333 1.8983333 1.88605 1.88605 1.8365444 1.59125
2.8475 2.8475 2.8475 2.8475 2.8475 2.8352167 2.8352167 2.7857111 2.4428944
3.7966667 3.7966667 3.7966667 3.7966667 3.7966667 3.7843833 3.7843833 3.7348778 3.3192917
4.7458333 4.7458333 4.7458333 4.7458333 4.7458333 4.73355 4.73355 4.6840444 4.2232333

0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0


0.949166660.949166660.949166660.949166660.949166660.936883330.936883330.894077770.76305555
1.898333331.898333331.898333331.898333331.898333331.88605,3.41.88605,3.41.836544441.59125,3.4
2.8475,5.1 2.8475,5.1 2.8475,5.1 2.8475,5.1 2.8475,5.1 2.835216662.835216662.785711112.44289444
3.796666663.796666663.796666663.796666663.796666663.784383333.784383333.734877773.31929166
4.745833334.745833334.745833334.745833334.745833334.73355,8.54.73355,8.54.684044444.22323333
t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 7 Gading 8
wl ord fs hg wl ord fs
0 6.9 1 6.9 0 8.5 1
1 8.43 4 33.72 1 8.5 4
2 8.49 1 8.49 2 8.5 1
Σ= 49.11 Σ=
maka A0-1 = 21.9358 maka A0-1 =
s/d WL 1 = 21.9358 s/d WL 1 =
0.438716

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 7 Gading 8
wl ord fs hg wl ord fs
2 8.49 1 8.49 2 8.5 1
3 8.5 4 34 3 8.5 4
4 8.5 1 8.5 4 8.5 1
Σ= 50.99 Σ=
maka A0-1 = 22.77553 maka A0-1 =
s/d WL 1 = 44.71133 s/d WL 1 =
0.8942267

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 7 Gading 8
wl ord fs hg wl ord fs
4 8.5 1 8.5 4 8.5 1
5 8.5 4 34 5 8.5 4
6 8.5 1 8.5 6 8.5 1
Σ= 51 Σ=
maka A0-1 = 22.78 maka A0-1 =
s/d WL 1 = 67.49133 s/d WL 1 =
1.3498267

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 7 Gading 8
wl ord fs hg wl ord fs
6 8.5 1 8.5 6 8.5 1
7 8.5 4 34 7 8.5 4
8 8.5 1 8.5 8 8.5 1
Σ= 51 Σ=
maka A0-1 = 22.78 maka A0-1 =
s/d WL 1 = 90.27133 s/d WL 1 =
1.8054267

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 7 Gading 8
wl ord fs hg wl ord fs
8 8.5 1 8.5 8 8.5 1
9 8.5 4 34 9 8.5 4
10 8.5 1 8.5 10 8.5 1
Σ= 51 Σ=
maka A0-1 = 22.78 maka A0-1 =
s/d WL 1 = 113.0513 s/d WL 1 =
2.2610267

18 19 20
14.2844 7.37 2.1576
30.596667 9.1343333 2.8854667
47.659333 26.4114 5.5306667
65.2848 36.9974 5.5306667
83.691933 48.248933 5.5306667

18 19 20
0.5951833 0.3070833 0.0899 0.85
1.2748611 0.3805972 0.1202278
1.9858056 1.100475 0.2304444 0 0
2.7202 1.5415583 0.2304444 2 1.7
3.4871639 2.0103722 0.2304444 4 3.4
6 5.1
0,0 0,0 0,0 8 6.8
0.595183330.307083330.0899,1.7 10 8.5
1.274861110.380597220.120227777777778,3.4
1.985805551.100475,50.230444444444444,5.1
2.7202,6.8 1.541558330.230444444444444,6.8
3.487163882.010372220.230444444444444,8.5
meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ing 8 Gading 9 Gading 10


hg wl ord fs hg wl ord
8.5 0 8.5 1 8.5 0 8.5
34 1 8.5 4 34 1 8.5
8.5 2 8.5 1 8.5 2 8.5
51 Σ= 51
22.78 maka A0-1 = 22.78 maka A0-1 =
22.78 s/d WL 1 = 22.78 s/d WL 1 =
0.4556 0.4556

meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ing 8 Gading 9 Gading 10


hg wl ord fs hg wl ord
8.5 2 8.5 1 8.5 2 8.5
34 3 8.5 4 34 3 8.5
8.5 4 8.5 1 8.5 4 8.5
51 Σ= 51
22.78 maka A0-1 = 22.78 maka A0-1 =
45.56 s/d WL 1 = 45.56 s/d WL 1 =
0.9112 0.9112

meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ing 8 Gading 9 Gading 10


hg wl ord fs hg wl ord
8.5 4 8.5 1 8.5 4 8.5
34 5 8.5 4 34 5 8.5
8.5 6 8.5 1 8.5 6 8.5
51 Σ= 51
22.78 maka A0-1 = 22.78 maka A0-1 =
68.34 s/d WL 1 = 68.34 s/d WL 1 =
1.3668 1.3668

meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ing 8 Gading 9 Gading 10


hg wl ord fs hg wl ord
8.5 6 8.5 1 8.5 6 8.5
34 7 8.5 4 34 7 8.5
8.5 8 8.5 1 8.5 8 8.5
51 Σ= 51
22.78 maka A0-1 = 22.78 maka A0-1 =
91.12 s/d WL 1 = 91.12 s/d WL 1 =
1.8224 1.8224

meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ing 8 Gading 9 Gading 10


hg wl ord fs hg wl ord
8.5 8 8.5 1 8.5 8 8.5
34 9 8.5 4 34 9 8.5
8.5 10 8.5 1 8.5 10 8.5
51 Σ= 51
22.78 maka A0-1 = 22.78 maka A0-1 =
113.9 s/d WL 1 = 113.9 s/d WL 1 =
2.278 2.278
0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 10 Gading 11 Gading 12


fs hg wl ord fs hg wl
1 8.5 0 8.5 1 8.5 0
4 34 1 8.5 4 34 1
1 8.5 2 8.5 1 8.5 2
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 22.78 s/d WL 1 = 22.78
0.4556 0.4556

0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 10 Gading 11 Gading 12


fs hg wl ord fs hg wl
1 8.5 2 8.5 1 8.5 2
4 34 3 8.5 4 34 3
1 8.5 4 8.5 1 8.5 4
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 45.56 s/d WL 1 = 45.56
0.9112 0.9112

0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 10 Gading 11 Gading 12


fs hg wl ord fs hg wl
1 8.5 4 8.5 1 8.5 4
4 34 5 8.5 4 34 5
1 8.5 6 8.5 1 8.5 6
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 68.34 s/d WL 1 = 68.34
1.3668 1.3668

0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 10 Gading 11 Gading 12


fs hg wl ord fs hg wl
1 8.5 6 8.5 1 8.5 6
4 34 7 8.5 4 34 7
1 8.5 8 8.5 1 8.5 8
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 91.12 s/d WL 1 = 91.12
1.8224 1.8224

0.67 meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

Gading 10 Gading 11 Gading 12


fs hg wl ord fs hg wl
1 8.5 8 8.5 1 8.5 8
4 34 9 8.5 4 34 9
1 8.5 10 8.5 1 8.5 10
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 113.9 s/d WL 1 = 113.9
2.278 2.278
t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 12 Gading 13
ord fs hg wl ord fs hg
8.5 1 8.5 0 8.5 1 8.5
8.5 4 34 1 8.5 4 34
8.5 1 8.5 2 8.5 1 8.5
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 22.78 s/d WL 1 = 22.78
0.4556 0.4556

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 12 Gading 13
ord fs hg wl ord fs hg
8.5 1 8.5 2 8.5 1 8.5
8.5 4 34 3 8.5 4 34
8.5 1 8.5 4 8.5 1 8.5
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 45.56 s/d WL 1 = 45.56
0.9112 0.9112

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 12 Gading 13
ord fs hg wl ord fs hg
8.5 1 8.5 4 8.5 1 8.5
8.5 4 34 5 8.5 4 34
8.5 1 8.5 6 8.5 1 8.5
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 68.34 s/d WL 1 = 68.34
1.3668 1.3668

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 12 Gading 13
ord fs hg wl ord fs hg
8.5 1 8.5 6 8.5 1 8.5
8.5 4 34 7 8.5 4 34
8.5 1 8.5 8 8.5 1 8.5
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 91.12 s/d WL 1 = 91.12
1.8224 1.8224

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 12 Gading 13
ord fs hg wl ord fs hg
8.5 1 8.5 8 8.5 1 8.5
8.5 4 34 9 8.5 4 34
8.5 1 8.5 10 8.5 1 8.5
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 113.9 s/d WL 1 = 113.9
2.278 2.278
t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 14 Gading 15
wl ord fs hg wl ord fs hg
0 8 1 8 0 8 1 8
1 8.46 4 33.84 1 8.46 4 33.84
2 8.5 1 8.5 2 8.5 1 8.5
Σ= 50.34 Σ= 50.34
maka A0-1 = 22.4852 maka A0-1 = 22.4852
s/d WL 1 = 22.4852 s/d WL 1 = 22.4852
0.449704 0.449704

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 14 Gading 15
wl ord fs hg wl ord fs hg
2 8.5 1 8.5 2 8.5 1 8.5
3 8.5 4 34 3 8.5 4 34
4 8.5 1 8.5 4 8.5 1 8.5
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 45.2652 s/d WL 1 = 45.2652
0.905304 0.905304

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 14 Gading 15
wl ord fs hg wl ord fs hg
4 8.5 1 8.5 4 8.5 1 8.5
5 8.5 4 34 5 8.5 4 34
6 8.5 1 8.5 6 8.5 1 8.5
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 68.0452 s/d WL 1 = 68.0452
1.360904 1.360904

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 14 Gading 15
wl ord fs hg wl ord fs hg
6 8.5 1 8.5 6 8.5 1 8.5
7 8.5 4 34 7 8.5 4 34
8 8.5 1 8.5 8 8.5 1 8.5
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 90.8252 s/d WL 1 = 90.8252
1.816504 1.816504

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67 meter

Gading 14 Gading 15
wl ord fs hg wl ord fs hg
8 8.5 1 8.5 8 8.5 1 8.5
9 8.5 4 34 9 8.5 4 34
10 8.5 1 8.5 10 8.5 1 8.5
Σ= 51 Σ= 51
maka A0-1 = 22.78 maka A0-1 = 22.78
s/d WL 1 = 113.6052 s/d WL 1 = 113.6052
2.272104 2.272104
t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 16 Gading 17
wl ord fs hg wl ord fs
0 6.78 1 6.78 0 5.29 1
1 8.22 4 32.88 1 7.1 4
2 8.38 1 8.38 2 7.31 1
Σ= 48.04 Σ=
maka A0-1 = 21.45787 maka A0-1 =
s/d WL 1 = 21.45787 s/d WL 1 =
0.4291573

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 16 Gading 17
wl ord fs hg wl ord fs
2 8.38 1 8.38 2 7.31 1
3 8.44 4 33.76 3 7.42 4
4 8.5 1 8.5 4 7.51 1
Σ= 50.64 Σ=
maka A0-1 = 22.6192 maka A0-1 =
s/d WL 1 = 44.07707 s/d WL 1 =
0.8815413

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 16 Gading 17
wl ord fs hg wl ord fs
4 8.5 1 8.5 4 7.51 1
5 8.5 4 34 5 7.63 4
6 8.5 1 8.5 6 7.73 1
Σ= 51 Σ=
maka A0-1 = 22.78 maka A0-1 =
s/d WL 1 = 66.85707 s/d WL 1 =
1.3371413

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 16 Gading 17
wl ord fs hg wl ord fs
6 8.5 1 8.5 6 7.73 1
7 8.5 4 34 7 7.85 4
8 8.5 1 8.5 8 7.96 1
Σ= 51 Σ=
maka A0-1 = 22.78 maka A0-1 =
s/d WL 1 = 89.63707 s/d WL 1 =
1.7927413

t = 1/2 waterline 0.67 meter t = 1/2 waterline 0.67

Gading 16 Gading 17
wl ord fs hg wl ord fs
8 8.5 1 8.5 8 7.96 1
9 8.5 4 34 9 8.09 4
10 8.5 1 8.5 10 8.25 1
Σ= 51 Σ=
maka A0-1 = 22.78 maka A0-1 =
s/d WL 1 = 112.4171 s/d WL 1 =
2.2483413
meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ng 17 Gading 18 Gading 19
hg wl ord fs hg wl ord
5.29 0 3.34 1 3.34 0 1.01
28.4 1 5.68 4 22.72 1 3.06
7.31 2 5.92 1 5.92 2 3.25
41 Σ= 31.98
18.31333 maka A0-1 = 14.2844 maka A0-1 =
18.31333 s/d WL 1 = 14.2844 s/d WL 1 =
0.3662667 0.285688

meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ng 17 Gading 18 Gading 19
hg wl ord fs hg wl ord
7.31 2 5.92 1 5.92 2 3.25
29.68 3 6.09 4 24.36 3 3.41
7.51 4 6.24 1 6.24 4 3.56
44.5 Σ= 36.52
19.87667 maka A0-1 = 16.31227 maka A0-1 =
38.19 s/d WL 1 = 30.59667 s/d WL 1 =
0.7638 0.6119333

meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ng 17 Gading 18 Gading 19
hg wl ord fs hg wl ord
7.51 4 6.24 1 6.24 4 3.56
30.52 5 6.37 4 25.48 5 3.7
7.73 6 6.48 1 6.48 6 3.82
45.76 Σ= 38.2
20.43947 maka A0-1 = 17.06267 maka A0-1 =
58.62947 s/d WL 1 = 47.65933 s/d WL 1 =
1.1725893 0.9531867

meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ng 17 Gading 18 Gading 19
hg wl ord fs hg wl ord
7.73 6 6.48 1 6.48 6 3.82
31.4 7 6.57 4 26.28 7 3.95
7.96 8 6.7 1 6.7 8 4.08
47.09 Σ= 39.46
21.03353 maka A0-1 = 17.62547 maka A0-1 =
79.663 s/d WL 1 = 65.2848 s/d WL 1 =
1.59326 1.305696

meter t = 1/2 waterline 0.67 meter t = 1/2 waterline

ng 17 Gading 18 Gading 19
hg wl ord fs hg wl ord
7.96 8 6.7 1 6.7 8 4.08
32.36 9 6.86 4 27.44 9 4.19
8.25 10 7.07 1 7.07 10 4.35
48.57 Σ= 41.21
21.6946 maka A0-1 = 18.40713 maka A0-1 =
101.3576 s/d WL 1 = 83.69193 s/d WL 1 =
2.027152 1.6738387
0.67 meter t = 1/2 waterline 0.58 meter

Gading 19 Gading 20
fs hg wl ord fs hg
1 1.01 0 0 1 0
4 12.24 1 1.07 4 4.28
1 3.25 2 1.3 1 1.3
Σ= 16.5 Σ= 5.58
maka A0-1 = 7.37 maka A0-1 = 2.1576
s/d WL 1 = 7.37 s/d WL 1 = 2.1576
0.1474 0.043152

0.67 meter t = 1/2 waterline 0.67 meter

Gading 19 Gading 20
fs hg wl ord fs hg
1 3.25 2 1.3 1 1.3
4 13.64 3 1.09 4 4.36
1 3.56 4 0.8 1 0.8
Σ= 20.45 Σ= 6.46
maka A0-1 = 9.134333 maka A0-1 = 2.885467
s/d WL 1 = 16.50433 s/d WL 1 = 5.043067
0.3300867 0.1008613

0.67 meter t = 1/2 waterline 0.265 meter

Gading 19 Gading 20
fs hg wl ord fs hg
1 3.56 4 0.8 1 0.8
4 14.8 5 0.49 4 1.96
1 3.82 6 0 1 0
Σ= 22.18 Σ= 2.76
maka A0-1 = 9.907067 maka A0-1 = 0.4876
s/d WL 1 = 26.4114 s/d WL 1 = 5.530667
0.528228 0.1106133

0.67 meter t = 1/2 waterline 0.67 meter

Gading 19 Gading 20
fs hg wl ord fs hg
1 3.82 6 0 1 0
4 15.8 7 0 4 0
1 4.08 8 0 1 0
Σ= 23.7 Σ= 0
maka A0-1 = 10.586 maka A0-1 = 0
s/d WL 1 = 36.9974 s/d WL 1 = 5.530667
0.739948 0.1106133

0.67 meter t = 1/2 waterline 0.185 meter

Gading 19 Gading 20
fs hg wl ord fs hg
1 4.08 8 0 1 0
4 16.76 9 0 4 0
1 4.35 10 0 1 0
Σ= 25.19 Σ= 0
maka A0-1 = 11.25153 maka A0-1 = 0
s/d WL 1 = 48.24893 s/d WL 1 = 5.530667
0.9649787 0.1106133
Kapal Rancangan

Nama Kapal MT RANCANGAN


Tipe Kapal Chemical Tanker
Dimension Value Unit
GT
GT
#REF! m^3
DWT 6000 tons
LWT 2972.00 tons
Cargo cbm
∆ 8972.00 tons
Loa 100.00 m
Lwl 96.90 m
Lpp 95.00 m
B 17.00 m
H 8.50 m
T 6.70 m
Speed 11.5 kts
v 5.92 m/s
Cb 0.8 kerlen
Cm 0.993 Sabit Series 60
Cp 0.792 Cb/Cm
Cw 0.857 Posdunine
Cp' 0.917 Cb/Cw
Fn #REF! Kapal Pelan
Cruise Range 601 Naut. mi
#REF! km
CROSS Curve
ARIEF KURNIAWAN - 1806202323
Teknik perkapalan ftui
Ship Specifications
TABEL CROSS CURVE
Ship Name PERMATASARI
Heel 10°

Type CHEMICAL TANKER TABEL 1


GT
GT
m^3 WL 10
Gading Y1 Y2
0 3.16 0.19
DWT 6000.00 tons 1 5.87 2.18
LWT 2972.00 tons 2 7.95 4.21
∆ 8972.00 tons 3 9.16 5.85
Loa 100.00 m 4 9.73 6.9
Lwl 96.90 m 5 9.81 7.19
Lpp 95.00 m 6 9.81 7.45
B 17.00 m 7 9.81 7.45
H 8.50 m 8 9.81 7.45
T 6.70 m 9 9.81 7.45
Speed 12.00 kts 10 9.81 7.45
v 5.92 m/s 11 9.81 7.45
Cb 0.80 ∆/LBTγc 12 9.81 7.45
Cm 0.99 Sabit Series 60 13 9.81 7.45
Cp 0.76 Cb/Cm 14 9.81 7.45
Cw 0.85 Posdunine 15 9.81 7.45
Cp' 0.91 Cb/Cw 16 9.81 7.45
Fn 0.18 Kapal Sedang 17 9.81 6.91
601.00 Naut. mi 18 8.84 5.68
Cruise Range
km 19 5.85 3.08
LCB m (Fwd Mid) 20 1.36 -1.01
LCG m (Aft Mid) Skala 1
Cba Diagram L Gading 4.75
Cbf Diagram Awl 1433.6767
b 1.3140599
Data
γc 1.0291 Konstanta Heel 20°
g 9.80665 m/s^2
λ 1.19681696117715 Faktor TABEL 1
1 GT 2.83333333333333 m^3
1 SM 1852 m WL 10
µg 0.98 Konstanta Gading Y1 Y2
ȣst 7.86 tons/m^3 0 5.69 -0.94
π 3.14159265358979 Konstanta 1 8.96 0.88
2 9.5 2.82
3 9.5 4.5
4 9.5 5.77
5 9.5 6.19
6 9.5 6.61
7 9.5 6.61
8 9.5 6.61
9 9.5 6.61
10 9.5 6.61
11 9.5 6.61
12 9.5 6.61
13 9.5 6.61
14 9.5 6.61
15 9.5 9.18
16 13.84 7.7
17 11.88 5.6
18 9.18 3.4
19 6.16 0.75
20 3.4 -1.82
Skala 1
L Gading 4.75
Awl 1391.7658
b 1.9095321

Heel 30°

TABEL 1

WL 10
Gading Y1 Y2
0 8.32 -2.01
1 8.32 -0.33
2 8.32 1.59
3 8.32 3.26
4 8.32 4.75
5 8.32 5.34
6 8.32 5.91
7 8.32 5.95
8 8.32 5.95
9 8.32 5.95
10 8.32 5.95
11 8.32 5.95
12 8.32 5.95
13 8.32 5.95
14 8.32 5.95
15 14.53 8.2
16 14.53 6.61
17 14.53 4.53
18 11.5 2.33
19 8.17 -0.4
20 5.55 -2.8
Skala 1
L Gading 4.75
Awl 1309.5117
b 2.4554197

Heel 40°

TABEL 1

WL 10
Gading Y1 Y2
0 8.51 -3.1
1 8.51 -1.48
2 8.51 0.42
3 8.51 2.12
4 8.51 3.81
5 8.51 4.53
6 8.51 5.32
7 8.51 5.47
8 8.51 5.47
9 8.51 5.47
10 8.51 5.47
11 8.51 5.47
12 8.51 5.47
13 8.51 5.47
14 8.51 5.47
15 13.12 6.89
16 13.12 5.51
17 13.12 3.54
18 13.12 1.27
19 10.81 -1.61
20 8.15 -4.07
Skala 1
L Gading 4.75
Awl 1246.8592
b 2.8318491

Heel 50°

TABEL 1

WL 10
Gading Y1 Y2
0 8.22 -4.27
1 8.22 -2.66
2 8.22 -0.76
3 8.22 1.02
4 8.22 2.92
5 8.22 3.83
6 8.22 4.73
7 8.22 4.97
8 8.22 4.97
9 8.22 4.97
10 8.22 4.97
11 8.22 4.97
12 8.22 4.97
13 8.22 4.97
14 8.22 4.97
15 12.6 5.37
16 12.6 4.39
17 12.6 2.59
18 12.6 0.18
19 12.6 -3
20 11.45 -5.53
Skala 1
L Gading 4.75
Awl 1151.8908
b 3.1368544

Heel 60°

TABEL 1

WL 10
Gading Y1 Y2
0 8.67 -5.59
1 8.67 -3.94
2 8.67 -2.03
3 8.67 -0.12
4 8.67 2.07
5 8.67 3.16
6 8.67 3.64
7 8.67 3.74
8 8.67 3.74
9 8.67 3.74
10 8.67 3.74
11 8.67 3.74
12 8.67 3.74
13 8.67 3.74
14 8.67 3.74
15 12.64 3.81
16 12.64 3.25
17 12.64 1.62
18 12.64 -1.03
19 12.64 -4.74
20 12.64 -7.59
Skala 1
L Gading 4.75
Awl 1069.1142
b 3.8480984

Heel 70°

TABEL 1

WL 10
Gading Y1 Y2
0 8.84 -7.17
1 8.84 -5.45
2 8.84 -3.49
3 8.84 -1.38
4 8.84 1.2
5 8.84 2.13
6 8.84 2.36
7 8.84 2.43
8 8.84 2.43
9 8.84 2.43
10 8.84 2.43
11 8.84 2.43
12 8.84 2.43
13 8.84 2.43
14 8.84 2.43
15 12.56 2.43
16 12.56 2.43
17 12.56 0.58
18 12.56 -2.53
19 12.56 -7.36
20 11.4 0
Skala 1
L Gading 4.75
Awl 961.66917
b 4.4222979

Heel 80°

TABEL 1

WL 10
Gading Y1 Y2
0
1 8.51 -7.37
2 8.51 -5.3
3 8.51 -2.92
4 8.51 0.2
5 8.51 1
6 8.51 1.18
7 8.51 1.18
8 8.51 1.18
9 8.51 1.18
10 8.51 1.18
11 8.51 1.18
12 8.51 1.18
13 8.51 1.18
14 8.51 1.18
15 8.51 1.18
16 8.51 1.18
17 8.51 0.85
18 8.51 -1.79
19 8.51 -8.46
20
Skala 1
L Gading 4.75
Awl 712.43667
b 3.9432296

Heel 90°

TABEL 1

WL 10
Gading Y1 Y2
0
1
2 9.19 -8.03
3 9.19 -5.13
4 9.19 -1.14
5 9.19 -0.15
6 9.19 0
7 9.19 0
8 9.19 0
9 9.19 0
10 9.19 0
11 9.19 0
12 9.19 0
13 9.19 0
14 9.19 0
15 9.19 0
16 9.19 0
17 9.19 -0.3
18 9.19 -5.35
19
20
Skala 1
L Gading 4.75
Awl 646.22167
b 4.812419
ve
202323
tui

OSS CURVE

WL 8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
3.35 1 3.35 2.97 9.9495 0 0 0
8.05 4 32.2 3.69 118.818 1 4.08 1.36
12.16 2 24.32 3.74 90.9568 2 6.76 3.61
15.01 4 60.04 3.31 198.7324 3 8.43 5.43
16.63 2 33.26 2.83 94.1258 4 9.23 6.83
17 4 68 2.62 178.16 5 9.47 7.3
17.26 2 34.52 2.36 81.4672 6 9.58 7.68
17.26 4 69.04 2.36 162.9344 7 9.58 7.69
17.26 2 34.52 2.36 81.4672 8 9.58 7.69
17.26 4 69.04 2.36 162.9344 9 9.58 7.69
17.26 2 34.52 2.36 81.4672 10 9.58 7.69
17.26 4 69.04 2.36 162.9344 11 9.58 7.69
17.26 2 34.52 2.36 81.4672 12 9.58 7.69
17.26 4 69.04 2.36 162.9344 13 9.58 7.69
17.26 2 34.52 2.36 81.4672 14 9.58 7.69
17.26 4 69.04 2.36 162.9344 15 11.11 12.28
17.26 2 34.52 2.36 81.4672 16 9.68 11.45
16.72 4 66.88 2.9 193.952 17 7.55 9.27
14.52 2 29.04 3.16 91.7664 18 5.36 6.85
8.93 4 35.72 2.77 98.9444 19 2.73 3.92
0.35 1 0.35 2.37 0.8295 20 0 0
Σ1 = 905.48 Σ2 = 2379.71 Skala 1
L Gading 4.75
Awl 1425.4117
b 0.552295

WL 8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
4.75 1 4.75 6.63 31.4925 0 2.46 -1.81
9.84 4 39.36 8.08 318.0288 1 6.53 0.37
12.32 2 24.64 6.68 164.5952 2 9.16 2.49
14 4 56 5 280 3 10.48 4.24
15.27 2 30.54 3.73 113.9142 4 10.82 5.86
15.69 4 62.76 3.31 207.7356 5 10.82 6.46
16.11 2 32.22 2.89 93.1158 6 10.82 7.05
16.11 4 64.44 2.89 186.2316 7 10.82 7.09
16.11 2 32.22 2.89 93.1158 8 10.82 7.09
16.11 4 64.44 2.89 186.2316 9 10.82 7.09
16.11 2 32.22 2.89 93.1158 10 10.82 7.09
16.11 4 64.44 2.89 186.2316 11 10.82 7.09
16.11 2 32.22 2.89 93.1158 12 10.82 7.09
16.11 4 64.44 2.89 186.2316 13 10.82 7.09
16.11 2 32.22 2.89 93.1158 14 10.82 7.09
18.68 4 74.72 0.32 23.9104 15 10.82 7.09
21.54 2 43.08 6.14 264.5112 16 13.25 7.65
17.48 4 69.92 6.28 439.0976 17 11.09 5.6
12.58 2 25.16 5.78 145.4248 18 8.43 3.45
6.91 4 27.64 5.41 149.5324 19 5.32 0.89
1.58 1 1.58 5.22 8.2476 20 0 0
Σ1 = 879.01 Σ2 = 3356.9957 Skala 1
L Gading 4.75
Awl 1436.5425
b 2.2025268

WL 8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
6.31 1 6.31 10.33 65.1823 0 5.81 -2.51
7.99 4 31.96 8.65 276.454 1 9.8 -0.57
9.91 2 19.82 6.73 133.3886 2 9.8 1.51
11.58 4 46.32 5.06 234.3792 3 9.8 3.26
13.07 2 26.14 3.57 93.3198 4 9.8 5.02
13.66 4 54.64 2.98 162.8272 5 9.8 5.77
14.23 2 28.46 2.41 68.5886 6 9.8 6.52
14.27 4 57.08 2.37 135.2796 7 9.8 6.71
14.27 2 28.54 2.37 67.6398 8 9.8 6.72
14.27 4 57.08 2.37 135.2796 9 9.8 6.72
14.27 2 28.54 2.37 67.6398 10 9.8 6.72
14.27 4 57.08 2.37 135.2796 11 9.8 6.72
14.27 2 28.54 2.37 67.6398 12 9.8 6.72
14.27 4 57.08 2.37 135.2796 13 9.8 6.72
14.27 2 28.54 2.37 67.6398 14 9.8 6.72
22.73 4 90.92 6.33 575.5236 15 15.93 7.92
21.14 2 42.28 7.92 334.8576 16 15.52 6.53
19.06 4 76.24 10 762.4 17 13.56 4.7
13.83 2 27.66 9.17 253.6422 18 10.48 2.56
7.77 4 31.08 8.57 266.3556 19 7.08 -0.02
2.75 1 2.75 8.35 22.9625 20 0 0
Σ1 = 827.06 Σ2 = 4061.5588 Skala 1
L Gading 4.75
Awl 1429.655
b 2.6999099

WL 8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
5.41 1 5.41 11.61 62.8101 0 9.44 -3.28
7.03 4 28.12 9.99 280.9188 1 9.44 -1.5
8.93 2 17.86 8.09 144.4874 2 9.44 0.59
10.63 4 42.52 6.39 271.7028 3 9.44 2.4
12.32 2 24.64 4.7 115.808 4 9.44 4.33
13.04 4 52.16 3.98 207.5968 5 9.44 5.22
13.83 2 27.66 3.19 88.2354 6 9.44 5.83
13.98 4 55.92 3.04 169.9968 7 9.44 5.99
13.98 2 27.96 3.04 84.9984 8 9.44 5.99
13.98 4 55.92 3.04 169.9968 9 9.44 5.99
13.98 2 27.96 3.04 84.9984 10 9.44 5.99
13.98 4 55.92 3.04 169.9968 11 9.44 5.99
13.98 2 27.96 3.04 84.9984 12 9.44 5.99
13.98 4 55.92 3.04 169.9968 13 9.44 5.99
13.98 2 27.96 3.04 84.9984 14 9.44 5.99
20.01 4 80.04 6.23 498.6492 15 14.29 6.23
18.63 2 37.26 7.61 283.5486 16 14.29 5.37
16.66 4 66.64 9.58 638.4112 17 14.29 3.82
14.39 2 28.78 11.85 341.043 18 13.32 1.72
9.2 4 36.8 12.42 457.056 19 9.41 -0.98
4.08 1 4.08 12.22 49.8576 20 6.09 -3.97
Σ1 = 787.49 Σ2 = 4460.1057 Skala 1
L Gading 4.75
Awl 1349.2217
b 3.0535772

WL 8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
3.95 1 3.95 12.49 49.3355 0 9.34 -4.17
5.56 4 22.24 10.88 241.9712 1 9.34 -2.48
7.46 2 14.92 8.98 133.9816 2 9.34 -0.34
9.24 4 36.96 7.2 266.112 3 9.34 1.6
11.14 2 22.28 5.3 118.084 4 9.34 3.65
12.05 4 48.2 4.39 211.598 5 9.34 4.24
12.95 2 25.9 3.49 90.391 6 9.34 4.43
13.19 4 52.76 3.25 171.47 7 9.34 4.5
13.19 2 26.38 3.25 85.735 8 9.34 4.5
13.19 4 52.76 3.25 171.47 9 9.34 4.5
13.19 2 26.38 3.25 85.735 10 9.34 4.5
13.19 4 52.76 3.25 171.47 11 9.34 4.5
13.19 2 26.38 3.25 85.735 12 9.34 4.5
13.19 4 52.76 3.25 171.47 13 9.34 4.5
13.19 2 26.38 3.25 85.735 14 9.34 4.5
17.97 4 71.88 7.23 519.6924 15 13.41 4.43
16.99 2 33.98 8.21 278.9758 16 13.41 4.15
15.19 4 60.76 10.01 608.2076 17 13.41 2.93
12.78 2 25.56 12.42 317.4552 18 13.41 0.89
9.6 4 38.4 15.6 599.04 19 12.75 -2.07
5.92 1 5.92 16.98 100.5216 20 9.51 -4.98
Σ1 = 727.51 Σ2 = 4564.1859 Skala 1
L Gading 4.75
Awl 1238.2617
b 3.6970839

WL 8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
3.08 1 3.08 14.26 43.9208 0 9.15 -5.24
4.73 4 18.92 12.61 238.5812 1 9.15 -3.54
6.64 2 13.28 10.7 142.096 2 9.15 -1.35
8.55 4 34.2 8.79 300.618 3 9.15 0.78
10.74 2 21.48 6.6 141.768 4 9.15 2.76
11.83 4 47.32 5.51 260.7332 5 9.15 3.04
12.31 2 24.62 5.03 123.8386 6 9.15 3.09
12.41 4 49.64 4.93 244.7252 7 9.15 3.09
12.41 2 24.82 4.93 122.3626 8 9.15 3.09
12.41 4 49.64 4.93 244.7252 9 9.15 3.09
12.41 2 24.82 4.93 122.3626 10 9.15 3.09
12.41 4 49.64 4.93 244.7252 11 9.15 3.09
12.41 2 24.82 4.93 122.3626 12 9.15 3.09
12.41 4 49.64 4.93 244.7252 13 9.15 3.09
12.41 2 24.82 4.93 122.3626 14 9.15 3.09
16.45 4 65.8 8.83 581.014 15 13.17 3.09
15.89 2 31.78 9.39 298.4142 16 13.17 2.98
14.26 4 57.04 11.02 628.5808 17 13.17 2.07
11.61 2 23.22 13.67 317.4174 18 13.17 0.02
7.9 4 31.6 17.38 549.208 19 13.17 -3.4
5.05 1 5.05 20.23 102.1615 20 13.17 -6.39
Σ1 = 675.23 Σ2 = 5196.7029 Skala 1
L Gading 4.75
Awl 1113.1308
b 4.2703855

WL 8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
1.67 1 1.67 16.01 26.7367 0 9.33 -6.55
3.39 4 13.56 14.29 193.7724 1 9.33 -4.77
5.35 2 10.7 12.33 131.931 2 9.33 2.52
7.46 4 29.84 10.22 304.9648 3 9.33 -0.1
10.04 2 20.08 7.64 153.4112 4 9.33 1.79
10.97 4 43.88 6.71 294.4348 5 9.33 1.94
11.2 2 22.4 6.48 145.152 6 9.33 1.95
11.27 4 45.08 6.41 288.9628 7 9.33 1.95
11.27 2 22.54 6.41 144.4814 8 9.33 1.95
11.27 4 45.08 6.41 288.9628 9 9.33 1.95
11.27 2 22.54 6.41 144.4814 10 9.33 1.95
11.27 4 45.08 6.41 288.9628 11 9.33 1.95
11.27 2 22.54 6.41 144.4814 12 9.33 1.95
11.27 4 45.08 6.41 288.9628 13 9.33 1.95
11.27 2 22.54 6.41 144.4814 14 9.33 1.95
14.99 4 59.96 10.13 607.3948 15 9.33 1.95
14.99 2 29.98 10.13 303.6974 16 9.33 1.2
13.14 4 52.56 11.98 629.6688 17 13.27 0.98
10.03 2 20.06 15.09 302.7054 18 13.27 -5.22
5.2 4 20.8 19.92 414.336 19 13.27 -8.78
11.4 1 11.4 11.4 129.96 20 13.27 -10.63
Σ1 = 607.37 Σ2 = 5371.9421 Skala 1
L Gading 4.75
Awl 953.35667
b 4.515426

WL 8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 9.82 -8.23
1.14 4 4.56 15.88 72.4128 1 9.82 -6.3
3.21 2 6.42 13.81 88.6602 2 9.82 -3.94
5.59 4 22.36 11.43 255.5748 3 9.82 -1.18
8.71 2 17.42 8.31 144.7602 4 9.82 0.85
9.51 4 38.04 7.51 285.6804 5 9.82 0.94
9.69 2 19.38 7.33 142.0554 6 9.82 0.94
9.69 4 38.76 7.33 284.1108 7 9.82 0.94
9.69 2 19.38 7.33 142.0554 8 9.82 0.94
9.69 4 38.76 7.33 284.1108 9 9.82 0.94
9.69 2 19.38 7.33 142.0554 10 9.82 0.94
9.69 4 38.76 7.33 284.1108 11 9.82 0.94
9.69 2 19.38 7.33 142.0554 12 9.82 0.94
9.69 4 38.76 7.33 284.1108 13 9.82 0.94
9.69 2 19.38 7.33 142.0554 14 9.82 0.94
9.69 4 38.76 7.33 284.1108 15 9.82 0.94
9.69 2 19.38 7.33 142.0554 16 9.82 0.94
9.36 4 37.44 7.66 286.7904 17 9.82 0.94
6.72 2 13.44 10.3 138.432 18 9.82 0.57
0.05 4 0.2 16.97 3.394 19 9.82 -5.65
0 1 0 0 0 20
Σ1 = 449.96 Σ2 = 3548.5912 Skala 1
L Gading 4.75
Awl 872.7175
b 4.7726493

WL 8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
0 4 0 0 0 1 9.54 -8.47
1.16 2 2.32 17.22 39.9504 2 9.54 -5.93
4.06 4 16.24 14.32 232.5568 3 9.54 -2.72
8.05 2 16.1 10.33 166.313 4 9.54 -0.08
9.04 4 36.16 9.34 337.7344 5 9.54 0
9.19 2 18.38 9.19 168.9122 6 9.54 0
9.19 4 36.76 9.19 337.8244 7 9.54 0
9.19 2 18.38 9.19 168.9122 8 9.54 0
9.19 4 36.76 9.19 337.8244 9 9.54 0
9.19 2 18.38 9.19 168.9122 10 9.54 0
9.19 4 36.76 9.19 337.8244 11 9.54 0
9.19 2 18.38 9.19 168.9122 12 9.54 0
9.19 4 36.76 9.19 337.8244 13 9.54 0
9.19 2 18.38 9.19 168.9122 14 9.54 0
9.19 4 36.76 9.19 337.8244 15 9.54 0
9.19 2 18.38 9.19 168.9122 16 9.54 0
8.89 4 35.56 9.49 337.4644 17 9.54 0
3.84 2 7.68 14.54 111.6672 18 9.54 -0.35
0 4 0 0 0 19
0 1 0 0 0 20
Σ1 = 408.14 Σ2 = 3928.2814 Skala 1
L Gading 4.75
Awl 724.66
b 4.9461213
WL 6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
5.44 4 21.76 2.72 59.1872 1 2.62 0.94
10.37 2 20.74 3.15 65.331 2 5.43 3.09
13.86 4 55.44 3 166.32 3 7.58 4.93
16.06 2 32.12 2.4 77.088 4 8.8 6.66
16.77 4 67.08 2.17 145.5636 5 9.1 7.29
17.26 2 34.52 1.9 65.588 6 9.34 7.88
17.27 4 69.08 1.89 130.5612 7 9.34 7.92
17.27 2 34.54 1.89 65.2806 8 9.34 7.92
17.27 4 69.08 1.89 130.5612 9 9.34 7.92
17.27 2 34.54 1.89 65.2806 10 9.34 7.92
17.27 4 69.08 1.89 130.5612 11 9.34 7.92
17.27 2 34.54 1.89 65.2806 12 9.34 7.92
17.27 4 69.08 1.89 130.5612 13 9.34 7.92
17.27 2 34.54 1.89 65.2806 14 9.34 7.92
23.39 4 93.56 -1.17 -109.4652 15 10.1 12.07
21.13 2 42.26 -1.77 -74.8002 16 8.48 10.92
16.82 4 67.28 -1.72 -115.7216 17 6.37 8.69
12.21 2 24.42 -1.49 -36.3858 18 4.19 6.22
6.65 4 26.6 -1.19 -31.654 19 1.83 3.34
0 1 0 0 0 20 0 0
Σ1 = 900.26 Σ2 = 994.4182 Skala 1
L Gading 4.75
Awl 1354.8583
b 0.3138475

WL 6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0.65 1 0.65 4.27 2.7755 0 0 0
6.9 4 27.6 6.16 170.016 1 3.95 0.23
11.65 2 23.3 6.67 155.411 2 7.47 2.33
14.72 4 58.88 6.24 367.4112 3 9.4 4.07
16.68 2 33.36 4.96 165.4656 4 10.21 5.89
17.28 4 69.12 4.36 301.3632 5 10.46 6.64
17.87 2 35.74 3.77 134.7398 6 10.51 7.38
17.91 4 71.64 3.73 267.2172 7 10.51 7.58
17.91 2 35.82 3.73 133.6086 8 10.51 7.58
17.91 4 71.64 3.73 267.2172 9 10.51 7.58
17.91 2 35.82 3.73 133.6086 10 10.51 7.58
17.91 4 71.64 3.73 267.2172 11 10.51 7.58
17.91 2 35.82 3.73 133.6086 12 10.51 7.58
17.91 4 71.64 3.73 267.2172 13 10.51 7.58
17.91 2 35.82 3.73 133.6086 14 10.51 7.58
17.91 4 71.64 3.73 267.2172 15 13.36 8.81
20.9 2 41.8 5.6 234.08 16 12.6 7.3
16.69 4 66.76 5.49 366.5124 17 10.28 5.47
11.88 2 23.76 4.98 118.3248 18 7.63 3.4
6.21 4 24.84 4.43 110.0412 19 4.39 1.2
0 1 0 0 0 20 0 0
Σ1 = 907.29 Σ2 = 3996.6611 Skala 1
L Gading 4.75
Awl 1419.68
b 1.8495166

WL 6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
3.3 1 3.3 8.32 27.456 0 0 0
9.23 4 36.92 10.37 382.8604 1 6.97 -0.47
11.31 2 22.62 8.29 187.5198 2 10.5 1.64
13.06 4 52.24 6.54 341.6496 3 10.71 3.39
14.82 2 29.64 4.78 141.6792 4 10.71 5.27
15.57 4 62.28 4.03 250.9884 5 10.71 6.05
16.32 2 32.64 3.28 107.0592 6 10.71 6.53
16.51 4 66.04 3.09 204.0636 7 10.71 6.67
16.52 2 33.04 3.08 101.7632 8 10.71 6.67
16.52 4 66.08 3.08 203.5264 9 10.71 6.67
16.52 2 33.04 3.08 101.7632 10 10.71 6.67
16.52 4 66.08 3.08 203.5264 11 10.71 6.67
16.52 2 33.04 3.08 101.7632 12 10.71 6.67
16.52 4 66.08 3.08 203.5264 13 10.71 6.67
16.52 2 33.04 3.08 101.7632 14 10.71 6.67
23.85 4 95.4 8.01 764.154 15 15.22 6.82
22.05 2 44.1 8.99 396.459 16 14.68 6.03
18.26 4 73.04 8.86 647.1344 17 12.43 4.56
13.04 2 26.08 7.92 206.5536 18 9.41 2.69
7.06 4 28.24 7.1 200.504 19 5.84 0.59
0 1 0 0 0 20 0 0
Σ1 = 902.94 Σ2 = 4875.7132 Skala 1
L Gading 4.75
Awl 1432.505
b 2.8009677

WL 6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
6.16 1 6.16 12.72 78.3552 0 0 0
7.94 4 31.76 10.94 347.4544 1 10.05 -1.22
10.03 2 20.06 8.85 177.531 2 10.05 1.04
11.84 4 47.36 7.04 333.4144 3 10.05 2.82
13.77 2 27.54 5.11 140.7294 4 10.05 4.39
14.66 4 58.64 4.22 247.4608 5 10.05 4.71
15.27 2 30.54 3.61 110.2494 6 10.05 4.78
15.43 4 61.72 3.45 212.934 7 10.05 4.79
15.43 2 30.86 3.45 106.467 8 10.05 4.79
15.43 4 61.72 3.45 212.934 9 10.05 4.79
15.43 2 30.86 3.45 106.467 10 10.05 4.79
15.43 4 61.72 3.45 212.934 11 10.05 4.79
15.43 2 30.86 3.45 106.467 12 10.05 4.79
15.43 4 61.72 3.45 212.934 13 10.05 4.79
15.43 2 30.86 3.45 106.467 14 10.05 4.79
20.52 4 82.08 8.06 661.5648 15 15.47 4.71
19.66 2 39.32 8.92 350.7344 16 15.47 4.62
18.11 4 72.44 10.47 758.4468 17 15.47 3.68
15.04 2 30.08 11.6 348.928 18 11.8 2.04
8.43 4 33.72 10.39 350.3508 19 7.88 -0.06
2.12 1 2.12 10.06 21.3272 20 0 0
Σ1 = 852.14 Σ2 = 5204.1506 Skala 1
L Gading 4.75
Awl 1328.7017
b 3.696869

WL 6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
5.17 1 5.17 13.51 69.8467 0 10.46 -4.21
6.86 4 27.44 11.82 324.3408 1 10.46 -2.11
9 2 18 9.68 174.24 2 10.46 0.41
10.94 4 43.76 7.74 338.7024 3 10.46 2.32
12.99 2 25.98 5.69 147.8262 4 10.46 3.3
13.58 4 54.32 5.1 277.032 5 10.46 3.37
13.77 2 27.54 4.91 135.2214 6 10.46 3.37
13.84 4 55.36 4.84 267.9424 7 10.46 3.37
13.84 2 27.68 4.84 133.9712 8 10.46 3.37
13.84 4 55.36 4.84 267.9424 9 10.46 3.37
13.84 2 27.68 4.84 133.9712 10 10.46 3.37
13.84 4 55.36 4.84 267.9424 11 10.46 3.37
13.84 2 27.68 4.84 133.9712 12 10.46 3.37
13.84 4 55.36 4.84 267.9424 13 10.46 3.37
13.84 2 27.68 4.84 133.9712 14 10.46 3.37
17.84 4 71.36 8.98 640.8128 15 14.23 3.32
17.56 2 35.12 9.26 325.2112 16 14.23 3.32
16.34 4 65.36 10.48 684.9728 17 14.23 2.84
14.3 2 28.6 12.52 358.072 18 14.23 1.42
10.68 4 42.72 14.82 633.1104 19 10.8 -0.85
4.53 1 4.53 14.49 65.6397 20 0 0
Σ1 = 782.06 Σ2 = 5782.6828 Skala 1
L Gading 4.75
Awl 1266.0492
b 4.4246374

WL 6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
3.91 1 3.91 14.39 56.2649 0 9.92 -4.93
5.61 4 22.44 12.69 284.7636 1 9.92 -3
7.8 2 15.6 10.5 163.8 2 9.92 -0.29
9.93 4 39.72 8.37 332.4564 3 9.92 1.73
11.91 2 23.82 6.39 152.2098 4 9.92 2.31
12.19 4 48.76 6.11 297.9236 5 9.92 2.31
12.24 2 24.48 6.06 148.3488 6 9.92 2.31
12.24 4 48.96 6.06 296.6976 7 9.92 2.31
12.24 2 24.48 6.06 148.3488 8 9.92 2.31
12.24 4 48.96 6.06 296.6976 9 9.92 2.31
12.24 2 24.48 6.06 148.3488 10 9.92 2.31
12.24 4 48.96 6.06 296.6976 11 9.92 2.31
12.24 2 24.48 6.06 148.3488 12 9.92 2.31
12.24 4 48.96 6.06 296.6976 13 9.92 2.31
12.24 2 24.48 6.06 148.3488 14 9.92 2.31
16.26 4 65.04 10.08 655.6032 15 9.92 2.31
16.15 2 32.3 10.19 329.137 16 9.92 2.31
15.24 4 60.96 11.1 676.656 17 9.92 2.28
13.19 2 26.38 13.15 346.897 18 13.69 2.28
9.77 4 39.08 16.57 647.5556 19 13.69 2.05
6.78 1 6.78 19.56 132.6168 20 11.26 0.79
Σ1 = 703.03 Σ2 = 6004.4183 Skala 1
L Gading 4.75
Awl 1138.4483
b 4.2717744

WL 6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
2.78 1 2.78 15.88 44.1464 0 9.82 -5.93
4.56 4 18.24 14.1 257.184 1 9.82 -4.06
11.85 2 23.7 6.81 161.397 2 9.82 -1.14
9.23 4 36.92 9.43 348.1556 3 9.82 1.08
11.12 2 22.24 7.54 167.6896 4 9.82 1.46
11.27 4 45.08 7.39 333.1412 5 9.82 1.46
11.28 2 22.56 7.38 166.4928 6 9.82 1.46
11.28 4 45.12 7.38 332.9856 7 9.82 1.46
11.28 2 22.56 7.38 166.4928 8 9.82 1.46
11.28 4 45.12 7.38 332.9856 9 9.82 1.46
11.28 2 22.56 7.38 166.4928 10 9.82 1.46
11.28 4 45.12 7.38 332.9856 11 9.82 1.46
11.28 2 22.56 7.38 166.4928 12 9.82 1.46
11.28 4 45.12 7.38 332.9856 13 9.82 1.46
11.28 2 22.56 7.38 166.4928 14 9.82 1.46
11.28 4 45.12 7.38 332.9856 15 9.82 1.46
10.53 2 21.06 8.13 171.2178 16 9.82 1.46
14.25 4 57 12.29 700.53 17 13.67 1.32
8.05 2 16.1 18.49 297.689 18 13.67 0.14
4.49 4 17.96 22.05 396.018 19 13.67 -3.29
2.64 1 2.64 23.9 63.096 20 13.67 -7.08
Σ1 = 602.12 Σ2 = 5437.6566 Skala 1
L Gading 4.75
Awl 1032.6817
b 4.9760426

WL 6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
1.59 1 1.59 18.05 28.6995 0 10.05 -7.3
3.52 4 14.08 16.12 226.9696 1 10.05 -5.32
5.88 2 11.76 13.76 161.8176 2 10.05 -2.31
8.64 4 34.56 11 380.16 3 10.05 0.42
10.67 2 21.34 8.97 191.4198 4 10.05 0.71
10.76 4 43.04 8.88 382.1952 5 10.05 0.71
10.76 2 21.52 8.88 191.0976 6 10.05 0.71
10.76 4 43.04 8.88 382.1952 7 10.05 0.71
10.76 2 21.52 8.88 191.0976 8 10.05 0.71
10.76 4 43.04 8.88 382.1952 9 10.05 0.71
10.76 2 21.52 8.88 191.0976 10 10.05 0.71
10.76 4 43.04 8.88 382.1952 11 10.05 0.71
10.76 2 21.52 8.88 191.0976 12 10.05 0.71
10.76 4 43.04 8.88 382.1952 13 10.05 0.71
10.76 2 21.52 8.88 191.0976 14 10.05 0.71
10.76 4 43.04 8.88 382.1952 15 10.05 0.71
10.76 2 21.52 8.88 191.0976 16 10.05 0.71
10.76 4 43.04 8.88 382.1952 17 10.05 0.71
10.39 2 20.78 9.25 192.215 18 10.05 0.71
4.17 4 16.68 15.47 258.0396 19 10.05 -2.14
0 1 0 0 0 20
Σ1 = 551.19 Σ2 = 5261.2731 Skala 1
L Gading 4.75
Awl 924.84083
b 4.9141183

WL 6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 9.77 -9.2
1.07 4 4.28 18.01 77.0828 1 9.77 -6.96
3.61 2 7.22 15.47 111.6934 2 9.77 -3.95
6.82 4 27.28 12.26 334.4528 3 9.77 -0.28
9.46 2 18.92 9.62 182.0104 4 9.77 0
9.54 4 38.16 9.54 364.0464 5 9.77 0
9.54 2 19.08 9.54 182.0232 6 9.77 0
9.54 4 38.16 9.54 364.0464 7 9.77 0
9.54 2 19.08 9.54 182.0232 8 9.77 0
9.54 4 38.16 9.54 364.0464 9 9.77 0
9.54 2 19.08 9.54 182.0232 10 9.77 0
9.54 4 38.16 9.54 364.0464 11 9.77 0
9.54 2 19.08 9.54 182.0232 12 9.77 0
9.54 4 38.16 9.54 364.0464 13 9.77 0
9.54 2 19.08 9.54 182.0232 14 9.77 0
9.54 4 38.16 9.54 364.0464 15 9.77 0
9.54 2 19.08 9.54 182.0232 16 9.77 0
9.54 4 38.16 9.54 364.0464 17 9.77 0
9.19 2 18.38 9.89 181.7782 18 9.77 0
0 4 0 0 0 19 9.77 -5.02
0 1 0 0 0 20
Σ1 = 457.68 Σ2 = 4527.4816 Skala 1
L Gading 4.75
Awl 807.95917
b 5.1157131
WL 4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
3.56 4 14.24 1.68 23.9232 1 1.94 0.96
8.52 2 17.04 2.34 39.8736 2 4.23 2.88
12.51 4 50.04 2.65 132.606 3 6.49 4.57
15.46 2 30.92 2.14 66.1688 4 8.24 6.46
16.39 4 65.56 1.81 118.6636 5 8.73 7.24
17.22 2 34.44 1.46 50.2824 6 9.1 7.96
17.26 4 69.04 1.42 98.0368 7 9.1 8.15
17.26 2 34.52 1.42 49.0184 8 9.1 8.16
17.26 4 69.04 1.42 98.0368 9 9.1 8.16
17.26 2 34.52 1.42 49.0184 10 9.1 8.16
17.26 4 69.04 1.42 98.0368 11 9.1 8.16
17.26 2 34.52 1.42 49.0184 12 9.1 8.16
17.26 4 69.04 1.42 98.0368 13 9.1 8.16
17.26 2 34.52 1.42 49.0184 14 9.1 8.16
22.17 4 88.68 -1.97 -174.6996 15 9.58 11.73
19.4 2 38.8 -2.44 -94.672 16 7.88 10.36
15.06 4 60.24 -2.32 -139.7568 17 5.93 7.99
10.41 2 20.82 -2.03 -42.2646 18 3.83 5.5
5.17 4 20.68 -1.51 -31.2268 19 2.11 3
0 1 0 0 0 20 0.51 1.19
Σ1 = 855.7 Σ2 = 537.1186 Skala 1
L Gading 4.75
Awl 1313.945
b 0.1524394

WL 4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
4.18 4 16.72 3.72 62.1984 1 2.58 0.52
9.8 2 19.6 5.14 100.744 2 5.58 2.41
13.47 4 53.88 5.33 287.1804 3 8.23 4.03
16.1 2 32.2 4.32 139.104 4 9.51 5.79
17.1 4 68.4 3.82 261.288 5 9.8 6.51
17.89 2 35.78 3.13 111.9914 6 10.02 6.95
18.09 4 72.36 2.93 212.0148 7 10.02 7.11
18.09 2 36.18 2.93 106.0074 8 10.02 7.11
18.09 4 72.36 2.93 212.0148 9 10.02 7.11
18.09 2 36.18 2.93 106.0074 10 10.02 7.11
18.09 4 72.36 2.93 212.0148 11 10.02 7.11
18.09 2 36.18 2.93 106.0074 12 10.02 7.11
18.09 4 72.36 2.93 212.0148 13 10.02 7.11
18.09 2 36.18 2.93 106.0074 14 10.02 7.11
22.17 4 88.68 4.55 403.494 15 12.88 7.25
19.9 2 39.8 5.3 210.94 16 11.85 6.4
15.75 4 63 4.81 303.03 17 9.42 4.93
11.03 2 22.06 4.23 93.3138 18 6.68 3.19
5.59 4 22.36 3.19 71.3284 19 3.62 1.7
0 1 0 0 0 20 1.55 0.13
Σ1 = 896.64 Σ2 = 3316.7012 Skala 1
L Gading 4.75
Awl 1322.78
b 1.7555477

WL 4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
6.5 4 26 7.44 193.44 1 3.56 -0.07
12.14 2 24.28 8.86 215.1208 2 8.1 2.02
14.1 4 56.4 7.32 412.848 3 10.35 3.53
15.98 2 31.96 5.44 173.8624 4 11.17 4.52
16.76 4 67.04 4.66 312.4064 5 11.36 4.64
17.24 2 34.48 4.18 144.1264 6 11.36 4.64
17.38 4 69.52 4.04 280.8608 7 11.36 4.64
17.38 2 34.76 4.04 140.4304 8 11.36 4.64
17.38 4 69.52 4.04 280.8608 9 11.36 4.64
17.38 2 34.76 4.04 140.4304 10 11.36 4.64
17.38 4 69.52 4.04 280.8608 11 11.36 4.64
17.38 2 34.76 4.04 140.4304 12 11.36 4.64
17.38 4 69.52 4.04 280.8608 13 11.36 4.64
17.38 2 34.76 4.04 140.4304 14 11.36 4.64
22.04 4 88.16 8.4 740.544 15 14.46 4.57
20.71 2 41.42 8.65 358.283 16 13.78 4.57
16.99 4 67.96 7.87 534.8452 17 11.28 3.94
12.1 2 24.2 6.72 162.624 18 8.26 2.6
6.43 4 25.72 5.25 135.03 19 4.55 1.29
0 1 0 0 0 20 1.77 -0.38
Σ1 = 904.74 Σ2 = 5068.295 Skala 1
L Gading 4.75
Awl 1300.3442
b 3.4863247

WL 4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
8.83 4 35.32 11.27 398.0564 1 6.94 -0.41
11.09 2 22.18 9.01 199.8418 2 11.03 1.68
12.87 4 51.48 7.23 372.2004 3 11.03 2.84
14.44 2 28.88 5.66 163.4608 4 11.03 3.19
14.76 4 59.04 5.34 315.2736 5 11.03 3.19
14.83 2 29.66 5.27 156.3082 6 11.03 3.19
14.84 4 59.36 5.26 312.2336 7 11.03 3.19
14.84 2 29.68 5.26 156.1168 8 11.03 3.19
14.84 4 59.36 5.26 312.2336 9 11.03 3.19
14.84 2 29.68 5.26 156.1168 10 11.03 3.19
14.84 4 59.36 5.26 312.2336 11 11.03 3.19
14.84 2 29.68 5.26 156.1168 12 11.03 3.19
14.84 4 59.36 5.26 312.2336 13 11.03 3.19
14.84 2 29.68 5.26 156.1168 14 11.03 3.19
20.18 4 80.72 10.76 868.5472 15 16.46 3.14
20.09 2 40.18 10.85 435.953 16 16.32 3.14
19.15 4 76.6 11.79 903.114 17 14.03 3.03
13.84 2 27.68 9.76 270.1568 18 10.39 2.06
7.82 4 31.28 7.94 248.3632 19 6.08 0.89
0 1 0 0 0 20 1.78 -1.39
Σ1 = 839.18 Σ2 = 6204.677 Skala 1
L Gading 4.75
Awl 1267.9175
b 4.4411131

WL 4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
6.25 1 6.25 14.67 91.6875 0 0 0
8.35 4 33.4 12.57 419.838 1 10.26 -1
10.87 2 21.74 10.05 218.487 2 10.26 1.33
12.78 4 51.12 8.14 416.1168 3 10.26 2.14
13.76 2 27.52 7.16 197.0432 4 10.26 2.25
13.83 4 55.32 7.09 392.2188 5 10.26 2.25
13.83 2 27.66 7.09 196.1094 6 10.26 2.25
13.83 4 55.32 7.09 392.2188 7 10.26 2.25
13.83 2 27.66 7.09 196.1094 8 10.26 2.25
13.83 4 55.32 7.09 392.2188 9 10.26 2.25
13.83 2 27.66 7.09 196.1094 10 10.26 2.25
13.83 4 55.32 7.09 392.2188 11 10.26 2.25
13.83 2 27.66 7.09 196.1094 12 10.26 2.25
13.83 4 55.32 7.09 392.2188 13 10.26 2.25
13.83 2 27.66 7.09 196.1094 14 10.26 2.25
17.55 4 70.2 10.91 765.882 15 15.04 2.21
17.55 2 35.1 10.91 382.941 16 15.04 2.21
17.07 4 68.28 11.39 777.7092 17 15.04 2.21
15.65 2 31.3 12.81 400.953 18 13.65 2.21
9.95 4 39.8 11.65 463.67 19 8.64 1.56
0 1 0 0 0 20 0 0
Σ1 = 799.61 Σ2 = 7075.9687 Skala 1
L Gading 4.75
Awl 1195.67
b 4.6998641

WL 4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
4.99 1 4.99 14.85 74.1015 0 5.03 0
6.92 4 27.68 12.92 357.6256 1 10.69 -1.77
9.63 2 19.26 10.21 196.6446 2 10.69 0.94
11.65 4 46.6 8.19 381.654 3 10.69 1.52
12.23 2 24.46 7.61 186.1406 4 10.69 1.55
12.23 4 48.92 7.61 372.2812 5 10.69 1.55
12.23 2 24.46 7.61 186.1406 6 10.69 1.55
12.23 4 48.92 7.61 372.2812 7 10.69 1.55
12.23 2 24.46 7.61 186.1406 8 10.69 1.55
12.23 4 48.92 7.61 372.2812 9 10.69 1.55
12.23 2 24.46 7.61 186.1406 10 10.69 1.55
12.23 4 48.92 7.61 372.2812 11 10.69 1.55
12.23 2 24.46 7.61 186.1406 12 10.69 1.55
12.23 4 48.92 7.61 372.2812 13 10.69 1.55
12.23 2 24.46 7.61 186.1406 14 10.69 1.55
12.23 4 48.92 7.61 372.2812 15 10.69 1.55
12.23 2 24.46 7.61 186.1406 16 10.69 1.55
12.2 4 48.8 7.64 372.832 17 10.69 1.55
15.97 2 31.94 11.41 364.4354 18 14.22 1.09
15.74 4 62.96 11.64 732.8544 19 12.72 0.04
12.05 1 12.05 10.47 126.1635 20 0 0
Σ1 = 719.02 Σ2 = 6142.9824 Skala 1
L Gading 4.75
Awl 1121.8708
b 4.8637644

WL 4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
3.89 1 3.89 15.75 61.2675 0 10.33 -5.42
5.76 4 23.04 13.88 319.7952 1 10.33 -5.81
8.68 2 17.36 10.96 190.2656 2 10.33 0.51
10.9 4 43.6 8.74 381.064 3 10.33 0.98
11.28 2 22.56 8.36 188.6016 4 10.33 0.98
11.28 4 45.12 8.36 377.2032 5 10.33 0.98
11.28 2 22.56 8.36 188.6016 6 10.33 0.98
11.28 4 45.12 8.36 377.2032 7 10.33 0.98
11.28 2 22.56 8.36 188.6016 8 10.33 0.98
11.28 4 45.12 8.36 377.2032 9 10.33 0.98
11.28 2 22.56 8.36 188.6016 10 10.33 0.98
11.28 4 45.12 8.36 377.2032 11 10.33 0.98
11.28 2 22.56 8.36 188.6016 12 10.33 0.98
11.28 4 45.12 8.36 377.2032 13 10.33 0.98
11.28 2 22.56 8.36 188.6016 14 10.33 0.98
11.28 4 45.12 8.36 377.2032 15 10.33 0.98
11.28 2 22.56 8.36 188.6016 16 10.33 0.98
14.99 4 59.96 12.35 740.506 17 13.94 0.98
13.81 2 27.62 13.53 373.6986 18 13.94 0.43
10.38 4 41.52 16.96 704.1792 19 13.94 -0.45
6.59 1 6.59 20.75 136.7425 20 13.94 -6.1
Σ1 = 652.22 Σ2 = 6490.949 Skala 1
L Gading 4.75
Awl 1060.6908
b 5.3132559

WL 4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
2.75 1 2.75 17.35 47.7125 0 10.29 -6.37
4.73 4 18.92 15.37 290.8004 1 10.29 -4.1
7.74 2 15.48 12.36 191.3328 2 10.29 0.07
10.47 4 41.88 9.63 403.3044 3 10.29 0.47
10.76 2 21.52 9.34 200.9968 4 10.29 0.47
10.76 4 43.04 9.34 401.9936 5 10.29 0.47
10.76 2 21.52 9.34 200.9968 6 10.29 0.47
10.76 4 43.04 9.34 401.9936 7 10.29 0.47
10.76 2 21.52 9.34 200.9968 8 10.29 0.47
10.76 4 43.04 9.34 401.9936 9 10.29 0.47
10.76 2 21.52 9.34 200.9968 10 10.29 0.47
10.76 4 43.04 9.34 401.9936 11 10.29 0.47
10.76 2 21.52 9.34 200.9968 12 10.29 0.47
10.76 4 43.04 9.34 401.9936 13 10.29 0.47
10.76 2 21.52 9.34 200.9968 14 10.29 0.47
10.76 4 43.04 9.34 401.9936 15 10.29 0.47
10.76 2 21.52 9.34 200.9968 16 10.29 0.47
10.76 4 43.04 9.34 401.9936 17 10.29 0.47
10.76 2 21.52 9.34 200.9968 18 10.29 0.47
7.91 4 31.64 12.19 385.6916 19 10.29 0.17
0 1 0 0 0 20
Σ1 = 584.11 Σ2 = 5740.7713 Skala 1
L Gading 4.75
Awl 962.22333
b 5.0423027

WL 4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0.57 1 0.57 18.97 10.8129 0 10.6 -7.87
2.81 4 11.24 16.73 188.0452 1 10.6 -5.54
5.82 2 11.64 13.72 159.7008 2 10.6 -0.42
9.49 4 37.96 10.05 381.498 3 10.6 0
9.77 2 19.54 9.77 190.9058 4 10.6 0
9.77 4 39.08 9.77 381.8116 5 10.6 0
9.77 2 19.54 9.77 190.9058 6 10.6 0
9.77 4 39.08 9.77 381.8116 7 10.6 0
9.77 2 19.54 9.77 190.9058 8 10.6 0
9.77 4 39.08 9.77 381.8116 9 10.6 0
9.77 2 19.54 9.77 190.9058 10 10.6 0
9.77 4 39.08 9.77 381.8116 11 10.6 0
9.77 2 19.54 9.77 190.9058 12 10.6 0
9.77 4 39.08 9.77 381.8116 13 10.6 0
9.77 2 19.54 9.77 190.9058 14 10.6 0
9.77 4 39.08 9.77 381.8116 15 10.6 0
9.77 2 19.54 9.77 190.9058 16 10.6 0
9.77 4 39.08 9.77 381.8116 17 10.6 0
9.77 2 19.54 9.77 190.9058 18 10.6 0
4.75 4 19 14.79 281.01 19 10.6 -0.3
0 1 0 0 0 20
Σ1 = 510.29 Σ2 = 5220.9945 Skala 1
L Gading 4.75
Awl 939.43917
b 5.4302192
WL 2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
2.9 4 11.6 0.98 11.368 1 1.66 1.19
7.11 2 14.22 1.35 19.197 2 3.54 2.78
11.06 4 44.24 1.92 84.9408 3 5.47 4.25
14.7 2 29.4 1.78 52.332 4 7.55 5.89
15.97 4 63.88 1.49 95.1812 5 8.24 6.62
17.06 2 34.12 1.14 38.8968 6 8.83 7.09
17.25 4 69 0.95 65.55 7 8.87 7.31
17.26 2 34.52 0.94 32.4488 8 8.87 7.31
17.26 4 69.04 0.94 64.8976 9 8.87 7.31
17.26 2 34.52 0.94 32.4488 10 8.87 7.31
17.26 4 69.04 0.94 64.8976 11 8.87 7.31
17.26 2 34.52 0.94 32.4488 12 8.87 7.31
17.26 4 69.04 0.94 64.8976 13 8.87 7.31
17.26 2 34.52 0.94 32.4488 14 8.87 7.31
21.31 4 85.24 -2.15 -183.266 15 7.49 11.32
18.24 2 36.48 -2.48 -90.4704 16 6.46 9.65
13.92 4 55.68 -2.06 -114.7008 17 4.87 7.2
9.33 2 18.66 -1.67 -31.1622 18 3.16 4.62
5.11 4 20.44 -0.89 -18.1916 19 1.9 2.74
1.7 1 1.7 -0.68 -1.156 20 1.36 1.79
Σ1 = 829.86 Σ2 = 253.0068 Skala 1
L Gading 4.75
Awl 1207.1492
b 0.2107701

WL 2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
3.1 4 12.4 2.06 25.544 1 1.98 0.99
7.99 2 15.98 3.17 50.6566 2 4.16 2.39
12.26 4 49.04 4.2 205.968 3 6.65 3.33
15.3 2 30.6 3.72 113.832 4 8.67 3.68
16.31 4 65.24 3.29 214.6396 5 9.17 3.68
16.97 2 33.94 3.07 104.1958 6 9.53 3.68
17.13 4 68.52 2.91 199.3932 7 9.53 3.68
17.13 2 34.26 2.91 99.6966 8 9.53 3.68
17.13 4 68.52 2.91 199.3932 9 9.53 3.68
17.13 2 34.26 2.91 99.6966 10 9.53 3.68
17.13 4 68.52 2.91 199.3932 11 9.53 3.68
17.13 2 34.26 2.91 99.6966 12 9.53 3.68
17.13 4 68.52 2.91 199.3932 13 9.53 3.68
17.13 2 34.26 2.91 99.6966 14 9.53 3.68
20.13 4 80.52 5.63 453.3276 15 12.36 3.63
18.25 2 36.5 5.45 198.925 16 11.01 3.63
14.35 4 57.4 4.49 257.726 17 8.42 3.54
9.87 2 19.74 3.49 68.8926 18 5.59 2.52
5.32 4 21.28 1.92 40.8576 19 3.19 1.53
1.68 1 1.68 1.42 2.3856 20 1.98 1.12
Σ1 = 835.44 Σ2 = 2933.3096 Skala 1
L Gading 4.75
Awl 1050.9217
b 2.7675605

WL 2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
3.49 4 13.96 3.63 50.6748 1 2.4 0.79
10.12 2 20.24 6.08 123.0592 2 5.34 1.92
13.88 4 55.52 6.82 378.6464 3 8.73 2.32
15.69 2 31.38 6.65 208.677 4 10.09 2.32
16 4 64 6.72 430.08 5 10.4 2.32
16 2 32 6.72 215.04 6 10.59 2.32
16 4 64 6.72 430.08 7 10.59 2.32
16 2 32 6.72 215.04 8 10.59 2.32
16 4 64 6.72 430.08 9 10.59 2.32
16 2 32 6.72 215.04 10 10.59 2.32
16 4 64 6.72 430.08 11 10.59 2.32
16 2 32 6.72 215.04 12 10.59 2.32
16 4 64 6.72 430.08 13 10.59 2.32
16 2 32 6.72 215.04 14 10.59 2.32
19.03 4 76.12 9.89 752.8268 15 13.69 2.28
18.35 2 36.7 9.21 338.007 16 12.78 2.28
15.22 4 60.88 7.34 446.8592 17 10.08 2.28
10.86 2 21.72 5.66 122.9352 18 6.91 1.97
5.84 4 23.36 3.26 76.1536 19 3.66 1.2
1.39 1 1.39 2.15 2.9885 20 2.15 0.89
Σ1 = 821.27 Σ2 = 5726.4277 Skala 1
L Gading 4.75
Awl 1055.3233
b 3.9785333

WL 2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
6.53 4 26.12 7.35 191.982 1 8.83 0.59
12.71 2 25.42 9.35 237.677 2 11.49 1.48
13.87 4 55.48 8.19 454.3812 3 12 1.6
14.22 2 28.44 7.84 222.9696 4 12 1.6
14.22 4 56.88 7.84 445.9392 5 12 1.6
14.22 2 28.44 7.84 222.9696 6 12 1.6
14.22 4 56.88 7.84 445.9392 7 12 1.6
14.22 2 28.44 7.84 222.9696 8 12 1.6
14.22 4 56.88 7.84 445.9392 9 12 1.6
14.22 2 28.44 7.84 222.9696 10 12 1.6
14.22 4 56.88 7.84 445.9392 11 12 1.6
14.22 2 28.44 7.84 222.9696 12 12 1.6
14.22 4 56.88 7.84 445.9392 13 12 1.6
14.22 2 28.44 7.84 222.9696 14 12 1.6
19.6 4 78.4 13.32 1044.288 15 15.73 1.57
19.46 2 38.92 13.18 512.9656 16 15.12 1.57
17.06 4 68.24 11 750.64 17 12.41 1.57
12.45 2 24.9 8.33 207.417 18 8.79 1.49
6.97 4 27.88 5.19 144.6972 19 4.39 0.92
0.39 1 0.39 3.17 1.2363 20 2.35 0.65
Σ1 = 800.79 Σ2 = 7112.7979 Skala 1
L Gading 4.75
Awl 1197.8233
b 5.2405866

WL 2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
9.26 4 37.04 11.26 417.0704 1 11.33 0.38
11.59 2 23.18 8.93 206.9974 2 11.33 1.09
12.4 4 49.6 8.12 402.752 3 11.33 1.12
12.51 2 25.02 8.01 200.4102 4 11.33 1.12
12.51 4 50.04 8.01 400.8204 5 11.33 1.12
12.51 2 25.02 8.01 200.4102 6 11.33 1.12
12.51 4 50.04 8.01 400.8204 7 11.33 1.12
12.51 2 25.02 8.01 200.4102 8 11.33 1.12
12.51 4 50.04 8.01 400.8204 9 11.33 1.12
12.51 2 25.02 8.01 200.4102 10 11.33 1.12
12.51 4 50.04 8.01 400.8204 11 11.33 1.12
12.51 2 25.02 8.01 200.4102 12 11.33 1.12
12.51 4 50.04 8.01 400.8204 13 11.33 1.12
12.51 2 25.02 8.01 200.4102 14 11.33 1.12
17.25 4 69 12.83 885.27 15 15.86 1.11
17.25 2 34.5 12.83 442.635 16 15.86 1.11
17.25 4 69 12.83 885.27 17 15.86 1.11
15.86 2 31.72 11.44 362.8768 18 11.56 1.1
10.2 4 40.8 7.08 288.864 19 5.96 0.67
0 1 0 0 0 20 2.62 0.42
Σ1 = 755.16 Σ2 = 7098.2988 Skala 1
L Gading 4.75
Awl 1178.7283
b 5.5464918

WL 2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
5.03 1 5.03 5.03 25.3009 0 9.17
8.92 4 35.68 12.46 444.5728 1 10.47 0.17
11.63 2 23.26 9.75 226.785 2 10.47 0.77
12.21 4 48.84 9.17 447.8628 3 10.47 0.77
12.24 2 24.48 9.14 223.7472 4 10.47 0.77
12.24 4 48.96 9.14 447.4944 5 10.47 0.77
12.24 2 24.48 9.14 223.7472 6 10.47 0.77
12.24 4 48.96 9.14 447.4944 7 10.47 0.77
12.24 2 24.48 9.14 223.7472 8 10.47 0.77
12.24 4 48.96 9.14 447.4944 9 10.47 0.77
12.24 2 24.48 9.14 223.7472 10 10.47 0.77
12.24 4 48.96 9.14 447.4944 11 10.47 0.77
12.24 2 24.48 9.14 223.7472 12 10.47 0.77
12.24 4 48.96 9.14 447.4944 13 10.47 0.77
12.24 2 24.48 9.14 223.7472 14 10.47 0.77
12.24 4 48.96 9.14 447.4944 15 14.74 0.77
12.24 2 24.48 9.14 223.7472 16 14.74 0.77
12.24 4 48.96 9.14 447.4944 17 14.74 0.77
15.31 2 30.62 13.13 402.0406 18 14.74 0.77
12.76 4 51.04 12.68 647.1872 19 9.58 0.76
0 1 0 0 0 20 2.89 0.44
Σ1 = 708.55 Σ2 = 6892.4405 Skala 1
L Gading 4.75
Awl 1123.6283
b 5.3818526

WL 2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
4.91 1 4.91 15.75 77.3325 0 10.79 -0.06
4.52 4 18.08 16.14 291.8112 1 10.79 0.49
10.84 2 21.68 9.82 212.8976 2 10.79 0.49
11.31 4 45.24 9.35 422.994 3 10.79 0.49
11.31 2 22.62 9.35 211.497 4 10.79 0.49
11.31 4 45.24 9.35 422.994 5 10.79 0.49
11.31 2 22.62 9.35 211.497 6 10.79 0.49
11.31 4 45.24 9.35 422.994 7 10.79 0.49
11.31 2 22.62 9.35 211.497 8 10.79 0.49
11.31 4 45.24 9.35 422.994 9 10.79 0.49
11.31 2 22.62 9.35 211.497 10 10.79 0.49
11.31 4 45.24 9.35 422.994 11 10.79 0.49
11.31 2 22.62 9.35 211.497 12 10.79 0.49
11.31 4 45.24 9.35 422.994 13 10.79 0.49
11.31 2 22.62 9.35 211.497 14 10.79 0.49
11.31 4 45.24 9.35 422.994 15 10.79 0.49
11.31 2 22.62 9.35 211.497 16 10.79 0.49
14.92 4 59.68 12.96 773.4528 17 14.21 0.49
14.37 2 28.74 13.51 388.2774 18 14.21 0.48
13.49 4 53.96 14.39 776.4844 19 14.21 0.21
7.84 1 7.84 20.04 157.1136 20 2.89 -0.04
Σ1 = 669.91 Σ2 = 7118.8065 Skala 1
L Gading 4.75
Awl 1109.7267
b 5.5068246

WL 2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
3.92 1 3.92 16.66 65.3072 0 10.53 -5.64
6.19 4 24.76 14.39 356.2964 1 10.53 -0.33
10.36 2 20.72 10.22 211.7584 2 10.53 0.24
10.76 4 43.04 9.82 422.6528 3 10.53 0.24
10.76 2 21.52 9.82 211.3264 4 10.53 0.24
10.76 4 43.04 9.82 422.6528 5 10.53 0.24
10.76 2 21.52 9.82 211.3264 6 10.53 0.24
10.76 4 43.04 9.82 422.6528 7 10.53 0.24
10.76 2 21.52 9.82 211.3264 8 10.53 0.24
10.76 4 43.04 9.82 422.6528 9 10.53 0.24
10.76 2 21.52 9.82 211.3264 10 10.53 0.24
10.76 4 43.04 9.82 422.6528 11 10.53 0.24
10.76 2 21.52 9.82 211.3264 12 10.53 0.24
10.76 4 43.04 9.82 422.6528 13 10.53 0.24
10.76 2 21.52 9.82 211.3264 14 10.53 0.24
10.76 4 43.04 9.82 422.6528 15 10.53 0.24
10.76 2 21.52 9.82 211.3264 16 10.53 0.24
10.76 4 43.04 9.82 422.6528 17 10.53 0.24
10.76 2 21.52 9.82 211.3264 18 10.53 0.24
10.46 4 41.84 10.12 423.4208 19 10.53 0.24
0 1 0 0 0 20 10.53 -0.66
Σ1 = 607.72 Σ2 = 6128.6164 Skala 1
L Gading 4.75
Awl 1008.805
b 5.1927856

WL 2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
2.73 1 2.73 18.47 50.4231 0 10.6 -6.56
5.06 4 20.24 16.14 326.6736 1 10.6 -0.72
10.18 2 20.36 11.02 224.3672 2 10.6 0
10.6 4 42.4 10.6 449.44 3 10.6 0
10.6 2 21.2 10.6 224.72 4 10.6 0
10.6 4 42.4 10.6 449.44 5 10.6 0
10.6 2 21.2 10.6 224.72 6 10.6 0
10.6 4 42.4 10.6 449.44 7 10.6 0
10.6 2 21.2 10.6 224.72 8 10.6 0
10.6 4 42.4 10.6 449.44 9 10.6 0
10.6 2 21.2 10.6 224.72 10 10.6 0
10.6 4 42.4 10.6 449.44 11 10.6 0
10.6 2 21.2 10.6 224.72 12 10.6 0
10.6 4 42.4 10.6 449.44 13 10.6 0
10.6 2 21.2 10.6 224.72 14 10.6 0
10.6 4 42.4 10.6 449.44 15 10.6 0
10.6 2 21.2 10.6 224.72 16 10.6 0
10.6 4 42.4 10.6 449.44 17 10.6 0
10.6 2 21.2 10.6 224.72 18 10.6 0
10.3 4 41.2 10.9 449.08 19 10.6 0
0 1 0 0 0 20 10.6 0
Σ1 = 593.33 Σ2 = 6443.8239 Skala 1
L Gading 4.75
Awl 992.05333
b 5.343856
WL 0
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
2.85 4 11.4 0.47 5.358 1 0.87 0
6.32 2 12.64 0.76 9.6064 2 2.79 0
9.72 4 38.88 1.22 47.4336 3 4.64 0
13.44 2 26.88 1.66 44.6208 4 6.82 0
14.86 4 59.44 1.62 96.2928 5 7.69 0
15.92 2 31.84 1.74 55.4016 6 8.47 0
16.18 4 64.72 1.56 100.9632 7 8.63 0
16.18 2 32.36 1.56 50.4816 8 8.63 0
16.18 4 64.72 1.56 100.9632 9 8.63 0
16.18 2 32.36 1.56 50.4816 10 8.63 0
16.18 4 64.72 1.56 100.9632 11 8.63 0
16.18 2 32.36 1.56 50.4816 12 8.63 0
16.18 4 64.72 1.56 100.9632 13 8.63 0
16.18 2 32.36 1.56 50.4816 14 8.63 0
18.81 4 75.24 -3.83 -288.1692 15 0 0
16.11 2 32.22 -3.19 -102.7818 16 0 0
12.07 4 48.28 -2.33 -112.4924 17 0 0
7.78 2 15.56 -1.46 -22.7176 18 0 0
4.64 4 18.56 -0.84 -15.5904 19 0 0
3.15 1 3.15 -0.43 -1.3545 20 0 0
762.41 Σ2 = 321.3865 Skala 1
L Gading 4.75
Awl 468.79333
b 3.994209

WL 0
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
2.97 4 11.88 0.99 11.7612 1 1.25 0
6.55 2 13.1 1.77 23.187 2 3.24 0
9.98 4 39.92 3.32 132.5344 3 5.27 0
12.35 2 24.7 4.99 123.253 4 7.66 0
12.85 4 51.4 5.49 282.186 5 8.42 0
13.21 2 26.42 5.85 154.557 6 9.02 0
13.21 4 52.84 5.85 309.114 7 9.05 0
13.21 2 26.42 5.85 154.557 8 9.05 0
13.21 4 52.84 5.85 309.114 9 9.05 0
13.21 2 26.42 5.85 154.557 10 9.05 0
13.21 4 52.84 5.85 309.114 11 9.05 0
13.21 2 26.42 5.85 154.557 12 9.05 0
13.21 4 52.84 5.85 309.114 13 9.05 0
13.21 2 26.42 5.85 154.557 14 9.05 0
15.99 4 63.96 8.73 558.3708 15 11.73 0
14.64 2 29.28 7.38 216.0864 16 10.06 0
11.96 4 47.84 4.88 233.4592 17 7.27 0
8.11 2 16.22 3.07 49.7954 18 4.17 0
4.72 4 18.88 1.66 31.3408 19 1.96 0
3.1 1 3.1 0.86 2.666 20 1.14 -0.81
Σ1 = 663.74 Σ2 = 3673.8812 Skala 1
L Gading 4.75
Awl 679.93083
b 4.2878147

WL 0
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
3.19 4 12.76 1.61 20.5436 1 1.57 0
7.26 2 14.52 3.42 49.6584 2 3.73 0
11.05 4 44.2 6.41 283.322 3 6.5 0
12.41 2 24.82 7.77 192.8514 4 8.94 0
12.72 4 50.88 8.08 411.1104 5 9.43 0
12.91 2 25.82 8.27 213.5314 6 9.81 0
12.91 4 51.64 8.27 427.0628 7 9.81 0
12.91 2 25.82 8.27 213.5314 8 9.81 0
12.91 4 51.64 8.27 427.0628 9 9.81 0
12.91 2 25.82 8.27 213.5314 10 9.81 0
12.91 4 51.64 8.27 427.0628 11 9.81 0
12.91 2 25.82 8.27 213.5314 12 9.81 0
12.91 4 51.64 8.27 427.0628 13 9.81 0
12.91 2 25.82 8.27 213.5314 14 9.81 0
15.97 4 63.88 11.41 728.8708 15 12.93 0
15.06 2 30.12 10.5 316.26 16 11.63 0
12.36 4 49.44 7.8 385.632 17 8.71 0
8.88 2 17.76 4.94 87.7344 18 5.3 0
4.86 4 19.44 2.46 47.8224 19 2.69 0
3.04 1 3.04 1.26 3.8304 20 1.75 -0.4
Σ1 = 666.52 Σ2 = 5303.544 Skala 1
L Gading 4.75
Awl 764.63917
b 4.7161157

WL 0
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
9.42 4 37.68 8.24 310.4832 1 1.83 0
12.97 2 25.94 10.01 259.6594 2 4.65 0
13.6 4 54.4 10.4 565.76 3 9.27 0
13.6 2 27.2 10.4 282.88 4 10.64 0
13.6 4 54.4 10.4 565.76 5 10.98 0
13.6 2 27.2 10.4 282.88 6 11.1 0
13.6 4 54.4 10.4 565.76 7 11.1 0
13.6 2 27.2 10.4 282.88 8 11.1 0
13.6 4 54.4 10.4 565.76 9 11.1 0
13.6 2 27.2 10.4 282.88 10 11.1 0
13.6 4 54.4 10.4 565.76 11 11.1 0
13.6 2 27.2 10.4 282.88 12 11.1 0
13.6 4 54.4 10.4 565.76 13 11.1 0
13.6 2 27.2 10.4 282.88 14 11.1 0
17.3 4 69.2 14.16 979.872 15 14.62 0
16.69 2 33.38 13.55 452.299 16 13.82 0
13.98 4 55.92 10.84 606.1728 17 10.75 0
10.28 2 20.56 7.3 150.088 18 6.88 0
5.31 4 21.24 3.47 73.7028 19 3.3 0
3 1 3 1.7 5.1 20 2.06 -0.29
Σ1 = 756.52 Σ2 = 7929.2172 Skala 1
L Gading 4.75
Awl 895.1375
b 5.442729

WL 0
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
11.71 4 46.84 10.95 512.898 1 2.18 0
12.42 2 24.84 10.24 254.3616 2 10.3 0
12.45 4 49.8 10.21 508.458 3 11.51 0
12.45 2 24.9 10.21 254.229 4 11.51 0
12.45 4 49.8 10.21 508.458 5 11.51 0
12.45 2 24.9 10.21 254.229 6 11.51 0
12.45 4 49.8 10.21 508.458 7 11.51 0
12.45 2 24.9 10.21 254.229 8 11.51 0
12.45 4 49.8 10.21 508.458 9 11.51 0
12.45 2 24.9 10.21 254.229 10 11.51 0
12.45 4 49.8 10.21 508.458 11 11.51 0
12.45 2 24.9 10.21 254.229 12 11.51 0
12.45 4 49.8 10.21 508.458 13 11.51 0
12.45 2 24.9 10.21 254.229 14 11.51 0
16.97 4 67.88 14.75 1001.23 15 16.55 0
16.97 2 33.94 14.75 500.615 16 16.55 0
16.97 4 67.88 14.75 1001.23 17 13.98 0
12.66 2 25.32 10.46 264.8472 18 9.3 0
6.63 4 26.52 5.29 140.2908 19 3.9 0
3.04 1 3.04 2.2 6.688 20 2.3 -0.23
Σ1 = 744.46 Σ2 = 8258.2826 Skala 1
L Gading 4.75
Awl 1005.6858
b 6.033587

WL 0
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
9.17 1 9.17 9.17 84.0889 0 0 0
10.64 4 42.56 10.3 438.368 1 8.03 0
11.24 2 22.48 9.7 218.056 2 11.02 0
11.24 4 44.96 9.7 436.112 3 11.02 0
11.24 2 22.48 9.7 218.056 4 11.02 0
11.24 4 44.96 9.7 436.112 5 11.02 0
11.24 2 22.48 9.7 218.056 6 11.02 0
11.24 4 44.96 9.7 436.112 7 11.02 0
11.24 2 22.48 9.7 218.056 8 11.02 0
11.24 4 44.96 9.7 436.112 9 11.02 0
11.24 2 22.48 9.7 218.056 10 11.02 0
11.24 4 44.96 9.7 436.112 11 11.02 0
11.24 2 22.48 9.7 218.056 12 11.02 0
11.24 4 44.96 9.7 436.112 13 11.02 0
11.24 2 22.48 9.7 218.056 14 11.02 0
15.51 4 62.04 13.97 866.6988 15 15.27 0
15.51 2 31.02 13.97 433.3494 16 15.27 0
15.51 4 62.04 13.97 866.6988 17 15.27 0
15.51 2 31.02 13.97 433.3494 18 13.35 0
10.34 4 41.36 8.82 364.7952 19 5.22 0
3.33 1 3.33 2.45 8.1585 20 2.49 -0.2
Σ1 = 709.66 Σ2 = 7638.571 Skala 1
L Gading 4.75
Awl 1034.6292
b 5.8734306

WL 0
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
10.73 1 10.73 10.85 116.4205 0 11.03 0
11.28 4 45.12 10.3 464.736 1 11.03 0
11.28 2 22.56 10.3 232.368 2 11.03 0
11.28 4 45.12 10.3 464.736 3 11.03 0
11.28 2 22.56 10.3 232.368 4 11.03 0
11.28 4 45.12 10.3 464.736 5 11.03 0
11.28 2 22.56 10.3 232.368 6 11.03 0
11.28 4 45.12 10.3 464.736 7 11.03 0
11.28 2 22.56 10.3 232.368 8 11.03 0
11.28 4 45.12 10.3 464.736 9 11.03 0
11.28 2 22.56 10.3 232.368 10 11.03 0
11.28 4 45.12 10.3 464.736 11 11.03 0
11.28 2 22.56 10.3 232.368 12 11.03 0
11.28 4 45.12 10.3 464.736 13 11.03 0
11.28 2 22.56 10.3 232.368 14 11.03 0
11.28 4 45.12 10.3 464.736 15 11.03 0
11.28 2 22.56 10.3 232.368 16 11.03 0
14.7 4 58.8 13.72 806.736 17 14.47 0
14.69 2 29.38 13.73 403.3874 18 14.47 0
14.42 4 57.68 14 807.52 19 11.39 0
2.85 1 2.85 2.93 8.3505 20 2.71 -0.18
Σ1 = 700.88 Σ2 = 7719.2464 Skala 1
L Gading 4.75
Awl 1069.3517
b 5.7330019

WL 0
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
4.89 1 4.89 16.17 79.0713 0 10.77 -6.47
10.2 4 40.8 10.86 443.088 1 10.77 0
10.77 2 21.54 10.29 221.6466 2 10.77 0
10.77 4 43.08 10.29 443.2932 3 10.77 0
10.77 2 21.54 10.29 221.6466 4 10.77 0
10.77 4 43.08 10.29 443.2932 5 10.77 0
10.77 2 21.54 10.29 221.6466 6 10.77 0
10.77 4 43.08 10.29 443.2932 7 10.77 0
10.77 2 21.54 10.29 221.6466 8 10.77 0
10.77 4 43.08 10.29 443.2932 9 10.77 0
10.77 2 21.54 10.29 221.6466 10 10.77 0
10.77 4 43.08 10.29 443.2932 11 10.77 0
10.77 2 21.54 10.29 221.6466 12 10.77 0
10.77 4 43.08 10.29 443.2932 13 10.77 0
10.77 2 21.54 10.29 221.6466 14 10.77 0
10.77 4 43.08 10.29 443.2932 15 10.77 0
10.77 2 21.54 10.29 221.6466 16 10.77 0
10.77 4 43.08 10.29 443.2932 17 10.77 0
10.77 2 21.54 10.29 221.6466 18 10.77 0
10.77 4 43.08 10.29 443.2932 19 10.77 0
9.87 1 9.87 11.19 110.4453 20 10.77 -0.24
Σ1 = 637.14 Σ2 = 6617.0628 Skala 1
L Gading 4.75
Awl 1012.5258
b 5.4087284

WL 0
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
4.04 1 4.04 17.16 69.3264 0 10.6 -5.58
9.88 4 39.52 11.32 447.3664 1 10.6 0
10.6 2 21.2 10.6 224.72 2 10.6 0
10.6 4 42.4 10.6 449.44 3 10.6 0
10.6 2 21.2 10.6 224.72 4 10.6 0
10.6 4 42.4 10.6 449.44 5 10.6 0
10.6 2 21.2 10.6 224.72 6 10.6 0
10.6 4 42.4 10.6 449.44 7 10.6 0
10.6 2 21.2 10.6 224.72 8 10.6 0
10.6 4 42.4 10.6 449.44 9 10.6 0
10.6 2 21.2 10.6 224.72 10 10.6 0
10.6 4 42.4 10.6 449.44 11 10.6 0
10.6 2 21.2 10.6 224.72 12 10.6 0
10.6 4 42.4 10.6 449.44 13 10.6 0
10.6 2 21.2 10.6 224.72 14 10.6 0
10.6 4 42.4 10.6 449.44 15 10.6 0
10.6 2 21.2 10.6 224.72 16 10.6 0
10.6 4 42.4 10.6 449.44 17 10.6 0
10.6 2 21.2 10.6 224.72 18 10.6 0
10.6 4 42.4 10.6 449.44 19 10.6 0
10.6 1 10.6 10.6 112.36 20 10.6 -0.24
Σ1 = 626.56 Σ2 = 6696.4928 Skala 1
L Gading 4.75
Awl 997.785
b 5.3241978
WL -2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0.87 4 3.48 0.87 3.0276 1 0 0
2.79 2 5.58 2.79 15.5682 2 0 0
4.64 4 18.56 4.64 86.1184 3 0 0
6.82 2 13.64 6.82 93.0248 4 0 0
7.69 4 30.76 7.69 236.5444 5 0 0
8.47 2 16.94 8.47 143.4818 6 0 0
8.63 4 34.52 8.63 297.9076 7 0 0
8.63 2 17.26 8.63 148.9538 8 0 0
8.63 4 34.52 8.63 297.9076 9 0 0
8.63 2 17.26 8.63 148.9538 10 0 0
8.63 4 34.52 8.63 297.9076 11 0 0
8.63 2 17.26 8.63 148.9538 12 0 0
8.63 4 34.52 8.63 297.9076 13 0 0
8.63 2 17.26 8.63 148.9538 14 0 0
0 4 0 0 0 15 0 0
0 2 0 0 0 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 296.08 Σ2 = 2365.2108 Skala 1
L Gading 4.75
Awl 0
b 0

WL -2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
1.25 4 5 1.25 6.25 1 0 0
3.24 2 6.48 3.24 20.9952 2 0 0
5.27 4 21.08 5.27 111.0916 3 0 0
7.66 2 15.32 7.66 117.3512 4 6.58 0
8.42 4 33.68 8.42 283.5856 5 7.58 0
9.02 2 18.04 9.02 162.7208 6 8.41 0
9.05 4 36.2 9.05 327.61 7 8.56 0
9.05 2 18.1 9.05 163.805 8 8.56 0
9.05 4 36.2 9.05 327.61 9 8.56 0
9.05 2 18.1 9.05 163.805 10 8.56 0
9.05 4 36.2 9.05 327.61 11 8.56 0
9.05 2 18.1 9.05 163.805 12 8.56 0
9.05 4 36.2 9.05 327.61 13 8.56 0
9.05 2 18.1 9.05 163.805 14 8.56 0
11.73 4 46.92 11.73 550.3716 15 11.44 0
10.06 2 20.12 10.06 202.4072 16 10.96 0
7.27 4 29.08 7.27 211.4116 17 8.71 0
4.17 2 8.34 4.17 34.7778 18 4.61 0
1.96 4 7.84 1.96 15.3664 19 0 0
0.33 1 0.33 1.95 0.6435 20 0 0
Σ1 = 429.43 Σ2 = 3682.6325 Skala 1
L Gading 4.75
Awl 597.67667
b 4.4057158

WL -2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
1.57 4 6.28 1.57 9.8596 1 0 0
3.73 2 7.46 3.73 27.8258 2 0 0
6.5 4 26 6.5 169 3 4.67 -2.32
8.94 2 17.88 8.94 159.8472 4 7.53 -2.32
9.43 4 37.72 9.43 355.6996 5 8.41 -2.32
9.81 2 19.62 9.81 192.4722 6 9.02 -2.32
9.81 4 39.24 9.81 384.9444 7 9.04 -2.32
9.81 2 19.62 9.81 192.4722 8 9.04 -2.32
9.81 4 39.24 9.81 384.9444 9 9.04 -2.32
9.81 2 19.62 9.81 192.4722 10 9.04 -2.32
9.81 4 39.24 9.81 384.9444 11 9.04 -2.32
9.81 2 19.62 9.81 192.4722 12 9.04 -2.32
9.81 4 39.24 9.81 384.9444 13 9.04 -2.32
9.81 2 19.62 9.81 192.4722 14 9.04 -2.32
12.93 4 51.72 12.93 668.7396 15 12.08 -2.29
11.63 2 23.26 11.63 270.5138 16 10.38 -2.29
8.71 4 34.84 8.71 303.4564 17 7.08 -2.29
5.3 2 10.6 5.3 56.18 18 0 0
2.69 4 10.76 2.69 28.9444 19 0 0
1.35 1 1.35 2.15 2.9025 20 0 0
Σ1 = 482.93 Σ2 = 4555.1075 Skala 1
L Gading 4.75
Awl 464.48667
b 5.7285956

WL -2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0
1.83 4 7.32 1.83 13.3956 1 0 0
4.65 2 9.3 4.65 43.245 2 2.66 0
9.27 4 37.08 9.27 343.7316 3 5.9 -1.6
10.64 2 21.28 10.64 226.4192 4 9.08 -1.6
10.98 4 43.92 10.98 482.2416 5 9.62 -1.6
11.1 2 22.2 11.1 246.42 6 9.97 -1.6
11.1 4 44.4 11.1 492.84 7 9.97 -1.6
11.1 2 22.2 11.1 246.42 8 9.97 -1.6
11.1 4 44.4 11.1 492.84 9 9.97 -1.6
11.1 2 22.2 11.1 246.42 10 9.97 -1.6
11.1 4 44.4 11.1 492.84 11 9.97 -1.6
11.1 2 22.2 11.1 246.42 12 9.97 -1.6
11.1 4 44.4 11.1 492.84 13 9.97 -1.6
11.1 2 22.2 11.1 246.42 14 9.97 -1.6
14.62 4 58.48 14.62 854.9776 15 13.51 -1.58
13.82 2 27.64 13.82 381.9848 16 12.35 -1.58
10.75 4 43 10.75 462.25 17 8.89 -1.58
6.88 2 13.76 6.88 94.6688 18 4.26 -1.72
3.3 4 13.2 3.3 43.56 19
1.77 1 1.77 2.35 4.1595 20
Σ1 = 565.35 Σ2 = 6154.0937 Skala 1
L Gading 4.75
Awl 618.70333
b 5.8058568

WL -2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
2.18 4 8.72 2.18 19.0096 1 0 0
10.3 2 20.6 10.3 212.18 2 3.37 -1.12
11.51 4 46.04 11.51 529.9204 3 9.86 -1.12
11.51 2 23.02 11.51 264.9602 4 11.36 -1.12
11.51 4 46.04 11.51 529.9204 5 11.63 -1.12
11.51 2 23.02 11.51 264.9602 6 11.63 -1.12
11.51 4 46.04 11.51 529.9204 7 11.63 -1.12
11.51 2 23.02 11.51 264.9602 8 11.63 -1.12
11.51 4 46.04 11.51 529.9204 9 11.63 -1.12
11.51 2 23.02 11.51 264.9602 10 11.63 -1.12
11.51 4 46.04 11.51 529.9204 11 11.63 -1.12
11.51 2 23.02 11.51 264.9602 12 11.63 -1.12
11.51 4 46.04 11.51 529.9204 13 11.63 -1.12
11.51 2 23.02 11.51 264.9602 14 11.63 -1.12
16.55 4 66.2 16.55 1095.61 15 15.85 -1.12
16.55 2 33.1 16.55 547.805 16 15.13 -1.12
13.98 4 55.92 13.98 781.7616 17 11.6 -1.12
9.3 2 18.6 9.3 172.98 18 6.46 -1.12
3.9 4 15.6 3.9 60.84 19 0 0
2.07 1 2.07 2.53 5.2371 20 0 0
Σ1 = 635.17 Σ2 = 7664.7069 Skala 1
L Gading 4.75
Awl 815.06833
b 6.5553298

WL -2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
8.03 4 32.12 8.03 257.9236 1 0 0
11.02 2 22.04 11.02 242.8808 2 11.24 -0.78
11.02 4 44.08 11.02 485.7616 3 11.24 -0.78
11.02 2 22.04 11.02 242.8808 4 11.24 -0.78
11.02 4 44.08 11.02 485.7616 5 11.24 -0.78
11.02 2 22.04 11.02 242.8808 6 11.24 -0.78
11.02 4 44.08 11.02 485.7616 7 11.24 -0.78
11.02 2 22.04 11.02 242.8808 8 11.24 -0.78
11.02 4 44.08 11.02 485.7616 9 11.24 -0.78
11.02 2 22.04 11.02 242.8808 10 11.24 -0.78
11.02 4 44.08 11.02 485.7616 11 11.24 -0.78
11.02 2 22.04 11.02 242.8808 12 11.24 -0.78
11.02 4 44.08 11.02 485.7616 13 11.24 -0.78
11.02 2 22.04 11.02 242.8808 14 11.24 -0.78
15.27 4 61.08 15.27 932.6916 15 11.24 -0.76
15.27 2 30.54 15.27 466.3458 16 11.24 -0.76
15.27 4 61.08 15.27 932.6916 17 11.24 -0.76
13.35 2 26.7 13.35 356.445 18 15.79 -0.76
5.22 4 20.88 5.22 108.9936 19 10 -0.76
2.29 1 2.29 2.69 6.1601 20 2.51 -1.77
Σ1 = 653.45 Σ2 = 7675.9865 Skala 1
L Gading 4.75
Awl 902.56333
b 6.0817306

WL -2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
11.03 1 11.03 11.03 121.6609 0 0 0
11.03 4 44.12 11.03 486.6436 1 7.78 0
11.03 2 22.06 11.03 243.3218 2 10.64 -0.49
11.03 4 44.12 11.03 486.6436 3 10.64 -0.49
11.03 2 22.06 11.03 243.3218 4 10.64 -0.49
11.03 4 44.12 11.03 486.6436 5 10.64 -0.49
11.03 2 22.06 11.03 243.3218 6 10.64 -0.49
11.03 4 44.12 11.03 486.6436 7 10.64 -0.49
11.03 2 22.06 11.03 243.3218 8 10.64 -0.49
11.03 4 44.12 11.03 486.6436 9 10.64 -0.49
11.03 2 22.06 11.03 243.3218 10 10.64 -0.49
11.03 4 44.12 11.03 486.6436 11 10.64 -0.49
11.03 2 22.06 11.03 243.3218 12 10.64 -0.49
11.03 4 44.12 11.03 486.6436 13 10.64 -0.49
11.03 2 22.06 11.03 243.3218 14 10.64 -0.49
11.03 4 44.12 11.03 486.6436 15 14.76 -0.49
11.03 2 22.06 11.03 243.3218 16 14.76 -0.49
14.47 4 57.88 14.47 837.5236 17 14.76 -0.49
14.47 2 28.94 14.47 418.7618 18 14.76 -0.49
11.39 4 45.56 11.39 518.9284 19 3.69 -0.93
2.53 1 2.53 2.89 7.3117 20 0 0
Σ1 = 675.38 Σ2 = 7743.9096 Skala 1
L Gading 4.75
Awl 948.575
b 6.0068181

WL -2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
4.3 1 4.3 17.24 74.132 0 11 -8.31
10.77 4 43.08 10.77 463.9716 1 11 -5.32
10.77 2 21.54 10.77 231.9858 2 11 -0.24
10.77 4 43.08 10.77 463.9716 3 11 -0.24
10.77 2 21.54 10.77 231.9858 4 11 -0.24
10.77 4 43.08 10.77 463.9716 5 11 -0.24
10.77 2 21.54 10.77 231.9858 6 11 -0.24
10.77 4 43.08 10.77 463.9716 7 11 -0.24
10.77 2 21.54 10.77 231.9858 8 11 -0.24
10.77 4 43.08 10.77 463.9716 9 11 -0.24
10.77 2 21.54 10.77 231.9858 10 11 -0.24
10.77 4 43.08 10.77 463.9716 11 11 -0.24
10.77 2 21.54 10.77 231.9858 12 11 -0.24
10.77 4 43.08 10.77 463.9716 13 11 -0.24
10.77 2 21.54 10.77 231.9858 14 11 -0.24
10.77 4 43.08 10.77 463.9716 15 11 -0.24
10.77 2 21.54 10.77 231.9858 16 11 -0.24
10.77 4 43.08 10.77 463.9716 17 11 -0.24
10.77 2 21.54 10.77 231.9858 18 11 -0.24
10.77 4 43.08 10.77 463.9716 19 11 -0.24
10.53 1 10.53 11.01 115.9353 20
Σ1 = 639.49 Σ2 = 6917.6555 Skala 1
L Gading 4.75
Awl 960.2125
b 5.7330562

WL -2
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
5.02 1 5.02 16.18 81.2236 0 10.6 -6.56
10.6 4 42.4 10.6 449.44 1 10.6 -0.72
10.6 2 21.2 10.6 224.72 2 10.6 0
10.6 4 42.4 10.6 449.44 3 10.6 0
10.6 2 21.2 10.6 224.72 4 10.6 0
10.6 4 42.4 10.6 449.44 5 10.6 0
10.6 2 21.2 10.6 224.72 6 10.6 0
10.6 4 42.4 10.6 449.44 7 10.6 0
10.6 2 21.2 10.6 224.72 8 10.6 0
10.6 4 42.4 10.6 449.44 9 10.6 0
10.6 2 21.2 10.6 224.72 10 10.6 0
10.6 4 42.4 10.6 449.44 11 10.6 0
10.6 2 21.2 10.6 224.72 12 10.6 0
10.6 4 42.4 10.6 449.44 13 10.6 0
10.6 2 21.2 10.6 224.72 14 10.6 0
10.6 4 42.4 10.6 449.44 15 10.6 0
10.6 2 21.2 10.6 224.72 16 10.6 0
10.6 4 42.4 10.6 449.44 17 10.6 0
10.6 2 21.2 10.6 224.72 18 10.6 0
10.6 4 42.4 10.6 449.44 19 10.6 0
10.36 1 10.36 10.84 112.3024 20 10.6 0
Σ1 = 630.18 Σ2 = 6710.406 Skala 1
L Gading 4.75
Awl 992.05333
b 5.343856
WL -4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
0 4 0 0 0 5 0 0
0 2 0 0 0 6 0 0
0 4 0 0 0 7 0 0
0 2 0 0 0 8 0 0
0 4 0 0 0 9 0 0
0 2 0 0 0 10 0 0
0 4 0 0 0 11 0 0
0 2 0 0 0 12 0 0
0 4 0 0 0 13 0 0
0 2 0 0 0 14 0 0
0 4 0 0 0 15 0 0
0 2 0 0 0 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
6.58 2 13.16 6.58 86.5928 4 0 0
7.58 4 30.32 7.58 229.8256 5 0 0
8.41 2 16.82 8.41 141.4562 6 0 0
8.56 4 34.24 8.56 293.0944 7 0 0
8.56 2 17.12 8.56 146.5472 8 0 0
8.56 4 34.24 8.56 293.0944 9 0 0
8.56 2 17.12 8.56 146.5472 10 0 0
8.56 4 34.24 8.56 293.0944 11 0 0
8.56 2 17.12 8.56 146.5472 12 0 0
8.56 4 34.24 8.56 293.0944 13 0 0
8.56 2 17.12 8.56 146.5472 14 0 0
11.44 4 45.76 11.44 523.4944 15 0 0
10.96 2 21.92 10.96 240.2432 16 0 0
8.71 4 34.84 8.71 303.4564 17 0 0
4.61 2 9.22 4.61 42.5042 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 377.48 Σ2 = 3326.1392 Skala 1
L Gading 4.75
Awl 0
b 0

WL -4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
2.35 4 9.4 6.99 65.706 3 0 0
5.21 2 10.42 9.85 102.637 4 5.88 -4.64
6.09 4 24.36 10.73 261.3828 5 7.2 -4.64
6.7 2 13.4 11.34 151.956 6 8.13 -4.64
6.72 4 26.88 11.36 305.3568 7 8.27 -4.64
6.72 2 13.44 11.36 152.6784 8 8.27 -4.64
6.72 4 26.88 11.36 305.3568 9 8.27 -4.64
6.72 2 13.44 11.36 152.6784 10 8.27 -4.64
6.72 4 26.88 11.36 305.3568 11 8.27 -4.64
6.72 2 13.44 11.36 152.6784 12 8.27 -4.64
6.72 4 26.88 11.36 305.3568 13 8.27 -4.64
6.72 2 13.44 11.36 152.6784 14 8.27 -4.64
9.79 4 39.16 14.37 562.7292 15 11.08 -4.58
8.09 2 16.18 12.67 205.0006 16 8.69 -4.58
4.79 4 19.16 9.37 179.5292 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 293.36 Σ2 = 3361.0816 Skala 1
L Gading 4.75
Awl 223.31333
b 6.6556452

WL -4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
0 4 0 0 0 1
2.66 2 5.32 2.66 14.1512 2 0 0
4.3 4 17.2 7.5 129 3 0 -3.19
7.48 2 14.96 10.68 159.7728 4 7.1 -3.19
8.02 4 32.08 11.22 359.9376 5 8.18 -3.19
8.37 2 16.74 11.57 193.6818 6 8.83 -3.19
8.37 4 33.48 11.57 387.3636 7 8.85 -3.19
8.37 2 16.74 11.57 193.6818 8 8.85 -3.19
8.37 4 33.48 11.57 387.3636 9 8.85 -3.19
8.37 2 16.74 11.57 193.6818 10 8.85 -3.19
8.37 4 33.48 11.57 387.3636 11 8.85 -3.19
8.37 2 16.74 11.57 193.6818 12 8.85 -3.19
8.37 4 33.48 11.57 387.3636 13 8.85 -3.19
8.37 2 16.74 11.57 193.6818 14 8.85 -3.19
11.93 4 47.72 15.09 720.0948 15 12.4 -3.15
10.77 2 21.54 13.93 300.0522 16 10.64 -3.15
7.31 4 29.24 10.47 306.1428 17 6.49 -3.37
2.54 2 5.08 5.98 30.3784 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 390.76 Σ2 = 4537.3932 Skala 1
L Gading 4.75
Awl 358.78333
b 6.4933469

WL -4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
2.25 2 4.5 4.49 20.205 2 13.28 0
8.74 4 34.96 10.98 383.8608 3 4.42 0
10.24 2 20.48 12.48 255.5904 4 9.14 -2.25
10.51 4 42.04 12.75 536.01 5 9.69 -2.25
10.51 2 21.02 12.75 268.005 6 10.03 -2.25
10.51 4 42.04 12.75 536.01 7 10.03 -2.25
10.51 2 21.02 12.75 268.005 8 10.03 -2.25
10.51 4 42.04 12.75 536.01 9 10.03 -2.25
10.51 2 21.02 12.75 268.005 10 10.03 -2.25
10.51 4 42.04 12.75 536.01 11 10.03 -2.25
10.51 2 21.02 12.75 268.005 12 10.03 -2.25
10.51 4 42.04 12.75 536.01 13 10.03 -2.25
10.51 2 21.02 12.75 268.005 14 10.03 -2.25
14.73 4 58.92 16.97 999.8724 15 10.03 -2.25
14.01 2 28.02 16.25 455.325 16 13.25 -2.25
10.48 4 41.92 12.72 533.2224 17 8.96 -2.25
5.34 2 10.68 7.58 80.9544 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 514.78 Σ2 = 6749.1054 Skala 1
L Gading 4.75
Awl 585.865
b 6.0147822

WL -4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
10.46 2 20.92 12.02 251.4584 2 0 0
10.46 4 41.84 12.02 502.9168 3 11.2 -1.55
10.46 2 20.92 12.02 251.4584 4 11.65 -1.55
10.46 4 41.84 12.02 502.9168 5 11.65 -1.55
10.46 2 20.92 12.02 251.4584 6 11.65 -1.55
10.46 4 41.84 12.02 502.9168 7 11.65 -1.55
10.46 2 20.92 12.02 251.4584 8 11.65 -1.55
10.46 4 41.84 12.02 502.9168 9 11.65 -1.55
10.46 2 20.92 12.02 251.4584 10 11.65 -1.55
10.46 4 41.84 12.02 502.9168 11 11.65 -1.55
10.46 2 20.92 12.02 251.4584 12 11.65 -1.55
10.46 4 41.84 12.02 502.9168 13 11.65 -1.55
10.46 2 20.92 12.02 251.4584 14 11.65 -1.55
10.48 4 41.92 12 503.04 15 16.24 -1.55
10.48 2 20.96 12 251.52 16 16.24 -1.55
10.48 4 41.92 12 503.04 17 16.24 -1.53
15.03 2 30.06 16.55 497.493 18 4.69 -2.85
9.24 4 36.96 10.76 397.6896 19 0 0
0.74 1 0.74 4.28 3.1672 20 0 0
Σ1 = 570.04 Σ2 = 6933.6594 Skala 1
L Gading 4.75
Awl 811.395
b 7.2198168

WL -4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
7.78 4 31.12 7.78 242.1136 1 0 0
10.15 2 20.3 11.13 225.939 2 6.13 -0.98
10.15 4 40.6 11.13 451.878 3 11.13 -0.98
10.15 2 20.3 11.13 225.939 4 11.13 -0.98
10.15 4 40.6 11.13 451.878 5 11.13 -0.98
10.15 2 20.3 11.13 225.939 6 11.13 -0.98
10.15 4 40.6 11.13 451.878 7 11.13 -0.98
10.15 2 20.3 11.13 225.939 8 11.13 -0.98
10.15 4 40.6 11.13 451.878 9 11.13 -0.98
10.15 2 20.3 11.13 225.939 10 11.13 -0.98
10.15 4 40.6 11.13 451.878 11 11.13 -0.98
10.15 2 20.3 11.13 225.939 12 11.13 -0.98
10.15 4 40.6 11.13 451.878 13 11.13 -0.98
10.15 2 20.3 11.13 225.939 14 11.13 -0.98
14.27 4 57.08 15.25 870.47 15 15.03 -0.98
14.27 2 28.54 15.25 435.235 16 15.03 -0.98
14.27 4 57.08 15.25 870.47 17 15.03 -0.98
14.27 2 28.54 15.25 435.235 18 11.67 -0.98
2.76 4 11.04 4.62 51.0048 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 599.1 Σ2 = 7197.3694 Skala 1
L Gading 4.75
Awl 851.16833
b 6.5274834

WL -4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
2.69 1 2.69 19.31 51.9439 0
5.68 4 22.72 16.32 370.7904 1 10.23 -7.44
10.76 2 21.52 11.24 241.8848 2 10.23 -1.05
10.76 4 43.04 11.24 483.7696 3 10.23 -0.47
10.76 2 21.52 11.24 241.8848 4 10.23 -0.47
10.76 4 43.04 11.24 483.7696 5 10.23 -0.47
10.76 2 21.52 11.24 241.8848 6 10.23 -0.47
10.76 4 43.04 11.24 483.7696 7 10.23 -0.47
10.76 2 21.52 11.24 241.8848 8 10.23 -0.47
10.76 4 43.04 11.24 483.7696 9 10.23 -0.47
10.76 2 21.52 11.24 241.8848 10 10.23 -0.47
10.76 4 43.04 11.24 483.7696 11 10.23 -0.47
10.76 2 21.52 11.24 241.8848 12 10.23 -0.47
10.76 4 43.04 11.24 483.7696 13 10.23 -0.47
10.76 2 21.52 11.24 241.8848 14 10.23 -0.47
10.76 4 43.04 11.24 483.7696 15 10.23 -0.47
10.76 2 21.52 11.24 241.8848 16 10.23 -0.47
10.76 4 43.04 11.24 483.7696 17 10.23 -0.47
10.76 2 21.52 11.24 241.8848 18 10.23 -0.47
10.76 4 43.04 11.24 483.7696 19 10.23 -0.85
0 1 0 0 0 20
Σ1 = 606.45 Σ2 = 6953.6239 Skala 1
L Gading 4.75
Awl 847.90667
b 5.4458803

WL -4
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
4.04 1 4.04 17.16 69.3264 0 10.6 -7.87
9.88 4 39.52 11.32 447.3664 1 10.6 -5.54
10.6 2 21.2 10.6 224.72 2 10.6 -0.42
10.6 4 42.4 10.6 449.44 3 10.6 0
10.6 2 21.2 10.6 224.72 4 10.6 0
10.6 4 42.4 10.6 449.44 5 10.6 0
10.6 2 21.2 10.6 224.72 6 10.6 0
10.6 4 42.4 10.6 449.44 7 10.6 0
10.6 2 21.2 10.6 224.72 8 10.6 0
10.6 4 42.4 10.6 449.44 9 10.6 0
10.6 2 21.2 10.6 224.72 10 10.6 0
10.6 4 42.4 10.6 449.44 11 10.6 0
10.6 2 21.2 10.6 224.72 12 10.6 0
10.6 4 42.4 10.6 449.44 13 10.6 0
10.6 2 21.2 10.6 224.72 14 10.6 0
10.6 4 42.4 10.6 449.44 15 10.6 0
10.6 2 21.2 10.6 224.72 16 10.6 0
10.6 4 42.4 10.6 449.44 17 10.6 0
10.6 2 21.2 10.6 224.72 18 10.6 0
10.6 4 42.4 10.6 449.44 19 10.6 -0.3
10.6 1 10.6 10.6 112.36 20
Σ1 = 626.56 Σ2 = 6696.4928 Skala 1
L Gading 4.75
Awl 939.43917
b 5.4302192
WL -6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
0 4 0 0 0 5 0 0
0 2 0 0 0 6 0 0
0 4 0 0 0 7 0 0
0 2 0 0 0 8 0 0
0 4 0 0 0 9 0 0
0 2 0 0 0 10 0 0
0 4 0 0 0 11 0 0
0 2 0 0 0 12 0 0
0 4 0 0 0 13 0 0
0 2 0 0 0 14 0 0
0 4 0 0 0 15 0 0
0 2 0 0 0 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
0 4 0 0 0 1
0 2 0 0 0 2
0 4 0 0 0 3
0 2 0 0 0 4
0 4 0 0 0 5
0 2 0 0 0 6
0 4 0 0 0 7
0 2 0 0 0 8
0 4 0 0 0 9
0 2 0 0 0 10
0 4 0 0 0 11
0 2 0 0 0 12
0 4 0 0 0 13
0 2 0 0 0 14
0 4 0 0 0 15
0 2 0 0 0 16
0 4 0 0 0 17
0 2 0 0 0 18
0 4 0 0 0 19
0 1 0 0 0 20
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
0 4 0 0 0 1
0 2 0 0 0 2
0 4 0 0 0 3
1.24 2 2.48 10.52 26.0896 4
2.56 4 10.24 11.84 121.2416 5
3.49 2 6.98 12.77 89.1346 6
3.63 4 14.52 12.91 187.4532 7
3.63 2 7.26 12.91 93.7266 8
3.63 4 14.52 12.91 187.4532 9
3.63 2 7.26 12.91 93.7266 10
3.63 4 14.52 12.91 187.4532 11
3.63 2 7.26 12.91 93.7266 12
3.63 4 14.52 12.91 187.4532 13
3.63 2 7.26 12.91 93.7266 14
6.5 4 26 15.66 407.16 15
4.11 2 8.22 13.27 109.0794 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 141.04 Σ2 = 1877.4244 Skala 1
L Gading 4.75
Awl 0
b 0

WL -6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
-3.19 4 -12.76 3.19 -40.7044 3 0 0
3.91 2 7.82 10.29 80.4678 4 0 0
4.99 4 19.96 11.37 226.9452 5 6.47 -4.79
5.64 2 11.28 12.02 135.5856 6 7.58 -4.79
5.66 4 22.64 12.04 272.5856 7 7.72 -4.79
5.66 2 11.32 12.04 136.2928 8 7.72 -4.79
5.66 4 22.64 12.04 272.5856 9 7.72 -4.79
5.66 2 11.32 12.04 136.2928 10 7.72 -4.79
5.66 4 22.64 12.04 272.5856 11 7.72 -4.79
5.66 2 11.32 12.04 136.2928 12 7.72 -4.79
5.66 4 22.64 12.04 272.5856 13 7.72 -4.79
5.66 2 11.32 12.04 136.2928 14 7.72 -4.79
9.25 4 37 15.55 575.35 15 11.08 -4.72
7.49 2 14.98 13.79 206.5742 16 8.45 -4.88
3.12 4 12.48 9.86 123.0528 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 226.6 Σ2 = 2942.7848 Skala 1
L Gading 4.75
Awl 182.4
b 6.6038333

WL -6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
13.28 2 26.56 13.28 352.7168 2 0 0
4.42 4 17.68 4.42 78.1456 3 0 0
6.89 2 13.78 11.39 156.9542 4 6.14 0
7.44 4 29.76 11.94 355.3344 5 7.67 -3.37
7.78 2 15.56 12.28 191.0768 6 8.43 -3.37
7.78 4 31.12 12.28 382.1536 7 8.43 -3.37
7.78 2 15.56 12.28 191.0768 8 8.43 -3.37
7.78 4 31.12 12.28 382.1536 9 8.43 -3.37
7.78 2 15.56 12.28 191.0768 10 8.43 -3.37
7.78 4 31.12 12.28 382.1536 11 8.43 -3.37
7.78 2 15.56 12.28 191.0768 12 8.43 -3.37
7.78 4 31.12 12.28 382.1536 13 8.43 -3.37
7.78 2 15.56 12.28 191.0768 14 8.43 -3.37
7.78 4 31.12 12.28 382.1536 15 8.43 -3.37
11 2 22 15.5 341 16 10.96 -3.37
6.71 4 26.84 11.21 300.8764 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 370.02 Σ2 = 4451.1794 Skala 1
L Gading 4.75
Awl 311.06167
b 5.7875817

WL -6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
9.65 4 38.6 12.75 492.15 3 0 0
10.1 2 20.2 13.2 266.64 4 9.1 -2.32
10.1 4 40.4 13.2 533.28 5 9.72 -2.32
10.1 2 20.2 13.2 266.64 6 10.04 -2.32
10.1 4 40.4 13.2 533.28 7 10.04 -2.32
10.1 2 20.2 13.2 266.64 8 10.04 -2.32
10.1 4 40.4 13.2 533.28 9 10.04 -2.32
10.1 2 20.2 13.2 266.64 10 10.04 -2.32
10.1 4 40.4 13.2 533.28 11 10.04 -2.32
10.1 2 20.2 13.2 266.64 12 10.04 -2.32
10.1 4 40.4 13.2 533.28 13 10.04 -2.32
10.1 2 20.2 13.2 266.64 14 10.04 -2.32
14.69 4 58.76 17.79 1045.3404 15 15.54 -2.32
14.69 2 29.38 17.79 522.6702 16 14.16 -2.32
14.71 4 58.84 17.77 1045.5868 17 9.18 -2.66
1.84 2 3.68 7.54 27.7472 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 512.46 Σ2 = 7399.7346 Skala 1
L Gading 4.75
Awl 548.65667
b 6.6888041

WL -6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
5.15 2 10.3 7.11 73.233 2 0 -2.36
10.15 4 40.6 12.11 491.666 3 2.36 -2.36
10.15 2 20.3 12.11 245.833 4 10.83 -2.36
10.15 4 40.6 12.11 491.666 5 10.83 -2.36
10.15 2 20.3 12.11 245.833 6 10.83 -2.36
10.15 4 40.6 12.11 491.666 7 10.83 -2.36
10.15 2 20.3 12.11 245.833 8 10.83 -2.36
10.15 4 40.6 12.11 491.666 9 10.83 -2.36
10.15 2 20.3 12.11 245.833 10 10.83 -2.36
10.15 4 40.6 12.11 491.666 11 10.83 -2.36
10.15 2 20.3 12.11 245.833 12 10.83 -2.36
10.15 4 40.6 12.11 491.666 13 10.83 -2.36
10.15 2 20.3 12.11 245.833 14 10.83 -2.36
14.05 4 56.2 16.01 899.762 15 15.3 -2.36
14.05 2 28.1 16.01 449.881 16 15.3 -2.36
14.05 4 56.2 16.01 899.762 17 15.3 -2.36
10.69 2 21.38 12.65 270.457 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 537.58 Σ2 = 7018.089 Skala 1
L Gading 4.75
Awl 701.82833
b 7.3779509

WL -6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
2.79 4 11.16 17.67 197.1972 1 10.4 -9.63
9.18 2 18.36 11.28 207.1008 2 10.4 -6.29
9.76 4 39.04 10.7 417.728 3 10.4 -1.07
9.76 2 19.52 10.7 208.864 4 10.4 -0.71
9.76 4 39.04 10.7 417.728 5 10.4 -0.71
9.76 2 19.52 10.7 208.864 6 10.4 -0.71
9.76 4 39.04 10.7 417.728 7 10.4 -0.71
9.76 2 19.52 10.7 208.864 8 10.4 -0.71
9.76 4 39.04 10.7 417.728 9 10.4 -0.71
9.76 2 19.52 10.7 208.864 10 10.4 -0.71
9.76 4 39.04 10.7 417.728 11 10.4 -0.71
9.76 2 19.52 10.7 208.864 12 10.4 -0.71
9.76 4 39.04 10.7 417.728 13 10.4 -0.71
9.76 2 19.52 10.7 208.864 14 10.4 -0.71
9.76 4 39.04 10.7 417.728 15 10.4 -0.71
9.76 2 19.52 10.7 208.864 16 10.4 -0.71
9.76 4 39.04 10.7 417.728 17 10.4 -0.71
9.76 2 19.52 10.7 208.864 18 10.4 -0.73
9.38 4 37.52 11.08 415.7216 19
0 1 0 0 0 20
Σ1 = 535.52 Σ2 = 5832.7556 Skala 1
L Gading 4.75
Awl 751.98833
b 5.6467623

WL -6
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
2.73 1 2.73 18.47 50.4231 0 9.77 -9.2
5.06 4 20.24 16.14 326.6736 1 9.77 -6.96
10.18 2 20.36 11.02 224.3672 2 9.77 -3.95
10.6 4 42.4 10.6 449.44 3 9.77 -0.28
10.6 2 21.2 10.6 224.72 4 9.77 0
10.6 4 42.4 10.6 449.44 5 9.77 0
10.6 2 21.2 10.6 224.72 6 9.77 0
10.6 4 42.4 10.6 449.44 7 9.77 0
10.6 2 21.2 10.6 224.72 8 9.77 0
10.6 4 42.4 10.6 449.44 9 9.77 0
10.6 2 21.2 10.6 224.72 10 9.77 0
10.6 4 42.4 10.6 449.44 11 9.77 0
10.6 2 21.2 10.6 224.72 12 9.77 0
10.6 4 42.4 10.6 449.44 13 9.77 0
10.6 2 21.2 10.6 224.72 14 9.77 0
10.6 4 42.4 10.6 449.44 15 9.77 0
10.6 2 21.2 10.6 224.72 16 9.77 0
10.6 4 42.4 10.6 449.44 17 9.77 0
10.6 2 21.2 10.6 224.72 18 9.77 0
10.3 4 41.2 10.9 449.08 19 9.77 -5.02
0 1 0 0 0 20
Σ1 = 593.33 Σ2 = 6443.8239 Skala 1
L Gading 4.75
Awl 807.95917
b 5.1157131
WL -8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
0 4 0 0 0 5 0 0
0 2 0 0 0 6 0 0
0 4 0 0 0 7 0 0
0 2 0 0 0 8 0 0
0 4 0 0 0 9 0 0
0 2 0 0 0 10 0 0
0 4 0 0 0 11 0 0
0 2 0 0 0 12 0 0
0 4 0 0 0 13 0 0
0 2 0 0 0 14 0 0
0 4 0 0 0 15 0 0
0 2 0 0 0 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
0 4 0 0 0 1
0 2 0 0 0 2
0 4 0 0 0 3
0 2 0 0 0 4
0 4 0 0 0 5
0 2 0 0 0 6
0 4 0 0 0 7
0 2 0 0 0 8
0 4 0 0 0 9
0 2 0 0 0 10
0 4 0 0 0 11
0 2 0 0 0 12
0 4 0 0 0 13
0 2 0 0 0 14
0 4 0 0 0 15
0 2 0 0 0 16
0 4 0 0 0 17
0 2 0 0 0 18
0 4 0 0 0 19
0 1 0 0 0 20
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
0 4 0 0 0 5 0 0
0 2 0 0 0 6 0 0
0 4 0 0 0 7 0 0
0 2 0 0 0 8 0 0
0 4 0 0 0 9 0 0
0 2 0 0 0 10 0 0
0 4 0 0 0 11 0 0
0 2 0 0 0 12 0 0
0 4 0 0 0 13 0 0
0 2 0 0 0 14 0 0
0 4 0 0 0 15 0 0
0 2 0 0 0 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
0 4 0 0 0 1
0 2 0 0 0 2 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
1.68 4 6.72 11.26 75.6672 5 0 0
2.79 2 5.58 12.37 69.0246 6 0 0
2.93 4 11.72 12.51 146.6172 7 0 0
2.93 2 5.86 12.51 73.3086 8 0 0
2.93 4 11.72 12.51 146.6172 9 0 0
2.93 2 5.86 12.51 73.3086 10 0 0
2.93 4 11.72 12.51 146.6172 11 0 0
2.93 2 5.86 12.51 73.3086 12 0 0
2.93 4 11.72 12.51 146.6172 13 0 0
2.93 2 5.86 12.51 73.3086 14 0 0
6.36 4 25.44 15.8 401.952 15 0 0
3.57 2 7.14 13.33 95.1762 16
0 4 0 0 0 17
0 2 0 0 0 18
0 4 0 0 0 19
0 1 0 0 0 20
Σ1 = 115.2 Σ2 = 1521.5232 Skala 1
L Gading 4.75
Awl 0
b 0

WL -8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
6.14 2 12.28 6.14 75.3992 4 0 0
4.3 4 17.2 11.04 189.888 5 0 0
5.06 2 10.12 11.8 119.416 6 6.63 0
5.06 4 20.24 11.8 238.832 7 6.84 -4.5
5.06 2 10.12 11.8 119.416 8 6.84 -4.5
5.06 4 20.24 11.8 238.832 9 6.84 -4.5
5.06 2 10.12 11.8 119.416 10 6.84 -4.5
5.06 4 20.24 11.8 238.832 11 6.84 -4.5
5.06 2 10.12 11.8 119.416 12 6.84 -4.5
5.06 4 20.24 11.8 238.832 13 6.84 -4.5
5.06 2 10.12 11.8 119.416 14 6.84 -4.5
5.06 4 20.24 11.8 238.832 15 11.03 -4.43
7.59 2 15.18 14.33 217.5294 16 7.94 -5.03
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 196.46 Σ2 = 2274.0566 Skala 1
L Gading 4.75
Awl 160.93
b 5.9444982

WL -8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
6.78 2 13.56 11.42 154.8552 4 0 0
7.4 4 29.6 12.04 356.384 5 6.63 -3.1
7.72 2 15.44 12.36 190.8384 6 7.73 -3.1
7.72 4 30.88 12.36 381.6768 7 7.73 -3.1
7.72 2 15.44 12.36 190.8384 8 7.73 -3.1
7.72 4 30.88 12.36 381.6768 9 7.73 -3.1
7.72 2 15.44 12.36 190.8384 10 7.73 -3.1
7.72 4 30.88 12.36 381.6768 11 7.73 -3.1
7.72 2 15.44 12.36 190.8384 12 7.73 -3.1
7.72 4 30.88 12.36 381.6768 13 7.73 -3.1
7.72 2 15.44 12.36 190.8384 14 7.73 -3.1
13.22 4 52.88 17.86 944.4368 15 13.25 -3.1
11.84 2 23.68 16.48 390.2464 16 11.65 -3.1
6.52 4 26.08 11.84 308.7872 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 346.52 Σ2 = 4635.6088 Skala 1
L Gading 4.75
Awl 304.31667
b 6.1319927

WL -8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 4.72 0 2 0 0
8.47 4 33.88 13.19 446.8772 3 0 0
8.47 2 16.94 13.19 223.4386 4 9.02 -2.15
8.47 4 33.88 13.19 446.8772 5 10.13 -1.95
8.47 2 16.94 13.19 223.4386 6 10.13 -1.95
8.47 4 33.88 13.19 446.8772 7 10.13 -1.95
8.47 2 16.94 13.19 223.4386 8 10.13 -1.95
8.47 4 33.88 13.19 446.8772 9 10.13 -1.95
8.47 2 16.94 13.19 223.4386 10 10.13 -1.95
8.47 4 33.88 13.19 446.8772 11 10.13 -1.95
8.47 2 16.94 13.19 223.4386 12 10.13 -1.95
8.47 4 33.88 13.19 446.8772 13 10.13 -1.95
12.94 2 25.88 17.66 457.0408 14 10.13 -1.95
12.94 4 51.76 17.66 914.0816 15 15.52 -1.92
12.94 2 25.88 17.66 457.0408 16 15.52 -1.93
12.94 4 51.76 17.66 914.0816 17 9.96 -3.34
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 443.26 Σ2 = 6540.701 Skala 1
L Gading 4.75
Awl 581.4
b 6.6627435

WL -8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
0.77 4 3.08 20.03 61.6924 1
4.11 2 8.22 16.69 137.1918 2 9.99 -9.53
9.33 4 37.32 11.47 428.0604 3 9.99 -5.19
9.69 2 19.38 11.11 215.3118 4 9.99 -1.05
9.69 4 38.76 11.11 430.6236 5 9.99 -0.95
9.69 2 19.38 11.11 215.3118 6 9.99 -0.95
9.69 4 38.76 11.11 430.6236 7 9.99 -0.95
9.69 2 19.38 11.11 215.3118 8 9.99 -0.95
9.69 4 38.76 11.11 430.6236 9 9.99 -0.95
9.69 2 19.38 11.11 215.3118 10 9.99 -0.95
9.69 4 38.76 11.11 430.6236 11 9.99 -0.95
9.69 2 19.38 11.11 215.3118 12 9.99 -0.95
9.69 4 38.76 11.11 430.6236 13 9.99 -0.95
9.69 2 19.38 11.11 215.3118 14 9.99 -0.95
9.69 4 38.76 11.11 430.6236 15 9.99 -0.95
9.69 2 19.38 11.11 215.3118 16 9.99 -0.95
9.69 4 38.76 11.11 430.6236 17 9.99 -1.44
9.67 2 19.34 11.13 215.2542 18
0 4 0 0 0 19
0 1 0 0 0 20
Σ1 = 474.94 Σ2 = 5363.7466 Skala 1
L Gading 4.75
Awl 629.59667
b 5.6056096

WL -8
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0.57 1 0.57 18.97 10.8129 0
2.81 4 11.24 16.73 188.0452 1 9.54 -8.47
5.82 2 11.64 13.72 159.7008 2 9.54 -5.93
9.49 4 37.96 10.05 381.498 3 9.54 -2.72
9.77 2 19.54 9.77 190.9058 4 9.54 -0.08
9.77 4 39.08 9.77 381.8116 5 9.54 0
9.77 2 19.54 9.77 190.9058 6 9.54 0
9.77 4 39.08 9.77 381.8116 7 9.54 0
9.77 2 19.54 9.77 190.9058 8 9.54 0
9.77 4 39.08 9.77 381.8116 9 9.54 0
9.77 2 19.54 9.77 190.9058 10 9.54 0
9.77 4 39.08 9.77 381.8116 11 9.54 0
9.77 2 19.54 9.77 190.9058 12 9.54 0
9.77 4 39.08 9.77 381.8116 13 9.54 0
9.77 2 19.54 9.77 190.9058 14 9.54 0
9.77 4 39.08 9.77 381.8116 15 9.54 0
9.77 2 19.54 9.77 190.9058 16 9.54 0
9.77 4 39.08 9.77 381.8116 17 9.54 0
9.77 2 19.54 9.77 190.9058 18 9.54 -0.35
4.75 4 19 14.79 281.01 19
0 1 0 0 0 20
Σ1 = 510.29 Σ2 = 5220.9945 Skala 1
L Gading 4.75
Awl 724.66
b 4.9461213
WL -10
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
0 4 0 0 0 5 0 0
0 2 0 0 0 6 0 0
0 4 0 0 0 7 0 0
0 2 0 0 0 8 0 0
0 4 0 0 0 9 0 0
0 2 0 0 0 10 0 0
0 4 0 0 0 11 0 0
0 2 0 0 0 12 0 0
0 4 0 0 0 13 0 0
0 2 0 0 0 14 0 0
0 4 0 0 0 15 0 0
0 2 0 0 0 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -10
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
0 4 0 0 0 5 0 0
0 2 0 0 0 6 0 0
0 4 0 0 0 7 0 0
0 2 0 0 0 8 0 0
0 4 0 0 0 9 0 0
0 2 0 0 0 10 0 0
0 4 0 0 0 11 0 0
0 2 0 0 0 12 0 0
0 4 0 0 0 13 0 0
0 2 0 0 0 14 0 0
0 4 0 0 0 15 0 0
0 2 0 0 0 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -10
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
0 4 0 0 0 5 0 0
0 2 0 0 0 6 0 0
0 4 0 0 0 7 0 0
0 2 0 0 0 8 0 0
0 4 0 0 0 9 0 0
0 2 0 0 0 10 0 0
0 4 0 0 0 11 0 0
0 2 0 0 0 12 0 0
0 4 0 0 0 13 0 0
0 2 0 0 0 14 0 0
0 4 0 0 0 15 0 0
0 2 0 0 0 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -10
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
0 4 0 0 0 5 0 0
0 2 0 0 0 6 0 0
0 4 0 0 0 7 0 0
0 2 0 0 0 8 0 0
0 4 0 0 0 9 0 0
0 2 0 0 0 10 0 0
0 4 0 0 0 11 0 0
0 2 0 0 0 12 0 0
0 4 0 0 0 13 0 0
0 2 0 0 0 14 0 0
0 4 0 0 0 15 0 0
0 2 0 0 0 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 0 Σ2 = 0 Skala 1
L Gading 4.75
Awl 0
b 0

WL -10
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
0 4 0 0 0 5 0 0
6.63 2 13.26 6.63 87.9138 6 0 0
2.34 4 9.36 11.34 106.1424 7 0 0
2.34 2 4.68 11.34 53.0712 8 0 0
2.34 4 9.36 11.34 106.1424 9 0 0
2.34 2 4.68 11.34 53.0712 10 0 0
2.34 4 9.36 11.34 106.1424 11 0 0
2.34 2 4.68 11.34 53.0712 12 0 0
2.34 4 9.36 11.34 106.1424 13 0 0
2.34 2 4.68 11.34 53.0712 14 0 0
6.6 4 26.4 15.46 408.144 15 0 0
2.91 2 5.82 12.97 75.4854 16 0 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 101.64 Σ2 = 1208.3976 Skala 1
L Gading 4.75
Awl 0
b 0

WL -10
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
0 2 0 0 0 4 0 0
3.53 4 14.12 9.73 137.3876 5 0 0
4.63 2 9.26 10.83 100.2858 6 4.67 -4.06
4.63 4 18.52 10.83 200.5716 7 5.38 -4.33
4.63 2 9.26 10.83 100.2858 8 5.38 -4.33
4.63 4 18.52 10.83 200.5716 9 5.38 -4.33
4.63 2 9.26 10.83 100.2858 10 5.38 -4.33
4.63 4 18.52 10.83 200.5716 11 5.38 -4.33
4.63 2 9.26 10.83 100.2858 12 5.38 -4.33
4.63 4 18.52 10.83 200.5716 13 5.38 -4.33
4.63 2 9.26 10.83 100.2858 14 5.38 -4.33
10.15 4 40.6 16.35 663.81 15 5.38 0
8.55 2 17.1 14.75 252.225 16 6.72 0
0 4 0 0 0 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 192.2 Σ2 = 2357.138 Skala 1
L Gading 4.75
Awl 97.185
b 3.7588547

WL -10
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0 0 0
0 4 0 0 0 1 0 0
0 2 0 0 0 2 0 0
0 4 0 0 0 3 0 0
6.87 2 13.74 11.17 153.4758 4 0 0
8.18 4 32.72 12.08 395.2576 5 3.68 0
8.18 2 16.36 12.08 197.6288 6 6.42 -2.45
8.18 4 32.72 12.08 395.2576 7 6.42 -2.45
8.18 2 16.36 12.08 197.6288 8 6.42 -2.45
8.18 4 32.72 12.08 395.2576 9 6.42 -2.45
8.18 2 16.36 12.08 197.6288 10 6.42 -2.45
8.18 4 32.72 12.08 395.2576 11 6.42 -2.45
8.18 2 16.36 12.08 197.6288 12 6.42 -2.45
8.18 4 32.72 12.08 395.2576 13 6.42 -2.45
8.18 2 16.36 12.08 197.6288 14 6.42 -2.45
13.6 4 54.4 17.44 948.736 15 14.61 -2.45
13.59 2 27.18 17.45 474.291 16 13.12 -2.45
6.62 4 26.48 13.3 352.184 17 0 0
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 367.2 Σ2 = 4893.1188 Skala 1
L Gading 4.75
Awl 297.54
b 5.6720764

WL -10
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
0 4 0 0 0 1
0.46 2 0.92 19.52 17.9584 2
4.8 4 19.2 15.18 291.456 3
8.94 2 17.88 11.04 197.3952 4 10.05 -2.31
9.04 4 36.16 10.94 395.5904 5 10.05 -4.28
9.04 2 18.08 10.94 197.7952 6 10.05 -1.39
9.04 4 36.16 10.94 395.5904 7 10.05 -1.22
9.04 2 18.08 10.94 197.7952 8 10.05 -1.18
9.04 4 36.16 10.94 395.5904 9 10.05 -1.18
9.04 2 18.08 10.94 197.7952 10 10.05 -1.18
9.04 4 36.16 10.94 395.5904 11 10.05 -1.18
9.04 2 18.08 10.94 197.7952 12 10.05 -1.18
9.04 4 36.16 10.94 395.5904 13 10.05 -1.18
9.04 2 18.08 10.94 197.7952 14 10.05 -1.18
9.04 4 36.16 10.94 395.5904 15 10.05 -1.18
9.04 2 18.08 10.94 197.7952 16 10.05 -1.61
8.55 4 34.2 11.43 390.906 17
0 2 0 0 0 18 0 0
0 4 0 0 0 19 0 0
0 1 0 0 0 20 0 0
Σ1 = 397.64 Σ2 = 4458.0292 Skala 1
L Gading 4.75
Awl 508.18667
b 5.7728838

WL -10
Y1 + Y2 FS HK Y1 - Y2 HK Gading Y1 Y2
0 1 0 0 0 0
1.07 4 4.28 18.01 77.0828 1
3.61 2 7.22 15.47 111.6934 2 9.19 -8.03
6.82 4 27.28 12.26 334.4528 3 9.19 -5.13
9.46 2 18.92 9.62 182.0104 4 9.19 -1.14
9.54 4 38.16 9.54 364.0464 5 9.19 -0.15
9.54 2 19.08 9.54 182.0232 6 9.19 0
9.54 4 38.16 9.54 364.0464 7 9.19 0
9.54 2 19.08 9.54 182.0232 8 9.19 0
9.54 4 38.16 9.54 364.0464 9 9.19 0
9.54 2 19.08 9.54 182.0232 10 9.19 0
9.54 4 38.16 9.54 364.0464 11 9.19 0
9.54 2 19.08 9.54 182.0232 12 9.19 0
9.54 4 38.16 9.54 364.0464 13 9.19 0
9.54 2 19.08 9.54 182.0232 14 9.19 0
9.54 4 38.16 9.54 364.0464 15 9.19 0
9.54 2 19.08 9.54 182.0232 16 9.19 0
9.54 4 38.16 9.54 364.0464 17 9.19 -0.3
9.19 2 18.38 9.89 181.7782 18 9.19 -5.35
0 4 0 0 0 19
0 1 0 0 0 20
Σ1 = 457.68 Σ2 = 4527.4816 Skala 1
L Gading 4.75
Awl 646.22167
b 4.812419
1.7547708 3.6048932 5.1896344 6.0765972

1.5001445 2.9650648 3.9268101 4.718694


1.6306876 3.2468873 4.5567499 5.5474457

Heel 10°

TABEL 2

WL AWL FS
Y1 + Y2 FS HK Y1 - Y2 HK -5 0 1
0 1 0 0 0 -4 0 4
0 4 0 0 0 -3 0 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -3 0 1
0 2 0 0 0 -2 0 4
0 4 0 0 0 -1 0 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -1 0 1
0 2 0 0 0 0 468.79333 4
0 4 0 0 0 1 1207.1492 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 1 1207.1492 1
0 2 0 0 0 2 1313.945 4
0 4 0 0 0 3 1354.8583 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 3 1354.8583 1
0 2 0 0 0 4 1425.4117 4
0 4 0 0 0 5 1433.6767 1
0 2 0 0 0 Σ1 =
0 4 0 0 0
0 1 0 0 0
Σ1 = 0 Σ2 = 0

Heel 20°

TABEL 2

WL AWL FS
Y1 + Y2 FS HK Y1 - Y2 HK -5 0 1
0 1 0 0 0 -4 0 4
0 4 0 0 0 -3 0 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -3 0 1
0 2 0 0 0 -2 0 4
0 4 0 0 0 -1 597.67667 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -1 597.67667 1
0 2 0 0 0 0 679.93083 4
0 4 0 0 0 1 1050.9217 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 1 1050.9217 1
0 2 0 0 0 2 1322.78 4
0 4 0 0 0 3 1419.68 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 3 1419.68 1
0 2 0 0 0 4 1436.5425 4
0 4 0 0 0 5 1391.7658 1
0 2 0 0 0 Σ1 =
0 4 0 0 0
0 1 0 0 0
Σ1 = 0 Σ2 = 0

TABEL 2

WL AWL FS
Y1 + Y2 FS HK Y1 - Y2 HK -5 0 1
0 1 0 0 0 -4 0 4
0 4 0 0 0 -3 0 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -3 0 1
0 2 0 0 0 -2 223.31333 4
0 4 0 0 0 -1 464.48667 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -1 464.48667 1
0 2 0 0 0 0 764.63917 4
0 4 0 0 0 1 1055.3233 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 1 1055.3233 1
0 2 0 0 0 2 1300.3442 4
0 4 0 0 0 3 1432.505 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 3 1432.505 1
0 2 0 0 0 4 1429.655 4
0 4 0 0 0 5 1309.5117 1
0 2 0 0 0 Σ1 =
0 4 0 0 0
0 1 0 0 0
Σ1 = 0 Σ2 = 0

TABEL 2

WL AWL FS
Y1 + Y2 FS HK Y1 - Y2 HK -5 0 1
0 1 0 0 0 -4 0 4
0 4 0 0 0 -3 182.4 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -3 182.4 1
0 2 0 0 0 -2 358.78333 4
0 4 0 0 0 -1 618.70333 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -1 618.70333 1
0 2 0 0 0 0 895.1375 4
0 4 0 0 0 1 1197.8233 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 1 1197.8233 1
0 2 0 0 0 2 1267.9175 4
0 4 0 0 0 3 1328.7017 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 3 1328.7017 1
0 2 0 0 0 4 1349.2217 4
0 4 0 0 0 5 1246.8592 1
0 2 0 0 0 Σ1 =
0 4 0 0 0
0 1 0 0 0
Σ1 = 0 Σ2 = 0

TABEL 2

WL AWL FS
Y1 + Y2 FS HK Y1 - Y2 HK -7 0 1
0 1 0 0 0 -6 55.036667 4
0 4 0 0 0 -5 0 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -5 0 1
0 2 0 0 0 -4 160.93 4
0 4 0 0 0 -3 311.06167 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -3 311.06167 1
0 2 0 0 0 -2 585.865 4
0 4 0 0 0 -1 815.06833 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -1 815.06833 1
0 2 0 0 0 0 1005.6858 4
0 4 0 0 0 1 1178.7283 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 1 1178.7283 1
0 2 0 0 0 2 1195.67 4
0 4 0 0 0 3 1266.0492 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 3 1266.0492 1
0 1 0 0 0 4 1238.2617 4
Σ1 = 0 Σ2 = 0 5 1151.8908 1
Σ1 =

TABEL 2

WL AWL FS
Y1 + Y2 FS HK Y1 - Y2 HK -7 25.998333 1
0 1 0 0 0 -6 121.15667 4
0 4 0 0 0 -5 97.185 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -5 97.185 1
0 2 0 0 0 -4 304.31667 4
0 4 0 0 0 -3 548.65667 1
0.61 2 1.22 8.73 10.6506 Σ1 =
1.05 4 4.2 9.71 40.782 -3 548.65667 1
1.05 2 2.1 9.71 20.391 -2 811.395 4
1.05 4 4.2 9.71 40.782 -1 902.56333 1
1.05 2 2.1 9.71 20.391 Σ1 =
1.05 4 4.2 9.71 40.782 -1 902.56333 1
1.05 2 2.1 9.71 20.391 0 1034.6292 4
1.05 4 4.2 9.71 40.782 1 1123.6283 1
1.05 2 2.1 9.71 20.391 Σ1 =
5.38 4 21.52 5.38 115.7776 1 1123.6283 1
6.72 2 13.44 6.72 90.3168 2 1121.8708 4
0 4 0 0 0 3 1138.4483 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 3 1138.4483 1
0 1 0 0 0 4 1113.1308 4
Σ1 = 61.38 Σ2 = 461.437 5 1069.1142 1
Σ1 =

TABEL 2

WL AWL FS
Y1 + Y2 FS HK Y1 - Y2 HK -9 0 1
0 1 0 0 0 -8 0 4
0 4 0 0 0 -7 207.765 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -7 207.765 1
0 2 0 0 0 -6 512.17667 4
3.68 4 14.72 3.68 54.1696 -5 297.54 1
3.97 2 7.94 8.87 70.4278 Σ1 =
3.97 4 15.88 8.87 140.8556 -5 297.54 1
3.97 2 7.94 8.87 70.4278 -4 581.4 4
3.97 4 15.88 8.87 140.8556 -3 701.82833 1
3.97 2 7.94 8.87 70.4278 Σ1 =
3.97 4 15.88 8.87 140.8556 -3 701.82833 1
3.97 2 7.94 8.87 70.4278 -2 851.16833 4
3.97 4 15.88 8.87 140.8556 -1 948.575 1
3.97 2 7.94 8.87 70.4278 Σ1 =
12.16 4 48.64 17.06 829.7984 -1 948.575 1
10.67 2 21.34 15.57 332.2638 0 1069.3517 4
0 4 0 0 0 1 1109.7267 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 1 1109.7267 1
0 1 0 0 0 2 1060.6908 4
Σ1 = 187.92 Σ2 = 2131.7932 3 1032.6817 1
Σ1 =
3 1032.6817 1
4 953.35667 4
5 961.66917 1
Σ1 =

TABEL 2

WL AWL FS
Y1 + Y2 FS HK Y1 - Y2 HK -9 0 1
0 1 0 0 0 -8 124.00667 4
0 4 0 0 0 -7 655.18333 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 -7 655.18333 1
7.74 2 15.48 12.36 191.3328 -6 864.81667 4
5.77 4 23.08 14.33 330.7364 -5 508.18667 1
8.66 2 17.32 11.44 198.1408 Σ1 =
8.83 4 35.32 11.27 398.0564 -5 508.18667 1
8.87 2 17.74 11.23 199.2202 -4 629.59667 4
8.87 4 35.48 11.23 398.4404 -3 751.98833 1
8.87 2 17.74 11.23 199.2202 Σ1 =
8.87 4 35.48 11.23 398.4404 -3 751.98833 1
8.87 2 17.74 11.23 199.2202 -2 847.90667 4
8.87 4 35.48 11.23 398.4404 -1 960.2125 1
8.87 2 17.74 11.23 199.2202 Σ1 =
8.87 4 35.48 11.23 398.4404 -1 960.2125 1
8.44 2 16.88 11.66 196.8208 0 1012.5258 4
0 4 0 0 0 1 1008.805 1
0 2 0 0 0 Σ1 =
0 4 0 0 0 1 1008.805 1
0 1 0 0 0 2 962.22333 4
Σ1 = 320.96 Σ2 = 3705.7296 3 924.84083 1
Σ1 =
3 924.84083 1
4 872.7175 4
5 712.43667 1
Σ1 =

TABEL 2

WL AWL FS
Y1 + Y2 FS HK Y1 - Y2 HK -9 0 1
0 1 0 0 0 -8 756.83333 4
0 4 0 0 0 -7 851.105 1
1.16 2 2.32 17.22 39.9504 Σ1 =
4.06 4 16.24 14.32 232.5568 -7 851.105 1
8.05 2 16.1 10.33 166.313 -6 937.23833 4
9.04 4 36.16 9.34 337.7344 -5 646.22167 1
9.19 2 18.38 9.19 168.9122 Σ1 =
9.19 4 36.76 9.19 337.8244 -5 646.22167 1
9.19 2 18.38 9.19 168.9122 -4 724.66 4
9.19 4 36.76 9.19 337.8244 -3 807.95917 1
9.19 2 18.38 9.19 168.9122 Σ1 =
9.19 4 36.76 9.19 337.8244 -3 807.95917 1
9.19 2 18.38 9.19 168.9122 -2 939.43917 4
9.19 4 36.76 9.19 337.8244 -1 992.05333 1
9.19 2 18.38 9.19 168.9122 Σ1 =
9.19 4 36.76 9.19 337.8244 -1 992.05333 1
9.19 2 18.38 9.19 168.9122 0 997.785 4
8.89 4 35.56 9.49 337.4644 1 992.05333 1
3.84 2 7.68 14.54 111.6672 Σ1 =
0 4 0 0 0 1 992.05333 1
0 1 0 0 0 2 939.43917 4
Σ1 = 408.14 Σ2 = 3928.2814 3 807.95917 1
Σ1 =
3 807.95917 1
4 724.66 4
5 646.22167 1
Σ1 =
6.6933961 6.9291613 6.8363979 6.2234317 5.5896137 A B B

5.2695731 5.7067427 5.8120358 5.6204576 5.4025021 3602.31 8383.42 6426.32


6.0541953 6.3700543 6.3343651 5.901491 5.4589089 1 2 3
10 0.88 0.76 0.81
20 3.49 2.55 2.67
30 4.78 3.79 4.08
40 5.70 4.80 5.17
50 6.23 5.48 5.79
TABEL 2 60 6.59 5.84 6.16
Jarak WL 1.34 70 6.64 6.21 6.35
HK bn HK Volume bn' 80 #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 0 90 #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 #DIV/0!
0 0 0 1376.7707 2.5124773 270 271 270
0 Σ1 = 0 4868.7158 0.8463312 271 272 271
0 0 0 8660.9969 0.7572475
0 0 0
0 0 0
0 Σ1 = 0 Heel 10°
0 0 0 3
1875.1733 3.994209 7489.8342 2.51247725673309
2.5
1207.1492 0.2107701 254.43098
3082.3225 Σ1 = 7744.2652 2
NK SIN10° (M)

1207.1492 0.2107701 254.43098


5255.78 0.1524394 801.1882 1.5

1354.8583 0.3138475 425.21889 0.7572475156167


1 0.84633120674929 7
10900.11 Σ1 = 9225.1033
1354.8583 0.3138475 425.21889 0.5

5701.6467 0.552295 3148.991 0


1433.6767 1.3140599 1883.9371 1000 2000 3000 4000 5000 6000 7000 8000 9000

19390.292 Σ1 = 14683.25 dISPLACEMENT (M3)

TABEL 2
Jarak WL 1.34
HK bn HK Volume bn'
0 0 0 0 0
0 0 0 266.96224 4.4057158
0 0 0 2218.1459 3.9944729
0 Σ1 = 0 5685.0483 2.7231563
0 0 0 9507.45 2.4711383
0 0 0
597.67667 4.4057158 2633.1935
597.67667 Σ1 = 2633.1935 Heel 20°
597.67667 4.4057158 2633.1935
5
2719.7233 4.2878147 11661.67 4.40571579951256
4.5 3.99447293410959
1050.9217 2.7675605 2908.4893 4

NK SIN 20° (M)


4965.9983 Σ1 = 19836.546 3.5
3 2.72315628669811
1050.9217 2.7675605 2908.4893 2.471138
2.5
5291.12 1.7555477 9288.8137 2
1419.68 1.8495166 2625.7218 1.5
12727.72 Σ1 = 34659.571 1
0.5
1419.68 1.8495166 2625.7218
0
5746.17 2.2025268 12656.093 0 1000 2000 3000 4000 5000 6000 7000 8000 9000
1391.7658 1.9095321 2657.6216 dISPLACEMENT (M3)
21285.336 Σ1 = 52599.008

TABEL 2
Jarak WL 1.34
HK bn HK Volume bn'
0 0 0 0 #DIV/0!
0 0 0 606.4572 6.3384989
0 0 0 2651.461 5.0352929
0 Σ1 = 0 6085.9725 4.1272276
0 0 0 9865.0569 3.5725123
893.25333 6.6556452 5945.1773
464.48667 5.7285956 2660.8563
1357.74 Σ1 = 8606.0335 Heel 30°
464.48667 5.7285956 2660.8563
7
6.33849892713873
3058.5567 4.7161157 14424.507
6
1055.3233 3.9785333 4198.639 5.03529292207238
5
NK SIN 30° (M)

5936.1067 Σ1 = 29890.036 4.12722763222419


1055.3233 3.9785333 4198.639 4 3.57251230552397
5201.3767 3.4863247 18133.688 3
1432.505 2.8009677 4012.4002 2
13625.312 Σ1 = 56234.763
1
1432.505 2.8009677 4012.4002
0
0 2000 4000 6000 8000 10000
dISPLACEMENT (M3)
3

NK SIN
2
1
0
5718.62 2.6999099 15439.758 0 2000 4000 6000 8000 10000
1309.5117 2.4554197 3215.4007 dISPLACEMENT (M3)
22085.948 Σ1 = 78902.322

TABEL 2
Jarak WL 1.34
HK bn HK Volume bn'
0 0 0 81.472 6.6038333
0 0 0 1080.3244 6.3341469
182.4 6.6038333 1204.5392 3491.0186 5.7163513
182.4 Σ1 = 1204.5392 6884.8791 5.0857028
182.4 6.6038333 1204.5392 10445.906 4.417675
1435.1333 6.4933469 9318.8185
618.70333 5.8058568 3592.103
2418.6367 Σ1 = 15320 Heel 40°
618.70333 5.8058568 3592.103
6.60383333333333
76.33414687475451
3580.55 5.442729 19487.963
6 5.71635131192973
1197.8233 5.2405866 6277.297 5.08570275600662
5
NK SIN 40° (M)

7815.7133 Σ1 = 44677.363 4.417674991012


1197.8233 5.2405866 6277.297 4
5071.67 4.4411131 22523.86 3
1328.7017 3.696869 4912.036 2
15413.908 Σ1 = 78390.556 1
1328.7017 3.696869 4912.036
0
5396.8867 3.0535772 16479.81 0 2000 4000 6000 8000 10000
1246.8592 2.8318491 3530.917 dISPLACEMENT (M3)
23386.356 Σ1 = 103313.32

TABEL 2
Jarak WL 1.34
HK bn HK Volume bn'
0 0 0
220.14667 6.6325949 1460.1437
0 0 0
220.14667 Σ1 = 1460.1437 98.332178 6.6325949
0 0 0 524.80132 6.0318835
643.72 5.9444982 3826.5924 2074.5515 6.0987527
311.06167 5.7875817 1800.2948 4761.9394 6.0480102
1174.9283 Σ1 = 7087.0309 7990.2037 5.5396296 Heel 50°
311.06167 5.7875817 1800.2948 11282.578 5.012874 6.63259493670886
7
2343.46 6.0147822 14095.401 6.09875273575193 6.04801020302081
6.03188354041452
6 5.539629576
815.06833 6.5553298 5343.0418
5

NK SIN 50° (M)


4644.5183 Σ1 = 28325.769
815.06833 6.5553298 5343.0418 4
4022.7433 6.033587 24271.572 3
1178.7283 5.5464918 6537.8071 2
10661.058 Σ1 = 64478.19 1
1178.7283 5.5464918 6537.8071
0
4782.68 4.6998641 22477.946 0 2000 4000 6000 8000
1266.0492 4.4246374 5601.8086 dISPLACEMENT (M3)
17888.516 Σ1 = 99095.751
1266.0492 4.4246374 5601.8086
4953.0467 3.6970839 18311.829
1151.8908 3.1368544 3613.3138
25259.503 Σ1 = 126622.7

TABEL 2
Jarak WL 1.34
HK bn HK Volume bn'
25.998333 1.97176 51.262475
484.62667 5.5812448 2704.8201
97.185 3.7588547 365.30429
607.81 Σ1 = 3121.3868 271.48847 5.1354647
97.185 3.7588547 365.30429 1103.6769 5.9171597
1217.2667 6.1319927 7464.2703 3201.5809 6.5867984
548.65667 6.6888041 3669.857 5955.1506 6.2296202
2470.9183 Σ1 = 14620.818 8969.954 5.765984 Heel 60°
548.65667 6.6888041 3669.857 11944.792 5.3766833
7 6.58679835121869
3245.58 7.2198168 23432.493 6.22962023542601
5.91715970985147 5.76598395850942
6
902.56333 6.0817306 5489.147 5.13546472856101
5
NK SIN 60° (M)

7167.7183 Σ1 = 47212.315
902.56333 6.0817306 5489.147 4
4138.5167 5.8734306 24307.291 3
1123.6283 5.3818526 6047.202 2
13332.427 Σ1 = 83055.955 1
1123.6283 5.3818526 6047.202
0
0 2000 4000 6000 8000 10000
dISPLACEMENT (M3)
3

NK SIN
2
1
0
4487.4833 4.8637644 21826.062 0 2000 4000 6000 8000 10000
1138.4483 4.2717744 4863.1944 dISPLACEMENT (M3)
20081.987 Σ1 = 115792.41
1138.4483 4.2717744 4863.1944
4452.5233 4.2703855 19013.991
1069.1142 3.8480984 4114.0565
26742.073 Σ1 = 143783.66

TABEL 2
Jarak WL 1.34
HK bn HK Volume bn'
0 0 0 0 0
0 0 0
207.765 5.2035612 1081.1179
207.765 Σ1 = 1081.1179
207.765 5.2035612 1081.1179
2048.7067 6.4158205 13144.134
297.54 5.6720764 1687.6696 92.8017 5.2035612
2761.7767 Σ1 = 16994.04 1233.5936 6.1532997 Heel 70°
297.54 5.6720764 1687.6696 2718.7461 6.4656299 7 6.50293671681157
6.46562987415003
6.15329969958952 6.22433084747483
2325.6 6.6627435 15494.876 4976.6803 6.5029367 5.9
6
701.82833 7.3779509 5178.055 7806.6301 6.2243308 5.2035611949398
5
NK SIN 70° (M)

6086.745 Σ1 = 39354.64 10658.673 5.9749544


701.82833 7.3779509 5178.055 13252.814 5.7022758 4

3404.6733 6.5274834 22223.949 3


948.575 6.0068181 5697.9174 2
11141.822 Σ1 = 72454.561 1
948.575 6.0068181 5697.9174 0
4277.4067 5.7330019 24522.38 0 2000 4000 6000 8000 1

1109.7267 5.5068246 6111.0701 dISPLACEMENT (M3)


17477.53 Σ1 = 108785.93
1109.7267 5.5068246 6111.0701
4242.7633 5.3132559 22542.887
1032.6817 4.9760426 5138.668
23862.702 Σ1 = 142578.55
1032.6817 4.9760426 5138.668
3813.4267 4.515426 17219.246
961.66917 4.4222979 4252.7875
29670.479 Σ1 = 169189.26

TABEL 2
Jarak WL 1.34
HK bn HK Volume bn'
0 0 0 0 0
496.02667 2.9651653 1470.8011
655.18333 6.9057815 4524.553
1151.21 Σ1 = 5995.3541
655.18333 6.9057815 4524.553
3459.2667 7.8203929 27052.824
508.18667 5.7728838 2933.7026
5773.8467 Σ1 = 40506.434
514.20713
2578.9848
5.2078718
7.0155022
Heel 80°
508.18667 5.7728838 2933.7026 4266.7424 6.4699421 8
7.01550221573832
2518.3867 5.6056096 14117.092 6546.452 6.1424484 7 6.4699420695828
6.14244843932472
5.93337006399084
5.7398787
751.98833 5.6467623 4246.2994 9234.9926 5.9333701 6
5.20787176101667

NK SIN 80° (M)


9552.4083 Σ1 = 61803.529 11817.86 5.7398787 5

751.98833 5.6467623 4246.2994 14108.433 5.5682786 4

3391.6267 5.4458803 18470.393 3

960.2125 5.7330562 5504.9523 2

14656.236 Σ1 = 90025.173 1

960.2125 5.7330562 5504.9523 0


0 2000 4000 6000 8000 10000 120
4050.1033 5.4087284 21905.909
dISPLACEMENT (M3)
1008.805 5.1927856 5238.5081
20675.357 Σ1 = 122674.54
1008.805 5.1927856 5238.5081
3848.8933 5.0423027 19407.285
924.84083 4.9141183 4544.7773
26457.896 Σ1 = 151865.11
924.84083 4.9141183 4544.7773
3490.87 4.7726493 16660.698
712.43667 3.9432296 2809.3014
31586.043 Σ1 = 175879.89

TABEL 2
Jarak WL 1.34
HK bn HK Volume bn'
0 0 0 0 0
3027.3333 6.5161264 19726.487
851.105 6.4734184 5509.5587 Heel 90°
3878.4383 Σ1 = 25236.045 6.66.5067542885603
6.41959161753121
851.105 6.4734184 5509.5587 6.4
3748.9533 6.594233 24721.472 6.2
NK SIN 90° (M)

646.22167 4.812419 3109.8894 1732.3691 6.5067543 5.94746312027659


6
5.77859234089983
9124.7183 Σ1 = 58576.965 4075.7075 6.4195916 5.8 5.6715929018
5
646.22167 4.812419 3109.8894 6019.9675 5.9474631 5.6
2898.64 4.9461213 14337.025 8502.4377 5.7785923 5.4
807.95917 5.1157131 4133.2873 11171.381 5.6715929 5.2
13477.539 Σ1 = 80157.167 13653.851 5.616592 5
0 2000 4000 6000 8000 10000 120
807.95917 5.1157131 4133.2873 15598.111 5.5344694
3757.7567 5.4302192 20405.442 dISPLACEMENT (M3)
992.05333 5.343856 5301.3901
19035.308 Σ1 = 109997.29
992.05333 5.343856 5301.3901
3991.14 5.3241978 21249.619
992.05333 5.343856 5301.3901
25010.555 Σ1 = 141849.69
992.05333 5.343856 5301.3901
3757.7567 5.4302192 20405.442
807.95917 5.1157131 4133.2873
30568.324 Σ1 = 171689.81
807.95917 5.1157131 4133.2873
2898.64 4.9461213 14337.025
646.22167 4.812419 3109.8894
34921.145 Σ1 = 193270
8

3.2363
5

nk (m) 4

10° 2

0
0.75724751561670 0 2000 4000 6000
4929 7

Kurva Stabilitas Statis Sesungguhnya 3.2347639


6000 7000 8000 9000 10000 a sin a NK sin a GK sin a GZ
MENT (M3) 0 0 0 0 0
10 0.1736481777 0.757247515616707 0.5617109 0.1955367
20 0.3420201433 2.47113825253638 1.1063544 1.3647838
30 0.5 3.57251230552397 1.6173819 1.9551304
40 0.6427876097 4.41767499101239 2.0792661 2.3384088
50 0.7660444431 5.01287397270921 2.4779729 2.5349011
60 0.8660254038 5.37668331879787 2.8013877 2.5752956
70 0.9396926208 5.70227581413344 3.0396838 2.6625921
80 0.984807753 5.5682786173598 3.1856206 2.3826581
90 1 5.53446938309153 3.2347639 2.2997055

Actual Statical St
3
Actual Statical St
3

0° 2

GZ (m)
2315628669811
2.47113825253638
1

000 6000 7000 8000 9000 10000


MENT (M3) 0
0 5 10 15 20 25 30 35 40 45 50

HEEL Angle (')

763222419
3.57251230552397

00 8000 10000 12000


MENT (M3)
00 8000 10000 12000
MENT (M3)

8570275600662
4.41767499101239

00 8000 10000 12000


MENT (M3)

WL -12
Gading Y1 Y2 Y1 + Y2
0 0 0 0
1 0 0 0
2 0 0 0
3 0 0 0
4 7.8 -7.1 0.7
5 7.84 -6.98 0.86
Heel 50° 6 7.9 -6.84 1.06
7 7.93 -6.74 1.19
93 6.04801020302081 8 7.95 -6.67 1.28
5.53962957635902
5.01287397270921 9 7.95 -6.67 1.28
10 7.95 -6.67 1.28
11 7.95 -6.67 1.28
12 7.95 -6.67 1.28
13 7.95 -6.67 1.28
14 0 0 0
15 0 0 0
4000 6000 8000 10000 12000 16 0 0 0
dISPLACEMENT (M3) 17 0 0 0
18 0 0 0
19 0 0 0
20 0 0 0
Skala 1
L Gading 4.75
Awl 55.0366666666667
b 6.63259493670886

WL -6
Gading Y1 Y2 Y1 + Y2
0 0 0 0
1 0 0 0
2 0 0 0
3 6.8 -4.78 2.02
4 8.68 -4.57 4.11
5 8.68 -4.57 4.11
Heel 60° 6 8.68 -4.57 4.11
7 8.68 -4.57 0.1
1869
6.22962023542601 8 8.68 -4.57 0.89
5.76598395850942
5.37668331879787 9 8.68 -4.57 0.89
10 8.68 -4.57 0.89
11 8.68 -4.57 0.89
12 8.68 -4.57 0.89
13 8.68 -4.57 0.89
14 8.68 -4.57 4.11
15 8.01 -5.28 2.73
00 6000 8000 10000 12000 14000
dISPLACEMENT (M3)
00 6000 8000 10000 12000 14000 16 0 0 0
dISPLACEMENT (M3) 17 0 0 0
18 0 0 0
19 0 0 0
20 0 0 0
Skala 1
L Gading 4.75
Awl 121.156666666667
b 5.58124477260847

WL -6
Gading Y1 Y2 Y1 + Y2
0 0 0 0
1 0 0 0
2 0 0 0
3 10.98 -2.88 8.1
4 10.98 -2.88 8.1
5 10.98 -2.88 8.1
Heel 70° 6 10.98 -2.88 8.1
6.50293671681157
15003
7 10.98 -2.88 8.1
6.22433084747483
5.97495440303944
5.70227581413344 8 10.98 -2.88 8.1
9 10.98 -2.88 8.1
10 10.98 -2.88 8.1
11 10.98 -2.88 8.1
12 10.98 -2.88 8.1
13 10.98 -2.88 8.1
14 10.98 -2.88 8.1
15 10.98 -3.01 7.97
4000 6000 8000 10000 12000 14000 16 0
0 0
dISPLACEMENT (M3) 17 0 0 0
18 0 0 0
19 0 0 0
20 0 0 0
Skala 1
L Gading 4.75
Awl 512.176666666667
b 6.41582045257821

WL -6
Gading Y1 Y2 Y1 + Y2
0 0 0 0
1 0 0 0
2 13.99 -5.46 8.53
3 13.99 -1.4 12.59
4 13.99 -1.4 12.59
Heel 80° 5
6
13.99 -1.4 12.59
12.59
13.99 -1.4
7 13.99 -1.4 12.59
95828 8 12.59
6.14244843932472
5.93337006399084 13.99 -1.4
5.73987870618333
5.5682786173598
9 13.99 -1.4 12.59
10 13.99 -1.4 12.59
11 13.99 -1.4 12.59
12 13.99 -1.4 12.59
13 13.99 -1.4 12.59
14 14.36 -1.4 12.96
6000 8000 10000 12000 14000 16000 15 14.36 -1.4 12.96
16 14.36 -2.7 11.66
dISPLACEMENT (M3)
17 0 0 0
18 0 0 0
19 0 0 0
20 0 0 0
Skala 1
L Gading 4.75
Awl 864.816666666667
b 7.82039289637495

WL -6
Gading Y1 Y2 Y1 + Y2
0 0
Heel 90° 1 12.54 -10.48 2.06
2 12.54 -0.83 11.71
161753121
3 12.54 0 12.54
4 12.54 0 12.54
5.94746312027659 5 12.54 0 12.54
5.77859234089983
5.67159290181019 6 12.54 0 12.54
5.6165920338998
5.53446938309153 7 12.54 0 12.54
8 12.54 0 12.54
9 12.54 0 12.54
10 12.54 0 12.54
000 6000 8000 10000 12000 14000 16000 18000
11 12.54 0 12.54
dISPLACEMENT (M3) 12 12.54 0 12.54
13 12.54 0 12.54
14 13.18 0 13.18
15 13.18 0 13.18
16 13.18 -0.92 12.26
17 13.18 -5.6 7.58
18 0 0 0
19 0 0 0
20 0 0 0
Skala 1
L Gading 4.75
Awl 937.238333333333
b 6.5942330303747
DANDY
cross curve

C
2
C
4
5
6
7
8
9

000 6000 8000 10000 12000 14000 16000 18000

displacement (M3)

5.525
Garis GM
NK 0 0.7572475
0 0
2.72 57.30
0.00 57.30

ual Statical Stability Curve


ual Statical Stability Curve

GZ sin a
GM sin a

35 40 45 50 55 60 65 70 75 80 85 90

HEEL Angle (')


FS HK Y1 - Y2 HK
1 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 1.4 14.9 10.43
4 3.44 14.82 12.7452
2 2.12 14.74 31.2488
4 4.76 14.67 69.8292
2 2.56 14.62 37.4272
4 5.12 14.62 74.8544
2 2.56 14.62 37.4272
4 5.12 14.62 74.8544
2 2.56 14.62 37.4272
4 5.12 14.62 74.8544
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
1 0 0 0
Σ1 = 34.76 Σ2 = 461.098

WL -7
FS HK Y1 - Y2 HK Gading Y1 Y2 Y1 + Y2
1 0 0 0 0 0 0 0
4 0 0 0 1 0 0 0
2 0 0 0 2 0 0 0
4 8.08 11.58 23.3916 3 0 0 0
2 8.22 13.25 54.4575 4 0 0 0
4 16.44 13.25 217.83 5 0 0 0
2 8.22 13.25 108.915 6 0 0 0
4 0.4 12.6 5.04 7 6.35 -6.25 0.1
2 1.78 11.89 21.1642 8 6.39 -5.5 0.89
4 3.56 11.89 42.3284 9 6.39 -5.5 0.89
2 1.78 11.89 21.1642 10 6.39 -5.5 0.89
4 3.56 11.89 42.3284 11 6.39 -5.5 0.89
2 1.78 11.89 21.1642 12 6.39 -5.5 0.89
4 3.56 11.89 42.3284 13 6.39 -5.5 0.89
2 8.22 13.25 108.915 14 0 0 0
4 10.92 13.29 145.1268 15 0 0 0
2 0 0 0 16 0 0 0
4 0 0 0 17 0 0 0
2 0 0 0 18 0 0 0
4 0 0 0 19 0 0 0
1 0 0 0 20 0 0 0
Σ1 = 76.52 Σ2 = 854.1537 Skala 1
L Gading 4.75
Awl 25.998333
b 1.97176

WL -7
FS HK Y1 - Y2 HK Gading Y1 Y2 Y1 + Y2
1 0 0 0 0 0 0 0
4 0 0 0 1 0 0 0
2 0 0 0 2 0 0 0
4 32.4 13.86 112.266 3 0 0 0
2 16.2 13.86 224.532 4 7.35 -3.41 3.94
4 32.4 13.86 449.064 5 7.35 -3.36 3.99
2 16.2 13.86 224.532 6 7.35 -3.36 3.99
4 32.4 13.86 449.064 7 7.35 -3.36 3.99
2 16.2 13.86 224.532 8 7.35 -3.36 3.99
4 32.4 13.86 449.064 9 7.35 -3.36 3.99
2 16.2 13.86 224.532 10 7.35 -3.36 3.99
4 32.4 13.86 449.064 11 7.35 -3.36 3.99
2 16.2 13.86 224.532 12 7.35 -3.36 3.99
4 32.4 13.86 449.064 13 7.35 -3.36 3.99
2 16.2 13.86 224.532 14 7.35 -3.36 3.99
4 31.88 13.99 446.0012 15 6.12 -5.21 0.91
2 0 0 0 16 0 0 0
4 0 0 0 17 0 0 0
2 0 0 0 18 0 0 0
4 0 0 0 19 0 0 0
1 0 0 0 20 0 0 0
Σ1 = 323.48 Σ2 = 4150.7792 Skala 1
L Gading 4.75
Awl 207.765
b 5.2035612

WL -7
FS HK Y1 - Y2 HK Gading Y1 Y2 Y1 + Y2
1 0 0 0 0 0 0 0
4 0 0 0 1 0 0 0
2 17.06 19.45 331.817 2 0 0 0
4 50.36 15.39 775.0404 3 12.08 -1.91 10.17
2 25.18 15.39 387.5202 4 12.08 -1.65 10.43
4 50.36 15.39 775.0404 5 12.08 -1.65 10.43
2 25.18 15.39 387.5202 6 12.08 -1.65 10.43
4 50.36 15.39 775.0404 7 12.08 -1.65 10.43
2 25.18 15.39 387.5202 8 12.08 -1.65 10.43
4 50.36 15.39 775.0404 9 12.08 -1.65 10.43
2 25.18 15.39 387.5202 10 12.08 -1.65 10.43
4 50.36 15.39 775.0404 11 12.08 -1.65 10.43
2 25.18 15.39 387.5202 12 12.08 -1.65 10.43
4 50.36 15.39 775.0404 13 12.08 -1.65 10.43
2 25.92 15.76 408.4992 14 12.08 -1.63 10.45
4 51.84 15.76 816.9984 15 12.08 -2.25 9.83
2 23.32 17.06 397.8392 16 0 0 0
4 0 0 0 17 0 0 0
2 0 0 0 18 0 0 0
4 0 0 0 19 0 0 0
1 0 0 0 20 0 0 0
Σ1 = 546.2 Σ2 = 8542.9972 Skala 1
L Gading 4.75
Awl 655.18333
b 6.9057815

WL -7
FS HK Y1 - Y2 HK Gading Y1 Y2 Y1 + Y2
1 0 0 0 0 0 0 0
4 8.24 23.02 189.6848 1 0 0 0
2 23.42 13.37 313.1254 2 12.46 -5.15 7.31
4 50.16 12.54 629.0064 3 12.46 -0.17 12.29
2 25.08 12.54 314.5032 4 12.46 0 12.46
4 50.16 12.54 629.0064 5 12.46 0 12.46
2 25.08 12.54 314.5032 6 12.46 0 12.46
4 50.16 12.54 629.0064 7 12.46 0 12.46
2 25.08 12.54 314.5032 8 12.46 0 12.46
4 50.16 12.54 629.0064 9 12.46 0 12.46
2 25.08 12.54 314.5032 10 12.46 0 12.46
4 50.16 12.54 629.0064 11 12.46 0 12.46
2 25.08 12.54 314.5032 12 12.46 0 12.46
4 50.16 12.54 629.0064 13 12.46 0 12.46
2 26.36 13.18 347.4248 14 12.99 0 12.99
4 52.72 13.18 694.8496 15 12.99 -0.45 12.54
2 24.52 14.1 345.732 16 12.99 -2.9 10.09
4 30.32 18.78 569.4096 17 12.99 -12.08 0.91
2 0 0 0 18 0 0 0
4 0 0 0 19 0 0 0
1 0 0 0 20 0 0 0
Σ1 = 591.94 Σ2 = 7806.7806 Skala 1
L Gading 4.75
Awl 851.105
b 6.4734184
Column DG
20
Column DG
40
50
60
70
80
90

16000 18000

2.4711383 3.5725123 4.417675 5.012874 5.3766833 5.7022758 5.5682786 5.5344694


FS HK Y1 - Y2 HK
1 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0.4 12.6 1.26
2 1.78 11.89 10.5821
4 3.56 11.89 10.5821
2 1.78 11.89 10.5821
4 3.56 11.89 10.5821
2 1.78 11.89 10.5821
4 3.56 11.89 10.5821
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
1 0 0 0
Σ1 = 16.42 Σ2 = 64.7526

WL -8
FS HK Y1 - Y2 HK Gading Y1 Y2 Y1 + Y2
1 0 0 0 0 0 0 0
4 0 0 0 1 0 0 0
2 0 0 0 2 0 0 0
4 0 0 0 3 0 0 0
2 7.88 10.76 42.3944 4 0 0 0
4 15.96 10.71 170.9316 5 0 0 0
2 7.98 10.71 85.4658 6 0 0 0
4 15.96 10.71 170.9316 7 0 0 0
2 7.98 10.71 85.4658 8 0 0 0
4 15.96 10.71 170.9316 9 0 0 0
2 7.98 10.71 85.4658 10 0 0 0
4 15.96 10.71 170.9316 11 0 0 0
2 7.98 10.71 85.4658 12 0 0 0
4 15.96 10.71 170.9316 13 0 0 0
2 7.98 10.71 85.4658 14 0 0 0
4 3.64 11.33 41.2412 15 0 0 0
2 0 0 0 16 0 0 0
4 0 0 0 17 0 0 0
2 0 0 0 18 0 0 0
4 0 0 0 19 0 0 0
1 0 0 0 20 0 0 0
Σ1 = 131.22 Σ2 = 1365.6226 Skala 1
L Gading 4.75
Awl 0
b 0

WL -8
FS HK Y1 - Y2 HK Gading Y1 Y2 Y1 + Y2
1 0 0 0 0 0 0 0
4 0 0 0 1 0 0 0
2 0 0 0 2 0 0 0
4 40.68 13.99 569.1132 3 0 0 0
2 20.86 13.73 286.4078 4 4.6 -2.36 2.24
4 41.72 13.73 572.8156 5 4.6 -2.33 2.27
2 20.86 13.73 286.4078 6 4.6 -2.28 2.32
4 41.72 13.73 572.8156 7 4.6 -2.15 2.45
2 20.86 13.73 286.4078 8 4.6 -2 2.6
4 41.72 13.73 572.8156 9 4.6 -2 2.6
2 20.86 13.73 286.4078 10 4.6 -2 2.6
4 41.72 13.73 572.8156 11 4.6 -2 2.6
2 20.86 13.73 286.4078 12 4.6 -2 2.6
4 41.72 13.73 572.8156 13 4.6 -2 2.6
2 20.9 13.71 286.539 14 4.6 -2.84 1.76
4 39.32 14.33 563.4556 15 0 0 0
2 0 0 0 16 0 0 0
4 0 0 0 17 0 0 0
2 0 0 0 18 0 0 0
4 0 0 0 19 0 0 0
1 0 0 0 20 0 0 0
Σ1 = 413.8 Σ2 = 5715.2248 Skala 1
L Gading 4.75
Awl 124.00667
b 2.9651653

WL -8
FS HK Y1 - Y2 HK Gading Y1 Y2 Y1 + Y2
1 0 0 0 0 0 0 0
4 0 0 0 1 0 0 0
2 14.62 17.61 257.4582 2 12.38 -8.48 3.9
4 49.16 12.63 620.8908 3 12.38 -4.53 7.85
2 24.92 12.46 310.5032 4 12.38 -0.3 12.08
4 49.84 12.46 621.0064 5 12.38 -0.26 12.12
2 24.92 12.46 310.5032 6 12.38 -0.21 12.17
4 49.84 12.46 621.0064 7 12.38 -0.14 12.24
2 24.92 12.46 310.5032 8 12.38 -0.07 12.31
4 49.84 12.46 621.0064 9 12.38 -0.07 12.31
2 24.92 12.46 310.5032 10 12.38 -0.07 12.31
4 49.84 12.46 621.0064 11 12.38 -0.07 12.31
2 24.92 12.46 310.5032 12 12.38 -0.07 12.31
4 49.84 12.46 621.0064 13 12.38 -0.07 12.31
2 25.98 12.99 337.4802 14 12.17 -0.5 11.67
4 50.16 13.44 674.1504 15 12.17 -1.95 10.22
2 20.18 15.89 320.6602 16 12.17 -8.64 3.53
4 3.64 25.07 91.2548 17 0 0 0
2 0 0 0 18 0 0 0
4 0 0 0 19 0 0 0
1 0 0 0 20 0 0 0
Σ1 = 537.54 Σ2 = 6959.4426 Skala 1
L Gading 4.75
Awl 756.83333
b 6.5161264
FS HK Y1 - Y2 HK
1 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
1 0 0 0
Σ1 = 0 Σ2 = 0

FS HK Y1 - Y2 HK
1 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
2 4.48 6.96 15.5904
4 9.08 6.93 15.7311
2 4.64 6.88 31.9232
4 9.8 6.75 66.15
2 5.2 6.6 34.32
4 10.4 6.6 68.64
2 5.2 6.6 34.32
4 10.4 6.6 68.64
2 5.2 6.6 34.32
4 10.4 6.6 68.64
2 3.52 7.44 26.1888
4 0 0 0
2 0 0 0
4 0 0 0
2 0 0 0
4 0 0 0
1 0 0 0
Σ1 = 78.32 Σ2 = 464.4635

FS HK Y1 - Y2 HK
1 0 0 0
4 0 0 0
2 7.8 20.86 81.354
4 31.4 16.91 530.974
2 24.16 12.68 306.3488
4 48.48 12.64 612.7872
2 24.34 12.59 306.4406
4 48.96 12.52 612.9792
2 24.62 12.45 306.519
4 49.24 12.45 613.038
2 24.62 12.45 306.519
4 49.24 12.45 613.038
2 24.62 12.45 306.519
4 49.24 12.45 613.038
2 23.34 12.67 295.7178
4 40.88 14.12 577.2256
2 7.06 20.81 146.9186
4 0 0 0
2 0 0 0
4 0 0 0
1 0 0 0
Σ1 = 478 Σ2 = 6229.4168
INITIAL STABILITY
ARIEF KURNIAWAN - 1806202323
Teknik Perkapalan FTUI
Dimensi Perkiraan Titik Stabilitas Data Prohaska

LPP 95.00 KM (m) 7.5852755129688 Sf (m) 2.08


B 17.00 GM (m) 2.0602755129688 Sa (m) 1.04
T 6.70 KB (m) 3.49951661100408 Hid 9.13
H 8.50 KG (m) 5.525 Hid/B 0.54
Cb 0.80 BM (m) 4.08575890196471 T/B 0.39
Cm 0.993
Cwp 0.86 GM (m) 2.06027551
Grafik Prohaska
Cp 0.7917323 KG (m) 5.525
BM (m) 4.0857589

Longitudinal Centre of Buoyancy

Menurut BSRA 0.4259701 FWD


Menurut TNSW 1.88 FWD
Menurut Troost 1.29 FWD

Menurut Guldhammer 2.70 FWD

Koreksi
GM (ft) 6.79890919279702 > 2.5 (ft)
5.21
9.02391524447419
Rolling Period (s)
7.93525840328987
7.96
Fb (m) 1.80 Fb > Fb min
C1 0.0882352941176471
Fb min (m) 0.960911764705882

Tabel Stabilitas Awal


a h* h* x MB sin a GM Sin j h
0 0 0 0 0 0
15 0.009 0.0367718 0.258819 0.53323854 0.5700104
30 -0.013 -0.053115 0.5 1.03013776 0.9770229
45 -0.09 -0.367718 0.7071068 1.45683479 1.0891165
60 -0.25 -1.02144 0.8660254 1.78425093 0.7628112
Gr
75 -0.47 -1.920307 0.9659258 1.99007333 0.0697666 2
90 -0.6 -2.451455 1 2.06027551 -0.39118
2; 1.73

MG sin a Garis GM sin a


1 radian : 57.29578 GM sin a x
1.089116485156
GZ (m)

1 0.977022890758856
0.762811207534814
0.570010371032372
2; 1.73

1.089116485156

GZ (m)
sin a : 0.841471 0 0 1 0.977022890758856
MG sin a : 1.7336621 1.73 57.30 0.762811207534814
0.00 57.30 0.570010371032372

Perhitungan h Prohaska 0.0697666433241031


0 1; 03; 0.00
0
a h fs HK fm GK x fm 0 5 10 15 20 25
0 0 1 0
5 0.1900035 4 0.7600138
10 0.3800069 2 0.7600138
15 0.5700104 4 2.2800415
20 0.6875703 2 1.3751407
25 0.859 4 3.4378517
30 0.9770229 1 0.9770229 1 0.9770229
35 0.413944 4 1.6557761
40 0.4730789 1 0.4730789
-0.09 S1 = 9.5900844 S2 = 3.1058778
Pengecekan Stabilitas dengan IMO
ata Prohaska
Criteria IMO Hasil Catatan
2.08 MG (m) ≥ 0.15 2.06 Memenuhi
1.04 h 30° (m) ≥ 0.2 0.98 Memenuhi
9.13 Ah 30° (m) ≥ 0.055 0.28 Memenuhi
0.54 Ah 40° (m) ≥ 0.09 0.09 Memenuhi
0.39 Ah 30°- 40° (m) ≥ 0.03 0.19 Memenuhi
Rolling Period (s) 8 s/d 14 9.02 Memenuhi

rafik Prohaska

Grafik Stabilitas Awal

2; 1.73

1.089116485156
0.977022890758856
0.762811207534814
0.570010371032372
2; 1.73

1.089116485156
0.977022890758856
0.762811207534814
0.570010371032372

0.0697666433241031
1; 03; 0.00
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90
HEEL Angle (')
DANDY
Hambatan Kapal
Arief Kurniawan
1806202323
Teknik Perkapalan FTUI

1. Metode Guldhammer & Harv


v [knot] 9 10
No Formulasi Keterangan Simbol Hasil Perhitungan
V₁ V₂
1 V [m/s] kecepatan service V 4.6296 5.144
2 L = Lwl [m] panjang garis air L 96.90 96.90
3 Rn = V.L/∂ Reynold number Rn 3.90E+08 4.33E+08
4 T [m] sarat kapal T 6.70 6.70
5 B [m] lebar kapal B 17.00 17.00
6 Fn = V/√g.L Froude number Fn 0.15 0.17
7 v [m³] volume carena v 8753.171 8753.171
8 ∆ [ton] displacement ∆ 8972.000 8972.000
9 Cm midship coefficient Cm 0.990 0.990
10 Cp prismatic coefficient Cp 0.790 0.790
11 Cb block coefficient Cb 0.800 0.800
12 B/T Perbandingan B dan T B/T 2.537313433 2.5373134328
13 γ [ton/m³] mass density air laut γ 1.025 1.025
14 S Luas bidang basah S 2433.401 2433.401
15 L/V1/3 Volumetric coefficient L/V1/3 4.70 4.70
16 10³Cr Residual Resistance Coeff. (Grafik) 10³Cr 0.85 1.05
17 10³Cr₁ Koreksi Cr untuk perbedaan B/T 10³Cr₁ 0.005970149 0.0059701493
Bossings (3-5% Cr) = 3 % Cr 0.0255 0.0315
Shaft bracket & shafts 6% Cr 0.051 0.063
22 10³Cr Tot. Residual Resistance Coeff. Total 10³Cr Tot. 0.932470149 1.1504701493
23 10³Cf Specific fric. res. coeff. ITTC 1957 10³Cf 0.001778171 0.0017537368
24 10³Ca Incremental resistance coeff. 10³Ca 1.820191297 1.820191297
25 10³Ct Specific tot. resistance coefficient 10³Ct 2.754439617 2.9724151831
26 Rt [kN] Hambatan total kapal Rt 73.62542106 98.088701955
27 PE [kW] Daya efektif dalam Kilowatt PE 340.8562493 504.56828285
28 PE [HP] Daya efektif dalam Horse Power PE 463.4347374 686.02077886
29 Rt [kg] Hambatan total kapal Rt 7507.657811 10002.203027
30 PE x 1.15 Daya + 15% (kW) PE 391.9846867 580.25352528
Metode Guldhammer
250

200

Hambatan (kN)
150

100

50

0
8.5 9 9.5 10 10.5 11 11.5 12 12.5

Service Speed (Knots)

Metode Guldhammer
2000
1800
1600
Daya + 15% (kW)

1400
1200
1000
800
600
400
200
0
8.5 9 9.5 10 10.5 11 11.5 12 12.5

Service Speed (Knots)

Dokumentasi Metode Guldhammer


Lwl (m) :

Kapal Lpp (m) :


B (m) :
H (m) :
T (m) :
UI Cb :
Cp :

er & Harvald 2.
11 12 13
Hasil Perhitungan Variabel Bedasarkan No Uraian
buku Prinsip
V₃ V₄ V₅
Merancang
5.6584 6.1728 6.6872 Kapal 1 Vs
96.90 96.90 96.90 2 Vs
4.77E+08 5.20E+08 5.63E+08 3 ρ
6.70 6.70 6.70 4 Lwl = L
17.00 17.00 17.00 5 B
0.184 0.20 0.22 6 T
8753.171 8753.171 8753.171 7 Cb
8972.000 8972.000 8972.000 8 S
0.990 0.990 0.990 9 ∂
0.790 0.790 0.790 10 Rn = V.L/∂
0.800 0.800 0.800 11 Cf
2.53731343284 2.537313433 2.537313432836 12 V
1.025 1.025 1.025 13 V/L³
2433.401 2433.401 2433.401 14 Fn = V/√g.L
4.70 4.70 3.93 15 B/T
1.1500 1.57 2.1 16 Cp
0.00597014925 0.005970149 0.005970149254 17 Cr
0.0345 0.0471 0.063 18 ΔCf
0.069 0.0942 0.126 19 Ct
1.2595 1.717270149 2.294970149254 20 Rt
0.00173206463 0.001712628 0.001695036155 21 Pe
1.82019129705 1.820191297 1.820191297049 22 Rt
3.0814 3.539174075 4.116856482458 23 Pe
123.038789672 168.179839 229.5947474752 24 Pe x 1.15
696.202687482 1038.14051 1535.345995316
946.570615203 1411.475881 2087.486057534
12546.3884217 17149.46636 23412.0059948 Fn 0.150
800.633090604 1193.861587 1765.647894614 B/H 2.5
B/H 2.5

Fn 0.167
B/H 2.5
Guldhammer B/H 2.5

Fn 0.184
B/H 2.5
B/H 2.5

Metode Taylor
250

5 11 11.5 12 12.5 13 13.5


200

Hambatan (kN)
e Speed (Knots)
150

100
Guldhammer
50

0
8.5 9 9.5 10 10.5 11 11.5 12

Service Speed (Knots)

.5 11 11.5 12 12.5 13 13.5

Speed (Knots)

Guldhammer
96.90 v (m2/s) : 0.0000019
95.00 r (ton/m3) : 1.025
17.00 V (m3) : 8753.171
8.50 D (ton) : 8972.00
6.70
0.80 Cm : 0.99
0.79

2. Metode Taylor
Keterangan Satuan Kecepatan
I II
Kecepatan kapal Knot 9 10
Kecepatan kapal m/s 4.6296 5.144
Massa jenis air laut kg.sec²/kg4 104.6 104.6
Panjang kapal m 96.90 96.90
Lebar kapal m 17.00 17.00
Sarat kapal m 6.70 6.70
Block Coefficient 0.800 0.800
Luas bidang basah m² 2468.466109 2468.466109
Kinematic viscosity m²/s 0.00000119 0.00000119
Reynold number 390094121.74 433437913.043478
Koeff. Hamb. gesek 0.0017263797 0.00170265710600415
Volume m³ 8753.171 8753.171
Rasio vol dan panjang 0.0096204208 0.00962042079439137
Froude number 0.15 0.17
rasio lebar dan tinggi 2.5373134328 2.53731343283582
Prismatic coeff. 0.790 0.790
Coeff. Hamb. Sisa 0.0006 0.00065
Fric. Allowance 0.00044 0.00044
Total Fric. Coeff. 0.0027663797 0.00279265710600415
Hambatan Total kN 75.010103225 93.4847073810315
Daya efektif kW 347.26677389 480.885334768026
Hambatan Total kg 7654.6895584 9540.00038249355
Daya efektif HP 472.50867706 654.316826233958
Daya efektif + 15% kW 399.35678998 553.01813498323
Grafik hambatan sisa dari diagram Taylor & Gertler
Cr didapatkan dengan interpolasi
v 9 Fn
B/H
Cr 0.0006 B/H

v 10 Fn
B/H
Cr 0.00065 B/H

v 11

Cr 0.00075

Metode Taylor Metode Taylor


1800
1600
1400

Daya + 15% (kW)


1200
1000
800
600
400
200
9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 0
8.5 9 9.5 10 10.5 11 11.5 12 12.
Service Speed (Knots)
Service Speed (Knots)
or 3. Met
No Uraian
III IV V
11 12 13 1 Vs
5.6584 6.1728 6.6872 2 ∆
104.6 104.6 104.6 3 L = Lpp
96.90 96.90 96.90 4 RT rumus di atas
17.00 17.00 17.00 5 RT
6.70 6.70 6.70 6 Vs
0.800 0.800 0.800 7 Pe
2468.466109 2468.466109 2468.466109 8 Pe x 1.15
0.00000119 0.00000119 0.00000119 9 Pe
476781704.35 520125495.65 563469286.96 10 Pe x 1.15
0.0016816161 0.001662746 0.0016456662
8753.171 8753.171 8753.171
0.0096204208 0.0096204208 0.0096204208 V(knot)
0.18 0.20 0.22 V(m/s)
2.5373134328 2.5373134328 2.5373134328 Rn
0.790 0.790 0.790 Cf
0.00075 0.00115 0.00154 10^3 Cr
0.00044 0.00044 0.00044
0.0028716161 0.003252746 0.0036256662 8.59116940605265
116.31472946 156.79622311 205.11502648 0.00172637967912868
658.1552652 967.87172602 1371.6452051 5.179139037386E-05
11869.776295 16000.863354 20931.738312 0.00177817106950254
895.51922914 1316.9350575 1866.3296058
756.87855498 1113.0524849 1577.3919858 Cr
S
Rt
0.200 v 12 Ct
2.5
2.5 Cr 0.00115

0.217 v 13
2.5
2.5 Cr 0.00154

Metode Taylor

1200

1000
10 10.5 11 11.5 12 12.5 13 13.5

Daya + 15% (kW)


800
Service Speed (Knots)
600

400

200

0
8.5 9 9.5 1
3. Metode Telfer
Keterangan Satuan Kecepatan
I II III IV
Kecepatan kapal Knot 9 10 11 12
Displacement ton 8972.000 8972.000 8972.000 8972.000
Panjang LPP m 95.00 95.00 95.00 95.00
Hambatan Total kg 5454.4109203 6875.22029669 8708.8055069 11189.413249
Hambatan Total kN 53.490349322 67.4239511296 85.40556543 109.73240413
Kecepatan kapal m/s 4.6296 5.144 5.6584 6.1728
Daya efektif HP 336.68987729 471.548442749 657.0387344 920.93346805
Daya efektif HP 387.19335888 542.280709161 755.59454456 1059.0734883
Daya efektif kW 247.63892122 346.828804611 483.25885143 677.35618421
Daya efektif kW 284.7847594 398.853125302 555.74767914 778.95961184

9 10 11 12 13
4.6296 5.144 5.6584 6.1728 6.6872
390094121.73913 433437913.043 476781704.35 520125495.652 563469287
0.00172637967912868 0.00170265711 0.0016816161 0.00166274596 0.0016456662
0.274776106540343 0.34051373886 0.4572878221 0.64646114491 0.9331410455

8.63692689661332 8.67831958177 8.7161081427 8.75087024892


0.00170265710600415 0.00168161614 0.001662746 0.00164566617
5.10797131801246E-05 5.0448484E-05 4.988238E-05 4.93699851E-05
0.00175373681918428 0.00173206463 0.0017126283 0.00169503616

0.000274776106540343 0.00034051374 0.0004572878 0.00064646114 0.000933141


2433.401 2433.401 2433.401 2433.401 2433.401
53490.3493216821 67423.9511296 85405.56543 109732.40413 143818.61354
0.00200115578566902 0.00204317084 0.002138904 0.00230920711 0.0025788072
Metode Telfer
160
140
120
Hambatan (kN)

100
80
60
40
20
0
8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5

Service Speed (Knots)

Metode Telfer
1200

1000
Daya + 15% (kW)

800

600

400

200

0
8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5

Service Speed (Knots)


4. Hasil
Hambatan [kN]
v [knot]
V Guldhammar Taylor
13 12 73.6254210560939 75.010103
8972.000 13 98.0887019545014 93.484707
95.00 14 123.038789672263 116.31473
14665.18402236 15 168.179839021042 156.79622
143.8186135369 16 229.594747475221 205.11503
6.6872
1307.586914591 Daya Efektif x 1.15 (kW)
1503.724951779 v [knot] Guldhammar Taylor
961.743832444 12 391.984686719486 399.35679
1106.005407311 13 580.253525282048 553.01813
14 800.633090603761 756.87855
15 1193.86158685545 1113.0525
16 1765.64789461374 1577.392

250

200

150
Hambatan (kN)

Guldhammer
100 Taylor
Telfer

50

0
11.5 12 12.5 13 13.5 14 14.5 15 15.5 16 16.5
Service Speed (Knots)
Telfer

H
50

0
11.5 12 12.5 13 13.5 14 14.5 15 15.5 16 16.5
Service Speed (Knots)

2000
1800
1600

Daya Efektif x 1,15 (Kw)


1400
1200
1000
Guldhammer
800 Taylor
Telfer
600
400
200
0
11.5 12 12.5 13 13.5 14 14.5 15 15.5 16 16.5

Service Speed (Knots)


asil
ambatan [kN]
Telfer
53.4903493216821
67.4239511296253
85.4055654300564
109.732404129608
143.818613536899

Efektif x 1.15 (kW)


Telfer
284.784759402608
398.853125302411
555.747679143846
778.959611842931
1106.00540731054

Guldhammer
Taylor
Telfer

15 15.5 16 16.5
ts)
Telfer

15 15.5 16 16.5
ts)

Guldhammer
Taylor
Telfer

5 15 15.5 16 16.5

ots)
menggunakan 2 mesin
Propulsion Calculation
ARIEF KURNIAWAN 1806202323
Teknik Perkapalan FTUI

DATA KAPAL RANCANGAN


Principal Dimension
Lpp 95.0
B 17.0
H 8.5
T 6.7
Form Coefficient
Block coeff. 0.77
Midship coeff. 0.99
Prismatic coeff. 0.78
Waterline coeff. 0.85
Vertical prismatic coeff. 0.91

Resistance
Metode Guldhammer
Service Speed 12
Effective Engine Power 1411.48
17149.47
Total Resistance
168.179839021042

Perhitungan Daya Mesin (1 Mesin)


Efisiensi Relatif Rotatif(nrr) 1,02 - 1,05
Efisiensi Propulsi (nO) 40 - 70%
Efisiensi lambung (nH) (1-t) / (1-w)
Koefisien Propulsi (Pc) Pc=nrr*nO*nH
Thrust Power(THP)
Delivery Power(DHP)
Shaft Power(SHP) 1.02*DHP
BHP SHP/nG

Koofisien-koofisien untuk perhitungan Power


parameter hitungan

D = 0.7 T [m]
Diamater Propeller (D)
D = 0.7 T [feet]
Putaran mesin (rpm = n) (MCR) rpm
Reduction gear ratio ( asumsi
putaran mesin tereduksi rpm
rps rpm/60
Putaran Propeller bebas kavitasi (V tip) V tip = π D n/60 [m/s]
Memenuhi bebas kavitasi
Froud Wake factor (Single Screw) w = (0.5 Cb) - 0.05
Kecepatan kapal Vs [knot]
Vs [m/s]
Advance of speed (Va) Va = (1-W)Vs [knot]
Va [m/s]
Thrust deduction factor t = 0.8*W

t
n Calculation
AWAN 1806202323
erkapalan FTUI

Perhitungan Propeller dengan me

meter Wake Cooficient(w)


meter Speed Advance(Va)
meter Power Factor(Bp)
meter δ
Pitch Ratio(P/D)
- efisiensi propeller(n)
- Diameter Propeller(D)
- Pitch
- Thrust
-

Knot
HP
kg
KN

Planed
1.04
0.46 BHP 3217.08 HP
1.10053022183 2398.97491197833 kW
0.52649365812
1282.54168107
2680.89816278
2734.516 Penggunaan BHP(nG)
3217.08 0.85
nilai

4.69

15.38713910761
720
0.15
108
1.8
26.50788
< 35 m/s
0.334509525253
12
6.17333328
7.985885696959
4.108294495276
0.267607620203
n Propeller dengan metode Bp-δ

0.63 dari grafik


7.56 knot
35.9384639680123
337 grafik
0.536 grafik
0.46 ambil paling tinggi di grafik
283.08 inch
151.73 inch
54241.80 pound thrust

Menentukan Engine

Manufacturer
Engine Name
Engine Type
Revolution Speed
mep

Power Output
Bore

Stroke

Oversquare Ratio
SFC
MaK
M 25 C
8 M 25 C
720 rpm
23.5 bar
2534 kW

0.00 HP
255 mm

400 mm

0.6375
186 g/HP
DANDY
DATA KAPAL
CHEMICAL TANKER
∆ 8972.00 tons
Loa 100.00 m
Lwl 96.90 m
Lpp 95.00 m
B 17.00 m
H 8.50 m
T 6.70 m
Speed 12.00 kts
v 6.17 m/s
Cb 0.80 Schneekluth
Cm 0.992 Sabit Series 60
Cp 0.78 Cb/Cm
Cw 0.84 Posdunine
Cp' 0.90 Cb/Cw
Fn 0.20 Kapal Sedang

DWT 6074.80 tons


LWT 2955.71 tons
G 5845 tons
V 5152 m^3
density muatan 1200 kg/m^3

Kelengkapan Loads
f1 1 (shell plating, weather deck)
f2 0.75 (frame, deck beam)
f3 0.6 (web frame, stringer, grillage system)
Crw 1 (unlimited service range)
Co 7.814847 for 90 ≤ L ≤ 300 m
CL 1 for L ≥ 90 m
Po = basic external dynamic load
x/L (A) 0.18
x/L (M) 0.7
x/L (F) 0.82
CD (A) 1.02
CD (M) 1
CD (F) 1.17
c 4.25
CF1 (A) 1.125502
CF1 (M) 1
CF1 (F) 1.361447
Beban superstructured dan deck house
z poop deck 10.70 n pd 0.78
z boat deck 12.90 n btd 0.56
z bridge deck 15.10 n bed 0.34
z navigation 17.30 n nd 0.12
Forecastle deck n fd 1
Beban Sisi Kapal

z BSK bawah 2.233333


z BSK atas 7.60
z poop deck 9.60
z boat deck 11.80
z bridge deck 14.00
z navi deck 16.20
z forecastle 9.60
Beban Alas Dalam
F 0.027789
m0 1.527789
m (A) 1.052779
m (M) 1
m (F) 2.011116
av (A) 0.029256
av (M) 0.027789
av (F) 0.055888
Hdbrm 1m
h 7.50 m

Kelengkapan Data untuk Mencari Frame


n 0.5675
Hdb 1.133333
l 5.10 m
a (A) dan a (F) 0.6 m
a (M) 0.7 m
a/l (A) dan (F) 0.117647
a/l (M) 0.137255
ma (A) dan (F) 0.095668
ma (M) 0.111473
ma^2 (A) dan (F) 0.009152
ma^2 (M) 0.012426
P (A) = Ps (A) 78.89638 kN/m^2
P (M) = Ps (M) 75.07949 kN/m^2
P (F) = Ps (F) 86.07212 kN/m^2
s
Cr 0.75
Reh 235 N/mm^2
k 1
c 0.6
Bending stress 150 N/mm^2
Shear stress 100 N/mm^2
Equivalent stress 180 N/mm^2
h1 4.13 m
Pv 0.2 bar
av (A) 0.029256
av (B) 0.027789
av (C) 0.055888
P1 (A) 50060.75 kN/m^2
P1 (M) 49989.44 kN/m^2
P1 (F) 51355.54 kN/m^2
P2 (A)
P2 (M)
P2 (F)
m (A) 1.052779
m (M) 1
m (F) 2.011116
h 3.2 m
Pc 22.4 kN/m^2
PL (A) 23.05534 kN/m^2
PL (M) 23.02248 kN/m^2
PL (F) 23.65189 kN/m^2
Pmin (A) 0.354561 kN/m^2
Pmin (M) 0.354056 kN/m^2
Pmin (F) 0.363735 kN/m^2
b 1
Tb 1.133333
c1 1
Csl 0
Ca 1
Cs 1
PsL
2.4 m A
e 2.6 m M
2.4 m F
l 5.10 m
k 1
Ꝺpr = ꝹLB 150 N/mm^2
ꝹL 120 N/mm^2
Ꝺpermmax 230 N/mm^2
y 8.5 m
ps1 91.97551 kN/m^2
po1 30.41283 kN/m^2
Pf 170 kN
Mf 48.875 kNm
1.Plating
1.1 Minimum Thickness Requiremens (mm
1.1.1 Tabel 1 Plate Thickness Minimum
Elemen

Shell

Breasthook

Deck

Inner Bottom

Bulkhead
rillage system)
Width Keel Plate

2. Stiffener and Tripping Brackets (mm). Ch


2.1 Minimum Thickness Requirements
Elemen
Stiffeners and attached end brackets
attached end brackets
Tripping brackets
3. Primary Supporting Members
3.1 Minimum Thickness Requirements
Elemen
Double bottom centreline
girder

Other bottom girder

Girders bounding a duct keel

Bottom Floor

After peak floor


Other Primary Supporting
member
Perencanaan Konstruksi Kapal

Arief Kurniawan
1806202323
imum Thickness Requiremens (mm) 2.Double Bottom
abel 1 Plate Thickness Minimum Chapter 2 Secition 3.2
Location Area Net Thickness Planed Height of double bottom = B/
keel - 10.35 11 calculation
fore 9.35 10 planed
botom,Side
shell,Bilge machinery space 9.85 10
elswere 8.35 9 3.Double Side
- fore 6.5 7 Chapter 2 Section 3.3

weather
deck,strenght
6.4
deck,internal tank
boundary

Wds
Machineri space 3.4365 Planed
Platform deck
elsewhere 6.5
machinery space 8.88
elswhere 8.35
all 5.45

5.55 m

ner and Tripping Brackets (mm). Ch 6 sec 3


imum Thickness Requirements
Elemen Location Net Thickness Planed
ers and attached end brackets watertight boundary 4.925
attached end brackets Other structure 4.425
Tripping brackets 6.425
ary Supporting Members
imum Thickness Requirements
Elemen Location Net Thickness Planed
ouble bottom centreline Machinery space 52.58333333333
girder elsewhere 7.875

Other bottom girder Machinery space 54.83333333333


Elsewhere and forepart 7.4
ders bounding a duct keel Machinery space 40.5
Machinery space 54.83333333333
Bottom Floor Fore part 33.25
Elsewhere 28.5
After peak floor 33.25
ther Primary Supporting Aft part/fore part 33.25
member elsewhere 6.925
Double Bottom
hapter 2 Secition 3.2
Height of double bottom = B/15 ,however not less than 1 m
1.133333 m
1.2 m

Double Side
hapter 2 Section 3.3

0.80374 m
1m
3. Loads
Rules for Hull BKI (Vol II) 2019
3.1 Beban Geladak Cuaca sec 4, B-1
PLAT GELADAK DECK BEAM, STIFFENER
Po 24.564206997 kN/m^2 Po 22.8096207832709 kN/m^2
PD (A) 33.473936315 kN/m^2 PD (A) 31.0829408639827 kN/m^2
PD (M) 32.817584623 kN/m^2 PD (M) 30.4734714352771 kN/m^2
PD (F) 38.396574008 kN/m^2 PD (F) 35.6539615792742 kN/m^2
3.2 Beban superstructure dan deck house sec 4, B-5
PLAT GELADAK DECK BEAM, STIFFENER
PDA pd 26.109670326 kN/m^2 PDA pd 24.2446938739065 kN/m^2
PDA btd 18.745404336 kN/m^2 PDA btd 17.4064468838303 kN/m^2
PDA bed 11.381138347 kN/m^2 PDA bed 10.5681998937541 kN/m^2
PDA nd 4.0168723578 kN/m^2 PDA nd 3.72995290367793 kN/m^2
PDA fd 38.396574008 kN/m^2 PDA fd 35.6539615792742 kN/m^2
3.3 Beban Sisi Kapal Sec 4, B-2
3.3.1 Beban Sisi Kapal di bawah garis air
PLAT SISI MAIN FRAME
Ps (A) 81.529432988 kN/m^2 Ps (A) 78.8963782506567 kN/m^2
Ps (M) 77.418942663 kN/m^2 Ps (M) 75.0794943776945 kN/m^2
Ps (F) 89.257154798 kN/m^2 Ps (F) 86.0721199318256 kN/m^2
3.3.2 Beban Sisi Kapal di atas garis air
Ps (A) 80.176516749 kN/m^2 Ps (A) 74.4496226951783 kN/m^2
Ps (M) 71.236200292 kN/m^2 Ps (M) 66.1479002714855 kN/m^2
Ps (F) 96.984311686 kN/m^2 Ps (F) 90.0568608517207 kN/m^2
3.4 Beban Sisi Kapal diatas garis air muat pada superstructure deck dan deck house Sec 4, B-2
Ps pd 42.863681769 kN/m^2 Ps pd 39.8019902139419 kN/m^2
Ps btd 36.618642041 kN/m^2 Ps btd 34.0030247523079 kN/m^2
Ps bed 31.961936117 kN/m^2 Ps bed 29.6789406797601 kN/m^2
Ps nd 28.355974093 kN/m^2 Ps nd 26.3305473723 kN/m^2
Ps fd 51.849404804 kN/m^2 Ps fd 48.1458758897197 kN/m^2
3.5 Beban Alas Kapal Sec 4, B-3
3.5.1 Untuk menghitung plat alas
PB (A) 94.647074741 kN/m^2
PB (M) 91.564206997 kN/m^2
PB (F) 100.4428661 kN/m^2
3.5.2 Untuk menghitung bottom longitudinal
PB (M) 91.564206997 kN/m^2
3.6 Beban Alas Dalam Sec 4, C-2
Pi (A) 85.913697875 kN/m^2
Pi (M) 85.791270094 kN/m^2
Pi (F) 88.136687511 kN/m^2

3.7.Load on accomodation and machinery deck


3.7.1.Load on accomodation

P 3.602396605 kN/m2

3.7.2.Load on machinery

P 8.2340493828 kN/m2
Shell P
A.
CDG,SDG,STR BEAM
Po 18.24769663 kN/m^2
PD (A) 24.86635269 kN/m^2
PD (M) 24.37877715 kN/m^2
PD (F) 28.52316926 kN/m^2

CDG,SDG,STR BEAM
PDA pd 19.3957551 kN/m^2
PDA btd 13.92515751 kN/m^2
PDA bed 8.454559915 kN/m^2
PDA nd 2.983962323 kN/m^2
PDA fd 28.52316926 kN/m^2

WEB FRAME, STRINGER, GIRDER


Ps (A) 72.05043593 kN/m^2
Ps (M) 68.99692884 kN/m^2
Ps (F) 77.79102928 kN/m^2

Ps (A) 59.55969816 kN/m^2


Ps (M) 52.91832022 kN/m^2
Ps (F) 72.04548868 kN/m^2

Ps pd 31.84159217 kN/m^2 k 1
Ps btd 27.2024198 kN/m^2 tk 1.5
Ps bed 23.74315254 kN/m^2
Ps nd 21.0644379 kN/m^2 σperm 230 N/mm2
Ps fd 38.51670071 kN/m^2
B.Bottom Plate
0.6 A nf
a 0.65 M
0.6 F

8.563016 A mm
tB2 9.025955 M mm
8.776058 F mm

Bulwark

t 6.38415 mm

Double B
2.Center girder
l 17.00 m k 1
h 1115 mm
planed 1200 mm

tm 11.28938 mm

4.Inner Bottom

a 0.65 m tk 1.5
hDB 1200 mm

t 8.122586 mm

5.Floor
tpf 9.289375 mm

7.Bottom Structure Of Machinery Space


1.Plate Floor

P 2534 kW (from Engine Estimation TMK1)

t 8.668 %

2.Engine Seating
Long.Girder

t 182.9333 mm

Area Engine Seating

AT 103.7867 cm2
Shell Plating

C.Side Plate
Above draft Below draft
1 7.961701 A 8.028593347 A
ts2 8.130078 M ts2 8.475551641 M
8.756549 F 8.400473569 F

Psl 89.72 kN

Plat thickness in the strenghebed area

t 6.242031 mm

Side Longitudinal or transversal

W 31.402 cm3 l 1
34 cm3

Size 100x6 mm

Double Bottom
3.Side Girder / bottom girder
t 8.633507 mm

lebar kapal 17.00 m


sesuai aturan diatas jadi:
Jarak CG ke side shell 8.5 m
Jadi seusai aturan diatas:
Jmlh SG di kanan/kiri 1

jarak CG ruang muat 4.3 m


ke SG engine room 1.8 m

6.Bottom and Inner Bottom Frames

n 0.7
l 1m
c 1
Bottom Frame Inner Bottom Frame
W 41.66171 cm3 W 39.03502789 cm3

Size 90x60x6 mm Size 90x60x6 mm

ine Estimation TMK1)


Framing Syst
Frame Spacing
For & aft 600 mm
midship 650 mm

Ordinary Frames
Scantlings

Section Modulus
A 311.55443741 M 344.752723472 F 339.8907719 (cm^3)

Wr
size 180x90x14 size 200x100x12 size 200x100x12 (mm)

Upper end Shear Area Lower end Shear Area


Aro (A) 8.902126 cm^2 Aro (A) 15.58 cm^2
Aro (M) 9.74493 cm^2 Aro (M) 17.05 cm^2
Aro (F) 9.71179 cm^2 Aro (F) 17 cm^2

Frames in tanks
Shear Area Shear Area

A1 (A) 7060.639 cm^2 A2 (A) 0 cm^2


A1 (M) 8110.46 cm^2 A2 (M) 0 cm^2
A1 (F) 7243.26 cm^2 A2 (F) 0 cm^2

Tween Deck and Superstructure Frames


Scantlings

Section Modulus
Wt A 2.402945301 M 2.65909692632 F 4.70910182 cm^3

size 50 x 5 size 50 x 5 size 50 x 5 (mm)

Shear Area
At (A) 0.050008 cm^2
At (M) 0.05744 cm^2
At (F) 0.0513 cm^2

Peak Frames and Frames in way of the stern


Peak Frames
Shear Area
Ap (A) 0 cm^2
Ap (M) 0 cm^2
Ap (F) 0 cm^2

Strengthenings in fore- and aft body


Framing System

Web frame

Section Modulus
A 4071.5146598687 M 4188.42673323 F

size 550 x 500 x 52 Size 650x600X40 Size

Depth Web pframe

h 425 mm

Longitudinals and longitudinal beams


strength deck
Profil Plan

l 10.6662 m
W 1437.43028 cm^3 Size 370x18
c 0.55
k 1
Side Longitudinal
Profil Plan
Wlmin 1263.5604 cm^3 Size 370x15
Almin 11.042595 cm^2

Side Shell Longitudinal

Profil Plan

Wl 207.97872 cm^3

Side Transverses Size 180x18

Profil Plan

W 2879.5434 cm^3
Aw 51.328759 cm^2
Size 110x12

Bottom longitudinal
W 72.813581 cm^3 Profil Plan
l 3.23 m

Size 100x50x10

Inner Bottom Longitudinal


W 68.222833 cm^3 Profil Plan
l 3.23 m

Size 100x50x10
Bulkhead

4457.4309049 (cm^3)

550X 500 X 57(mm)

Plan
P 83.385 kN/m2 f 1
h 8.5 m tk 1.5

mm Thickness plate of bulkhead

Plan
1.1 collsion
cp
mm 0.9 stern tube and engine room

7.526816 mm collsion
t
6.431031 mm stern tube and engine room

Plan
Stiffner for bulkhead

mm

Plan 0.33 collsion


cs
0.265 stern tube and engine room

W 863.6356 cm3 collision


mm

Plan size 320x25 mm

W 693.5256 cm3 stern tube and engine room

mm

size 300x25 mm
Plan

mm
Perhitungan penentuan ukuran profil T untuk main f

b h A yi
5.2 55 286 27.5
50 5.2 260 57.6
546

ytot 41.83333333333 cm
Itot 196071.6333333 cm4
W 4686.971314741 cm3

b h A yi
4 65 260 32.5
60 4 240 67
500

ytot 49.06 cm
Itot 240404.8666667 cm4
W 4900.221497486 cm3

b h A yi
5.7 55 313.5 27.5
50 5.7 285 57.85
598.5

ytot 41.95238095238 cm
Itot 217310.1928571 cm4
W 5179.925141884 cm3
ntuan ukuran profil T untuk main frame

Ayi δyi A x (δyi)^2 Inersia


7865 -14.3333333333 58757.11111111 72095.83333333
14976 15.76666666667 64632.82222222 585.8666666667
22841 123389.9333333 72681.7

Ayi δyi A x (δyi)^2 Inersia


8450 -16.56 71300.736 91541.66666667
16080 17.94 77242.464 320
24530 148543.2 91861.66666667

Ayi δyi A x (δyi)^2 Inersia


8621.25 -14.4523809524 65481.15731293 79028.125
16487.25 15.89761904762 72029.27304422 771.6375
25108.5 137510.4303571 79799.7625
space of wing tank w 0.80374 mm
w yang diambil 1 mm
Tinggi double bottom Hdb 1.13333333333 mm
Hdb yg diambil 1.2 mm

Sheer strake t 7.375 mm

alpha 35 derajat
Longitudinal Ship Strength
Arief Kurniawan

DATA KAPAL RANCANGAN


ukuran utama
Lpp 95.00 m
B 17.00 m
H 8.50 m
T 6.70 m
L/20 4.75 m

1. KEKUATAN HOGGING
tinggi gelombang hogging

Ord H c
AP 4.75 0.000
1 4.75 0.034
2 4.75 0.128
3 4.75 0.226
4 4.75 0.421
5 4.75 0.577
6 4.75 0.720
7 4.75 0.839
8 4.75 0.927
9 4.75 0.982
10 4.75 1.000
11 4.75 0.982
12 4.75 0.927
13 4.75 0.839
14 4.75 0.720
15 4.75 0.577
16 4.75 0.421
17 4.75 0.226
18 4.75 0.128
19 4.75 0.034
FP 4.75 0.000

Keadaan dimana tinggi poros gelombang di atas AP dan FP, T = 0 m


Luasan yang dibentuk pada kurva bonjean
Ord Acad A bonjean
AP 00
1 0.01 0.28
2 0.1 2.8
3 0.3 8.4
4 0.89 24.92
5 1.41 39.48
6 1.97 55.16
7 3.3 92.4
8 2.55 71.4
9 2.64 73.92
10 2.64 73.92
11 2.54 71.12
12 2.35 65.8
13 2.1 58.8
14 1.76 49.28
15 1.41 39.48
16 0.95 26.6
17 0.45 12.6
18 0.2 5.6
19 0.04 1.12
FP 00

Keadaan dimana tinggi poros gelombang di atas AP dan FP, T = 1.675 m


Luasan yang dibentuk pada kurva bonjean
Ord Acad A bonjean
AP 00
1 0.14 3.92
2 0.42 11.76
3 0.86 24.08
4 1.74 48.72
5 2.36 66.08
6 2.97 83.16
7 3.3 92.4
8 3.51 98.28
9 3.58 100.24
10 3.56 99.68
11 3.44 96.32
12 3.24 90.72
13 2.97 83.16
14 2.63 73.64
15 2.27 63.56
16 1.79 50.12
17 1.19 33.32
18 0.79 22.12
19 0.31 8.68
FP 0.09 2.52

Keadaan dimana tinggi poros gelombang di atas AP dan FP, T = 3.35 m


Luasan yang dibentuk pada kurva bonjean
Ord Acad A bonjean
AP 0 0
1 0.3 8.4
2 0.81 22.68
3 1.51 42.28
4 2.64 73.92
5 3.34 93.52
6 3.96 110.88
7 4.27 119.56
8 4.47 125.16
9 4.52 126.56
10 4.48 125.44
11 4.34 121.52
12 4.13 115.64
13 3.85 107.8
14 3.49 97.72
15 3.13 87.64
16 2.62 73.36
17 1.99 55.72
18 1.45 40.6
19 0.4 11.2
FP 0.12 3.36

Keadaan dimana tinggi poros gelombang di atas AP dan FP, T = 5.03 m


Luasan yang dibentuk pada kurva bonjean
Ord Acad A bonjean
AP 0 0
1 0.47 13.16
2 1.26 35.28
3 2.27 63.56
4 3.59 100.52
5 4.33 121.24
6 4.75 133
7 4.75 133
8 4.75 133
9 4.75 133
10 4.75 133
11 4.75 133
12 4.75 133
13 4.72 132.16
14 4.36 122.08
15 3.99 111.72
16 3.47 97.16
17 2.8 78.4
18 2.13 59.64
19 1.1 30.8
FP 0.91 25.48

Menentukan tinggi poros yang sebenarnya dengan keadaan displacement yang sebenarnya pada keadaan

T (poros) D (ton)
0.00 3815.03
1.68 5614.88
3.35 7610.90
5.03 9318.59

menentukan tinggi poros dengan menggunakan tabel interpolasi

TABEL INTERPOLASI Displacement vs Tinggi Poros


Nilai Bawah : 7610.90
Nilai Tengah : 8972
Nilai Atas : 9318.59

Keadaan dimana tinggi poros gelombang di atas AP dan FP pada keadaan dimana kapal berisi muatan penu
Luasan yang dibentuk pada kurva bonjean
Ord Acad A bonjean
AP 0.0000 0
1 0.4300 12.04
2 1.1600 32.48
3 2.1000 58.8
4 3.3900 94.92
5 4.1300 115.64
6 4.6600 130.48
7 4.7100 131.88
8 4.7500 133
9 4.7500 133
10 4.7500 133
11 4.7500 133
12 4.7500 133
13 4.5400 127.12
14 4.1800 117.04
15 3.8100 106.68
16 3.2900 92.12
17 2.6300 73.64
18 1.9800 55.44
19 0.9700 27.16
FP 0.2100 5.88

Perhitungan Buoyancy untuk keadaan hogging pada gelombang yang didapat dari grafik menggunakan au

AP L (m2) C (ton/m3)
0 0 1.0291
1 15.652 1.0291
2 32.48 1.0291
3 82.32 1.0291
4 94.92 1.0291
5 109.858 1.0291
6 130.48 1.0291
7 131.88 1.0291
8 133 1.0291
9 133 1.0291
10 133 1.0291
11 133 1.0291
12 133 1.0291
13 127.12 1.0291
14 117.04 1.0291
15 106.68 1.0291
16 92.12 1.0291
17 73.64 1.0291
18 55.44 1.0291
19 27.16 1.0291
20 5.88 1.0291

DISTRIBUSI BERAT KAPAL

Wst = 1461.79 ton


Distribusi berat lambung kapal
Posisi dari AP Jarak dari AP k
AP 0 0.493
1/3 31.67 1.195
2/3 63.33 1.195
FP 95.00 0.766

Distribusi berat pada komponen lambung dan kelengkapannya

berat bangunan atas


No Bagian
1 Rancangan Kapal Kosong
2 Propeller + Shaft
3 Mesin Cadangan
3 Main engine
4 Outfitting and Equipment
5 Pelumas
6 Bahan bakar
7 Air tawar

9 Konsumsi
10 Crew and luggage
11 Berat lain-lain

Payload

Tabel dan Grafik Kekuatan Memanjang

Tabel Kekuatan Memanjang (hogging condition)


Lpp = 95.00
Jmlh Gading = 20
L ordinat G (ton/m)

0 0 15.00
1 4.75 15.95
2 9.50 28.92
3 14.25 28.57
4 19.00 14.03
5 23.75 80.45
6 28.50 80.45
7 33.25 80.45
8 38.00 80.45
9 42.75 80.45
10 47.50 80.45
11 52.25 80.45
12 57.00 80.45
13 61.75 80.45
14 66.50 80.45
15 71.25 80.45
16 76.00 80.45
17 80.75 80.45
18 85.50 80.45
19 90.25 80.45
20 95.00 0.68
1309.83
Grafik Kekuatan Memanjang

L G (ton/m) B Hogging (ton/m)


1:1 1:1
0 14.998 0.00
4.75 15.948 16.11
9.50 28.919 33.43
14.25 28.566 84.72
19.00 14.027 97.68
23.75 80.446 113.05
28.50 80.446 134.28
33.25 80.446 135.72
38.00 80.446 136.87
42.75 80.446 136.87
47.50 80.446 136.87
52.25 80.446 136.87
57.00 80.446 136.87
61.75 80.446 130.82
66.50 80.446 120.45
71.25 80.446 109.78
76.00 80.446 94.80
80.75 80.446 75.78
85.50 80.446 57.05
90.25 80.446 27.95
95.00 0.684 6.05

Tabel Kekuatan Memanjang (sagging condition)


Lpp = 95.00
Jmlh Gading = 20

L ordinat G (ton/m)

0 0 15.00
1 4.75 15.95
2 9.50 28.92
3 14.25 28.57
4 19.00 14.03
5 23.75 80.45
6 28.50 80.45
7 33.25 80.45
8 38.00 80.45
9 42.75 80.45
10 47.50 80.45
11 52.25 80.45
12 57.00 80.45
13 61.75 80.45
14 66.50 80.45
15 71.25 80.45
16 76.00 80.45
17 80.75 80.45
18 85.50 80.45
19 90.25 80.45
20 95.00 0.68

Grafik Kekuatan Memanjang

L G (ton/m) B sagging (ton/m)


1:1 1:1
0 14.998 0.58
4.75 15.948 29.97
9.50 28.919 53.64
14.25 28.566 91.92
19.00 14.027 110.94
23.75 80.446 111.23
28.50 80.446 111.23
33.25 80.446 107.19
38.00 80.446 101.43
42.75 80.446 97.11
47.50 80.446 93.65
52.25 80.446 94.51
57.00 80.446 99.70
61.75 80.446 111.23
66.50 80.446 117.56
71.25 80.446 127.94
76.00 80.446 136.87
80.75 80.446 136.87
85.50 80.446 100.56
90.25 80.446 57.92
95.00 0.684 6.92
kapasitas
displacement 8972.00 ton
t1 0m
t2 1.6750 m
t3 3.3500 m
t4 5.0250 m

H= 4.75 m
Y=Hxc C= Tinggi Gelombang dengan koefisien C pada tabel Hanske
0.000
0.162
0.608
1.074
2.000
2.741
3.420
3.985
4.403
4.665
4.750
4.665
4.403
3.985
3.420
2.741
2.000
1.074
0.608
0.162
0.000

FS HG tinggi poros gelombang


1 0 skala bonjean
4 1.12 jarak antar gading
2 5.6 Σ1 =
4 33.6 Volume =
2 49.84 D = Volume x 1.0291 =
4 157.92
2 110.32
4 369.6
2 142.8
4 295.68
2 147.84
4 284.48
2 131.6
4 235.2
2 98.56
4 157.92
2 53.2
4 50.4
2 11.2
4 4.48
1 0

FS HG tinggi poros gelombang


1 0 skala bonjean
4 15.68 jarak antar gading
2 23.52 Σ1 =
4 96.32 Volume =
2 97.44 D = Volume x 1.0291 =
4 264.32
2 166.32
4 369.6
2 196.56
4 400.96
2 199.36
4 385.28
2 181.44
4 332.64
2 147.28
4 254.24
2 100.24
4 133.28
2 44.24
4 34.72
1 2.52

FS HG tinggi poros gelombang


1 0 skala bonjean
4 33.6 jarak antar gading
2 45.36 Σ1 =
4 169.12 Volume =
2 147.84 D = Volume x 1.0291 =
4 374.08
2 221.76
4 478.24
2 250.32
4 506.24
2 250.88
4 486.08
2 231.28
4 431.2
2 195.44
4 350.56
2 146.72
4 222.88
2 81.2
4 44.8
1 3.36

FS HG tinggi poros gelombang


1 0 skala bonjean
4 52.64 jarak antar gading
2 70.56 Σ1 =
4 254.24 Volume =
2 201.04 D = Volume x 1.0291 =
4 484.96
2 266
4 532
2 266
4 532
2 266
4 532
2 266
4 528.64
2 244.16
4 446.88
2 194.32
4 313.6
2 119.28
4 123.2
1 25.48

placement yang sebenarnya pada keadaan kondisi penuh

D Pada Kondisi Penuh : 8972 ton


0
draft sebenarnya 4.6850 m
0

displacement hogging sebenarnya


6.00

5.00

4.00

3.00

2.00

1.00

0.00
0.00 1000.00 2000.00 3000.00 4000.00 5000.00 6000.00 7000.00 8000.00 9000.00 1000

Displacement vs Tinggi Poros


Nilai Bawah : 3.35
Nilai X : 4.6850
Nilai Atas : 5.025

a keadaan dimana kapal berisi muatan penuh T

FS HG tinggi poros gelombang


1 0 skala bonjean
4 48.16 jarak antar gading
2 64.96 Σ1 =
4 235.2 Volume =
2 189.84 D = Volume x 1.0291 =
4 462.56
2 260.96
4 527.52
2 266
4 532
2 266
4 532
2 266
4 508.48
2 234.08
4 426.72
2 184.24
4 294.56
2 110.88
4 108.64
1 5.88

yang didapat dari grafik menggunakan autocad B (ton/m ) = C (ton/m 3) x L (m2)

T(tinggi poros)
B (ton/m) 4.6850 m
0
16.1074732
33.425168
distribusi bouyancy hog
84.715512
160
97.682172
113.0548678 140
134.276968 120
135.717708
100
136.8703
136.8703 80
136.8703 60
136.8703
40
136.8703
130.819192 20
120.445864 0
109.784388 0 2 4 6 8 10 12
94.800692
75.782924
57.053304
27.950356
6.051108

24.5
( estimasi watson ) 29.68571316715
39.58095088954
k. G/L (ton/m) 49.47618861192
7.586 197.496 1212.167 242.43332419841 59.3714263343
18.388 478.718 2938.213 146.910660454919 64.3190451955
18.388 478.718 2938.213 146.910660454919 242.4333241984
11.787 306.860 1883.407 94.170348040559
56.148 1461.793 8972.000

L (m) B (m) T (m) W (ton) q (Ton/m)


100.00 17.00 6.70 1461.79 14.618
10.00 17.00 4.00 9.50 0.950
7.00 15.00 3.00 48.60 0.144
8.00 6.04 4.00 103.77 12.971
80.00 47.79 0.597
2.00 4.17 2.085
6.00 81.52 13.587
6.00 1.20 0.200

4.00 0.240 0.060


10.00 3.80 0.380
70.00 8.00 2.50 1342.36 19.177

65.00 5987.00 46.054

9091.74

L gading = 4.75
q= -410.254
B Hogging (ton/m) 1 2 3 4
P (ton/m) ΣP (ton/m) Koreksi ΣP ' (ton/m)
B (x) - G (x) ΣP 20/-20*No.gdg 2+3
0.00 -15.00 -15.00 0.00 -15.00
16.11 0.16 -14.84 -30.61 -45.45
33.43 4.51 -10.33 -61.22 -71.55
84.72 56.15 45.82 -91.83 -46.01
97.68 83.66 129.47 -122.44 7.03
113.05 32.61 162.08 -153.05 9.03
134.28 53.83 215.91 -183.66 32.26
135.72 55.27 271.18 -214.27 56.92
136.87 56.42 327.61 -244.88 82.73
136.87 56.42 384.03 -275.49 108.55
136.87 56.42 440.46 -306.10 134.36
136.87 56.42 496.88 -336.71 160.18
136.87 56.42 553.31 -367.32 185.99
130.82 50.37 603.68 -397.92 205.76
120.45 40.00 643.68 -428.53 215.15
109.78 29.34 673.02 -459.14 213.88
94.80 14.36 687.38 -489.75 197.62
75.78 -4.66 682.71 -520.36 162.35
57.05 -23.39 659.32 -550.97 108.35
27.95 -52.50 606.82 -581.58 25.24
6.05 5.37 612.19 -612.19 0.00

P (ton/m) σ (ton) M (ton*m) 150.000


1:1 1 : 10 1 : 100
-14.998 -7.124 -3.384
0.160 -22.983 -14.301 100.000
4.506 -39.238 -32.939
56.149 -31.127 -47.724
83.655 -13.931 -54.341
50.000
32.609 -19.381 -63.547
53.831 -14.217 -70.300
55.272 -7.384 -73.808
56.425 1.267 -73.206 0.000
0 10 20
56.425 11.273 -67.851
56.425 22.797 -57.023
56.425 35.797 -40.019 -50.000
56.425 50.316 -16.119
50.374 63.314 13.291
40.000 72.657 44.061
-100.000
-50.000

-100.000
29.339 77.920 74.330
14.355 76.599 101.553
-4.663 67.844 118.531
-23.392 46.214 117.361
-52.495 10.595 78.728
5.367 0.000 12.072
-73.808

L gading = 4.75
q= -149.674

B sagging (ton/m) 1 2 3 4
P (ton/m) ΣP (ton/m) Koreksi ΣP ' (ton/m)
B (x) - G (x) ΣP 20/-20*No.gdg 2+3
0.58 -14.42 -14.42 0.00 -14.42
29.97 14.02 -0.40 -29.46 -29.86
53.64 24.72 24.32 -58.91 -34.59
91.92 63.35 87.67 -88.37 -0.70
110.94 96.91 184.58 -117.82 66.76
111.23 30.78 215.36 -147.28 68.08
111.23 30.78 246.14 -176.73 69.41
107.19 26.75 272.88 -206.19 66.70
101.43 20.98 293.87 -235.64 58.22
97.11 16.66 310.53 -265.10 45.43
93.65 13.20 323.73 -294.56 29.17
94.51 14.07 337.80 -324.01 13.79
99.70 19.25 357.05 -353.47 3.58
111.23 30.78 387.83 -382.92 4.91
117.56 37.12 424.95 -412.38 12.57
127.94 47.49 472.44 -441.83 30.61
136.87 56.42 528.87 -471.29 57.58
136.87 56.42 585.29 -500.74 84.55
100.56 20.12 605.41 -530.20 75.21
57.92 -22.53 582.88 -559.66 23.22
6.92 6.23 589.11 -589.11 0.00

150.000
P (ton/m) σ (ton) M (ton*m)
1:1 1 : 10 1 : 100
-14.422 -21.818 -10.363
100.000
14.019 -28.880 -24.082
24.720 -30.307 -38.477

50.000
100.000

63.353 -12.888 -44.599


50.000
96.910 20.934 -34.656
30.779 23.703 -23.397
30.779 26.667 -10.730
26.745 28.298 3.013 0.000
20.982 25.740 16.598 0 10 20

16.660 21.069 27.718


13.202 13.858 31.528 -50.000
14.067 6.039 29.910
19.254 -0.214 26.381
30.779 -1.052 22.531
-100.000
37.119 -0.330 19.222
47.492 5.902 19.180
56.425 16.572 22.157
56.425 27.601 27.345
20.118 21.849 29.480
-22.528 -3.667 18.875
6.231 -14.967 5.895
2. KEKUATAN SAGGING
tinggi gelombang sagging

isien C pada tabel Hanske Ord


AP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

Keadaan dimana tinggi poros gelom


Luasan yang dibentuk pada kurva bo
0m Ord
1 : 28 AP
: 4.75 1
2341.36 2
3707.15333333333 m3 3
3815.03149533333 ton 4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

Keadaan dimana tinggi poros gelom


Luasan yang dibentuk pada kurva bo
1.68 m Ord
1 : 28 AP
: 4.8 1
3445.96 2
5456.10333333333 m3 3
5614.87594033333 ton 4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

Keadaan dimana tinggi poros gelom


Luasan yang dibentuk pada kurva bo
3.35 m Ord
1 : 28 AP
: 4.8 1
4670.96 2
7395.68666666667 m3 3
7610.90114866667 ton 4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

Keadaan dimana tinggi poros gelom


Luasan yang dibentuk pada kurva bo
5.03 m Ord
1 : 28 AP
: 4.8 1
5719 2
9055.08333333333 m3
3
9318.58625833333 ton 4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

Menentukan tinggi poros yang sebe

5
5
8972
8972

8000.00 9000.00 10000.00

menentukan tinggi poros dengan m

TABEL INTERPOLASI Displacement vs Tinggi Poros


Nilai Bawah :
Nilai Tengah :
Nilai Atas :

Keadaan dimana tinggi poros gelom


Luasan yang dibentuk pada kurva bo
4.6850 m Ord
1 18 AP
: 4.8 1
5524.68 2
8747.41 m3 3
9001.959631 ton 4
-0.332812323406 % 5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

Perhitungan Buoyancy untuk keadaa

AP
0
1
si bouyancy hogging 2
3
4
5
6
7
8
9
10
11
12
13
14
10 12 14 16 18 20 15
16
17
18
19
20

distribusi berat lambung kapal


20.000
18.000
16.000
14.000
12.000
10.000
8.000
6.000
4.000
2.000
0.000
0 10 20 30 40 50 60 70 8

600.000

500.000

400.000

300.000

200.000

100.000

0.000
0 31.6666666666667 63.3333333333333 95
5 6 7 8 9
Σ(ΣP ' )(ton/m) s (ton) M (tonm) Faktor Henske ∆2 .σ(ton)
- DL*(4) DL2*(5) C (Hogging)
-15.00 -71.24 -338.39 0.000 0
-60.45 -215.88 -1363.81 0.034 -13.94865163469
-132.00 -339.87 -2978.19 0.128 -52.51257086
-178.01 -218.55 -4016.32 0.226 -92.71750792469
-170.97 33.41 -3857.62 0.421 -172.7171275942
-161.94 42.91 -3653.80 0.577 -236.7168233299
-129.69 153.21 -2926.04 0.720 -295.3832110875
-72.77 270.36 -1641.84 0.839 -344.2034918089
9.96 392.98 224.82 0.927 -380.3058842752
118.51 515.60 2673.93 0.982 -402.8698795666
252.87 638.22 5705.49 1.000 -410.2544598438
413.05 760.84 9319.50 0.982 -402.8698795666
599.05 883.47 13515.96 0.927 -380.3058842752
804.80 977.34 18158.35 0.839 -344.2034918089
1019.95 1021.95 23012.61 0.720 -295.3832110875
1233.83 1015.91 27838.19 0.577 -236.7168233299
1431.45 938.70 32297.04 0.421 -172.7171275942
1593.80 771.16 35960.05 0.226 -92.71750792469
1702.14 514.65 38404.64 0.128 -52.51257086
1727.39 119.90 38974.17 0.034 -13.94865163469
1727.39 0.00 38974.17 0.000 0

10 20 30 40 50 60 70 80 90
5 6 7 8 9
Σ(ΣP ' )(ton/m) s (ton) M (tonm) Faktor Henske ∆2 .σ(ton)
- DL*(4) DL *(5)
2
C (Hogging)
-14.42 -68.50 -325.39 1.000 -149.6739391888
-44.28 -141.82 -999.05 0.982 -146.9798082834
-78.87 -164.32 -1779.57 0.927 -138.747741628
-79.57 -3.31 -1795.27 0.839 -125.5764349794
-12.81 317.10 -289.03 0.720 -107.7652362159
55.27 323.39 1247.07 0.577 -86.36186291192
124.68 329.68 2813.05 0.421 -63.01272839847
191.37 316.81 4317.88 0.226 -33.82631025666
249.60 276.56 5631.53 0.128 -19.15826421616
295.02 215.78 6656.49 0.034 -5.088913932418
324.20 138.58 7314.73 0.000 0
337.98 65.48 7625.77 0.034 -5.088913932418
341.57 17.02 7706.62 0.128 -19.15826421616
346.48 23.31 7817.35 0.226 -33.82631025666
359.05 59.71 8100.97 0.421 -63.01272839847
389.65 145.38 8791.55 0.577 -86.36186291192
447.23 273.49 10090.61 0.720 -107.7652362159
531.77 401.59 11998.16 0.839 -125.5764349794
606.98 357.24 13695.03 0.927 -138.747741628
630.21 110.31 14219.02 0.982 -146.9798082834
630.21 0.00 14219.02 1.000 -149.6739391888
10 20 30 40 50 60 70 80 90
ATAN SAGGING
elombang sagging
H= 3.8 m
H c Y=Hxc C= Tinggi Gelombang dengan koefisien C
3.8 1.000 3.800
3.8 0.982 3.732
3.8 0.927 3.523
3.8 0.839 3.188
3.8 0.720 2.736
3.8 0.577 2.193
3.8 0.421 1.600
3.8 0.226 0.859
3.8 0.128 0.486
3.8 0.034 0.129
3.8 0.000 0.000
3.8 0.034 0.129
3.8 0.128 0.486
3.8 0.226 0.859
3.8 0.421 1.600
3.8 0.577 2.193
3.8 0.720 2.736
3.8 0.839 3.188
3.8 0.927 3.523
3.8 0.982 3.732
3.8 1.000 3.800

n dimana tinggi poros gelombang di atas midship, T = 0 m


yang dibentuk pada kurva bonjean
Acad A bonjean FS HG tinggi poros gelombang
0.0000 0 1 0 skala bonjean
0.3200 8.96 4 35.84 jarak antar gading
0.6800 19.04 2 38.08 Σ1 =
0.8800 24.64 4 98.56 Volume =
1.1000 30.8 2 61.6 D = Volume x 1.0291 =
0.9800 27.44 4 109.76
0.7600 21.28 2 42.56
0.4300 12.04 4 48.16
0.2600 7.28 2 14.56
0.0700 1.96 4 7.84
0.0000 0 2 0
0.0700 1.96 4 7.84
0.2800 7.84 2 15.68
0.5200 14.56 4 58.24
0.9600 26.88 2 53.76
1.2900 36.12 4 144.48
1.5500 43.4 2 86.8
1.5500 43.4 4 173.6
1.3900 38.92 2 77.84
0.4800 13.44 4 53.76
0.1400 3.92 1 3.92

n dimana tinggi poros gelombang di atas midship, T = 1.675 m


yang dibentuk pada kurva bonjean
Acad A bonjean FS HG tinggi poros gelombang
0.0000 0 1 0 skala bonjean
0.4900 13.72 4 54.88 jarak antar gading
1.0900 30.52 2 61.04 Σ1 =
1.5300 42.84 4 171.36 Volume =
1.8500 51.8 2 103.6 D = Volume x 1.0291 =
1.7900 50.12 4 200.48
1.6000 44.8 2 89.6
1.3000 36.4 4 145.6
1.1600 32.48 2 64.96
0.9800 27.44 4 109.76
0.9400 26.32 2 52.64
1.0500 29.4 4 117.6
1.2500 35 2 70
1.5900 44.52 4 178.08
1.9700 55.16 2 110.32
2.3000 64.4 4 257.6
2.5400 71.12 2 142.24
2.4200 67.76 4 271.04
2.0700 57.96 2 115.92
1.2200 34.16 4 136.64
0.2400 6.72 1 6.72

n dimana tinggi poros gelombang di atas midship, T = 3.35 m


yang dibentuk pada kurva bonjean
Acad A bonjean FS HG tinggi poros gelombang
0.0200 0.56 1 0.56 skala bonjean
0.7300 20.44 4 81.76 jarak antar gading
1.5800 44.24 2 88.48 Σ1 =
2.1900 61.32 4 245.28 Volume =
2.6400 73.92 2 147.84 D = Volume x 1.0291 =
2.6200 73.36 4 293.44
2.4500 68.6 2 137.2
2.2000 61.6 4 246.4
2.0500 57.4 2 114.8
1.8900 52.92 4 211.68
1.8800 52.64 2 105.28
2.0200 56.56 4 226.24
2.2200 62.16 2 124.32
2.5600 71.68 4 286.72
2.9700 83.16 2 166.32
3.3000 92.4 4 369.6
3.5300 98.84 2 197.68
3.3100 92.68 4 370.72
2.8200 78.96 2 157.92
1.6200 45.36 4 181.44
0.2400 6.72 1 6.72

n dimana tinggi poros gelombang di atas midship, T = 6.03 m


yang dibentuk pada kurva bonjean
Acad A bonjean FS HG tinggi poros gelombang
0.0200 0.56 1 0.56 skala bonjean
1.0400 29.12 4 116.48 jarak antar gading
2.1900 61.32 2 122.64 Σ1 =
3.1900 89.32 4 357.28 Volume =
3.9700 111.16 2 222.32 D = Volume x 1.0291 =
3.9700 111.16 4 444.64
3.8300 107.24 2 214.48
3.6400 101.92 4 407.68
3.4900 97.72 2 195.44
3.3700 94.36 4 377.44
3.4900 97.72 2 195.44
3.5900 100.52 4 402.08
3.7900 106.12 2 212.24
4.2100 117.88 4 471.52
4.5700 127.96 2 255.92
4.4750 125.3 4 501.2
4.7500 133 2 266
4.2200 118.16 4 472.64
3.4900 97.72 2 195.44
2.0100 56.28 4 225.12
0.2400 6.72 1 6.72

ukan tinggi poros yang sebenarnya dengan keadaan displacement yang sebenarnya pada keadaan kondisi penuh

T (poros) D (ton) D Pada Kondisi Penuh : 8972 ton


0.00 1845.92 0
1.68 4008.47 draft sebenarnya 5.8089 m
3.35 6127.23 0
6.03 9227.80
displacement sagging sebenarnya
7.00

6.00

5.00

4.00

3.00

2.00

1.00

0.00
0.00 2000.00 4000.00 6000.00 8000.00 10000.00

ukan tinggi poros dengan menggunakan tabel interpolasi

placement vs Tinggi Poros


Nilai Bawah : 6127.23 Nilai Bawah : 3.35
Nilai Tengah : 8972 Nilai X : 5.8089
Nilai Atas : 9227.80 Nilai Atas : 6.030

n dimana tinggi poros gelombang di atas midship pada keadaan dimana kapal berisi muatan penuh T
yang dibentuk pada kurva bonjean
Acad A bonjean FS HG tinggi poros gelombang
0.0200 0.56 1 0.56 skala bonjean
1.0400 29.12 4 116.48 jarak antar gading
2.1900 61.32 2 122.64 Σ1 =
3.1900 89.32 4 357.28 Volume =
3.8500 107.8 2 215.6 D = Volume x 1.0291 =
3.8600 108.08 4 432.32
3.7200 108.08 2 216.16
3.5200 104.16 4 416.64
3.3700 98.56 2 197.12
3.2500 94.36 4 377.44
3.2800 91 2 182
3.4600 91.84 4 367.36
3.8600 96.88 2 193.76
4.0800 108.08 4 432.32
4.4400 114.24 2 228.48
4.7500 124.32 4 497.28
4.7500 133 2 266
4.22 133 4 532
3.4900 97.72 2 195.44
2.0100 56.28 4 225.12
0.2400 6.72 1 6.72
0.24
ngan Buoyancy untuk keadaan hogging pada gelombang yang didapat dari grafik menggunakan autocad B (ton/m ) = C (ton/m 3)

T(tinggi poros)
L (m2) C (ton/m3) B (ton/m) 5.8089 m
0.56 1.0291 0.576296
29.12 1.0291 29.967392
52.122 1.0291 53.6387502 distribusi berat kond
89.32 1.0291 91.919212
160
107.8 1.0291 110.93698
108.08 1.0291 111.225128 140
108.08 1.0291 111.225128 120
104.16 1.0291 107.191056
100
98.56 1.0291 101.428096
94.36 1.0291 97.105876 80

91 1.0291 93.6481 60
91.84 1.0291 94.512544 40
96.88 1.0291 99.699208
20
108.08 1.0291 111.225128
114.24 1.0291 117.564384 0
0 2 4 6 8 10
124.32 1.0291 127.937712
133 1.0291 136.8703
133 1.0291 136.8703
97.72 1.0291 100.563652
56.28 1.0291 57.917748
6.72 1.0291 6.915552

ng kapal

60 70 80 90 100

Column F

333333 95
10 11 12 13
Σ ∆2.σ(ton) ∆ M(tonm) σ (ton) M (ton*m)
- ∆L *(10) (6) + (9) (7) + (11)
0 0 -71.2 -338.39
-13.95 -66.256095265 -229.8 -1430.07
-66.46 -315.69080685 -392.4 -3293.88
-159.18 -756.09896949 -311.3 -4772.42
-331.90 -1576.5053256 -139.3 -5434.12
-568.61 -2700.9102364 -193.8 -6354.71
-864.00 -4103.980489 -142.2 -7030.02
-1208.20 -5738.9470751 -73.8 -7380.78
-1588.51 -7545.4000254 12.7 -7320.58
-1991.38 -9459.0319534 112.7 -6785.10
-2401.63 -11407.740638 228.0 -5702.25
-2804.50 -13321.372566 358.0 -4001.87
-3184.81 -15127.825516 503.2 -1611.86
-3529.01 -16762.792102 633.1 1395.55
-3824.39 -18165.862355 726.6 4846.75
-4061.11 -19290.267265 779.2 8547.93
-4233.83 -20110.673622 766.0 12186.36
-4326.54 -20551.081784 678.4 15408.97
-4379.06 -20800.516496 462.1 17604.12
-4393.00 -20866.772591 106.0 18107.40
-4393.00 -20866.772591 0.0 18107.40
18107.40

G (ton/m)
B Hogging (ton/m)
P (ton/m)
σ (ton)
M (ton*m)
80 90 100
10 11 12 13
Σ ∆2.σ(ton) ∆ M(tonm) σ (ton) M (ton*m)
- ∆L *(10) (6) + (9) (7) + (11)
-149.673939189 -710.95121115 -218.2 -1036.34
-296.65 -1409.1053005 -288.8 -2408.16
-435.40 -2068.1570732 -303.1 -3847.72
-560.98 -2664.6451394 -128.9 -4459.92
-668.74 -3176.5300114 209.3 -3465.56
-755.11 -3586.7488602 237.0 -2339.68
-818.12 -3886.0593201 266.7 -1073.01
-851.94 -4046.7342938 283.0 271.14
-871.10 -4137.7360489 257.4 1493.79
-876.19 -4161.9083901 210.7 2494.58
-876.19 -4161.9083901 138.6 3152.82
-881.28 -4186.0807312 60.4 3439.69
-900.44 -4277.0824863 -2.1 3429.54
-934.26 -4437.75746 -10.5 3379.59
-997.28 -4737.0679199 -3.3 3363.91
-1083.64 -5147.2867687 59.0 3644.26
-1191.40 -5659.1716407 165.7 4431.44
-1316.98 -6255.6597069 276.0 5742.50
-1455.73 -6914.7114796 218.5 6780.32
-1602.71 -7612.865569 -36.7 6606.16
-1752.38 -8323.8167801 -149.7 5895.21

G (ton/m)
B sagging (ton/m)
P (ton/m)
G (ton/m)
B sagging (ton/m)
P (ton/m)
σ (ton)
M (ton*m)
80 90 100
No. WL
0 1
ombang dengan koefisien C pada tabel Hanske 0 0 0
2 0 0
4 0 0
6 5.4808171 5.6996057
8 38.74337 41.083679

No SB X SB Y
0 0 0.000
1 4.75 0.162
2 9.5 0.608
3 14.25 1.074
4 19 2.000
5 23.75 2.741
6 28.5 3.420
7 33.25 3.985
8 38 4.403
9 42.75 4.665
10 47.5 4.750
11 52.25 4.665
12 57 4.403
13 61.75 3.985
14 66.5 3.420
15 71.25 2.741
os gelombang 0m 16 76 2.000
1 : 28 17 80.75 1.074
: 4.75 18 85.5 0.608
1132.88 19 90.25 0.162
1793.7267 m3 20 95 0.000
me x 1.0291 = 1845.9241 ton

os gelombang 1.68 m
1 : 28
: 4.8
2460.08
3895.1267 m3
me x 1.0291 = 4008.4749 ton
os gelombang 3.35 m
1 : 28
: 4.8
3760.4
5953.9667 m3
me x 1.0291 = 6127.2271 ton

os gelombang 6.03 m
1 : 28
: 4.75
5663.28
8966.86 m3
me x 1.0291 = 9227.7956 ton
ndisi penuh

6
6
8972
8972

benarnya

0 8000.00 10000.00

os gelombang 5.8089 m
1 : 28
: 4.8
5578.72
8832.9733 m3
me x 1.0291 = 9090.0129 ton
1.2982694 %

cad B (ton/m ) = C (ton/m 3) x L (m2)

tribusi berat kondisi sagging

6 8 10 12 14 16 18 20
TABEL 3
Nomor Gading
2 3 4 5 6 7 8
0 0 0 0 0 0 0
0 0 5.3843955 27.234857 28.271634 28.486129 28.2001764818
5.39899367773333 5.6797325 39.433533 62.56434 63.905409 64.0674 63.4521298505333
39.5220420154667 41.023814 75.094603 98.243995 99.582857 99.687129 98.7979899621333
75.2033534508667 76.700525 110.77328 133.92365 135.2603 135.31894 134.217024955667

Ord No SB X SB Y Ord
0,0 0 0 3.800 0,3.8
4.75,0.1615 1 4.75 3.732 4.75,3.7316
9.5,0.608 2 9.5 3.523 9.5,3.5226
14.25,1.0735 3 14.25 3.188 14.25,3.1882
19,1.99975 4 19 2.736 19,2.736
23.75,2.74075 5 23.75 2.193 23.75,2.1926
28.5,3.42 6 28.5 1.600 28.5,1.5998
33.25,3.98525 7 33.25 0.859 33.25,0.8588
38,4.40325 8 38 0.486 38,0.4864
42.75,4.6645 9 42.75 0.129 42.75,0.1292
47.5,4.75 10 47.5 0.000 47.5,0
52.25,4.6645 11 52.25 0.129 52.25,0.1292
57,4.40325 12 57 0.486 57,0.4864
61.75,3.98525 13 61.75 0.859 61.75,0.8588
66.5,3.42 14 66.5 1.600 66.5,1.5998
71.25,2.74075 15 71.25 2.193 71.25,2.1926
76,1.99975 16 76 2.736 76,2.736
80.75,1.0735 17 80.75 3.188 80.75,3.1882
85.5,0.608 18 85.5 3.523 85.5,3.5226
90.25,0.1615 19 90.25 3.732 90.25,3.7316
95,0 20 95 3.800 95,3.8
TABEL 3
Nomor Gading
9 10 11 12 13 14 15 16 17
0 0 0 0 0 0 0 0 0
27.521729 26.535494 25.254473 23.550535 21.467658 19.088156 16.420738 13.562869 10.438185
62.083091 60.091974 57.481354 53.978037 49.652255 44.745735 39.138196 33.103446 26.305419
96.934883 94.054749 90.353621 85.305413 78.963855 71.747757 63.408151 54.267854 43.904745
131.98909 128.41051 123.86256 117.5264 109.38989 100.05963 89.128662 76.998254 63.145446
18 19 20
0 0 0
6.4041209 2.9822598 0.2403792
17.339564 6.5018305 2.0564411
29.934722 11.212318 4.4095073
44.035638 16.639649 7.1217623
DANDY
beban
t/m2
Beban Geladak Cuaca = 3.34646231104467
Beban Luar Sisi = 7.89453510252311
Beban Alas Dalam = 8.74827490472218
Beban Alas = 9.3369506403684

PROFIL KONSTRUKSI MELINTANG

1 Web Frame

Profil 1 2
AB b (cm) h (cm)
Luas I 4.00 56.00
Luas II 65.00 4.00

2 Deck Frame

Profil 1 2
BC = CD = C b h
Luas I 5 50
3 ORDINARY FRAME

Profil 1 2
BC = CD = C b h
Luas I 10 1.2
Luas ii 1.2 18.8

beban terbagi rata dan inersia

q (t/m) I (cm4)
A'B 1.178 1.44000000000233
BC 0.718 153224.506887052
CD 1.178 1.44000000000233
D'E 0.197 1.44000000000233

Faktor Kekakuan
l adalah panjang daerah tersebut↓
Nama rumus L
Kab 4EI/L 8.5
Kbc 4EI/L 12
Kcd 4EI/L 8.5
Kde 4EI/L 18.8

Data Buat cari Momen Primer

qab 1.178
a= 6.7
Lab 8.5 b= 1.8
qBC 0.718
Lbc 12 a=-
b= -
qcd 1.178
Lcd 8.5 a= 6.7
b= 1.8
qDE 0.197
Lde 18.8 a= 17
b= 1.8
α 0.904255319148936

Tabel Cross
KEKUATAN MELINTANG

1 kn/m2
0.101971621297793 ton/m2 Beban geladak cuaca 32.817585
Beban Luar Sisi 77.418943
Beban alas dalam 85.79127
Beban Alas 91.564207

3 1x2=4 3x4=5 3x5=6 (1/12) x 1 x 23 = 7


a (cm) F Fxa F x a2 I = (1/12) x b x h3
30.00 224 6720 201600 58538.6667
2.00 260 520 1040 346.6667
S= 484 7240 202640 58885.3333
S 5= 261525.333333333 e = 14.95867769 cm
Itotal = 153224.5069 cm4
W = 10243.18527 cm³

3 1x2=4 3x4=5 3x5=6 (1/12) x 1 x 23 = 7


a F Fxa F x a2 I = (1/12) x b x h3
25 250 6250 156250 52083.3333333333
S= 250 6250 156250 52083.3333
S 5= 208333.3333 e= 25 cm
Itotal = 52083.33333 cm4
W = 2083.333333 cm³
3 1x2=4 3x4=5 3x5=6 (1/12) x 1 x 23 = 7
a F Fxa F x a2 I = (1/12) x b x h3
106 12 1272 134832 1.44
9.9 22.56 223.344 2211.1056 664.4672
S= 12 1272 134832 1.44
S 5= 134833.44 e= 106 cm
Itotal = 1.44 cm4
W = 0.013584906 cm³

LA'B 6.7 m

LBC 13 m
LCD 6.7 m
LED' 17 m

Faktor Distribusi
Nama nilai
nilai Vab 0.000
0.47058823529412 EI Vba 0.585
0.33333333333333 EI Vbc 0.415
0.47058823529412 EI Vcb 0.415
0.21276595744681 EI Vcd 0.585365853658537
Vdc 0.688644688644689
Vde 0.311355311355311
Ved 0

momen primer

ton/m Nama nilai


Mab -1.83 ton.m
Mbc 8.62 ton.m
ton/m Mcb -8.62 ton.m
Mcd 3.51 ton.m
Mdc -3.51 ton.m
ton/m Mde -13.271188598562 ton.m
Mba 0.510095174492601 ton.m
Med 5.7790164703906 ton.m
ton/m
kn/m2
kn/m2
kn/m2
kn/m2
Itot 604692.1067 cm4
0.00604692107 m4
y 19.7882037534 cm

METODE CROSS

A' D'
Mab &Mba

Mbc & Mcb

Mcd & Mdc

Mde & Med


SS

T
Titik Kumpul(titik jepit) A B
Batang AB BA
FD 0.000 0.585

D' MP
MD
-1.83 0.5100952
0 -5.343699
MI -2.67184941732 0
MD 0 -0.619976
MI -0.30998813009 0
MD 0 0.4715394
MI 0.23576971791 0
MD 0 -0.089126
MI -0.04456316211 0
MD 0 0.0677874
MI 0.03389369831 0
MD 0 -0.012813
MI -0.00640629503 0
MD 0 0.009745
MI 0.00487247809 0
MD 0 -0.001842
MI -0.00092095386 0
MD 0 0.0014009
MI 0.00070045595 0
MD 0 -0.000265
Momen Cross -4.59 -5.01
-4589.68866672 -5007.153
Momen Reaksi
Nama Batang Momen Reaksi
Mab 17.631128395635
Mbc 51.7123420081942
Mcb -51.7123420081942
Mcd 28.3771224456366
Mdc -28.3771224456366
Mde 34.7874599769302
Mba -17.631128395635
Med -34.7874599769302

Momen Max -61.6927256565 ton.m


-6169272.56565 kg.cm
Itot 604692.1067 cm4
y 19.7882037534 cm
f ( σ) 201.885920443 kg/cm2
Tabel Cross
B C D E
BC CB CD DC DE ED Ket
0.415 0.415 0.5853659 0.6886447 0.3113553 0 FD
8.62 -8.62 3.51 -3.51 -13.27119 5.7790165 MP
-3.78512000788 2.11825222230544 2.9904737 11.556275 5.2249115 0 Iterasi 1 MD
1.059126111153 -1.8925600039381 5.7781374 1.4952369 0 2.6124557 MI
-0.43914985097 -1.6110930723645 -2.274484 -1.029687 -0.46555 0 Iterasi 2
-0.80554653618 -0.219574925482881 -0.514843 -1.137242 0 -0.232775
0.334007100368 0.304514941117358 0.4299034 0.7831558 0.3540864 0 Iterasi 3
0.152257470559 0.167003550184125 0.3915779 0.2149517 0 0.1770432
-0.06313114633 -0.231606938446501 -0.326975 -0.148025 -0.066926 0 Iterasi 4
-0.11580346922 -0.0315655731646042 -0.074013 -0.163487 0 -0.033463
0.048016072605 0.0437763493824094 0.0618019 0.1125846 0.0509026 0 Iterasi 5
0.021888174691 0.0240080363023812 0.0562923 0.030901 0 0.0254513
-0.00907558463 -0.0332952669567591 -0.047005 -0.02128 -0.009621 0 Iterasi 6
-0.01664763348 -0.00453779231403024 -0.01064 -0.023503 0 -0.004811
0.006902677296 0.00629318468978577 0.0088845 0.0161849 0.0073176 0 Iterasi 7
0.003146592345 0.00345133864795673 0.0080925 0.0044422 0 0.0036588
-0.00130468463 -0.00478644901209608 -0.006757 -0.003059 -0.001383 0 Iterasi 8
-0.00239322451 -0.00065234231540462 -0.00153 -0.003379 0 -0.000692
0.0009923126 0.0009046933812089 0.0012772 0.0023267 0.001052 0 Iterasi 9
0.000452346691 0.00049615630003435 0.0011634 0.0006386 0 0.000526
-0.00018755838 -0.00068808861557257 -0.000971 -0.00044 -0.000199 0 Iterasi 10
5.01 -9.98 9.98 8.18 -8.18 8.33 ton.m
5007.152830136 -9980.38364833212 9980.3836 8176.5979 -8176.598 8326.4112 kg.m

Momen Cross Momen Total


-4.59 13.0414397289158 ton.m
5.01 56.7194948383298 ton.m
-9.98 -61.6927256565263 ton.m
9.98 38.3575060939687 ton.m
8.18 -20.2005245329431 ton.m
-8.18 26.6108620642368 ton.m
-5.01 -22.6382812257705 ton.m
8.33 -26.4610487467502 ton.m

f material 1100 kg/cm

AMAN
Ket
Faktor Distribusi
Momen Primer
Momen Distribusi
Momen Induksi
Floodable Length Curve
Arief Kurniawan

Data Webster
Ship Specifications
Lpp 95.00
Ship Name B 17.00
Owner H 8.50
Shipyard T 6.700
Type Cb 0.769
∆ 8972.00 tons t 0.018
Loa 100.00 m ML 0.076
Lwl 96.90 m H' 8.442
Lpp 95.00 m fb 1.742
B 17.00 m f 0.206
H 8.50 m Za 9.540
T 6.70 m Zf 10.600
Cb 0.77 ∆/LBTγc Za' 1.040
Cm 0.992 Sabit Series 60 Zf' 2.100
Cp 0.776 Cb/Cm Za" 0.123
Cw 0.846 Posdunine Zf" 0.249
Cp' 0.909 Cb/Cw
Cba 0.75 Diagram
Cbf 0.85 Diagram

AP 15%LPP
Cb Za"
m a m a
0.15 39.7 0.19 51.2 0.04
0.78
0.08 38.1 0.166 48.2 0.013
0.15 39.645095252534 0.197686665 51.69414273 0.039450953
0.77
0.08 38.045095252534 0.173686665 48.74904747 0.011901905
0.15 39.8 0.176 50.3 0.041
0.8
0.08 38.2 0.152 47.2 0.015

50%LPP 60%LPP 70%LPP


m a m a m a
107 0.008 81.1 0.03 59.4 0.059
106.3 0.006 77.2 0.028 54.5 0.046
106.12152404 0.0074509525253386 78.629286364024 0.03 58.57642879 0.057352858
105.36661929 0.0054509525253386 75.937190808279 0.028 53.89604778 0.044352858
108.6 0.009 85.6 0.03 60.9 0.062
108 0.007 79.5 0.028 55.6 0.049

AP 15%LPP 20%LPP
Za"
m a m a m
0.15 39.65 0.19 51.20 0.04 51.10
0.12 39.03 0.18 50.05 0.03 50.07
0.08 38.05 0.17 48.20 0.01 48.40
50%LPP 60%LPP 70%LPP
m a m a m a
106.12 0.01 78.63 0.03 58.58 0.06
105.85 0.01 77.64 0.03 56.86 0.05
105.37 0.01 75.94 0.03 53.90 0.04
AP 15%LPP 20%LPP 30%LPP 40%LPP
m 39.03 50.05 50.07 61.73 89.29
a 0.18 0.03 0.03 0.04 0.02

0 15 20 30
f μ 0.00 14.25 19.00 28.50

0.63 23.99 18.75 18.86 23.87


0.20633 0.85 17.78 13.90 13.98 17.69
1 15.11 11.81 11.88 15.04

kargo
mesin
Kosong
Data Webster
m Length b.p. Floodable Length Curve
m Breadth mld. 40.00
m Height
35.00
m Draft mld.
- Block coeff Floodable Length (m) 30.00

m Plate thickness 25.00


m Margin line
20.00
m Height correction
m Freeboard 15.00
- Freeboard ratio 10.00
m Aft height
5.00
m Fwd height
m Aft sheer 0.00
0 10 20 30 40 50 60 70 80 90 100
m Fwd sheer
%LPP
- Aft sheer ratio
- Fwd sheer ratio

20%LPP 30%LPP 40%LPP 45%LPP


m a m a m a m
51.1 0.041 62.5 0.048 90.9 0.023 106.1
48.4 0.015 60.5 0.02 86.7 0.018 105.1
51.42942848 0.03825476262669 62.44509525 0.04580381 90.84509525 0.02080381 105.7705715
48.67452374 0.01335285757602 60.44509525 0.01780381 86.7 0.016352858 104.7705715
50.5 0.046 62.6 0.052 91 0.027 106.7
47.9 0.018 60.6 0.024 86.7 0.021 105.7

80%LPP 85%LPP FP
Zf"
m a m a m a
50.7 0.065 54.2 0.065 38.4 0.288 0.3
44.9 0.054 47.1 0.059 36.2 0.269 0.16
50.86471424 0.06445095252534 54.58433323 0.068294285 38.34509525 0.29678476 0.3
44.95490475 0.054 47.53923798 0.06119619 36.2 0.27778476 0.16
50.4 0.066 53.5 0.059 38.5 0.272 0.3
44.8 0.054 46.3 0.055 36.2 0.253 0.16

20%LPP 30%LPP 40%LPP 45%LPP


a m a m a m a
0.04 62.50 0.05 90.90 0.02 106.10 0.01
0.03 61.73 0.04 89.29 0.02 105.72 0.00
0.02 60.50 0.02 86.70 0.02 105.10 0.00
80%LPP 85%LPP FP
Zf"
m a m a m a
50.86 0.06 54.58 0.07 38.35 0.30 0.30
48.70 0.06 52.01 0.07 37.56 0.29 0.25
44.95 0.05 47.54 0.06 36.20 0.28 0.16
45%LPP 50%LPP 60%LPP 70%LPP 80%LPP 85%LPP FP
105.72 105.85 77.64 56.86 48.70 52.01 37.56
0.00 0.01 0.03 0.05 0.06 0.07 0.29

40 45 50 60 70 80 85
38.00 42.75 47.50 57.00 66.50 76.00 80.75
l'
32.23 35.40 35.79 29.04 23.37 20.64 22.46
23.89 26.24 26.53 21.52 17.32 15.30 16.64
20.31 22.30 22.55 18.29 14.72 13.00 14.15
ve

0.63
0.85
1

0 80 90 100

45%LPP
a
0.005
0.004
0.00335
0.00125
0.008
0.009

Cb

0.78
0.77

0.8

100
95.00

29.58
21.92
18.64
DANDY
Stabilitas Berbagai Kondisi P
Naval Architecture and Marine Engineering UI
ARIEF KURNIAWAN
1806202323

No. Kondisi
0 Kondisi Kapal Kosong
LWT
1 Kondisi Pemuatan I (Berangkat Penuh)
Consumables
Person + Luggage
Makanan
Water Ballast
Kargo
2 Kondisi Pemuatan II (Ditengah Perjalanan)
Consumables
Person + Luggage
Makanan
Water Ballast
Kargo
3 Kondisi Pemuatan III (Loading)
Consumables
Person + Luggage
Makanan
Water Ballast
Kargo
4 Kondisi Pemuatan IV (Dengan Ballast & Tanpa Kargo)
Consumables
Person + Luggage
Makanan
Water Ballast
Kargo
5 Kondisi Pemuatan V (Hampir Tiba)
Consumables
Person + Luggage
Makanan
Water Ballast
Kargo

Kondisi Pemuatan I (Berangkat Penuh


No. Load Weight (Ton)
1 Kapal kosong 2955.71
2 Consumables 84.44
3 Person + Luggage 3.80
4 Makanan 0.24
5 Water Ballast 0.00
6 Kargo 5987.00
Σ1 Displacement = 9031.19
Volume = 8810.92

GK = Σ2 / Σ1 = 4.451
Data Cross Curve
α0 0 10 20
Sin α 0 0.174 0.342
NK 0 0.757247515616707 2.47113825253638
GK Sin α 0 0.773 1.522
MG Sin α = h 0 -0.016 0.949
GZ 0 -0.016 0.949

Data Perubahan beberapa komponen akibat perubahan displacement

No. Perubahan
1 Draft (D)
2 MK (HSC pd T no. 1)
3 GK
4 MG
5 C.O.B dari AP
6 C.O.G dari AP
7 Jarak GF = 5-6
8 Moment perubahan trim (MCT)
9 C.O.F dari AP
10 Lwl
11 Trim (t) = (1*7)/8

17.621831776819

Interpolasi Displacement vs Draft


Displacement (ton) Twl (m)
Nilai D WL 1 : 6834.92 Nilai Bawah :
Nilai D WL (x) : 9031.19 Nilai X :
Nilai D WL 2 : 8727.413 Nilai Atas :

Interpolasi Displacement vs MK
Displacement (ton) MK (m)
Nilai D WL 1 : 6834.91714352533 Nilai Bawah :
Nilai D WL (x) : 9031.19 Nilai X :
Nilai D WL 2 : 8727.413 Nilai Atas :
Interpolasi Displacement vs CB (FO'')
Displacement (ton) CB (m)
Nilai D WL 1 : 6834.91714352533 Nilai Bawah :
Nilai D WL (x) : 9031.19 Nilai X :
Nilai D WL 2 : 8727.413 Nilai Atas :

Interpolasi Displacement vs CG (FO)


Displacement (ton) CG (m)
Nilai D WL 1 : 6834.91714352533 Nilai Bawah :
Nilai D WL (x) : 9031.19 Nilai X :
Nilai D WL 2 : 8727.413 Nilai Atas :

Interpolasi Displacement vs MCT


Displacement (ton) MCT (m)
Nilai D WL 1 : 6834.91714352533 Nilai Bawah :
Nilai D WL (x) : 9031.19 Nilai X :
Nilai D WL 2 : 8727.413 Nilai Atas :

Interpolasi Displacement vs LCF (FK)


Displacement (ton) LCF (FO') (m)
Nilai D WL 1 : 6834.91714352533 Nilai Bawah :
Nilai D WL (x) : 9031.19 Nilai X :
Nilai D WL 2 : 8727.413 Nilai Atas :

BM (m) : 4.09
GM (m): 2.06

Tabel Prohaska
j h* h* x MB Sin j
0 0 0 0
15 0.009 0.0368 0.258819045102521
30 -0.013 -0.0531 0.5
45 -0.09 -0.3677 0.707106781186547
60 -0.25 -1.0214 0.866025403784439
75 -0.47 -1.9203 0.965925826289068
90 -0.6 -2.4515 1

Interpolasi
Sudut h
Nilai 0 : 0 Nilai Bawah :
Nilai 5: 5 Nilai X :
Nilai 10: 10 Nilai Atas :
Interpolasi
Sudut h
Nilai 10: 10 Nilai Bawah :
Nilai 15: 15 Nilai X :
Nilai 20: 20 Nilai Atas :
Interpolasi
Sudut h
Nilai 20: 20 Nilai Bawah :
Nilai 25: 25 Nilai X :
Nilai 30: 30 Nilai Atas :
Interpolasi
Sudut h
Nilai 30: 30 Nilai Bawah :
Nilai 35: 35 Nilai X :
Nilai 40: 40 Nilai Atas :
Interpolasi
Sudut h
Nilai 30 : 40 Nilai Bawah :
Nilai 35 : 35 Nilai X :
Nilai 45 : 45 Nilai Atas :
Interpolasi
Sudut h
Nilai 35 : 35 Nilai Bawah :
Nilai 40 : 40 Nilai X :
Nilai 45 : 45 Nilai Atas :

MG sina Tabel 1 radian


1 radian : 57.3 MG sin a
sin a : 0.841510782 0
MG sin a : 1.733744058 1.73
0

Stabilitas Penuh
2

1.5

0.5

0
0 10 20 30 40 50 60 70 80 90 100

-0.5

Kondisi I MG sin 57.3

α0 h FS HG
0 0 1 0.000
5 -0.008 4 -0.031
10 -0.016 2 -0.031
15 0.467 4 1.866
20 0.949 2 1.897
25 1.148 4 4.591
30 1.347 2 2.694
35 1.452 4 5.807
40 1.556 1 1.556
Σ1= 10.986
Σ1= 18.349
Ah 30° = 0.319
Ah 40° = 0.534
Ah 30°-40° = 0.253

* Pengecekan Stabilitas dengan IMO


Criteria IMO Result
MG (m) ≥ 0.15 2.060
h 30° (m) ≥ 0.2 1.35
Ah 30° (m) ≥ 0.055 0.319
Ah 40° (m) ≥ 0.09 0.534
Ah 30°- 40° (m) ≥ 0.03 0.253

KESIMPULAN GRAFIK
MG Sin α = h
j0
Kondisi 1 Kondisi 2 Kondisi 3
0 0 0 0
10 -0.016 0.060 0.012
20 0.949 1.098 1.002
30 1.347 1.566 1.425
40 1.556 1.838 1.657
50 1.603 1.938 1.723
60 1.499 1.901 1.658
70 1.100 1.931 1.667
80 0.627 1.616 1.339
90 0.201 1.521 1.240
erbagai Kondisi Pemuatan
l Architecture and Marine Engineering UI
ARIEF KURNIAWAN
1806202323

Persentase (%) Berat (ton)

100.00% 2955.71

100% 84.44
100% 3.80
100% 0.24
0% 0.00
100% 5987.00

50% 42.22
100% 3.80
50% 0.12
85% 1141.00
100% 5987.00

50% 42.22
50% 1.90
50% 0.12
50% 671.18
50% 2993.50
a Kargo)
100% 84.44
100% 3.80
100% 0.24
100% 1342.36
0% 0.00

20% 16.89
100% 3.80
20% 0.05
90% 1208.12
100% 5987.00

si Pemuatan I (Berangkat Penuh)


COG (m) MOMENT (ton m)
Base Line After Pick Base line After Pick
5.53 94.49 16330.280 279275.862
3.493 10.59 294.984 894.241
11.578 11.6625 43.995 44.318
ukur COG dari GA di CAD
7.99 8.37 1.918 2.009
0.53 47.04 0.000 0.000
3.93 47.05 23528.910 281688.350
ton 40200.086 561904.780
8.81091588840959 Skala CC Σ2 Σ3

30 40 50 60 70
0.500 0.643 0.766 0.866 0.940
3.57251230552397 4.41767499101239 5.01287397270921 5.37668331879787 5.70227581
2.226 2.861 3.410 3.878 4.602
1.347 1.556 1.603 1.499 1.100
1.347 1.556 1.603 1.499 1.100

Nilai Satuan Perubahan Nilai


4.45 m
ta = (9*11)/10 0.28050158
7.08 m
4.451 m
tf = t-ta 0.2509835
2.626 m
48.04 m
Ta = d + ta 4.73
48.62 m
0.58 m
Tf = d - tf 4.20
9877.41 ton.m/m
51.14 m
Tm = (Ta + Tf ) / 2 4.46312397
96.90 m
0.531485083584943 m

ft
Twl (m)
3.45
4.45
4.31

MK (m)
7.22
7.08
7.10
'')
CB (m)
48.00
48.04
48.0374886876175

O)
CG (m)
49.12
48.62
48.6932061308502

MCT (m)
9051.40
9877.41
9763.16

K)
LCF (FO') (m)
50.34
51.14
51.0295860016999

GM Sin j h
0 0
0.5332 0.570
1.0301 0.977
1.4568 1.089
1.7843 0.763
1.9901 0.070
2.0603 -0.391

h
0.00
-0.01
-0.02

h
-0.02
0.47
0.95
h
0.95
1.15
1.35

h
1.35
1.45
1.56

h
1.56
2.02
1.09

h
2.02
1.56
1.09

Tabel 1 radian
x
0
57.30
57.30

60 70 80 90 100

n 57.3

FS HG
1 1.347
4 5.807
1 1.556
Σ2= 8.710

Koreksi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi

N GRAFIK
MG Sin α = h
Kapal Tanpa Kargo Kapal Tiba (Hampir)
0 0
0.069 0.064
1.116 1.106
1.591 1.577
1.870 1.852
1.977 1.955
1.945 1.920
1.979 1.951
1.666 1.637
1.572 1.543
Ship Specification
LPP : 95
B: 17
H: 8.5
T: 6.7
Cb : 0.77

Avaible Load
Consumables 84.4
Person + Luggage 3.8
Makanan 0.2
Water Ballast 1,342.4
Kargo 5,987.0

Consumables : 84.44
Minyak Pelumas 1.48
Bahan Bakar 81.52
Air Tawar 1.20
Makanan 0.24

Kondisi Pemuata
No. Load
1 Kapal kosong
2 Consumables
3 Person + Luggage
ukur COG dari GA di CAD
4 Makanan
5 Water Ballast
6 Kargo
Σ1 Displacement =
Volume =

GK = Σ2 / Σ1 =
Data Cross Curve
80 90 α0 0
0.985 1.000 Sin α 0
5.56827862 5.53446938 NK 0
4.941 5.333 GK Sin α 0
0.627 0.201 MG Sin α = h 0
0.627 0.201 GZ 0

Data Perubahan beberapa komponen akibat perubahan displ

No. Perubahan
1 Draft (D)
2 MK
3 GK
4 MG
5 C.O.B dari AP
6 C.O.G dari AP
7 Jarak GF = 5-6
8 Moment perubahan trim (MCT)
9 C.O.F dari AP
10 Lwl
11 Trim (t) = (∆*7)/8

19.7655655107056

Interpolasi Displacement vs Dra


Displacement (ton)
Nilai D WL 1 :
Nilai D WL (x) :
Nilai D WL 2 :

Interpolasi Displacement vs MK
Displacement (ton)
Nilai D WL 1 :
Nilai D WL (x) :
Nilai D WL 2 :
Interpolasi Displacement vs CB (FO
Displacement (ton)
Nilai D WL 1 :
Nilai D WL (x) :
Nilai D WL 2 :

Interpolasi Displacement vs CG (FO


Displacement (ton)
Nilai D WL 1 :
Nilai D WL (x) :
Nilai D WL 2 :

Interpolasi Displacement vs MCT


Displacement (ton)
Nilai D WL 1 :
Nilai D WL (x) :
Nilai D WL 2 :

Interpolasi Displacement vs LCF (F


Displacement (ton)
Nilai D WL 1 :
Nilai D WL (x) :
Nilai D WL 2 :

BM (m) : 4.09
GM (m): 2.06

Tabel Prohaska
j h*
0 0
15 0.009
30 -0.013
45 -0.09
60 -0.25
75 -0.47
90 -0.6

Interpolasi
Sudut
Nilai 0 :
Nilai 5:
Nilai 10:
Interpolasi
Sudut
Nilai 10:
Nilai 15:
Nilai 20:
Interpolasi
Sudut
Nilai 20:
Nilai 25:
Nilai 30:
Interpolasi
Sudut
Nilai 30:
Nilai 35:
Nilai 40:
Interpolasi
Sudut
Nilai 30 :
Nilai 35 :
Nilai 45 :
Interpolasi
Sudut
Nilai 35 :
Nilai 40 :
Nilai 45 :

MG sina
1 radian : 57.3
sin a : 0.8415108
MG sin a : 1.7337441

Stabilitas Ditengah
2.5

1.5

0.5

0
0 10 20 30 40
Kond

α0 h
0 0
5 0.030
10 0.060
15 0.579
20 1.098
25 1.332
30 1.566
35 1.702
40 1.838

Ah 30°
Ah 40°
Ah 30°-40°

* Pengecekan Stabilitas dengan IMO


Criteria IMO
MG (m) ≥
h 30° (m) ≥
Ah 30° (m) ≥
Ah 40° (m) ≥
Ah 30°- 40° (m) ≥
COG consumable
from AP from baseline
FO 14.64 3.920
LO 14.64 0.530
FW 2.490 6.030
COG crew and luggage
from AP from Base Line ukur dari GA di CAD
Main Deck 8.37 7.990
Poop Deck 10.62 10.39
Boat Deck 13.48 12.79
Bridge Deck 14.18 15.14

Kondisi Pemuatan II (Ditengah Perjalanan)


COG (m) MOMENT (ton m)
Load Weight (Ton)
Base Line After Pick Base line After Pick
Kapal kosong 2955.7 5.53 94.49 16330.3 279275.9
Consumables 42.2 3.4933333333333 10.59 147.5 447.1
Person + Luggage 3.8 11.5775 11.6625 44.0 44.3
Makanan 0.1 7.99 8.37 1.0 1.0
Water Ballast 1141.0 0.53 47.04 604.7 53672.9
Kargo 5987.0 3.93 47.05 23528.9 281688.4
Displacement = 10129.85232424 ton 40656.37 615129.509
Volume = 9882.78 9.8827827553528 Skala CC Σ2 Σ3

GK = Σ2 / Σ1 = 4.014 m
oss Curve
10 20 30 40 50 60 70
0.174 0.342 0.500 0.643 0.766 0.866 0.940
0.75724751562 2.4711382525364 3.572512305524 4.41767499 5.012873972709 5.376683318798 5.70227581
0.697 1.373 2.007 2.580 3.075 3.476 3.771
0.060 1.098 1.566 1.838 1.938 1.901 1.931
0.060 1.098 1.566 1.838 1.938 1.901 1.931

a komponen akibat perubahan displacement

Perubahan Nilai Satuan Perubahan Nilai


Draft (D) 4.95 m
ta = (9*11)/10 0.16341313
MK 7.01 m
GK 4.451 m
tf = t-ta 0.14379912
MG 2.626 m
C.O.B dari AP 48.06 m
Ta = d + ta 5.11
C.O.G dari AP 48.38 m
Jarak GF = 5-6 0.31 m
Tf = d - tf 4.80
Moment perubahan trim (MCT) 10290.62 ton.m/m
C.O.F dari AP 51.54 m
Tm = (Ta + Tf ) / 2 4.95859476
Lwl 96.90 m
Trim (t) = (∆*7)/8 0.3072122515568 m

nterpolasi Displacement vs Draft


ment (ton) Twl (m)
6834.92 Nilai Bawah : 3.45
10129.85 Nilai X : 4.95
8727.413 Nilai Atas : 4.31

Interpolasi Displacement vs MK
ment (ton) MK (m)
6834.9171435 Nilai Bawah : 7.22
10129.85 Nilai X : 7.01
8727.413 Nilai Atas : 7.10
nterpolasi Displacement vs CB (FO'')
ment (ton) CB (m)
6834.9171435 Nilai Bawah : 48.00
10129.85 Nilai X : 48.06
8727.413 Nilai Atas : 48.03748868762

Interpolasi Displacement vs CG (FO)


ment (ton) CG (m)
6834.9171435 Nilai Bawah : 49.12
10129.85 Nilai X : 48.38
8727.413 Nilai Atas : 48.69320613085

Interpolasi Displacement vs MCT


ment (ton) MCT (m)
6834.9171435 Nilai Bawah : 9051.40
10129.85 Nilai X : 10290.62
8727.413 Nilai Atas : 9763.16

Interpolasi Displacement vs LCF (FK)


ment (ton) LCF (FO') (m)
6834.9171435 Nilai Bawah : 50.34
10129.85 Nilai X : 51.54
8727.413 Nilai Atas : 51.0295860017

h* x MB Sin j GM Sin j h
0 0 0.000 0
0.0368 0.25881904510252 0.533 0.570
-0.0531 0.5 1.030 0.977
-0.3677 0.70710678118655 1.457 1.089
-1.0214 0.86602540378444 1.784 0.763
-1.9203 0.96592582628907 1.990 0.070
-2.4515 1 2.060 -0.391

Interpolasi
dut h
0 Nilai Bawah : 0.00
5 Nilai X : 0.03
10 Nilai Atas : 0.06
Interpolasi
dut h
10 Nilai Bawah : 0.06
15 Nilai X : 0.58
20 Nilai Atas : 1.10
Interpolasi
dut h
20 Nilai Bawah : 1.10
25 Nilai X : 1.33
30 Nilai Atas : 1.57
Interpolasi
dut h
30 Nilai Bawah : 1.57
35 Nilai X : 1.70
40 Nilai Atas : 1.84
Interpolasi
dut h
40 Nilai Bawah : 1.84
35 Nilai X : 2.59
45 Nilai Atas : 1.09
Interpolasi
dut h
35 Nilai Bawah : 2.59
40 Nilai X : 1.84
45 Nilai Atas : 1.09

Tabel 1 radian
MG sin a x
0 0
1.73 57.30
0 57.30

abilitas Ditengah Perjalann

20 30 40 50 60 70 80 90 100
Kondisi II MG sin 57.3

FS HG FS HG
1 0.000
4 0.121
2 0.121
4 2.317
2 2.197
4 5.328
2 3.132 1 1.566
4 6.807 4 6.807
1 1.838 1 1.838
Σ1= 13.215 Σ2= 10.211
Σ1= 21.860
= 0.384
= 0.636
= 0.297

ngan IMO
a IMO Result Koreksi
0.15 2.060 Memenuhi
0.2 1.57 Memenuhi
0.055 0.384 Memenuhi
0.09 0.636 Memenuhi
0.03 0.297 Memenuhi
Kondisi Pemuatan III
No. Load
1 Kapal kosong
2 Consumables
3 Person + Luggage
4 Makanan
5 Water Ballast
6 Kargo
Σ1 Displacement =
Volume =

GK = Σ2 / Σ1 =
Data Cross Curve
80 90 α0 0 10
0.985 1.000 Sin α 0 0.174
5.56827862 5.53446938 NK 0 0.7572475156
3.953 4.014 GK Sin α 0 0.746
1.616 1.521 MG Sin α = h 0 0.012
1.616 1.521 GZ 0 0.012

Data Perubahan beberapa komponen akibat perubahan displacem

No. Perubahan
1 Draft (D)
2 MK (HSC pd T no. 1)
3 GK
4 MG
5 C.O.B dari AP
6 C.O.G dari AP
7 Jarak GF = 5-6
8 Moment perubahan trim (MCT)
9 C.O.F dari AP
10 Lwl
11 Trim (t) = (1*7)/8

13.0041500778471

Interpolasi Displacement vs Draft


Displacement (ton)
Nilai D WL 1 : 2940.34
Nilai D WL (x) : 6664.63
Nilai D WL 2 : 3994.722

Interpolasi Displacement vs MK
Displacement (ton)
Nilai D WL 1 : 2940.336884
Nilai D WL (x) : 6664.63
Nilai D WL 2 : 3994.722
Interpolasi Displacement vs CB (FO'')
Displacement (ton)
Nilai D WL 1 : 2940.336884
Nilai D WL (x) : 6664.63
Nilai D WL 2 : 3994.722

Interpolasi Displacement vs CG (FO)


Displacement (ton)
Nilai D WL 1 : 2940.336884
Nilai D WL (x) : 6664.63
Nilai D WL 2 : 3994.722

Interpolasi Displacement vs MCT


Displacement (ton)
Nilai D WL 1 : 2940.336884
Nilai D WL (x) : 6664.63
Nilai D WL 2 : 3994.722

Interpolasi Displacement vs LCF (FK)


Displacement (ton)
Nilai D WL 1 : 2940.336884
Nilai D WL (x) : 6664.63
Nilai D WL 2 : 3994.722

BM (m) : 10.28
GM (m): 4.24

Tabel Prohaska
j h* h* x MB
0 0 0
15 0.009 0.0368
30 -0.013 -0.0531
45 -0.09 -0.3677
60 -0.25 -1.0214
75 -0.47 -1.9203
90 -0.6 -2.4515

Interpolasi
Sudut
Nilai 0 : 0
Nilai 5: 5
Nilai 10: 10
Interpolasi
Sudut
Nilai 10: 10
Nilai 15: 15
Nilai 20: 20
Interpolasi
Sudut
Nilai 20: 20
Nilai 25: 25
Nilai 30: 30
Interpolasi
Sudut
Nilai 30: 30
Nilai 35: 35
Nilai 40: 40
Interpolasi
Sudut
Nilai 30 : 40
Nilai 35 : 35
Nilai 45 : 45
Interpolasi
Sudut
Nilai 35 : 35
Nilai 40 : 40
Nilai 45 : 45

MG sina
1 radian : 57.3
sin a : 0.8415108
MG sin a : 3.571733

Stabilitas
Stabilitas KondisiLoad
Kondisi III
1 2
0.9 1.8
0.8
1.6
0.7
0.6 1.4
0.5 1.2
0.4 1
0.3 0.8
0.2
0.1 0.6
0 0.4
0
0.2 0.1 0.2 Kondisi
0.3III 0.4 0.5 0.6 0.7
MG sin05
0
0 10 20 30 40 50
Kondisi Kapal Penuh

α0 h FS
0 0 1
5 0.006 4
10 0.012 2
15 0.507 4
20 1.002 2
25 1.214 4
30 1.425 2
35 1.541 4
40 1.657 1
Σ1=
Σ1=
Ah 30° =
Ah 40° =
Ah 30°-40° =

* Pengecekan Stabilitas dengan IMO


Criteria IMO
MG (m) ≥ 0.15
h 30° (m) ≥ 0.2
Ah 30° (m) ≥ 0.055
Ah 40° (m) ≥ 0.09
Ah 30°- 40° (m) ≥ 0.03
Kondisi Pemuatan III (Loading)
COG (m) MOMENT (ton m)
Weight (Ton)
Base Line After Pick Base line After Pick
2955.71 5.53 94.49 16330.3 279275.9
42.22 3.493333333 10.59 147.5 447.1
1.90 11.5775 11.6625 22.0 22.2
0.12 7.99 8.37 1.0 1.0
671.18 0.53 47.04 355.7 31572.3
2993.50 3.93 47.05 11764.5 140844.2
6664.6269149 ton 28620.9 452162.6
6502.08 6.502075039 Skala CC Σ2 Σ3

4.294 m

20 30 40 50 60 70 80 90
0.342 0.500 0.643 0.766 0.866 0.940 0.985 1.000
2.471138252536 3.572512306 4.417674991 5.012873973 5.3766833188 5.70227581 5.56827862 5.53446938
1.469 2.147 2.760 3.290 3.719 4.035 4.229 4.294
1.002 1.425 1.657 1.723 1.658 1.667 1.339 1.240
1.002 1.425 1.657 1.723 1.658 1.667 1.339 1.240

mponen akibat perubahan displacement

Perubahan Nilai Satuan Perubahan Nilai


6.92 m
ta = (9*11)/10 -7.4989517
o. 1) 4.52 m
4.451 m
tf = t-ta -6.7289565
2.626 m
58.07 m
Ta = d + ta -0.57
47.27 m
-10.80 m
Tf = d - tf 13.65
ahan trim (MCT) 5057.63 ton.m/m
51.07 m
Tm = (Ta + Tf ) / 2 6.53912607
96.90 m
/8 -14.2279083 m

isplacement vs Draft
Twl (m)
Nilai Bawah : 3.18
Nilai X : 6.92
Nilai Atas : 4.24

Displacement vs MK
MK (m)
Nilai Bawah : 6.59
Nilai X : 4.52
Nilai Atas : 6.00
placement vs CB (FO'')
CB (m)
Nilai Bawah : 79.21
Nilai X : 58.07
Nilai Atas : 73.2286943

splacement vs CG (FO)
CG (m)
Nilai Bawah : 47.45
Nilai X : 47.27
Nilai Atas : 47.4019287

Displacement vs MCT
MCT (m)
Nilai Bawah : 4728.40
Nilai X : 5057.63
Nilai Atas : 4821.61

splacement vs LCF (FK)


LCF (FO') (m)
Nilai Bawah : 49.14
Nilai X : 51.07
Nilai Atas : 49.690176

Sin j GM Sin j h
0 0 0
0.2588190451025 0.5332 0.570
0.5 1.0301 0.977
0.7071067811865 1.4568 1.089
0.8660254037844 1.7843 0.763
0.9659258262891 1.9901 0.070
1 2.0603 -0.391

nterpolasi
h
Nilai Bawah : 0.00
Nilai X : 0.01
Nilai Atas : 0.01
nterpolasi
h
Nilai Bawah : 0.01
Nilai X : 0.51
Nilai Atas : 1.00
nterpolasi
h
Nilai Bawah : 1.00
Nilai X : 1.21
Nilai Atas : 1.43
nterpolasi
h
Nilai Bawah : 1.43
Nilai X : 1.54
Nilai Atas : 1.66
nterpolasi
h
Nilai Bawah : 1.66
Nilai X : 2.23
Nilai Atas : 1.09
nterpolasi
h
Nilai Bawah : 2.23
Nilai X : 1.66
Nilai Atas : 1.09

Tabel 1 radian
MG sin a x
0 0
3.57 57.30
0 57.30

bilitas
as KondisiLoading
Kondisi III

0.4 0.5 0.6 0.7


MG sin0.8
57.3 0.9 1

30 40 50 60 70 80 90 100
Kondisi Kapal Penuh MG sin 57.3

HG FS HG
0.000
0.023
0.023
2.028
2.005
4.855
2.851 1 1.425
6.165 4 6.165
1.657 1 1.657
11.784 Σ2= 9.248
19.607
0.343
0.570
0.269

MO
Result Koreksi
4.244 Memenuhi
1.43 Memenuhi
0.343 Memenuhi
0.570 Memenuhi
0.269 Memenuhi
Kondisi Pemuatan IV (Dengan Ballast & Tanpa Kargo)
COG (m)
No. Load Weight (Ton)
Base Line
1 Kapal kosong 2955.71 5.53
2 Consumables 84.44 3.49
3 Person + Luggage 3.80 11.58
4 Makanan 0.24 7.99
5 Water Ballast 1342.36 0.53
6 Kargo 0.00 3.93
Σ1 Displacement = 4386.54709802
Volume = 4279.56 4.27955814

GK = Σ2 / Σ1 = 3.963 m
Data Cross Curve
α0 0 10 20 30
Sin α 0 0.174 0.342 0.500
NK 0 0.75724751562 2.4711382525364 3.572512306
GK Sin α 0 0.688 1.355 1.981
MG Sin α = h 0 0.069 1.116 1.591
GZ 0 0.069 1.116 1.591

Data Perubahan beberapa komponen akibat perubahan displacement

No. Perubahan Nilai


1 Draft (D) 4.75
2 MK (HSC pd T no. 1) -7.29
3 GK 4.451
4 MG 2.626
5 C.O.B dari AP 130.28
6 C.O.G dari AP 48.33
7 Jarak GF = 5-6 -81.95
8 Moment perubahan trim (MCT) 5609.54
9 C.O.F dari AP 49.95
10 Lwl 96.90
11 Trim (t) = (1*7)/8 -64.08406987

8.5591162888192

Interpolasi Displacement vs Draft


Displacement (ton) Twl (m)
Nilai D WL 3 : 906.84 Nilai Bawah : 1.06
Nilai D WL (x) : 4386.55 Nilai X : 4.75
Nilai D WL 4 : 1907.24 Nilai Atas : 2.12

Interpolasi Displacement vs MK
Displacement (ton) MK (m)
Nilai D WL 3 : 906.83744911 Nilai Bawah : 14.76
Nilai D WL (x) : 4386.55 Nilai X : -7.29
Nilai D WL 4 : 1907.237 Nilai Atas : 8.42
Interpolasi Displacement vs CB (FO')
Displacement (ton) CB (m)
Nilai D WL 3 : 906.83744911 Nilai Bawah : 71.26
Nilai D WL (x) : 4386.55 Nilai X : 130.28
Nilai D WL 4 : 1907.237 Nilai Atas : 88.224532

Interpolasi Displacement vs CG (FO)


Displacement (ton) CG (m)
Nilai D WL 3 : 906.83744911 Nilai Bawah : 47.29
Nilai D WL (x) : 4386.55 Nilai X : 48.33
Nilai D WL 4 : 1907.237 Nilai Atas : 47.5871357

Interpolasi Displacement vs MCT


Displacement (ton) MCT (m)
Nilai D WL 3 : 906.83744911 Nilai Bawah : 4012.00
Nilai D WL (x) : 4386.55 Nilai X : 5609.54
Nilai D WL 4 : 1907.237 Nilai Atas : 4471.29

Interpolasi Displacement vs LCF (FK)


Displacement (ton) LCF (FO') (m)
Nilai D WL 3 : 906.83744911 Nilai Bawah : 48.05
Nilai D WL (x) : 4386.55 Nilai X : 49.95
Nilai D WL 4 : 1907.237 Nilai Atas : 48.5985006

BM (m) : 10.28
GM (m): 4.24

Tabel Prohaska
j h* h* x MB Sin j GM Sin j
0 0 0 0 0
15 0.009 0.0368 0.2588190451025 0.5332
30 -0.013 -0.0531 0.5 1.0301
45 -0.09 -0.3677 0.7071067811865 1.4568
60 -0.25 -1.0214 0.8660254037844 1.7843
75 -0.47 -1.9203 0.9659258262891 1.9901
90 -0.6 -2.4515 1 2.0603

Interpolasi
Sudut h
Nilai 0 : 0 Nilai Bawah : 0.00
Nilai 5: 5 Nilai X : 0.03
Nilai 10: 10 Nilai Atas : 0.07
Interpolasi
Sudut h
Nilai 10: 10 Nilai Bawah : 0.07
Nilai 15: 15 Nilai X : 0.59
Nilai 20: 20 Nilai Atas : 1.12
Interpolasi
Sudut h
Nilai 20: 20 Nilai Bawah : 1.12
Nilai 25: 25 Nilai X : 1.35
Nilai 30: 30 Nilai Atas : 1.59
Interpolasi
Sudut h
Nilai 30: 30 Nilai Bawah : 1.59
Nilai 35: 35 Nilai X : 1.73
Nilai 40: 40 Nilai Atas : 1.87
Interpolasi
Sudut h
Nilai 30 : 40 Nilai Bawah : 1.87
Nilai 35 : 35 Nilai X : 2.65
Nilai 45 : 45 Nilai Atas : 1.09
Interpolasi
Sudut h
Nilai 35 : 35 Nilai Bawah : 2.65
Nilai 40 : 40 Nilai X : 1.87
Nilai 45 : 45 Nilai Atas : 1.09

MG sina Tabel 1 radian


1 radian : 57.3 MG sin a x
sin a : 0.8415108 0 0
MG sin a : 3.571733 3.57 57.30
0 57.30

Stabilitas Dengan Ballast Tanpa


2.5
Kargo
2

1.5

0.5

0
0 10 20 30 40 50 60 70 80 90 100
Kondisi III MG sin 57.3

α0 h FS HG FS
0 0 1 0.000
5 0.035 4 0.138
10 0.069 2 0.138
15 0.592 4 2.370
20 1.116 2 2.232
25 1.353 4 5.414
30 1.591 2 3.182 1
35 1.731 4 6.923 4
40 1.870 1 1.870 1
Σ1= 13.474 Σ2=
Σ1= 22.268
Ah 30° = 0.392
Ah 40° = 0.647
Ah 30°-40° = 0.302

* Pengecekan Stabilitas dengan IMO


Criteria IMO Result Koreksi
MG (m) ≥ 0.15 4.244 Memenuhi
h 30° (m) ≥ 0.2 1.59 Memenuhi
Ah 30° (m) ≥ 0.055 0.392 Memenuhi
Ah 40° (m) ≥ 0.09 0.647 Memenuhi
Ah 30°- 40° (m) ≥ 0.03 0.302 Memenuhi
Ballast & Tanpa Kargo)
COG (m) MOMENT (ton m)
After Pick Base line After Pick
94.487 16330.28 279275.86
10.59 294.98 894.24
11.6625 43.99 44.32
8.37 1.92 2.01
47.04 711.45 63144.54
47.05 0.00 0.00
17382.63 343360.96
Skala CC Σ2 Σ3

40 50 60 70 80 90
0.643 0.766 0.866 0.940 0.985 1.000
4.417674991 5.012873973 5.3766833188 5.70227581 5.56827862 5.53446938
2.547 3.036 3.432 3.724 3.903 3.963
1.870 1.977 1.945 1.979 1.666 1.572
1.870 1.977 1.945 1.979 1.666 1.572

Satuan Perubahan Nilai


m
ta = (9*11)/10 -33.036673
m
m
tf = t-ta -31.047397
m
m
Ta = d + ta -28.29
m
m
Tf = d - tf 35.79
ton.m/m
m
Tm = (Ta + Tf ) / 2 3.75238116
m
m
h
0
0.570
0.977
1.089
0.763
0.070
-0.391
HG
1.591
6.923
1.870
10.385

Koreksi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Kondisi Kapal Tiba (Hampir Tiba)
COG (m) MOMENT (ton m)
No. Load Weight (Ton)
Base Line After Pick Base line
1 Kapal kosong 2955.71 5.53 94.487 16330.28
2 Consumables 16.89 3.49 10.59 59.00
3 Person + Luggage 3.80 11.58 11.6625 43.99
4 Makanan 0.05 7.99 8.37 0.38
5 Water Ballast 1208.12 0.53 47.04 640.30
6 Kargo 5987.00 3.93 47.05 23528.91
Σ1 Displacement = 10171.5656237 40602.87
Volume = 9923.48 9.923478657 Skala CC Σ2

GK = Σ2 / Σ1 = 3.992 m
Data Cross Curve
α0 0 10 20 30 40 50
Sin α 0 0.174 0.342 0.500 0.643 0.766
NK 0 0.757247516 2.471138252536 3.5725123055 4.417674991 5.0128739727
GK Sin α 0 0.693 1.365 1.996 2.566 3.058
MG Sin α = h 0 0.064 1.106 1.577 1.852 1.955
GZ 0 0.064 1.106 1.577 1.852 1.955

Data Perubahan beberapa komponen akibat perubahan displacement

No. Perubahan Nilai Satuan Perubahan


1 Draft (D) 10.24 m
ta = (9*11)/10
2 MK (HSC pd T no. 1) 5.60 m
3 GK 4.451 m
tf = t-ta
4 MG 2.626 m
5 C.O.B dari AP -189.43 m
Ta = d + ta
6 C.O.G dari AP 44.34 m
7 Jarak GF = 5-6 233.76 m
Tf = d - tf
8 Moment perubahan trim (MCT) 7391.94 ton.m/m
9 C.O.F dari AP 52.83 m
Tm = (Ta + Tf ) / 2
10 Lwl 96.90 m
11 Trim (t) = (1*7)/8 321.66825106 m

19.846957314542

Interpolasi Displacement vs Draft


Displacement (ton) Twl (m)
Nilai D WL 1 : 3994.72 Nilai Bawah : 4.24
Nilai D WL (x) : 10171.57 Nilai X : 10.24
Nilai D WL 2 : 5085.245 Nilai Atas : 5.30

Interpolasi Displacement vs MK
Displacement (ton) MK (m)
Nilai D WL 1 : 3994.72178 Nilai Bawah : 6.00
Nilai D WL (x) : 10171.57 Nilai X : 5.60
Nilai D WL 2 : 5085.245 Nilai Atas : 5.93
Interpolasi Displacement vs CB (FO'')
Displacement (ton) CB (m)
Nilai D WL 1 : 3994.72178 Nilai Bawah : 73.23
Nilai D WL (x) : 10171.57 Nilai X : -189.43
Nilai D WL 2 : 5085.245 Nilai Atas : 26.85644737

Interpolasi Displacement vs CG (FO)


Displacement (ton) CG (m)
Nilai D WL 1 : 3994.72178 Nilai Bawah : 47.40
Nilai D WL (x) : 10171.57 Nilai X : 44.34
Nilai D WL 2 : 5085.245 Nilai Atas : 46.86062941

Interpolasi Displacement vs MCT


Displacement (ton) MCT (m)
Nilai D WL 1 : 3994.72178 Nilai Bawah : 4821.61
Nilai D WL (x) : 10171.57 Nilai X : 7391.94
Nilai D WL 2 : 5085.245 Nilai Atas : 5275.40

Interpolasi Displacement vs LCF (FK)


Displacement (ton) LCF (FO') (m)
Nilai D WL 1 : 3994.72178 Nilai Bawah : 49.69
Nilai D WL (x) : 10171.57 Nilai X : 52.83
Nilai D WL 2 : 5085.245 Nilai Atas : 50.24414668

BM (m) : 10.28
GM (m): 4.24

Tabel Prohaska
j h* h* x MB Sin j GM Sin j h
0 0 0 0 0 0
15 0.009 0.0368 0.2588190451025 0.5332 0.570
30 -0.013 -0.0531 0.5 1.0301 0.977
45 -0.09 -0.3677 0.7071067811865 1.4568 1.089
60 -0.25 -1.0214 0.8660254037844 1.7843 0.763
75 -0.47 -1.9203 0.9659258262891 1.9901 0.070
90 -0.6 -2.4515 1 2.0603 -0.391

Interpolasi
Sudut h
Nilai 0 : 0 Nilai Bawah : 0.00
Nilai 5: 5 Nilai X : 0.03
Nilai 10: 10 Nilai Atas : 0.06
Interpolasi
Sudut h
Nilai 10: 10 Nilai Bawah : 0.06
Nilai 15: 15 Nilai X : 0.58
Nilai 20: 20 Nilai Atas : 1.11
Interpolasi
Sudut h
Nilai 20: 20 Nilai Bawah : 1.11
Nilai 25: 25 Nilai X : 1.34
Nilai 30: 30 Nilai Atas : 1.58
Interpolasi
Sudut h
Nilai 30: 30 Nilai Bawah : 1.58
Nilai 35: 35 Nilai X : 1.71
Nilai 40: 40 Nilai Atas : 1.85
Interpolasi
Sudut h
Nilai 30 : 40 Nilai Bawah : 1.85
Nilai 35 : 35 Nilai X : 2.61
Nilai 45 : 45 Nilai Atas : 1.09
Interpolasi
Sudut h
Nilai 35 : 35 Nilai Bawah : 2.61
Nilai 40 : 40 Nilai X : 1.85
Nilai 45 : 45 Nilai Atas : 1.09

MG sina Tabel 1 radian


1 radian : 57.3 MG sin a x
sin a : 0.8415108 0 0
MG sin a : 3.571733 3.57 57.30
0 57.30

Stabilitas Kapal tiba


2.5

1.5

0.5

0
0 10 20 30 40 50 60 70 80 90 100
Kondisi I MG sin 57.3

α0 h FS HG FS HG
0 0 1 0.000
5 0.032 4 0.128
10 0.064 2 0.128
15 0.585 4 2.340
20 1.106 2 2.212
25 1.341 4 5.365
30 1.577 2 3.153 1 1.577
35 1.714 4 6.857 4 6.857
40 1.852 1 1.852 1 1.852
Σ1= 13.326 Σ2= 10.285
Σ1= 22.035
Ah 30° = 0.387
Ah 40° = 0.641
Ah 30°-40° = 0.299

* Pengecekan Stabilitas dengan IMO


Criteria IMO Result Koreksi
MG (m) ≥ 0.15 4.244 Memenuhi
h 30° (m) ≥ 0.2 1.58 Memenuhi
Ah 30° (m) ≥ 0.055 0.387 Memenuhi
Ah 40° (m) ≥ 0.09 0.641 Memenuhi
Ah 30°- 40° (m) ≥ 0.03 0.299 Memenuhi
MOMENT (ton m)
After Pick
279275.86
178.85
44.32
0.40
56830.08
281688.35
618017.86
Σ3

60 70 80 90
0.866 0.940 0.985 1.000
5.3766833188 5.7022758141 5.5682786174 5.5344693831
3.457 3.751 3.931 3.992
1.920 1.951 1.637 1.543
1.920 1.951 1.637 1.543

Perubahan Nilai

ta = (9*11)/10 175.36704378

tf = t-ta 146.30120728

Ta = d + ta 185.61

Tf = d - tf -136.06

Tm = (Ta + Tf ) / 2 24.776872634
N
Loa = 100.00 m
Lwl = 96.90 m
Lpp = 95.00 m

SHIP DATA
B= 17.00 m
H= 8.50 m
T= 6.70 m
Cb = 0.769 -
Cm = 0.992 -
Cp = 0.776 -
Cw = 0.846 -
D= 8972.000 ton
TPC = 14.328 ton/cm

1 Dimensi Freeboard
a Panjang ( L1 )
96% pada 0.85 H
Interpolasi
L1 pada 0.85 H
Tinggi Garis Air LWL
Pada Nilai T : 6.7 Nilai Bawah :
Pada Nilai 0.85 H : 7.2250 Nilai X :
Pada Nilai H : 8.500 Nilai Atas :
maka,
L1 = 97.80 m
b Lebar
B1 = 17 m
c Tinggi ( Hi )
Hi = 8.57 m
t= 60
Sp = 7.85
d Tabular Freeboard
Menurut International Load Line Convention 1966 pada regulasi 27 dan 28 chapt
L1 pada 0.85 H
Tinggi Garis Air LWL
L bawah : 94 Freeboard Bawah :
L1 : 95.00 Nilai X :
L atas : 95 Freeboard Atas :
maka,
Fb min = 1059.000 mm
1.059 m
2 Koreksi Freeboard
a Koreksi Cb dimana Cb > 0.68
fb2 = 1060.065 mm
1.060 m
C1 = 1.0654551841962
Fbmin x C1 = 1128.3170400637
b Koreksi tinggi kapal
fb3 = 1502.314 mm
1.502 m
Fb = 1.8
Fb > Fbmin =
H= 8.5
L/15 = 6.33
cek H > L/15 atau tidak =
C2 = 442.25
R=
3 Koreksi Bangunan Atas
fb4 = 1386.965 mm
1.387 m

l forcastle = 16.59

hs = 2.3
Regulation 33 chapter 3 hsr = 2.5
hsr > hs =
maka
E=S= 16.59
S E/L = 0.17
Faktor Reduksi
E/L
E/L (1) = 0.1
L(m) reduksi(mm) E/L = 0.17
24 350 E/L (2) = 0.2
85 860 Sehingga faktor reduksi didapat =
122 1070 Faktor Reduksi
L
L (1) = 24
L= 95.00
L (2) = 85.0
Sehingga faktor reduksi didapat =
Fs3 = 115.34845211389
4 Koreksi Chamber
Fs5 = 0 mm
B/50 = 0.34

5 Koreksi Sheer
FS4 = 712.040378289474 mm
0.71 m

Posisi Jarak
AP 47.5
1/6 L dari AP 31.6667
1/3 L dari AP 15.8333
Midship 0
1/3 L dari FP 31.6667
1/6 L dari FP 15.8333
FP 47.5

Posisi Sheer Standard


FP 2083.33
1/6 L dari FP 925.00
1/3 L dari FP 233.33
Midship 0

Midship 0
1/3 L dari AP 116.67
1/6 L dari AP 462.50
AP 1041.67

TFH = -519.7916666667
TAH = -1629.166666667
dimana

Difference Sheer = -1074.479166667

II RINGKASAN PLIMSOLL MARK

1 Summer Freeboard
Tinggi summer freeboard = 3388.702
a Basic/tabulor freeboard
fb4 = 1059.000 mm
b Koreksi terhadap Cb ( fbmin x C1 )
fb2 = 1060.065 mm
c Koreksi tehadap L/H ( C2 )
fb3 = 442.25 mm
d Koreksi terhdap banguna atas
Fs3 = 115.348452113891 mm
e Koreksi Sheer
FS4 = 712.040378289474 mm
f Koreksi Chamber
Fs5 = 0 mm
2 Sarat air pada summer freeboard ( To )
To = 5.179 m
3 Tanda lambung timbul freeboard
a Summer freeboard
S = Fso = 3388.70238 mm
b Tropical freeboard
T= 3280.80347 mm
c Fresh water ( F & TF )
F= 3373.0475 mm
TF = 3265.1486 mm
W= 3496.60128 mm
WNA= 3546.60128 mm
PLIMSOL MARK
ARIEF KURNIAWAN - 1806202323
Naval Arhitecture and Marine Engineering UI

Freeboard menurut Load Line Convention adalah jarak yang diukur secara vertikal
garis beban pada bagian tengah kapal

from HSC on Water Line Draft

nsi Freeboard

LWL
96.900
97.804
100.000

mm wood cover
mm

6 pada regulasi 27 dan 28 chapter 3

LWL
1044.000 Ini dapat nya dari tabel sebelah kanan lalu di
1059.000 interpolasi sesuai panjang kapal kita
1059.000
ksi Freeboard

abis itu cari ini Base on Regulation 30

Cari yang ini dulu


mm

m
Lanjut itung ke bawah ya
m
m
base Regulation 31 corretion for depth
mm
197.91666666667 mm L<120
Bangunan Atas
Freeboard akhir

m
m > 7% Lpp diukur di GA autocad

Tinggi superstructure standar Regulation 37 chapter 3

Tidak ada penambahan panjang

Faktor Reduksi
reduksi %
reduksi Bawah : 7.00% E/L Reduksi %
Nilai X : 12.22% 0.1 7%
reduksi Atas : 14.00% 0.2 14%
12.22% 0.3 21%
Faktor Reduksi 0.4 31%
reduksi (mm) 0.5 41%
reduksi Bawah : 350 0.6 52%
Nilai X : 943.606557377 0.7 63%
reduksi Atas : 860 0.8 75%
943.60655737705 mm 0.9 88%
mm 1 100%
eksi Chamber
( tidak ada koreksi karena kapal menggunakan chamber standar)

reksi Sheer

Rumus (mm) Tinggi sheer(mm) meter


25(L/3 + 10) 1041.67 1041.6666666667 1.04166667
11,1(L/3 + 10) 462.50 462.5 0.4625
2,8(L/3 + 10) 116.67 116.66666666667 0.11666667
0 0.00
5,6(L/3 + 10) 233.33 233.33333333333 0.23333333
22,2(L/3 + 10) 925.00 925 0.925
50(L/3 +10) 2083.33 2083.3333333333 2.08333333

Sheer Standard FK HK1 HK2


350 1 2083.333 350
250 3 2775 750
100 3 700 300
0 1 0 0
S 1 = 5558.333 1400 S 2 =
0 1 0 0
100 3 350 300
200 3 1387.5 600
250 1 1041.667 250
S 3 = 2779.167 1150 S 4 =

mm
mm
TFH < 0
TAH < 0
mm

PLIMSOLL MARK

mm
Diukur dari Deck Line
Plot di Autocad
3.388702376 m

3.280803467 m

3.373047503 m
3.265148594 m
3.496601285 m
3.546601285 m
ak yang diukur secara vertikal ke arah bawah dari ujung atas garis deck sampai ke ujung atas

Tulisan dan Tabel Ini didapat dari PDF Internastional Convention on Load 1966 chapter 3"Freeboard"
Regultion 27 dan 28
Tulisan dan Tabel Ini didapat dari PDF Internastional Convention on Load 1966 chapter 3"Freeboard"
Regultion 27 dan 28
BRT &
Naval Architecture and
ARIEF KU
1806

BRT, dan NRT

1 Dimensi Kapal
Loa = 100.00 m
Lwl = 96.90 m
Lpp = 95.00 m
B= 17.00 m
H= 8.50 m
T= 6.70 m
Cb = 0.77 -
Cm = 0.992 -
Cp = 0.78 -
Cw = 0.85 -
Δ= 8972.00 ton
HSC ; Waterline 10
TPC = 14.33 ton/cm

2 Tabel Perhitungan

BRT

2.1 Perhitungan Ruang


a Perhitungan Kompartement
Ruang Tonnage A (m2) L gading (m) Volume (m3)
Kompartemen I (Oil Tank 1)
Gading 4 93.6971 3.32 311.07
Gading 5 102.0574 4.75 484.77
Gading 6 110.0932 4.75 522.94
Gading 7 111.6677 2.18 243.44

Total 1562.23
Kompartemen II (Oil Tank 2)
Gading 7 111.6677 2.57 286.99
Gading 8 113.2134 4.75 537.76
Gading 9 113.2134 4.75 537.76
Gading 10 113.5865 2.93 332.81
113.5865 0 0.00

Total 1695.32
Kompartemen III (Oil Tank 3)
Gading 10 113.5865 1.82 206.727
Gading 11 113.5865 4.75 539.536
Gading 12 113.5865 4.75 539.536
Gading 13 113.5865 3.68 417.998

Total 1703.80
Total Tonnage 6653.08

b Perhitungan Kimbul (Belakang)


Ruang Tonnage A (m2) L gading (m) Volume (m3)
Gading 0 1.8158 2.5 4.54

Total 4.54
c

e Volume Deck dan Double Bottom


Ruang Tonnage Volume (m3)
Double Bottom 1397.8712
Main Deck 1909.142395
Poop Deck 451.67
Boat Deck 345.96
Bridge Deck 160.12
Navigation Deck 66.68
Top Deck 40.33
Total 4371.78

2.2 Yang termasuk BRT


No. Nama Ruang volume (m3)
1 Volume geladak tonnage 6653.08
2 Volume geladak akil 1100.61
3 Volume geladak kimbul 4.54
4 Volume Deck 4371.78
S1 = 12130.0 m3
Yang tidak termasuk BRT
2.3 No. Nama Ruang volume (m3)
1 Wheel House 18.20
3 Chain Locker 83.06
5 Pantry/Kitchen 54.81
6 Toilet & Bath Room 56.03
7 Gangway 99.96
8 Steering Room,Cerobong,Funel 154.1394
S2 = 466.20
NRT
Hasil Akhir
4 5536.29 m3
Volume NRT = Volume BRT
1956 RT

1 RT
2.83 m3

Koreksi NRT terhadap BRT


" International Convention of Tonage Measurement of Ship 1969 "

Syarat : NRT > 0.3BRT


5 BRT = 4121.5 RT
NRT = 1956 RT Memenuhi

0.3BRT 1236.446 RT
BRT & NRT
Naval Architecture and Marine Engineering UI
ARIEF KURNIAWAN
1806202323

HSC ; Waterline 10

Keterangan :
nilai "A" bisa didapat dari SAC maupun Bonjen

Ruang Tonnage A(m2) L Gading(m) Volume (m3)


Kompartemen IV (Oil Tank 4)
Gading 13 113.5865 1.07 121.537555
Gading 14 113.5865 4.75 539.535875
Gading 15 112.7048 4.75 535.3478
Gading 16 111.8083 4.43 495.310769
Gading 17 99.1788 0 0

Total 1691.731999
m3
m3

Perhitngan Akil (Depan)


Ruang Tonnage A (m2) L Gading(m) Volume (m3)
Gading 16 111.8083 0.32 35.778656
Gading 17 99.1788 4.75 471.0993
Gading 18 81.176 4.75 385.586
Gading 19 43.8193 4.75 208.141675
Total 1100.605631
Volume Chain Locker
L B T
4.31 4.4 4.38

11663.8070620000 m3
4121.48659434629 RT

nt of Ship 1969 "


PERHITUNGAN DECK
Geladak No Jenis Ruangan yang di hitung L B
Top Deck
1 Top Deck 6.4 4.6
Navigation Deck
1 Wheel House 3.5 1.3
2 Radio Room 2.4 2.4
3 ESEP Room 1.8 2.2
4 Chart Room 1.2 1
5 Toilet 1.2 1
Total
Bridge Deck
1 Captain Office 5 2.1
2 Captain Day Room 2.6 2.15
3 Chief Engineer 5 2.1
4 Chief Engineer Day Room 2.6 2.15
5 Toilet 1.46 0.88
6 Toilet 1.46 0.88
7 Gangway 2.6 0.5
8 Gangway 2.6 0.5
9 Engine Funel Casing 3.5 2.4

Total
Boat Deck
1 Second Engineer 4.2 3
2 Third Engineer 4.33 3
3 Purser 3.73 2.67
4 Spare Room 4.36 3
5 Spare Room 3.34 2.72
6 Life Jacket Locker 3.23 1.06
7 Smoking Area 3.21 2.5
8 Engine Casing 4.45 2
9 Gangway 1 2.23 1.94
10 3 buahToilet Sejenis 1.44 1.2
11 Toilet 1.51 0.78
12 Gangway 2 6.73 0.75
13 Gangway 3 6.73 0.75
Total
Poop Deck
1 Chief Officer 3.35 2.79
2 2nd & 3rd Officer 3.41 3.14
3 Quartermaster 2.47 3.14
4 Musholla 3.36 2.29
5 Meeting Room 4.3 1.09
6 Toilet 2.52 0.94
7 Engine Casing 4.32 2
8 Medical Room 3.93 2.32
9 Pantry Room 3.16 1.61
10 Cargo & Oil Enginer 6.17 3.96
11 Toilet Medical Room 1.47 0.8
12 Life Jacket 3.15 2.48
13 Gangway
Total
Main Deck A
1 Pump & Fire Man 8.31
2 Mechanical & electrical Man 402.97
3 Sea & Wiperman 7.17
4 Locker Room 4.68
5 Toilet 3.7875
6 Mesh Room Crew 18.41175
7 Cooking Room 10.1384
8 Steward & Chef 7.52125
9 Laundry 3.8009
10 Dry Room 1.332
11 Rope Room 2.3025
12 Fish Cold Store 3.2
13 Meat Cold Store 3.2
14 Office Room 6.432
15 Steering Room 8.736
16 Engine Casing 8.62
17 Pump Room 6.656
Total
Double Bottom
Ballas Tank 1
Posisi Gading A(m2) L antar Gading(m) Volume(m3)
Gading 4 0.54 3.32 50.1984
Gading 5 0.6 4.75 79.8
Gading 6 0.66 4.75 87.78
Gading 7 0.71 2.18 43.3384
Total 261.1168

Ballast Tank 2
Gading 7 0.6 2.57 43.176
Gading 8 0.74 4.75 98.42
Gading 9 0.74 4.75 98.42
Gading 10 0.74 2.93 60.7096
0 0.75 0 0
Total 300.7256

Ballast Tank 3
Gading 10 0.74 1.82 37.7104
Gading 11 0.75 4.75 99.75
Gading 12 0.75 4.75 99.75
Gading 13 0.73 3.68 75.2192
Total 312.4296

Ballast Tank 4
Gading 13 0.73 1.07 21.8708
Gading 14 0.66 4.75 87.78
Gading 15 0.57 4.75 75.81
Gading 16 0.46 4.43 57.0584
Gading 17 0.35 0 0
Total 242.5192

Volume Gabungan Pump Room,Sloope,LO,FO,Coverdam


Gading Terkait A(m2) L antar Gading (m) Volume (m3) A dari SAC
Gading 2 50.1724 0.31 8.68
Gading 3 72.2464 4.75 133
Total 141.68

Volume Fresh Water Tank


P L T(tebal) Volume(m3)
4.1 2 17.00 139.4

Ballas Total 1116.7912


T Volume

1.37 40.3328

4 18.2
4 23.04
4 15.84
4 4.8
4 4.8
66.68

3.5 36.75
3.5 19.565
3.5 36.75
3.5 19.565
3.5 4.4968
3.5 4.4968
3.5 4.55
3.5 4.55
3.5 29.4

160.1236

3.5 44.1
3.5 45.465
3.5 34.85685
3.5 45.78
3.5 31.7968
3.5 11.9833
3.5 28.0875
3.5 31.15
3.5 15.1417
3.5 18.144
3.5 4.1223
3.5 17.66625
3.5 17.66625
345.95995
tinggi Gangway on Poop
3.5 32.71275 1 8.58
3.5 37.4759 2 2
3.5 27.1453 t 3 3.96
3.5 19.775 2 bentuk diasumsikan trapesium 4 11.58
3.5 66.97075 7.1 bentuk diasumsikan trapesium
3.5 15.1375 2.5 bentuk diasumsikan trapesium
3.5 30.24
3.5 31.9116 Note: Yang ada "t" berarti
3.5 17.8066 dasumsikan bentuk ruanganya
3.5 85.5162 trapesium
3.5 4.116
3.5 27.342
55.524958
451.67456
T V L B
3.65 30.3315 4.32 3.99
3.65 1470.8405 399.34 3.63
3.65 26.1705 3.86 3.31
3.65 17.082 3.52 2.72
3.65 13.824375 3.06 1.99
3.65 67.2028875 4.64 3.71
3.65 37.00516 3.92 2.75
3.65 27.4525625 5.47 2.75
3.65 13.873285 3.82 1.99
3.65 4.8618 2.22 1.2
3.65 8.404125 3.07 1.5
3.65 11.68 3.2 1
3.65 11.68 3.2 1
3.65 23.4768 3.2 2.01
3.65 31.8864 3.2 2.73
3.65 31.463 4.31 2
3.65 24.2944 3.2 2.08
1909.1424

Gangway on Main Deck


L B
12.65 1.6
3 0.97
Keterangan
A: dari bonjen
Skala Bonjen : 28

Khusus Balasst menggunakan Pengukuran Bonjen

0.42 0.12 0.54


0.48 0.12 0.6
0.54 0.12 0.66
0.59 0.12 0.71
0.12 0.12
0.48 0.12 0.6
0.62 0.12 0.74
0.62 0.12 0.74
0.62 0.12 0.74
0.63 0.12 0.75
0.12 0.12
0.54 0.12 0.66
0.45 0.12 0.57
0.34 0.12 0.46
0.23 0.12 0.35
0.12
Gangway on Poop Deck
0.72 2.39 14.76446
0.52 2.39 2.4856
1.5 2.39 14.1966
0.87 2.39 24.07829 Boat Deck

t A
2 8.31
2 402.97
2 7.17
1.5 4.68
1.5 3.7875
4.41 18.41175
3.04 10.1384
- 7.52125
- 3.8009
- 1.332
- 2.3025
- 3.2
- 3.2
- 6.432
- 8.736
- 8.62
- 6.656

Gangway on Main Deck


T V
2.5 50.6
2.41 7.0131
PELU
ARIEF KURNIAWAN

Main Dimensions
Loa
Lwl
Lpp
B
H
T
Cb
Cm
Cp
Cw

Sudut Kemiringan Peluncuran


Kapal Yang di pilih

Kapal Sedang

Maka Sudut Kemiringannya adalah

Periode Peluncuran
Perhitungan Berat Peluncuran
W=
Berat kapal pada saat peluncuran
G=
LWT =
1. Berat baja kapal

2. berat mesin
3. Lain lain

4. berat outfit & acco

4. Ballast system
LWT+Ballast
Berat peralatan peluncuran

Perencanaan Sepatu P
Panjang balok peluncuran

Lluncur =
1/2 Lluncur =
Lebar minimum sepatu peluncuran
b min =

Tinggi sepatu peluncur


t =

Perhitungan Letak Titik Berat Tanpa Ballast


g=

Nama bagian
1. Berat baja kapal
2. berat mesin
3. Lain lain
4. berat outfit & acco
Berat peralatan peluncuran
Σ1

Perhitungan Beban Landasan terbagi rat


q=

Perhitungan Peluncuran
Fase I
Gaya peluncuran

K=

Percepatan peluncuran
a=

Jarak sampai titik B menyentuh permukaan air


S=

Waktu yang diperlukan sampai menyentuh air


t=

Kecepatan peluncuran
v=

Syarat langsung meluncur setelah kunci dilepas dimana G sin b > m.N dan tan(α) > μ, menu
G sin b > m.N

tan(α) > μ

Total jarak yang dibutuhkan dalam fase I


S fase I =

Fase II
Panjang landasan
Lb =

Jarak sisa lintasan


Sr ( a ) =

Gading yang tergenangi harus disebandingkan dengan tinggi waterline yang tergenangi air
Jarak yang diambil =
x=
Jarak antar gading =
Jarak B s/d tergenang air =

Sehingga jarak untuk WL tergenang

WATERLINE 2
WL 2 =
Titik berat pada waterline ini ( g ) =
Volume =
D=
Ord
AP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

WATERLINE 4
WL 4 =
Titik berat pada waterline ini ( g ) =
Volume =
D=
Ord
AP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

WATERLINE 6
WL 6 =
Titik berat pada waterline ini ( g ) =
Volume =
D=
Ord
AP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

WATERLINE 8
WL 8 =
Titik berat pada waterline ini ( g ) =
Volume =
D=
Ord
AP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

WATERLINE 10
WL 10 =
Titik berat pada waterline ini ( g ) =
Volume =
D=
Ord
AP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
FP

Perhitungan Peluncuran TEORITIS dengan water line yang dibagi menurut jarak
Penentuan nilai terlihat pada gam
No Uraian
1 Panjang kapal
2 Berat kapal yang diluncurkan
3 Panjang landasan
4 Lebar balok peluncur
5 Sudut kemiringan landasan
6 Jarak antara A ke FP
7 Jarak antara A ke AP
8 Jarak antara B ke AP
9 Panjang balok peluncur
10 Tinggi A dari landasan
11 Tinggi A dari ujung landasan
12 Tinggi permukaan air di atas ujung landasan
13 Tinggi A di atas permukaan air
14 Sudut kemiringan lunas
15 Tinggi A di atas B
16 Tinggi B di atas permukaan air
17 Jarak B dari ujung landasan
18 Jarak G ke AP
19 Jarak G dari ujung landasan
20 Jarak G ke A
21 Moment berat kapal terhadap A
22 fx sudut kemiringan lunas
23 Lpp x sudut kemiringan lunas

F Perhitungan Peluncuran TEORITIS dengan water line yang dibagi menurut jarak

No Uraian
24 Jarak yang ditempuh
25 A akan turun setinggi
26 Sarat pada FP
27 Sarat pada AP
28 Displacement
29 Jarak titik tekan ke midship
30 Jarak titik tekan ke AP
31 Jarak B ke ujung landasan
32 Jarak titik tekan ke ujung landasan
33 Moment gaya apung terhadap ujung landasan
34 jarak G ke ujung landasan
35 Moment berat kapal terhadap ujung landasan
36 Jarak titik tekan ke A
37 Moment gaya apung terhadap A
38 Gaya reaksi landasan
39 Moment gaya reaksi terhadap A
40 Jarak R ke - A
41 Moment anti tipping
42 Jarak R ke ujung landasan
43 Panjang peluncur
44 Persentase jarak R ke - A
45 Panjang bidang reaksi

46 Tekanan rata-rata
47 Reaksi maksimum

48 Reaksi pada ujung balok peluncur

49 Reaksi pada ujung landasan

Pembuatan Grafik

WL 24

Jarak yang ditempuh


2 70.00
4 92.56
6 115.12
8 137.69
10 160.25

Skala grafik

WL 24

Jarak yang ditempuh


2 70.00
4 92.56
6 115.12
8 137.69
10 160.25
skala

Diagram Peluncuran t
600.00

400.00

200.00

0.00
1 2 3 4 5 6 7

-200.00

-400.00

-600.00

-800.00

Nomor Waterline

Diagram Peluncuran Te
600.00

400.00

200.00

0.00
0.00 20.00 40.00 60.00 80.00 100.00 120.00

-200.00

-400.00

-600.00
-200.00

-400.00

-600.00

-800.00

Lwl (m)
PELUNCURAN KAPAL (EN
RNIAWAN 1806202323
TUGAS MERANCANG K

Main Dimensions
100.00 m
96.90 m
95.00 m
17.00 m
8.50 m
6.70 m
0.77 -
0.99 -
0.78 -
0.85 -

Sudut Kemiringan Peluncuran


rentang nilai tan b (s/d)
1/16 1/18

tan b b
1/17 3.38

Periode Peluncuran

4043.01 ton Koefisien Gesek Pe


2
P (t/m )
3485.36 ton 30
4100.42 ton 20
10
30
20
10
local structure
Buku Hidrodinamik
side erections
deck houses Lpp (m)
50
fittings at deck 1461.79 100
equipment seat
150
shell fittings
200
machinery structure
250
structure below deck
propulsion machinery 103.77
Storage Tank
1342.36

other structure
cargo space
47.79
accomodation
deck machinery
Ballast Water 1144.71
WT+Ballast 4100.42
alatan peluncuran 557.66

Perencanaan Sepatu Peluncuran

90% ( 80 - 90 ) %Lpp
85.50 m
42.75 m

0.70 m
n= 3 buah

2.94 m
Ws = 446.13 ton
g s= 0.85 ton/m3

46.30 m dari AP

Berat[ton] dari AP [m] Momen


1461.79 47.50 69435.15
103.77 15.00 1556.51
1342.36 50.00 67117.92
47.79 15.00 716.83
557.66 42.75 23839.83
3513.36 Σ2 162666.23

Perhitungan Beban Landasan terbagi rata


47.29 ton/m

Perhitungan Peluncuran

107.47 ton
sin b = 0.0589
cos b = 0.9983
gaya normal (N) = 4035.99 ton

0.26 m/s2
massa berat peluncuran (m) = 411.85 ton s2/m

24.8736 m
Tinggi AP 1.4682 m

13.81 detik

3.60 m/s

i dilepas dimana G sin b > m.N dan tan(α) > μ, menurut buku Hidrodinamika Kapal Hal 106
Memenuhi
G sin b = 205.38 ton
m.N = 130.77 ton

Memenuhi
tan(α) = 0.24
μ= 0.03

110.3736 m
161.5000 m
0.8 Lpp
0.8Lpp =
76.0000 m

51.1264 m

ingkan dengan tinggi waterline yang tergenangi air


22.56 m
4.75
4.75 m
24.8736

WL 2 47.4361 m
WL 4 69.9986 m
WL 6 92.5611 m
WL 8 115.1236 m
WL 10 137.6861 m

WATERLINE 2
69.9986 m
2.053 m
28.880 m3
29.720 ton
A bonjean FS HG
0 1 0
1.68 4 6.72
2.4 2 4.8
1.44 4 5.76
0.48 2 0.96
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 1 0
S1 = 18.24

WATERLINE 4
92.5611 m
4.433 m
340.480 m3
350.388 ton
A bonjean FS HG
0 1 0
4.32 4 17.28
8.64 2 17.28
10.8 4 43.2
13.44 2 26.88
12.48 4 49.92
10.32 2 20.64
7.44 4 29.76
4.08 2 8.16
0.48 4 1.92
0 2 0
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 1 0
S1 = 215.04

WATERLINE 6
115.1236 m
6.275 m
1098.200 m3
1130.158 ton
A bonjean FS HG
0 1 0
7.44 4 29.76
15.6 2 31.2
21.84 4 87.36
27.84 2 55.68
28.08 4 112.32
27.36 2 54.72
24.96 4 99.84
22.08 2 44.16
18.48 4 73.92
14.88 2 29.76
11.04 4 44.16
7.44 2 14.88
3.84 4 15.36
0.24 2 0.48
0 4 0
0 2 0
0 4 0
0 2 0
0 4 0
0 1 0
S1 = 693.6

WATERLINE 8
137.6861 m
7.774 m
2189.560 m3
2253.276 ton
A bonjean FS HG
0 1 0
10.56 4 42.24
23.04 2 46.08
32.88 4 131.52
42.24 2 84.48
43.68 4 174.72
44.16 2 88.32
41.52 4 166.08
38.88 2 77.76
35.04 4 140.16
31.44 2 62.88
27.84 4 111.36
24.24 2 48.48
20.64 4 82.56
16.8 2 33.6
13.2 4 52.8
8.88 2 17.76
4.8 4 19.2
1.44 2 2.88
0 4 0
0 1 0
S1 = 1382.88

WATERLINE 10
160.2486 m
8.899 m
3448.880 m3
3549.242 ton
A bonjean FS HG
0.48 1 0.48
1.44 4 5.76
31.68 2 63.36
45.36 4 181.44
57.84 2 115.68
60.24 4 240.96
61.68 2 123.36
59.28 4 237.12
56.4 2 112.8
52.8 4 211.2
49.2 2 98.4
45.36 4 181.44
41.76 2 83.52
38.16 4 152.64
34.08 2 68.16
30.48 4 121.92
25.92 2 51.84
19.2 4 76.8
12.48 2 24.96
6.24 4 24.96
1.44 1 1.44
S1 = 2178.24

ngan water line yang dibagi menurut jarak


Penentuan nilai terlihat pada gambar peluncuran
Simbol/Persamaan No. Kode Satuan
Lpp 1 m
G=P 2 t
Lb 3 m
bs 4 m
tg β 5 -
f 6 m
Lpp - f 1-6 m
u 8 m
Ls = Lpp-f-u 7-8 m
e 10 m
Lb tgβ + e = t+0+e (3x5)+10 m
t 12 m
Lb tgβ + e -t = 0 +e 11-12 m
tg α 14 -
(Lpp-f) tgα 7 x 14 m
0+e-(Lpp-f) tgα 13-15 m
Lb - (Lpp-f) + u 3-7+8 m
g 18 m
Lb - (Lpp-f) + g 3-7+18 m
(Lpp-f) -g = p 7-18 m
P.p 2 x 20 tm
f . Tg α 6 x 14 m
Lpp . Tg α 1 x 14 m

line yang dibagi menurut jarak

Penentuan nilai terlihat pada hitungan bonjea


Simbol/Persamaan No. Kode Satuan
S 24 m
MA = S . Tg β 24 x 5 m
TF = S.Tgβ - f.Tgα - (0+e) 25 - 22 - 13 m
TA = TF + Lpp.Tgα 26 + 23 m
Δ=γ.V 28 t
oФ 29 m
oAP = (Lpp/2) + oФ 0.5(1) + 29 m
Lb - (Lpp-f) - S + u 17-24 m
o' = [Lb-{S+(Lpp-f)}]+oAP 31 + 30 m
Δ . o' 28 x 32 tm
P' = {Lb-(Lpp-f)+g}-S 19 - 24 m
P . P' 2 x 34 tm
Θ = (Lpp-f) - oAP 7 - 30 m
Δ.Θ 28 x 36 tm
R=P-Δ 2 - 28 t
(P.p) - (Δ.Θ) 21 - 37 tm
μ = (P.p - Δ.Θ)/R 39 / 38 m
P.p' - Δ.o' 35 - 33 tm
μ' = (P.p' - Δ.o')/R 41 / 38 m
l = Lb - S ;jika l < Ls 3 - 24 m
μ/l 40 / 43 %
Ls = 3(l-μ) ; μ > 0.66 l I m
Ls = 3μ ; μ < 0.33 l II m
Ls = l ; 0.33 l <μ< 0.66 l III m
qm = R/(bs . Ls) 38/(4x45) t/m²
q = [3qm(Ls-2μ)]/Ls 3(46)[(45)-2(40)]/45 t/m²
; 0.33 l <μ< 0.66 l
qμ = 2qm ; μ < 0.33 l 2 x (46) I
qμ = qm+q ; μ > 0.33l & μ < 0.66l 46 + 47 II

ql = 2qm ; μ < 0.66 l 2 x (46) I


ql = qm - q 46 - 47 II

30 32 33
Jarak titik tekan ke ujung Moment gaya apung
Jarak titik tekan ke AP landasan terhadap ujung landasan
49.55 56.18 1669.81
51.93 36.00 12614.63
53.78 15.28 17270.84
55.27 -5.78 -13029.44
56.40 -27.22 -96608.81

30 32 33
Jarak titik tekan ke ujung Moment gaya apung
Jarak titik tekan ke AP landasan terhadap ujung landasan
49.55 56.18 8.35
51.93 36.00 63.07
53.78 15.28 86.35
55.27 -5.78 -65.15
56.40 -27.22 -483.04
1.00 1.00 200.00

Diagram Peluncuran terhadap Waterline

Momen gaya apung terhadap ujung landasa


Jarak G ke ujung landasan (m)
Momen gaya apung terhadap A (tm)
Momen gaya reaksi terhadap A (tm)
Momen anti-tipping (tm)
Displacement (ton)
4 5 6 7 8 9 10 11 Berat kapal saat peluncuran (ton)

Nomor Waterline

Diagram Peluncuran Terhadap Jarak Tempuh

Momen gaya apung terhadap ujung landasan (


Jarak G ke ujung landasan (m)
Momen gaya apung terhadap A (tm)
Momen gaya reaksi terhadap A (tm)
Momen anti-tipping (tm)
Displacement (ton)
Berat kapal saat peluncuran (ton)
0.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00

SKALA
1:1200
1:0,15
1:300
1:500
1:1500
1:10
SKALA
1:1200
1:0,15
1:300
1:500
1:1500
1:10

Lwl (m)
APAL (END LAUNCHNG)
806202323 CHEMICAL T
ERANCANG KAPAL II

KAPAL KECIL < 50 M


KAPAL SEDANG 50 > LOA > 150 M
KAPAL BESAR > 150 M

Koefisien Gesek Peluncuran Buku Hidrodinamika Kapal Hal 104


2
P (t/m ) μ
30 0,024
20 0,032
10 0,04
μ
30 0,024
20 0,032
10 0,04
Buku Hidrodinamika kapal Hal 107
2
Lpp (m) ton/m interpolasi perkiraan koefisi
50 15
Ppeluncuran (ton/m2)
100 20
Nilai Atas
150 25
Nilai X
200 30
Nilai Bawah
250 35

interpolasi perkiraan Ppeluncuran (ton/m2)


Lpp Ton/m2
Nilai Atas 100 Nilai Atas
Nilai X 95.00 Nilai X
Nilai Bawah 50 Nilai Bawah

80% M
jenis sepatu peluncuran
Skala bonjean 1: 24
g air laut+baja : 1.0291 ton/m3
Jarak antar gading : 4.75 m

FM HG L Cad
0 0 0
1 6.72 0.07
2 9.6 0.1
3 17.28 0.06
4 3.84 0.02
5 0 0
6 0 0
7 0 0
8 0 0
9 0 0
10 0 0
11 0 0
12 0 0
13 0 0
14 0 0
15 0 0
16 0 0
17 0 0
18 0 0
19 0 0
20 0 0
S1 = 37.44

Skala bonjean 1: 24
g air laut+baja : 1.0291 ton/m3
Jarak antar gading : 4.75 m

FM HG L Cad
0 0 0
1 17.28 0.18
2 34.56 0.36
3 129.6 0.45
4 107.52 0.56
5 249.6 0.52
6 123.84 0.43
7 208.32 0.31
8 65.28 0.17
9 17.28 0.02
10 0 0
11 0 0
12 0 0
13 0 0
14 0 0
15 0 0
16 0 0
17 0 0
18 0 0
19 0 0
20 0 0
S1 = 953.28

Skala bonjean 1: 24
g air laut+baja : 1.0291 ton/m3
Jarak antar gading : 4.75 m
FM HG L Cad
0 0 0
1 29.76 0.31
2 62.4 0.65
3 262.08 0.91
4 222.72 1.16
5 561.6 1.17
6 328.32 1.14
7 698.88 1.04
8 353.28 0.92
9 665.28 0.77
10 297.6 0.62
11 485.76 0.46
12 178.56 0.31
13 199.68 0.16
14 6.72 0.01
15 0 0
16 0 0
17 0 0
18 0 0
19 0 0
20 0 0
S1 = 4352.64

Skala bonjean 1: 24
g air laut+baja : 1.0291 ton/m3
Jarak antar gading : 4.75 m

FM HG L Cad
0 0 0
1 42.24 0.44
2 92.16 0.96
3 394.56 1.37
4 337.92 1.76
5 873.6 1.82
6 529.92 1.84
7 1162.56 1.73
8 622.08 1.62
9 1261.44 1.46
10 628.8 1.31
11 1224.96 1.16
12 581.76 1.01
13 1073.28 0.86
14 470.4 0.7
15 792 0.55
16 284.16 0.37
17 326.4 0.2
18 51.84 0.06
19 0 0
20 0 0
S1 = 10750.08

Skala bonjean 1: 24
g air laut+baja : 1.0291 ton/m3
Jarak antar gading : 4.75 m

FM HG L Cad
0 0 0.02
1 5.76 0.06
2 126.72 1.32
3 544.32 1.89
4 462.72 2.41
5 1204.8 2.51
6 740.16 2.57
7 1659.84 2.47
8 902.4 2.35
9 1900.8 2.2
10 984 2.05
11 1995.84 1.89
12 1002.24 1.74
13 1984.32 1.59
14 954.24 1.42
15 1828.8 1.27
16 829.44 1.08
17 1305.6 0.8
18 449.28 0.52
19 474.24 0.26
20 28.8 0.06
S1 = 19384.32
Nilai
95.00
4100.418
161.5
0.697
0.06
4.77
90.23
5.36
84.87
1.468
11.00
5.91
5.09
0.06
5.33
-0.23
76.63
46.30
117.57
43.93
180134.27
0.28
5.61

t pada hitungan bonjean


WL 1 WL 2 WL 3
70.00 92.56 115.12
4.13 5.46 6.80
8.94 10.27 11.61
14.55 15.88 17.21
29.72 350.39 1130.16
2.05 4.43 6.28
49.55 51.93 53.78
6.63 -15.93 -38.49
56.18 36.00 15.28
1669.81 12614.63 17270.84
47.57 25.01 2.45
195059.56 102543.88 10028.21
40.68 38.30 36.45
1208.95 13418.80 41199.41
4070.70 3750.03 2970.26
178925.32 166715.47 138934.86
43.95 44.46 46.78
47.51 23.98 -2.44
0.01 0.01 0.00
91.50 68.94 46.38
0.48 0.64 1.01

131.86 133.37 140.33

44.30 40.35 30.38


44.30 40.35 30.38

88.60 80.70 60.75


II II II

88.60 80.70 60.75


II II II

34 35 36
Moment berat kapal terhadap
jarak G ke ujung landasan ujung landasan Jarak titik tekan ke A
47.57 195059.56 40.68
25.01 102543.88 38.30
2.45 10028.21 36.45
-20.12 -82487.46 34.96
-42.68 -175003.14 33.83

34 35 36
Moment berat kapal terhadap
jarak G ke ujung landasan ujung landasan Jarak titik tekan ke A
317.14 325.10 406.77
166.72 170.91 382.97
16.30 16.71 364.55
-134.11 -137.48 349.56
-284.53 -291.67 338.31
0.15 600.00 0.10

G Saat Peluncuran (SKALA)


G Setelah Meluncur (SKALA)

omen gaya apung terhadap ujung landasan (tm)


rak G ke ujung landasan (m)
omen gaya apung terhadap A (tm)
omen gaya reaksi terhadap A (tm)
omen anti-tipping (tm)
splacement (ton)
erat kapal saat peluncuran (ton)

men gaya apung terhadap ujung landasan (tm)


G ke ujung landasan (m)
men gaya apung terhadap A (tm)
men gaya reaksi terhadap A (tm)
men anti-tipping (tm)
acement (ton)
t kapal saat peluncuran (ton)

SKALA
1:1200
1:0,15
1:300
1:500
1:1500
1:10
SKALA
1:1200
1:0,15
1:300
1:500
1:1500
1:10
CHEMICAL TANKER
interpolasi perkiraan koefisien gesek (μ)
Ppeluncuran (ton/m2) koefisien gesek (μ)
10 Nilai Atas 0.04
19.50 Nilai X 0.032
20 Nilai Bawah 0.032

Ton/m2
20
19.50
15
WL 4 WL 5
137.69 160.25
8.13 9.46
12.94 14.27
18.54 19.88
2253.28 3549.24
7.77 8.90
55.27 56.40
-61.06 -83.62
-5.78 -27.22
-13029.44 -96608.81
-20.12 -42.68
-82487.46 -175003.14
34.96 33.83
78766.22 120074.16
1847.14 551.18
101368.04 60060.11
54.88 108.97
-37.60 -142.23
-0.02 -0.26
23.81 1.25
2.30 87.08

164.63 326.90

16.10 2.42
16.10 2.42

32.20 4.84
II II

32.20 4.84
II II

37 39 41 28
Moment gaya apung Moment gaya reaksi
terhadap A terhadap A Moment anti tipping Displacement
1208.95 178925.32 47.51 29.72
13418.80 166715.47 23.98 350.39
41199.41 138934.86 -2.44 1130.16
78766.22 101368.04 -37.60 2253.28
120074.16 60060.11 -142.23 3549.24

37 39 41 28
Moment gaya apung Moment gaya reaksi
terhadap A terhadap A Moment anti tipping Displacement
4.03 357.85 237.54 2.97
44.73 333.43 119.90 35.04
137.33 277.87 -12.19 113.02
262.55 202.74 -188.01 225.33
400.25 120.12 -711.16 354.92
300.00 500.00 0.20 10

410.04 ton 0.00 m


46.24 ton 161.5 m
Tugas Merancang Ka

Dimensi Utama Kapal Rancangan Koefisien kapal


Teu's Cb
Lpp 95.00 Cm
Lwl 96.90 Cp
Loa 100.00 Cw
B 17.00
T 6.70
H 8.50
v (Knot) 12
v service (knot) 6.17
v service (m/s) 6.17
Fn 0.20
Volume 8972.00
Displacement 8972.00
Lcb 2.16
S (mil laut) 601 bontang - bali
t (jam) 76.80 bontang - bali
t (hari) 3.00 bontang - bali

Boiler Pada Storage Fuel Tank

Kebutuhan I
Q 164.7 Kw
U 90 W/m2.K
A 183 m2
T1 30 C
T2 40 C

Kebutuhan II

Q 15.2286432 kJ/s
m fuel 137057.7888 kg
Cp 2 kJ/kg K
0.2 Storage Tank K/hour
dT/t 4 Service Tank K/hour
dT/t
1 All Other K/hour

delta H 400 kJ/kg


m' 0.449821608

Q Total 179.9286432 kW

Q Total 1.12850127424
Transfer pump (Boiler Tank - Boiler)
Head Losses (H) 119.414849481 m
10 m3/hour
Capacity (Q)
0.00277777778 m3/s

Volume Storage 10 m3
Time 1 hour

0.02660289615 m Q = A x v = (π x D2 / 4) x v
Diameter of Pipe
26.6028961489 mm
Flow Velocity 5 m/s

in the market supply, the pipes which are used :


Inside diameter 0.02664 m
Outside diameter 0.0334 m
Nominal wall thickness 0.00338 m
Nominal pipe size 20 Schedule 40S

Head static of pump (hs) 2.5 m


Head of pressure difference (hp) 0 m
Head of velocity difference (hv) 0 m

Major Losses (hf) 96.4255528453 m


Length oh pipe (L) 52 m
Friction loss Coefficient (λ) 0.03876876877
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢
Reynold Number (Rn) 8500.31908105
Kinematic Viscocity (u) 0.00001567 m2/s

Minor Losses (hl) 20.4892966361 m


Type of Pipe N k Nxk
Elbow 6 0.75 4.5
Gate Valve 3 1.2 3.6
T Joint 3 1.8 5.4
Strainer 1 0.58 0.58
NRV 1 2 2
Jumlah 16.08
Transfer pump (Boiler Tank - Boiler)

Pump Selection
Merk Bedu Pompen
Type MXV(L)-E Series
Frekuensi 50 Hz
RPM 2900
Diameter (suc x dis) (125 x 100) mm
Head 230
Capacity 60 m3/h
Power (kW) 7.5
gas Merancang Kapal

Koefisien kapal
0.77 Luasan Storage Tan
0.992
0.78
Fuel Consumption Engine
0.85
Fuel Consumption satu kali perjalanan
Safety +5%

Jari - jari tanki


Tinggi Tanki

rho HFO

Luasan Water Jacke


Volume berdasarkan catalog
Luasan Water Jacket
rho HFO

Boiler Pada Service Fuel

Kebutuhan I
Q
U
A
T1
T2

Kebutuhan II

Q
m fuel
Cp

dT/t
dT/t

delta H
m'

Q Total

MW
Q = A x v = (π x D2 / 4) x v

𝑥 𝑑_𝐻)/𝑢
Luasan Storage Tank
#REF! Liter / hour
Fuel Consumption Engine
#REF! m3 / hour
Fuel Consumption satu kali perjalanan 152.286432
Safety +5% 159.9007536 m3

Jari - jari tanki 15 m


Tinggi Tanki 0.75 m

rho HFO 900 kg/m3

Luasan Water Jacket


Volume berdasarkan catalog 1.3 m3
Luasan Water Jacket 135.1 m2
rho HFO 900 kg/m3

Boiler Pada Service Fuel Tank

Kebutuhan I
Q 83.347218 Kw
U 90 W/m2.K
A 102.8978 m2
T1 50 C
T2 59 C

Kebutuhan II

Q 362.848 kJ/s
m fuel 163281.6 kg
Cp 2 kJ/kg K
0.2 Storage Tank K/hour
dT/t 4 Service Tank K/hour
dT/t
1 All Other K/hour

delta H 2308 kJ/kg


m' 0.1933254844

Q Total 446.195218 kW
Transfer pump (Kondensor - Boiler Tank)
Head Losses (H) 126.778203082 m
10 m3/hour
Capacity (Q)
0.00277777778 m3/s

Volume Storage 10 m3
Time 1 hour

0.02660289615 m Q = A x v = (π x D2 / 4) x v
Diameter of Pipe
26.6028961489 mm
Flow Velocity 5 m/s

in the market supply, the pipes which are used :


Inside diameter 0.02093 m
Outside diameter 0.02667 m
Nominal wall thickness 0.00287 m
Nominal pipe size 15 Schedule 40S

Head static of pump (hs) 8 m


Head of pressure difference (hp) 0 m
Head of velocity difference (hv) 0 m

Major Losses (hf) 98.8623009411 m


Length oh pipe (L) 37 m
Friction loss Coefficient (λ) 0.04388915432
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢
Reynold Number (Rn) 6678.36630504
Kinematic Viscocity (u) 0.00001567 m2/s

Minor Losses (hl) 19.9159021407 m


Type of Pipe N k Nxk
Elbow 3 0.75 2.25
Gate Valve 3 1.2 3.6
T Joint 4 1.8 7.2
Strainer 1 0.58 0.58
NRV 1 2 2
Jumlah 15.63
Transfer pump (Kondensor - Boiler Tank)

Pump Selection
Merk Bedu Pompen
Type MXV(L)-E Series
Frekuensi 50 Hz
RPM 2900
Diameter (suc x dis) (125 x 100) mm
Head 230
Capacity 60 m3/h
Power (kW) 7.5
Luasan Service Tank Engine
Volume 90.712 m3
Safety +2% 92.52624 m3

Jari - Jari Tanki 1.45 m


Tinggi Tanki 4.2 m

Dimensi Settle Tank

Jari - Jari Tanki 1.72 m


Tinggi Tanki 5 m
Volume 162.5 m3

Boiler Pada Settle Fuel Tank

Kebutuhan I
Q 29.25 Kw
U 90 W/m2.K
A 32.5 m2
T1 40 C
T2 50 C

Kebutuhan II

Q 4.644688 kJ/s
m fuel 41802.192 kg
Cp 2 kJ/kg K
0.2 Storage Tank
dT/t 4 Service Tank
dT/t
1 All Other

delta H 2308 kJ/kg


m' 0.0146857400347

Q Total 33.894688 kW

Tanki Boiler

Fuel Tank 152.286432


Lub Tank 2.374176
Daily tank 90.712
Settlink Tank 162.5
Water Jacket 1.3
409.172608
Luasan Storage Tank Lubricant
Lubricant Consumption 43.32 kg / hour
Lubricant Consumption satu kali perjalanan 2.374176
Safety +5% 2.4928848 m3

Jari - jari tanki 1.86 m


Tinggi Tanki 0.75 m

rho Lubricant 900 kg/m3

Boiler Pada Service Lubricant Tank

Kebutuhan I
Q 96.0336972
U 90
A 30.486888
T1 30
T2 65

Kebutuhan II

Q 4.96202784
m fuel 2136.7584
Cp 2.09
K/hour 0.2
K/hour dT/t 4
dT/t
K/hour 1

delta H 2308
m' 0.0437589797

Q Total 100.99572504

Boiler Pada Storage Fuel Tank


Boiler Pada Settle Fuel Tank
Boiler Pada Service Fuel Tank
Boiler Pada Engine Water Jacket
Boiler Pada Service Lubricant Tank
m3
m3
m3
m3
m3
Luasan Storage Tank Generator

Fuel Consumption Genset

Fuel Consumption satu kali perjalanan


Safety +5%

Jari - jari tanki


Tinggi Tanki

rho Diesel

vice Lubricant Tank Boiler Pada Engine Water Jacket

Kebutuhan I
Kw Q 364.77 Kw
W/m2.K U 90 W/m2.K
m2 A 135.1 m2
C (Berdasarkan catalog) T1 30 C
C T2 60 C

Kebutuhan II

kJ/s Q 2.717 kJ/s


kg m fuel 1170 kg
kJ/kg K Cp 2.09 kJ/kg K
Storage Tank K/hour 0.2 Storage Tank
Service Tank K/hour dT/t 4 Service Tank
dT/t
All Other K/hour 1 All Other

kJ/kg delta H 2308 kJ/kg


m' 0.1592231369

kW Q Total 367.487 kW

T masuk T Keluar
er Pada Storage Fuel Tank 30 40 C
er Pada Settle Fuel Tank 40 50 C
er Pada Service Fuel Tank 50 59 C
er Pada Engine Water Jacket 30 60 C
er Pada Service Lubricant Tank 30 65 C
orage Tank Generator
215.7 Liter / hour
sumption Genset
0.2157 m3 / hour
on satu kali perjalanan 16.56576 m3
afety +5% 17.394048 m3

- jari tanki 1.7542814 m


nggi Tanki 1.8 m

ho Diesel 832 kg/m3

Water Jacket

K/hour
K/hour
K/hour
Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806
1. Steps of C
a. Calculation of weight fuel oil
b. Calculation of MDO storage tank volume
c. Calculation of MDO service tank volume
d. Calculation of MDO transfer pump
e. Calculation of Oil primary pump
f. Pump Selection

2. Detail of c
Engine and Ship's Data
MCR engine 100% = 3398.14 HP =
SFOC engine in MCR = 186 g/kWh
Speed = 720 rpm
SLOC system oil = 0.7 g/kWh
Vs (speed service of ship) = 12.00 knot
Shipping radius = 601.00 nm =
Time of shipping = 76.80 hours
Density of MFO = 900 kg/m3
Factor = 1.5

a. Calculation of
Weight of MFO = T x SFOC x MCR (kWh) x fG x 10-6
= 54.297 ton
= 54296.5248 kg
b. Calculation of MFO
Volume of storage tank = ( weight / Density ) of MFO
= 60.329 m3

c. Calculation of M
Based on BKI Volume III Section 11 G.10.2
each service tank is to have a capacity of at least 8 h at maximum
Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806
continuous rating of the propulsion plant and normal
operation load of the generator plant
Based on Project Guide page 09.35
The service tank shall be dimensioned to contain purified MFO for operating
minimum 4 hours at MCR

Perencanaan dimensi Service Tank


Volume of service tank = 6.000 m3
Service tank dimension
Long = 3m
Breadth = 2m
High = 1m

Based on BKI Volume III Section 11 G.10.1


On cargo ship of 500 GT or above and all passenger ships two fuel oil service
tanks for each type of fuel used on board necessary for propulsion
and essential systems are to be provided

Amount of service tanks = 2 tank


Total Volume = 12 m3

d. Calculation of MFO transfer p


- calculation of MFO transfer pump pipe's diameter
pump is planned to move MFO from storage tank to settling tank
Time = 2 hours
Pump capacity = V/t
Pump capacity = 30.165 m3/hour
= 0.00838 m3/s
Flow velocity = 0.8 m/s
Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806
= 1 m/s

So diameter (D) of used pipe is :

Q = Axv D = ( Q / 0.25 x π x v )1/2

Q = Axv = (π x D2 / 4) = 0.00670327466666
D = 0.1033151 m
= 103.31507 mm
Ukuran Pipa sesuai hitungan mesti disesuaikan dengan ketersediaan di pasaran dan sesuai s
Inside diameter = 85.72 mm =
Outside diameter = 88.9 mm =
Nominal wall thickness = 3.18 mm

- Calculation of installation in engine room


Head static of pump (ha) = 1.731
Head of pressure difference (hp) = 0
Head of velocity difference (hv) = 0

- Calculation of head in sucti


caused by friction,
Rn = Reynould number
Based on Pompa dan Kompresor by Sularso Haruo Tahara
Chapter 2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢

assuming the temperature of fuel which flowing through the pipe


is in 40˚C, So
Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806
u = kinematic viscocity
u = 0.0000055 m2/s
Rn = 15585.5

Based on Pompa dan Kompresor by Sularso Haruo Tahara


Chapter 2 Spesifikasi Page. 29

So,
λ = Friction loss coefficient
λH = 0.0258329444703686

the major losses in suction pipe could be determined by,

L = Length of pipe
D = Diameter of pipe
V = Flow velocity

Main bilge pipe was designed,


L = 3.173 m Pipa Horizontal
D = 0.08572 m Pipa Vertikal
Hf = 0.0487871837142284 m

So, the total head of major losses in suction


Hf1 = Total head of major losses in suction
Hf1 = 0.0487871837142284 m

the minor losses in suction pipe could be determined by,


Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806

No Type N k Nxk
1 Elbow 90˚ 0 0.75 0
2 Butterfly 0 0.6 0
3 Gate Valve 0 1.2 0
4 T Joint 0 1.8 0
5 Strainer 0 0.58 0
6 NRV 0 2 0
Total 0

So, the total head of minor losses in suction


Hl1 = Total head of minor losses in suction
Hl1 = 0m

- Calculation of head in discharg


the friction losses and diameters are same,
the difference is on the length of pipe,
the major losses in discharge pipe could be determined by,

Main pipe was designed,


L = 3.173 m
D = 0.08572 m
Hf = 0.0487872 m

So, the total head of major losses in discharge


Hf2 = Total head of major losses in discharge
Hf2 = 0.0487871837142284 m

the minor losses in discharge pipe could be determined by,


Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806
No Type N k Nxk
1 Elbow 90˚ 0 0.75 0
2 Butterfly 0 0.6 0
3 Gate Valve 0 1.2 0
4 T Joint 0 1.8 0
5 Strainer 0 0.58 0
6 NRV 0 2 0
Total 0

So, the total head of minor losses in discharge


Hl2 = Total head of minor losses in discharge
Hl2 = 0m

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2

So, the total head total system is


HTOTAL = Total head
HTOTAL = 1.828574367428 m

e. Calculation of Oil primary p


The pump can be driven directly by the purifier or by
an independent motor.

Capacity = According to purifier


Pressure = Max 2.5 bar
Temperature = Max 40 Celcius

Q = SFOC x (24/T)
Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806

SFOC = 186 g/kWh


= 523.7 l/h
Time = Daily separating time, depending on purifier
(20-22 hours)
= 21 hours
Qpurifier = 598.51 l/h
= 0.5985 m3/h

- Purifier Specification
Brand = Bedu Pompen
Type = CT 61
Capacity = 1.89 m3/h
Frequency = 50 Hz
Head = 3m
RPM = 2900 rpm
kW = 0.33 kW

- calculation of Oil primary pump pipe's diameter


pump is planned to move MDO from service tank to main engine
Time = 2 hours
Pump capacity = V/t
Pump capacity = 6.000 m3/hour
= 0.00167 m3/s
Flow velocity = 0.8 m/s
= 1 m/s
So diameter (D) of used pipe is :

Q = Axv D = ( Q / 0.25 x π x v )1/2


Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806
Q = Axv = (π x D2 / 4) x v
D = 0.0460776 m
= 46.077568 mm
in the market supply, the pipes which are used :
Inside diameter = 26.64 mm =
Outside diameter = 33.4 mm
Nominal wall thickness = 3.38 mm
Nominal pipe size = 250 mm
Carbon Steel Pipe for

- Calculation of installation in engine room


Head static of pump (hs) = 1.15
Head of pressure difference (hp) = 0
Head of velocity difference (hv) = 0

- Calculation of head in suction


caused by friction,
Rn = Reynould number
Based on Pompa dan Kompresor by Sularso Haruo Tahara
Chapter 2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢

assuming the temperature of water which flowing through the pipe


is in 30˚C, So
u = kinematic viscocity
u = 0.0000055 m2/s
Rn = 4843.6

Based on Pompa dan Kompresor by Sularso Haruo Tahara


Chapter 2 Spesifikasi Page. 29
Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806

So,
λ = Friction loss coefficient
λ = 0.0387687687687688

the major losses in suction pipe could be determined by,

L = Length of pipe
D = Diameter of pipe
V = Flow velocity

Main pipe was designed,


L = 4.7655 m
D = 0.02664 m
Hf = 0.353834512256327 m

So, the total head of major losses in suction


Hf1 = Total head of major losses in suction
Hf1 = 0.353834512256327 m

the minor losses in suction pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 2 0.75 1.5
2 Butterfly 0 0.6 0
3 Gate Valve 0 1.2 0
Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806
4 T Joint 1 1.8 1.8
5 Strainer 0 0.58 0
6 NRV 0 2 0
Total 3.3

So, the total head of minor losses in suction


Hl1 = Total head of minor losses in suction
Hl1 = 0.168367346938775 m

- Calculation of head in discharg


the friction losses and diameters are same,
the difference is on the length of pipe,
the major losses in discharge pipe could be determined by

Main pipe was designed,


L = 4.7655 m
D = 0.02664 m
Hf = 0.353834512256327 m

So, the total head of major losses in discharge


Hf2 = Total head of major losses in discharge
Hf2 = 0.353834512256327 m

the minor losses in discharge pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 2 0.75 1.5
2 Butterfly 0 0.6 0
3 Gate Valve 0 1.2 0
4 T Joint 1 1.8 1.8
5 Strainer 0 0.58 0
Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806
6 NRV 0 2 0
Total 3.3

0
Hl2 = Total head of minor losses in discharge
Hl2 = 0.107755102040816 m

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2

So, the total head is


HTOTAL = Total head
HTOTAL = 2.133791473492 m

f. Pump se
- Transfer Pump
Head = 1.8286 m
Capacity = 30.16 m3/h

Brand = TAIKO
Type = TAIKO GEAR PUMP NHG-30
Capacity = 30 m3/h
Frequency = 60 Hz
Head = 125 m
RPM = 1200 rpm
Daya = 11.0 kW

- Feed Pump & Stand by Pump


Head = 2.1338 m
Capacity = 6.00 m3/h
Fuel O
Chemical Tanker
(Dimensi Utama)
Naval Architecture
L 95.00 UNIVERSI
B 17.00
T 6.70 Arief K
H 8.50
Cb 0.77 1806
Brand = TAIKO
Type = TAIKO GEAR PUMP NHG-6
Capacity = 9 m3/h
Frequency = 60 Hz
Head = 65 m
RPM = 1800 rpm
Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323
1. Steps of Calculation

2. Detail of calculation

2534.00 kW
0.186 kg/kWh from engine data

Specific lube oil consumption


22.2048 km/h
1113.052 km

MFO distillate fuel oil

a. Calculation of weight fuel oil


(kWh) x fG x 10-6

b. Calculation of MFO storage tank volume

c. Calculation of MFO service tank


Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323

Kalkulasi Berat Bahan Bakar untuk 8 jam ketersediaan di dalam Service Ta


Time 8 jam
Weight MFO
Volume MFO

Perencanaan Ukuran Service Tank harus sesuai volume hasil perhitungan

culation of MFO transfer pump (Storage-Settling Tank)

Ukuran Settlink Tank


L
P
m3/hour T

(MFO suction pipe) Ukuran settlink tank disamakan mendekati service tank
akan mengendapkan Fuel min.selama 24 jam
Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323 Ukuran settlink tank disamakan mendekati service tank
akan mengendapkan Fuel min.selama 24 jam

( Q / 0.25 x π x v )1/2

0.00670327466666667

n di pasaran dan sesuai standar hasilnya di bawah :


0.08572 m
0.0889

Sesuai standart ASTM A53 B


Steel Pipe

m h suction 0.334
m h discard 2.065
m

lculation of head in suction


Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323

1.108 m
2.065 m
Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323

lation of head in discharge


Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323

head total system is

lculation of Oil primary pump (Settlink-Service Tank)


Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323

ding on purifier

Bedu Pompen
CT 61

pump pipe's diameter

m3/hour

(MDO suction pipe)

( Q / 0.25 x π x v )1/2
Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323

0.02664 m

Carbon Steel Pipe for pressure service

m
m
m

on of head in suction
Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323

could be determined by,

Pipe Horizontal 2.0637 m


0.5844 m
total 2.6481
Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323

lation of head in discharge

e could be determined by,

dihitung sesuai alur pipa kalian


Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323

f. Pump selection.

TAIKO
GEAR PUMP NHG-30
Fuel Oil System
Naval Architecture & Marine Engineering
UNIVERSITAS INDONESIA

Arief Kurniawan
1806202323
TAIKO
O GEAR PUMP NHG-6
Arief Kurniawan
1806202323
Chemical Tanker
Naval Architecture & Marine Engin

1. Steps of Calculation
a. Calculation of Lubricating storage tank capacity
b. Calculation of Purifier
c. Calculation of Preheater
d. Calculation of Lub oil pump
e. Pump Selection

2. Detail of calculation
Engine and Ship's Data
MCR engine 100% = 3398.14 HP
SFOC engine in MCR = 186 g/kWh
Speed = 720 rpm
SLOC system oil = 0.7 g/kWh
Vs (speed service of ship) = 12 knot
Shipping radius = 601 nm
Time of shipping = 76.8 hours
Density of LO = 900 kg/m3
Factor = 6

a. Calculation of Lubricating oil storage tank


Weight of Lubricating = BHPME . SLOC . Endurance . C . 10-6
= 0.817 ton
Capacity of tank = 0.9082 m3

b. Calculation of Purifier
Based on Project Guide L27/38
In order to prolong the interval between the exchange
of oil it is necessary to install an automatic self_cleaning
lub oil purifier dimensioned to handle a flow of
approx 0.32-0.38 l/kWh.

As a guideline for the selection of purifier, the following


formula can be used:

V = The nominal capacity of the purifier (l/h)


F = 0.32
Arief Kurniawan
1806202323
Chemical Tanker
Naval Architecture & Marine Engin

P = Power in engine ( MCR )


T = 20-22 hours

V = F x P x 24/T

V = 884.596363636364 l/h = 0.885 m3/h

- Purifier Specification
Brand = ASSEN
Type = TYA-30
Capacity = 3.24 m3/h
Frequency = 50 Hz
Main supply voltage = 3-phase, 220 V up to 690 V
Control voltage = 1-phase, 100/110/115/230 V
Control air = min 5 bar, max 7 bar
Operating Water Press = min 2 bar, max 6 bar

c. Calculation of Preheater
Based on Project Guide L27/38
The preheater must be able to raise the temperature
of the oil from approx 65°C to approx 95°C, which is
the temperature of the oil for purifying.

C = Capacity of preheater (kW)


V = Flow through (l/h) defined as purifier
= 621.981818182 l/h
t = temperature difference
= 35 celcius

C = V x t/1800

C = 12.0940909090909 kW
Arief Kurniawan
1806202323
Chemical Tanker
Naval Architecture & Marine Engin

Max pressure 4 bar


Max pressure loss 0.5 bar

d. Calculation of Lubricating oil pump


Based on Project Guide L27/38
To ensure good suction conditions for the lub oil pump,
the pump should be placed as low as possible.

Design data:
Capacity : See planning data
Pressure : Min 5 bar
Temperature : Max 85 °C
Viscosity at normal operation:
40 cSt (corresponding to 70 °C)
Max viscosity for dimensioning of el-motor:
1000 cSt (corresponding to 12 °C for SAE 40 oil )

Capacity of pump = 621.981818181818 l/h


= 0.62198181818182 m3/h
= 0.6 m3/h
= 0.0002 m/s
Flow of oil = 1 m/s

So diameter (D) of used pipe is :

Q = Axv D = ( Q / 0.25 x π x v )1/2

Q = Axv = (π x D2 / 4) x
D = 0.0148355 m
= 14.83552 mm
in the market supply, the pipes which are used :
Inside diameter = 18.53 mm
Outside diameter = 21.3 mm
Nominal wall thickness = 2.77 mm
Arief Kurniawan
1806202323
Chemical Tanker
Naval Architecture & Marine Engin

Nominal pipe size = 1/2 inc (According to ASTM A5


Steel Pipe
Arief Kurniawan
1806202323

Architecture & Marine Engineering

= 2534.00 kW
g/kWh
rpm
g/kWh
knot

hours
kg/m3

Capacity Lub.Oil Pump


P = 2534
Arief Kurniawan
1806202323

Architecture & Marine Engineering

t = 22
MFO 4
HFO 5

Q = 621.9818181818
= 10.36636363636
= 0.621981818182

ASSEN
TYA-30
Arief Kurniawan
1806202323

Architecture & Marine Engineering

( Q / 0.25 x π x v )1/2

= 0.01853 m

(SCH 40)
Arief Kurniawan
1806202323

Architecture & Marine Engineering

(According to ASTM A53 B)


STD
Arief Kurniawan
1806202323
Naval Architecture & Marine Engineering Univer
Engine Cooling System
Step Calculation
1.Menntukan Jenis HEX yang akan digunakan
2.Penentuan & Perhitungan Seluruh komponen HEX
3.Pemilihan HEX
4.Perhitungan Pompa
5.Pump Selection

1.Menentukan Jenis HEX


Saya Menggunakan HEX Jenis Shell & Tube

2.Penentuan dan Perhitungan seluruh komponen HEX


Fluida Kerja : Fresh Water

Thin 90 oC Diasumsikan Temperatur dari Engine yg akan masuk ke HEX


Thout 30 C
o
Diasumsikan Temperatur yg keluar ke HEX
Th 60 oC Temperatur rata2
333 K

Data of Water at 333 K Base on Table 6 Fundamental Heat & Mass Transfer Book
Cp 4.1852 kJ/kg.K
μ 0.0004674 N.s/m2 velocity flow 1 m/s
K 0.6536 W/m.K
Pr 2.988

v 0.1 kg/s Flowrate dalam inner pipe HEX


0.0001 m3/s Digunakan jg sbg capacity pump
0.36 m /h3

Jenis Heat Exchanger yang digunakan: Shell & Tube dengan Contraflow :
Q= Axv
Q= v x π x D2 / 4
D= Q  4
  v
D= (( 0.05613381 x 4 ) / ( 3.14 x 3 ))1/2 Inner Diameter of HEX
0.676891 m= 676.89 mm

q pada fluida yg panas


q(heat) 25.1112 Watt

ΔTlm 24.58136

Perhitungan Koefisien Inner Pipe


Re 402.64537 Laminar

Penentuan Nusselt Number pada Inner Pipe


Karena aliran laminar,maka nilau Nusselt Number = 4.36
berdasarkan buku Fundamental Heat & Mass Transfer
Nu 4.36
Penentuan nilai heat transfer cooficient

hi 4.209976

Perhitungan koeefisien Outer Pipe

Dh 0.152127845868 m
Khusus outer pipe pada HEX menggunakan diameter hidraulic

Re 291.69783476931 Laminar

Penentuan Nusselt Number pada outer Pipe


Karena aliran laminar,maka nilau Nusselt Number = 4.36
berdasarkan buku Fundamental Heat & Mass Transfer
Nu 4.36

Penentuan nilai heat transfer cooficient

hi 17.68902

Penentuan U(total heat transfer cooficient)

r1 0.338446 1/hi
r2 0.348446 1/ho
r3 0.41451 r1/k
r2/r1
r1/r3
Spek material ln(r2/r1)
Stainless Steel AISI 302 U 3.51689 W/m2.K
p 8085 kg/m3
Cp 480 J/kg.K
k 15.1 W/m.K

Penentuan Panjang HEX

A 0.290470953 m2
L 0.136664003 m A=
3.Pemilihan HEX
Requirement Spesification
Flowrate 0.1 kg/s Type 2312
6 l/min Water Flow Max 8 l/min
Sea Water Flow Max 46 l/min
Daya 3.6 kW

Rencana Jalur

POMPA FRESH WATER


- Calculation of installation in engine room
Head static of pump (ha) 0.3403 m h suction =
Head of pressure difference (hp) 0m h discard =
Head of velocity difference (hv) 0m

- Calculation of head in suction


caused by friction,
Rn = Reynould number
Based on Pompa dan Kompresor by Sularso Haruo Tahara
Chapter 2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢

assuming the temperature of fuel which flowing through the pipe


is in 40˚C, So
u = kinematic viscocity
u = 0.0004674 m2/s
Rn = 1448.2

Based on Pompa dan Kompresor by Sularso Haruo Tahara


Chapter 2 Spesifikasi Page. 29

So,
λ = Friction loss coefficient
λH = 0.0207386710503566

the major losses in suction pipe could be determined by,

L = Length of pipe
D = Diameter of pipe
V = Flow velocity

Main bilge pipe was designed,


L = 2.6487 m Pipa Horizontal
D = 0.676891 m Pipa Vertikal
Hf = 0.00414036565672206 m

So, the total head of major losses in suction


Hf1 = Total head of major losses in suction
Hf1 = 0.00414036565672206 m
the minor losses in suction pipe could be determined by,

No Type N k
1 Elbow 90˚ 1 0.75
2 Butterfly 0 0.6
3 Gate Valve 0 1.2
4 T Joint 0 1.8
5 Strainer 0 0.58
6 NRV 0 2
Total

So, the total head of minor losses in suction


Hl1 = Total head of minor losses in suction
Hl1 = 0.038265306122449 m

- Calculation of head in discharge


the friction losses and diameters are same,
the difference is on the length of pipe,
the major losses in discharge pipe could be determined by,

Main pipe was designed,


L = 2.6487 m
D = 0.67689128978132 m
Hf = 0.0041404 m

So, the total head of major losses in discharge


Hf2 = Total head of major losses in discharge
Hf2 = 0.00414036565672206 m

the minor losses in discharge pipe could be determined by,

No Type N k
1 Elbow 90˚ 1 0.75
2 Butterfly 0 0.6
3 Gate Valve 0 1.2
4 T Joint 0 1.8
5 Strainer 0 0.58
6 NRV 0 2
Total
So, the total head of minor losses in discharge
Hl2 = Total head of minor losses in discharge
Hl2 = 0.038265306122449 m

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2

So, the total head total system is


HTOTAL = Total head
HTOTAL = 0.0848113435583421 m

Fresh Water Pump for Cooling System


Head Total 0.084811
Capacity 0.36

Brand = TAIKO
Type = TAIKO GEAR PUMP NHG-03
Capacity = 0.45 m3/h
Frequency = 60 Hz
Head = 32 m
RPM = 1800 rpm
Daya = 0.8 kW
Kurniawan
6202323
Engineering Universitas Indonesia Ship Design
oling System 3

Jenis HEX

seluruh komponen HEX


Fluida Cooling : Sea Water

Tcin 20 oC
Tcout 40.8686113189 oC
Tc 30 oC

Data of Sea Water at 30 oC


Cp 4.011 kJ/kg.K
μ 0.00087 N.s/m2
K 0.6172 W/m.K
Pr

v 0.3 kg/s Flowrate Pada Outer Pipe


0.0003 m3/s Digunakan jg sbg cacity pump
1.08 m /h
3

velocity flow 2 m/s


Q= Axv
Q= v x π x D2 / 4
D= Q  4
  v
D= (( 0.05613381 x 4 ) / ( 3.14 x 3 ))1/2 Outer Diameter of HEX
0.829019135649 m= 829.02 mm

q pada fluida yang dingin


q(cold) 25.1112 Watt

o
C

Thin - Tco 49.13139


Tho - Tcin 10
0.2375311
0.0565323
0.0224136
1.0295468
0.8164966
0.0291187

πxDxL
n HEX

4.Perhitungan Pompa

- Calculation of installati
0.7844 m Head static of pump (h
0.4441 m Head of pressure diffe
Head of velocity differe

n suction -
caused by friction,
Rn
Based on Pompa dan Kompreso
Chapter 2 Spesifikasi Page. 28

assuming the temperature of fue


is in 40˚C, So
u
u
Rn

Based on Pompa dan Kompreso


Chapter 2 Spesifikasi Page. 29

So,
λ
λH

the major losses in suction pipe

L
D
V

Main bilge pipe was designed,


1.4202 L
1.2285 D
Hf

So, the total head of major losse


Hf1
Hf1
the minor losses in suction pipe

k Nxk No Type
0.75 0.75 1
0.6 0 2 Butterf
1.2 0 3 Gate Va
1.8 0 4 T Join
0.58 0 5 Straine
2 0 6 NRV
otal 0.75

So, the total head of minor losse


Hl1
Hl1

ad in discharge -
the friction losses and diameters
the difference is on the length o
the major losses in discharge pi

Main pipe was designed,


L
D
Hf

So, the total head of major losse


Hf2
Hf2

the minor losses in discharge pi

k Nxk No Type
0.75 0.75 1
0.6 0 2 Butterf
1.2 0 3 Gate Va
1.8 0 4 T Join
0.58 0 5 Straine
2 0 6 NRV
otal 0.75
So, the total head of minor losse
Hl2
Hl2

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1

HTOTAL
HTOTAL

5.Pump Selection

Fresh Water Pump for


Head Total
Capacity

Brand
Type
Capacity
Frequency
Head
RPM
Daya
p Design
3
Diameter of HEX
POMPA SEA WATER
Calculation of installation in engine room
Head static of pump (ha) 2.9023 m h suction = 3.3505 m
Head of pressure difference (h 0m h discard = 0.4482 m
Head of velocity difference (hv 0m

Calculation of head in suction

= Reynould number v 2 m/s


Pompa dan Kompresor by Sularso Haruo Tahara Diamater 0.676891 m
2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢

g the temperature of fuel which flowing through the pipe

= kinematic viscocity
= 0.00087 m2/s
= 1556.1

Pompa dan Kompresor by Sularso Haruo Tahara


2 Spesifikasi Page. 29

= Friction loss coefficient


= 0.0207386710503566

r losses in suction pipe could be determined by,

= Length of pipe
= Diameter of pipe
= Flow velocity

ge pipe was designed,


= 4.2007 m Pipa Horizontal 0.9714
= 0.676891 m Pipa Vertikal 3.2293
= 0.02626561560644 m

otal head of major losses in suction


= Total head of major losses in suction
= 0.02626561560644 m
or losses in suction pipe could be determined by,

Type N k Nxk
Elbow 90˚ 1 0.75 0.75
Butterfly 0 0.6 0
Gate Valve 0 1.2 0
T Joint 0 1.8 0
Strainer 0 0.58 0
NRV 0 2 0
Total 0.75

otal head of minor losses in suction


= Total head of minor losses in suction
= 0.1530612244898 m

Calculation of head in discharge


on losses and diameters are same,
ence is on the length of pipe,
r losses in discharge pipe could be determined by,

e was designed,
= 4.2007 m
= 0.67689128978132 m
= 0.0262656 m

otal head of major losses in discharge


= Total head of major losses in discharge
= 0.02626561560644 m

or losses in discharge pipe could be determined by,

Type N k Nxk
Elbow 90˚ 1 0.75 0.75
Butterfly 0 0.6 0
Gate Valve 0 1.2 0
T Joint 0 1.8 0
Strainer 0 0.58 0
NRV 0 2 0
Total 0.75
otal head of minor losses in discharge
= Total head of minor losses in discharge
= 0.1530612244898 m

Total head

𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2

So, the total head total system is


= Total head
= 0.35865368019247 m

Fresh Water Pump for Cooling System


0.358654
1.08

= TAIKO
= TAIKO GEAR PUMP NHG-1
= 1.2 m3/h
= 50 Hz
= 32 m
= 1500 rpm
= 1.5 kW
Ship Dimension
Lpp 95.00
B 17.00
H 8.50
T 6.70
Δ 8972.00

Fresh Water System


1.Perhitungan Kebutuhan dan Volume Fresh Water
1.20 ton Diambil dari weight Estimation TMK 1
Kebutuhan Fresh Water :
1200 kg
Volume Tangki Air Tawar : 1.2 m3 per hari
Waktu Pelayaran

Estimasi Dimensi Fresh Water Tank Volume Tangk


L 2m 4
B 2m
H 2m
Volume 8 m3 Akan diisi dari pelabuhan dan dari Osmosis Air Laut

Perhitungan Hydrophore
Volume Yang Harus di Supply ke tangki Hydrophore per hari : 1.2 m3 1 Hari
Hydrophore diisi setiap : 8 hour Jumlah Pengisian
Volume Air Yang Dipindahkan ke Hydrophore Sekali Ngisi : 0.4 m3/h Waktu Pengisian

Pump Capacity 0.4 m3/h (from Fresh Water Tank to Hydrophore)

Dalam buku "Machinery Outfitting Design Manual" hal 61,


volume tangki hydrophore dapat dihitung dengan menggunakan formula :
q 0.0066666666667 m3/minute P1 4.5 kg/cm2
V 0.03 m3 P2 3 kg/cm2
30 liter a 1.5

Perhitungan Pipa ( Pompa to Hydrophore)

Time = 2 hours
Pump capacity = 0.4 m3/h
0.000111 m3/s

Flow velocity = 1 m/s

So diameter (D) of used pipe is :

D = ( Q / 0.25 x π x v )1/2

= 0.0118971768374708
D
= 11.8971768374708

Ukuran Pipa sesuai hitungan mesti disesuaikan dengan ketersediaan di pasaran dan sesu
Inside diameter = 12.05 mm =
Outside diameter = 13.7 mm
Nominal wall thickness = 1.65 mm
Sesuai standart ASTM A312
Steel Pipe
Perhitungan Head Pompa (From Fresh Water Tank to Hydrophore)
- Calculation of installation in engine room
Head static of pump (ha) 1.42 m h suction =
Head of pressure difference (hp) 0m h discard =
Head of velocity difference (hv) 0m

- Calculation of head in suction


caused by friction,
Rn = Reynould number
Based on Pompa dan Kompresor by Sularso Haruo Tahara
Chapter 2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢

assuming the temperature of fuel which flowing through the pipe


is in 40˚C, So
u = kinematic viscocity
u = 0.000001589 m2/s
Rn = 7.6

Based on Pompa dan Kompresor by Sularso Haruo Tahara


Chapter 2 Spesifikasi Page. 29

So,
λ = Friction loss coefficient
λH = 0.06149377593361

the major losses in suction pipe could be determined by,


L = Length of pipe
D = Diameter of pipe
V = Flow velocity

Main hydrophore pipe was designed,


L = 4.44 m Pipa Horizontal
D = 0.012050 m Pipa Vertikal
Hf = 1.1560350797918 m

So, the total head of major losses in suction


Hf1 = Total head of major losses in suction
Hf1 = 1.1560350797918 m

the minor losses in suction pipe could be determined by,

No Type N k
1 Elbow 90˚ 1 0.75
2 Butterfly 0 0.6
3 Gate Valve 2 1.2
4 T Joint 0 1.8
5 Strainer 0 0.58
6 NRV 0 2
Total

So, the total head of minor losses in suction


Hl1 = Total head of minor losses in suction
Hl1 = 0.160714285714286 m

- Calculation of head in discharge


the friction losses and diameters are same,
the difference is on the length of pipe,
the major losses in discharge pipe could be determined by,

Main pipe was designed,


L = 4.44 m
D = 0.01205 m
Hf = 1.1560351 m
So, the total head of major losses in discharge
Hf2 = Total head of major losses in discharge
Hf2 = 1.1560350797918 m

the minor losses in discharge pipe could be determined by,

No Type N k
1 Elbow 90˚ 1 0.75
2 Butterfly 0 0.6
3 Gate Valve 0 1.2
4 T Joint 0 1.8
5 Strainer 0 0.58
6 NRV 0 2
Total

So, the total head of minor losses in discharge


Hl2 = Total head of minor losses in discharge
Hl2 = 0.038265306122449 m

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2

HTOTAL = Total head


HTOTAL = 2.51104975142034 m

Pemilihan Purifire
Capacity 3 m /h
3
Requirement Hasil Hitungan(Keluar dari hydrophore)
3000 liter/h 12 GPM

Merk Pure Aqua


Type SSC -2
Capacity 12 GPM
Pemilihan Pompa
Head Total 2.5110497514204 m Requirement Hasil Hitungan
Capacity 0.4 m3/h

Brand = BEDU PUMPEN


Type = WLX
Capacity = 0.9 m3/h
Frequency = 50 Hz
Head Max = 150 m
RPM = 2900 rpm
Daya = 0.55 kW
Arief Kurniawan
Fresh and Sea Water System
Teknik Perkapalan Universitas Indones
TUGAS MERANCANG KAPAL 3

System
Volume Fresh Water
Estimation TMK 1

76.80 hour
Waktu Pelayaran
3.2 day
Volume Tangki Untuk Full Pelayaran
4 m3

ophore
1 Hari 24 day
mlah Pengisian 3 kali Pemilihan Hydrophore
aktu Pengisian 1 hour
Data dari Catalog Hydrophore
Hydrophore Capacity 3 m3/h
Daya 2.2 kW

to Hydrophore)

m
mm (inside)

diaan di pasaran dan sesuai standar hasilnya di bawah :


0.01205 m

suai standart ASTM A312M / ASTM A790M


Water Tank to Hydrophore)

2.37 m
0.95 m

d in suction
2.07 1.12 0.95
2.37

k Nxk
0.75 0.75
0.6 0
1.2 2.4
1.8 0
0.58 0
2 0
al 3.15

head in discharge
k Nxk
0.75 0.75
0.6 0
1.2 0
1.8 0
0.58 0
2 0
al 0.75

fire
mpa
awan
ater System
sitas Indonesia
G KAPAL 3

SEA WATER SYSTEM


1.Perhitungan Tangki Ballast dan Pump Capacity

Berat Air Ballast 897.2 ton Berat Air Ballast menurut


Volume Ballast 875.3171 m3 dari displacement.Dikutip
Pak Marcus

Diasumsikan Volume Kebutuhan Sea Water = Volume Ballast sehingga debit air d
Waktu Pengisian 2 hour
Pump Capacity 437.6585 m3/h
2.Perhitungan Pipa ( from Sea Chest to All System)
Time = 2
Pump capacity = 437.6585
0.121572
Hydrophore
Flow velocity = 1

So diameter (D) of used pipe is :

D = ( Q / 0.25 x π x v )1/2

= 0.393533423046858
D
= 393.533423046858
Ukuran Pipa sesuai hitungan mesti disesuaikan dengan ketersediaan di pasa
Inside diameter = 396.87 mm
Outside diameter = 406.4 mm
Nominal wall thickn= 9.53 mm

3.Perhitungan Head Pump


- Calculation of installation in engine room
Head static of pump (ha) 1.35 m h suction
Head of pressure difference (h 0m h discard
Head of velocity difference (hv 0m

- Calculation of head in suction


caused by friction,
Rn = Reynould number
Based on Pompa dan Kompresor by Sularso Haruo Tahara
Chapter 2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢
assuming the temperature of fuel which flowing through the pipe
is in 40˚C, So
u = kinematic viscocity
u = 0.000001589 m2/s
Rn = 249.8

Based on Pompa dan Kompresor by Sularso Haruo Tahara


Chapter 2 Spesifikasi Page. 29

So,
λ = Friction loss coefficient
λH = 0.0212598583919167

the major losses in suction pipe could be determined by,

L = Length of pipe
D = Diameter of pipe
V = Flow velocity

Main bilge pipe was designed,


L = 3.6 m Pipa Horizontal
D = 0.396870 m Pipa Vertikal
Hf = 0.00983917138997 m

So, the total head of major losses in suction


Hf1 = Total head of major losses in suction
Hf1 = 0.00983917138997 m

the minor losses in suction pipe could be determined by,

No Type N
1 Elbow 90˚ 2
2 Butterfly 0
3 Gate Valve 0
4 T Joint 0
5 Strainer 1
6 NRV 0
Total

So, the total head of minor losses in suction


Hl1 = Total head of minor losses in suction
Hl1 = 0.10612244897959 m

- Calculation of head in discha


the friction losses and diameters are same,
the difference is on the length of pipe,
the major losses in discharge pipe could be determined by,

Main pipe was designed,


L = 3.6 m
D = 0.39687 m
Hf = 0.0098392 m

So, the total head of major losses in discharge


Hf2 = Total head of major losses in discharge
Hf2 = 0.00983917138997 m

the minor losses in discharge pipe could be determined by,

No Type N
1 Elbow 90˚ 1
2 Butterfly 0
3 Gate Valve 0
4 T Joint 0
5 Strainer 0
6 NRV 0
Total

So, the total head of minor losses in discharge


Hl2 = Total head of minor losses in discharge
Hl2 = 0.03826530612245 m

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2
HTOTAL = Total head
HTOTAL = 1.33406609788197 m

4.Pemilhan Pompa Sea Water


Data Requirement Hasil Hitungan
Head 1.334066 m
Capacity 437.6585 m3/h

Data
Merk FLOWSERVE
Type MARK 3
Capacity 455 m3/h
Head 120 m
RPM 750
Frequency 50 Hz
Daya 3 kW
ER SYSTEM
Ballast dan Pump Capacity

Berat Air Ballast menurut Khetagurov berkisar antara 0.1-0.17


dari displacement.Dikutip dari buku Prinsip Merancang Kapal
Pak Marcus

e Ballast sehingga debit air dapat di entukan

om Sea Chest to All System)


hours
m3/h
m3/s

m/s

3533423046858 m
.533423046858 mm
ngan ketersediaan di pasaran dan sesuai standar hasilnya di bawah :
= 0.39687 m

Sesuai standart ASTM A312M dan ASME B36.19M


Steel Pipe

gan Head Pump

= 3.06 m 3.06
= 1.71 m 0.54 1.17

ation of head in suction


m2/s

Pipa Horizontal 3.06


Pipa Vertikal 0.54

k Nxk
0.75 1.5
0.6 0
1.2 0
1.8 0
0.58 0.58
2 0
Total 2.08

lculation of head in discharge

k Nxk
0.75 0.75
0.6 0
1.2 0
1.8 0
0.58 0
2 0
Total 0.75
Pompa Sea Water
Principal Dimension Calculation
Arief Kurniawan - 1806202323
Teknik Perkapalan FTUI
Data
Kapal Pembanding
γc
Ship Name NORTH PIONEER g
Type LNG Carrier λ
GT 1 GT
GT
0 m^3 1 Naut.mi
DWT 5877 tons ρ LNG
LWT 2519 tons ρ 9% Ni
Cargo cbm
∆ 8396 tons
Loa 100 m cb 0.774
Lwl 95.778 m
Lpp 93.9 m
B 16.5 m
H 8.5 m
T 6.67 m
Speed 12 kts
v 6.17 m/s
Cb 0.940 Schneekluth
Cm 1.005 Sabit Series 60
Cp 0.935 Cb/Cm
Cw 0.960 Posdunine
Cp' 0.979 Cb/Cw
Fn 0.20 Kapal Sedang

Kapal Rancangan Aspect Ratio

Nama Kapal SMALL SISTER SHIP L/B


Tipe Kapal Chemical Tanker L/H
Dimension Value Unit L/T
GT B/H
GT
0 m^3 B/T
DWT 6000 tons T/H
LWT 2972.00 tons T/B
Cargo cbm Cd
∆ 8972.00 tons Fn
Loa 100.00 m
Lwl 96.90 m
Lpp 95.00 m
B 17.00 m
H 8.50 m
T 6.70 m
Speed 12 kts
v 6.17 m/s
Cb 0.8 kerlen
Cm 0.992 Sabit Series 60
Cp 0.776 Cb/Cm
Cw 0.846 Posdunine
Cp' 0.909 Cb/Cw
Fn 0.20 Kapal Pelan
Cruise Range 601 Naut. mi
1,113 km
Data Perhitungan LCB, LCG, Cba & Cbf
1.0291 Konstanta cm 0 3.3
9.80665 m/s^2 %FWD 0
1.33549119069 Faktor LCB 2.3 %
2.83333333333 m^3 cm 0 0.85
1.852 km LCG 0.5 %
0.45 ton/m^3 Cba 0.75 Cbf
7.86 ton/m^3 Cb 0.80

Range
Aspect Ratio Status
Kapal Tanker
5.59 5,2~6,8 Memenuhi
11.2 11,2~13,5 Memenuhi
14.18
2.00 1,94~2,1 Memenuhi
2.54
0.79 0,77~0,9 Memenuhi
0.39 0,45~0,52 Tidak Memenuhi
0.67
0.20 0.06~0.27 Kapal Pelan
3.35
2.01
4.69
LCG, Cba & Cbf Dimension Value Unit
3.8 LCB 2.16 m (Fwd Mid)
3 LCG 0.51 m (Fwd Mid)
FWD Cba 0.748 Diagram
1.2 Cbf 0.852 Diagram
FWD
0.85
0.80
DANDY
Preliminary Ship Design - Weight Estim
Arief Kurniawan - 1806202323
Teknik Perkapalan FTUI
Ship Specifications

Ship Name MT TIRTASARI


Type Chemical Tanker
GT 0.00 GT
0.00 m^3
DWT 6000.00 tons
LWT 2972.00 tons
Cargo 0.00 cbm
∆ 8972.00 tons
Loa 100.00 m
Lwl 96.90 m
Lpp 95.00 m
B 17.00 m
H 8.50 m
T 6.70 m
Speed 12.00 kts
v 6.17 m/s
Cb 0.77 Schneekluth
Cm 0.992 Sabit Series 60
Cp 0.78 Cb/Cm
Cw 0.85 Posdunine
Cp' 0.91 Cb/Cw
Fn 0.20 Kapal Sedang
Cruise Range 601.00 Naut. mi
1113.05 km
LCB 2.16 m (Fwd Mid)
LCG 0.51 m (Aft Mid)
Cba 0.75 Diagram
Cbf 0.85 Diagram

Data
γc 1.0291 Konstanta
g 9.80665 m/s^2
λ 1.19681696117715 Faktor
1 GT 2.83333333333333 m^3
1 SM 1852 m
µg 0.98 Konstanta
ȣst 7.86 tons/m^3
π 3.14159265358979 Konstanta
1 KW 1.35962 HP
ρ Epoxy 1.2 ton/m^3
ρ 9% Ni 7.86 ton/m^3
ign - Weight Estimation
wan - 1806202323
kapalan FTUI
Kalkulasi LWT
1 Wst (Berat Rancangan Kapal Kosong) [Watson] Unit
Wst,n = k*E^1.36 1440.19 tons
Wst,g = Wst,n*(1+(scrap%/100)) 1461.79 tons
k = 0.033 ~ 0.04 0.03 Konstanta
E = Lpp(B+T)+0.85Lpp(H-T)+0.85(ldh*hdh) 2580.45 m^2
ldh (panjang max deckhouse) 30.00 m
hdh (tinggi max deckhouse) 7.20 m
scrap% 1.5 %
2 Wep (Berat Instalasi Mesin) [Scheneekluth] Unit
Wep = Wme + Wsh + Wprop + Wae 103.77 tons
Wme (Berat Mesin Utama)
Wme = 9.38*(BHP/RPM)^0.84 34.94 tons
Main Engine Power 3445.28 HP
Revolution 720 RPM
Wsh (Berat Shaft)
Wsh=(π/4)*((dps)^2)*lps*ȣst 4.75 tons
dps=90*((BHP/RPM)^(1/3))*µg 0.15 m
lps=(Lpp/3)*1.1 34.83 m
Wprop (Berat Propeller)
Wprop = D^3*K 15.47 tons
D = diameter prop = 0.7*H 4.69 m
Kprop = 0.15 0.15 tons/m^3
Wae (Berat Mesin Cadangan)
Wae = 40+Pae/30 (2x AE) 48.60 tons
Auxilliary Engine Power (Pae) 689.06 HP
3 Woe (Berat Outfitting & Equipment) [Katsoulis] Unit
Woe=k*(L^1.3)*(B^0.8)*(H^0.3) 47.79 tons
k = 0.7 ~ 0.9 0.70 tons/m^3
4 Wetc (Berat Lain Lain) Unit
Wetc = k*BHP/1000 1342.36 tons
k = 30 ~ 50 30 kg/kW
Storage Tank 1239 tons
TOTAL LWT LWT = Wst + Wep + Woe + Wetc 2955.71 tons

Perhitungan SHP dan BHP


ac 222.47
SHP 3333.50 HP
µm 0.98 0,95-0,98
BHP 3445.28 HP
3401.53130944383 HP
RPM 720 min^-1

Perhitungan Storage Tank


r1 = rdalam 3.9 m V dalam
r2 = r luar 3.97 m V luar
L1 55.0 m V tank
L2 63.3 m Tank Nikel
Tank Epoxy

Jumlah Kru 40 Orang


Berat Kru rata-rata 0.08 ton/pax
Berat Luggage 0.015 ton/pax
Konsumsi makanan 0.002 ton/pax.hari
Konsumsi air tawar 0.01 ton/pax.hari
Waktu pelayaran 50.11 jam
3.00 hari

PENENTUAN JUMLAH DAN SUSUNAN ANAK BUAH KAPAL


Jumlah anak buah kapal dapat dihitung dengan menggunakan rumus HB Tord

ZC = 39.67203802307
Maka diambil anak buah kapalnya adalah 40 orang
40

Perkiraan Susunan Anak Buah Kapal atau ABK


Master/Nakhoda/Captain 1
*Deck Department
Chief 1
Second Officer 2
Third Officer 3
Electric Officer 3
Radio Officer 3
Quarter Master 1
Purser 1
Seaman 2
Wiperman 2
*Engineering Department
Chief Engineer 1
Second Engineer 2
Third Engineer 3
Cargo Engineer 2
Oil Engineer 2
Pumpman 3
Fireman 3
*Stewards Department
Cook 2
Steward 3
Jumlah 40
Kalkulasi DWT
1 Wfo (Berat Bahan Bakar)
Wfo = [(Pme*Bme)+(PaexBae)]*(t*k/10^6) 81.52
k = 1.3 ~ 1.5 1.3
t (waktu pelayaran) = s/v 76.80
Bme (konsumsi ME) = 196 ~ 209 196
Pae = c*Pme*Nae 689.06
Nae (total mesin bantu) = 2 2
Bae (konsumsi AE) = 205 ~ 211 205
c = 0.1 ~ 0.15 0.10
2 Wlub (Berat Minyak Pelumas)
Wmp = (0.033*Wfo) 2.69
Wlub = (0.55*Wmp) 1.48
3 Wfw (Berat Air Tawar)
Wfw = N*t*Cfw 1.20
4 Wprov (Berat Konsumsi)
Wprov = N*t*Cprov 0.24
5 Wcl (Berat Awak dan Bawaan)
Wcl = N*(Wc+Wl) 4
6 Payload
LNG 5987.00
2628.09933436054
TOTAL DWT DWT = Wfo+Wlub+Wfw+Wprov+Wcl+PL 6075.24

1312.79

Δpreliminary 9030.95 tons


Δdata 8972.00 tons
Koreksi 0.66 %
Kurang dari 1% Memenuhi
Perhitungan storage 3 tan
2628.0993 m^3
3135.9074 m^3 V
507.80808 m^3 L
1239 tons
5987 tons r

st
3991
tanki epoxy 7144
3153
p
l
t
KAPAL

Cst 1.2
Cdek 11.5
Ceng 8.5

1
2
3
3
3
1
1
2
2

1
2
3
2
2
3
3

2
3
40
Unit
tons 229.5648
Konstanta
hours 236.715 227.2464 m3
tons/hour 154.37061
HP 77.185304 38.592652 19.296326
n 71.820326
tons/hour
Konstanta
Unit
tons
tons
Unit
tons
Unit
tons
Unit
tons

tons 66.294253
cbm
tons
Perhitungan storage 3 tank
DALAM LUAR
876.03311145351 1045.3025
18.333333333333 21.111111

3.6287721149406 3.6720645

893 jika 8 tnki

16.63 894.82704
7.6 7158.6163
7.08
117.74
DANDY
SMALL LNG

2500 CBM

1. Steps of Calculation
a. Calculation of main pipe diameter.
b. Calculation of branch pipe diameter.
c. Calculation of pump capacity.
d. Calculation of pump head.
e. Pump Selection.
d. Bilge well size

2. Detail of calculation
Ship Dimension
Lpp = Length between perpendiculars = 95.00 m
B = Breadht of ship = 17.00 m
H = Height of ship = 8.50 m
T = Draught of ship = 6.70 m
a. Calculation of main pipe diameter.
Based on BKI Volume III Section 11 N.2.2a
Calculation of pipe diameters for dry cargo and passanger ship.

mm

So, the value of inside diameter of main bilge pipe.


dH = Inside diameter of bilge main pipe
dH = 107.688 mm
= 4.240 inch
= 0.10769 m
Based on BKI Volume III Section 11 C.1 table 11.6
Calculation of wall thickness and elasticity, minimum wall thickness.
from,
117.8 > da > 76.1
the mimimum wall thickness for steel pipes,
s = Nominal minimum wall thickness
s = 4.5 mm

in the market supply, the pipes which are used :


Inside diameter = 90.119 mm = 0.0901192 m
Outside diameter = 101.6 mm
Nominal wall thickness = 5.7404 mm (SCH 40)
SMALL LNG

2500 CBM

Nominal pipe size = 101.6 (According to ASME B36.10)


Galvanized Steel Pipe
Grade STD
Pipe Code = ASME B36.10-40S

b. Calculation of branch pipe diameter.

mm

l = 18.6 m (Longest length of compartment)


So, the value of inside diameter of branch bilge pipe.
dZ = Inside diameter of bilge branch pipe
dZ = 71.82 mm = 0.0718 m
= 2.8277 inch
from,
76.1 > da > 51.0
the mimimum wall thickness for steel pipes,
s = 4 mm

in the market supply, the pipes which are used :


Inside diameter = 62.713 mm = 0.0627126 m
Outside diameter = 73.025 mm
Nominal wall thickness = 5.1562 mm (SCH 40)
Nominal pipe size = 73.025 (According to ASME B36.10)
Galvanized Steel Pipe
Grade STD
Pipe Code = ASME B36.10-40S

c. Calculation of bilge pump capacity.


Based on BKI Volume III Section 11 N.3.1
Calculation for bilge pump capacity.

So, the value of bilge pump capacity:


Qmin = Minimum capacity of pump
Q = 46.698 m3/h
SMALL LNG

2500 CBM

= 0.0130 m3/s
the pipe area can we calculate,
A = Pipe Area
A = 0.25 x π x dH2
A = 6375.354114 mm2
= 0.00974 m2
velocity of water in pipe could also be calculated,
V = Velocity of water in pipe
V = Q/A
V = 1.332 m/s
V = 1.5 m/s

d. Calculation of bilge pump head.


- Calculation of installation in engine room
Head static of bilge pump (hs) = hs discharge
= T + 0.75m
= 7.45 m
Head of pressure difference (hp) = 0m
Head of velocity difference (hv) = 0m

- Calculation of head in suction


caused by friction,
Rn = Reynould number
Based on Pompa dan Kompresor by Sularso Haruo Tahara
Chapter 2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢

assuming the temperature of water which flowing through the pipe


is in 30˚C, So
u = kinematic viscocity
u = 8.414E-07 m2/s
RnH = 160659.3772 RnZ = 111800.45

Based on Pompa dan Kompresor by Sularso Haruo Tahara


Chapter 2 Spesifikasi Page. 29
SMALL LNG

2500 CBM

So,
λ = Friction loss coefficient
λH = 0.025548207 λZ = 0.0279729

the major losses in suction pipe could be determined by,

L = Length of pipe
D = Diameter of pipe
V = Flow velocity

Main bilge pipe was designed,


L = 90 m
D = 0.0901 m
Hf = 2.929 m

Branch bilge pipe was designed,


L = 20 m
D = 0.0627 m
Hf = 0m

So, the total head of major losses in suction


Hf1 = Total head of major losses in suction
Hf1 = 2.929 m

the minor losses in suction pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 3 0.75 2.25
2 Butterfly 9 0.6 5.4
3 Gate Valve 0 1.2 0
4 T Joint 5 1.8 9
SMALL LNG

2500 CBM

5 Strainer 5 0.58 2.9


6 NRV 3 2 6
Total 25.55

So, the total head of minor losses in suction


Hl1 = Total head of minor losses in suction
Hl1 = 2.933 m

- Calculation of head in discharge


the friction losses and diameters are same,
the difference is on the length of pipe,
the major losses in discharge pipe could be determined by,

Main bilge pipe was designed,


L = 15 m
D = 0.0901 m
Hf = 0.4882 m

Branch bilge pipe was designed,


L = 6.5 m
D = 0.0627 m
Hf = 0.3328 m

So, the total head of major losses in discharge


Hf2 = Total head of major losses in discharge
Hf2 = 0.821 m

the minor losses in discharge pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 2 0.75 1.5
2 Butterfly 4 0.6 2.4
3 Gate Valve 0 1.2 0
4 T Joint 6 1.8 10.8
5 Strainer 0 0.58 0
6 NRV 4 2 8
SMALL LNG

2500 CBM

Total 22.7

So, the total head of minor losses in discharge


Hl2 = Total head of minor losses in discharge
Hl2 = 2.6059 m

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2

So, the total head is


HTOTAL = Total head
HTOTAL = 16.73884 m

e. Pump selection.
From the calculation above,
we can choose the suitable pump for bilge system.
Based on calculation, minimum specification of pump below :
Head = 16.73884 m
Capacity = 46.70 m3/h

- Bilge-Ballast-Fire Pump
Equipment No. = Bedu Pompen
Brand = Centrifugal Pump
Type = MXV(L)-E Series
Capacity = 60 m3/h
Head Max = 230 m
RPM = 2900 rpm

d. Bilge well size.


Based on BKI Volume II Section 8 B.5.3.
For the size and design of bilge wells
minimum capacity of bilge well = 0.2 m3

So, the dimesnsion of bilge well


length = 1m
SMALL LNG

2500 CBM

breadth = 0.5 m
height = 0.5 m
Volume = 0.25 m3
Nama Dosen :
Marcus Alberth Talahatu
Nama Asisten:
(Dimensi Utama)
L #REF! Member grup:
B #REF!
T #REF!
H #REF!
Cb #REF!
1. Steps of Calculation
a. Calculation of pump capacity.
b. Calculation of main pipe diameter.
c. Calculation of pump head.
- installation calculation in engine room
- head losses calculation in suction
- head losses calculation in discharge
- total head
d. Pump Selection.

2. Detail of calculation
Ship Dimension
Lpp = Length between perpendiculars = #REF! m
B = Breadht of ship = #REF! m
H = Height of ship = #REF! m
T = Draught of ship = #REF! m

a. Calculation of pump capacity.

Q = V/t

V = Volume of ballast tank


= 427.60 m3
t = Time to unload ballast water
= 2 hours

So, the value of minimum capacity of ballast pump is


Q = 213.8 m3/h
= 0.059388889 m3/s
Nama Dosen :
Marcus Alberth Talahatu
Nama Asisten:
(Dimensi Utama)
L #REF! Member grup:
B #REF!
T #REF!
H #REF!
Cb #REF!
b. Calculation of main pipe diameter

Q = Axv dBL = ( Q / 0.25 x π x v )1/2

dBL = inside diameter of ballast main pipe


A = Area of pipe
= 0.25 x π x dBL2
v = Flow velocity in pipe
= 8 m/s

So, the value of main diameter of ballast system is


dBL = 0.097 m
= 97.246 mm
Based on BKI Volume III Section 11 C.1 table 11.6
Calculation of wall thickness and elasticity, minimum wall thickness.
from,
193.7 > da > 117.8
the mimimum wall thickness for steel pipes,
s = Nominal minimum wall thickness
s = 5.0 mm

in the market supply, the pipes which are used :


Inside diameter = 100 mm = 0.1 m
Outside diameter = 114.3 mm
Nominal wall thickness = 6 mm (SCH 40)
Nominal pipe size = 100 (According JIS G-3454)
Carbon Steel Pipe
Nama Dosen :
Marcus Alberth Talahatu
Nama Asisten:
(Dimensi Utama)
L #REF! Member grup:
B #REF!
T #REF!
H #REF!
Cb #REF!
c. Calculation of pump head
- Calculation of installation in engine room
Head static of bilge pump (hs) = hs discharge
= T + 0.75m
= #REF! m
Head of pressure difference (hp) = 0m
Head of velocity difference (hv) = 0m

- Calculation of head in suction


caused by friction,
Rn = Reynould number
Based on Pompa dan Kompresor by Sularso Haruo Tahara
Chapter 2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢

assuming the temperature of water which flowing through the pipe


is in 30˚C, So
u = kinematic viscocity
u = 8.414E-07 m2/s
RnH = 950796.3

Based on Pompa dan Kompresor by Sularso Haruo Tahara


Chapter 2 Spesifikasi Page. 29

So,
λ = Friction loss coefficient
λH = 0.020005

Suction Pipe
the major losses in suction pipe could be determined by,
Nama Dosen :
Marcus Alberth Talahatu
Nama Asisten:
(Dimensi Utama)
L #REF! Member grup:
B #REF!
T #REF!
H #REF!
Cb #REF!

L = Length of pipe
D = Diameter of pipe
V = Flow velocity

Main bilge pipe was designed,


L = 170 m
D = 100 m
Hf = 0.111 m

So, the total head of major losses in suction


Hf1 = Total head of major losses in suction
Hf1 = 0.111 m

the minor losses in suction pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 8 0.75 6
2 Butterfly 7 0.6 4.2
3 Gate Valve 7 1.2 8.4
4 T Joint 5 1.8 9
5 Strainer 0 0.58 0
6 NRV 1 2 2
Total 29.6

So, the total head of minor losses in suction


Hl1 = Total head of minor losses in suction
Nama Dosen :
Marcus Alberth Talahatu
Nama Asisten:
(Dimensi Utama)
L #REF! Member grup:
B #REF!
T #REF!
H #REF!
Cb #REF!
Hl1 = 96.653 m

- Calculation of head in discharge


the friction losses and diameters are same,
the difference is on the length of pipe,
Discharge Pipe
the major losses in discharge pipe could be determined by,

Main bilge pipe was designed,


L = 35 m
D = 100 m
Hf = 0.0229 m

So, the total head of major losses in discharge


Hf2 = Total head of major losses in discharge
Hf2 = 0.0229 m

the minor losses in discharge pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 4 0.75 3
2 Butterfly 2 0.6 1.2
3 Gate Valve 3 1.2 3.6
4 T Joint 6 1.8 10.8
5 Strainer 3 0.58 1.74
6 NRV 4 2 8
Total 28.34

So, the total head of minor losses in discharge


Hl2 = Total head of minor losses in discharge
Hl2 = 92.539 m
Nama Dosen :
Marcus Alberth Talahatu
Nama Asisten:
(Dimensi Utama)
L #REF! Member grup:
B #REF!
T #REF!
H #REF!
Cb #REF!

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2

So, the total head is


HTOTAL = Total head
HTOTAL = #REF! m

d. Pump selection.
From the calculation above,
we can choose the suitable pump for bilge system.
Based on calculation, minimum specification of pump below :
Head = #REF! m
Capacity = 213.80 m3/h

- Bilge-Ballast-Fire Pump

Brand = Bedu Pompen


Type = 3M SERIES STAINLESS STEEL AISI 304
Capacity = 240 m3/h
Frequency = 50 Hz
Head = 195 m
en :
Talahatu
en:

up:

ulation

ulation

p capacity.
en :
Talahatu
en:

up:

pipe diameter
en :
Talahatu
en:

up:

mp head

e
en :
Talahatu
en:

up:

pe
en :
Talahatu
en:

up:

tion.
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

1. PUMP CALCULATION
1.1. Seawater Cooling pump
capacity of pump = 46 m3/hour
= 0.013 m3/s
velocity of flow = 2.5 m/s
Q= Axv
where : A = area of pipe
v = flow velocity ( 1.5-2.5) m/s, taken = 2.5 m/s
Q= Axv
Q = v x π x D2 / 4
D= Q  4
  v
D = (( 0.05613381 x 4 ) / ( 3.14 x 3 ))1/2
D= 0.080654 m= 80.65 mm
= 3.18 Inches
Pipe the selected type of carbon steel galvanized , JIS Standard :
Type = G 3455
Nominal Diameter = 200 A
Inside diameter = 7.9 inch = 199.9
Thickness = 0.323 inch = 8.2
Outside diameter = 8.5 inch = 216.3
Fluid Velocity= Q/A
Fluid Velocity= 1465 m/hr
0.407 m/s
Calculating Head
Head Static (Hs)
𝐻_𝑠=𝐻1−𝐻2
Hs= 3m
Head Velocity (Hv)
𝐻_𝑣=(( 〖𝑉 _1 〗 ^2− 〖𝑉 _2 〗 ^2))/2𝑔
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

Hv = 0m
Head Pressure (Hp)
𝐻_𝑝=((𝑃_1−𝑃_2))/(𝑔 𝜌)

Hp = 1.00000 m

Head Losses
Head Losses Suction Line
Head Losses Friction
𝑅𝑒=(𝜌 𝑣 𝑙)/𝜇
𝜌=
1025 kg/m3
𝜇=
1303583.87666757 0.001 Ns/m2
If Re <2300,"laminer"
if Re >2300,"turbulen"
so k= 0.0119
𝐻_𝑓𝑟𝑖𝑐𝑡𝑖𝑜𝑛=𝑓 (𝑉^2 𝐿 )/2𝑔𝐷

Hfriction= 0.00402437339569535 m

Head Losses Fitting


No. Equipments n k nxk
o
1 Elbow 90 3 0.3 0.9
2 Ball valve 4 0.05 0.2
3 T joint 6 0.2 1.2
4 Bellmounted pipe end 0 0.05 0
5 SDNRV 4 2 8
6 Bulkhead Fitting Watertight 0 0.02 0
7 Filter or strainer 6 2.5 15
8 Flexible Coupling 0 0.46 0
Σ 25.3
𝐻_𝑓𝑖𝑡𝑡𝑖𝑛𝑔=𝑘 (𝑉^2 )/2𝑔
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

Hfitting= 0.213793568461422 m

Head Losses Discharge Line


Head Losses Friction
𝑅𝑒=(𝜌 𝑣 𝑙)/𝜇
𝜌=
1025 kg/m3
𝜇=
2172639.79444594 0.001 Ns/m2
If Re <2300,"laminer"
if Re >2300,"turbulen"
so k= 0.0117
𝐻_𝑓𝑟𝑖𝑐𝑡𝑖𝑜𝑛=𝑓 (𝑉^2 𝐿 )/2𝑔𝐷

Hfriction= 0.00741888162756864 m

Head Losses Fitting


No. Equipments n k nxk
o
1 Elbow 90 5 0.3 1.5
2 Ball valve 5 0.05 0.25
3 T joint 1 0.2 0.2
4 Bellmounted pipe end 2 0.05 0.1
5 SDNRV 6 2 12
6 Bulkhead Fitting Watertight 0 0.02 0
7 Filter or strainer 4 2.5 10
8 Flexible Coupling 0 0.46 0
Σ 24.05
𝐻_𝑓𝑖𝑡𝑡𝑖𝑛𝑔=𝑘 (𝑉^2 )/2𝑔

Hfitting= 0.203230645118466 m
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

Head Total = 4.4285 m

2 COOLING SYSTEM CALCULATION


Heat exchanger For Lubrication Cooling (Cooling system)
Code = Lubrication oil cooler
Hot Stream
Sources = Lube Oil (Petrolium)
Inlet (T1) = 78 C
Outlet (T2) = 60 C
Capacity = 60 m3/h 0.016666667
Density = 920 KG/m3
Flow = 15.333 Kg/s
Lube specific heat capacity = 1.67 KJ/(kg K)

Cold Stream
Heater sources = Fresh Water
Inlet (T3) = 34 C
Outlet (T4) = 45 C
Capacity = 46 m3/h 0.012777778
Density = 1000 kg/m3
Flow = 12.778 Kg/s
FW specific heat capacity = 4.19 KJ/(kg K)

Heat Load
P= m x Cp x δt (at Lubrication oil)
where :
m = Mass flow 15.333 [Kg/s]
Cp = Specific Heat 2.13 [kJ/kg°C]
δt = T1-T2 18 °C
So,
P= 587.88 KW

Heat Load
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

P= m x Cp x δt (at LT fresh water system)


where :
m = Mass flow 12.778 [Kg/s]
Cp = Specific Heat 4.19 [kJ/kg°C]
δt = T4-T3 11 °C
So,
P= 588.927777777778 KW

LMTD =ΔT1-ΔT2/(ln(ΔT1/ΔT2))
where :
T1 Inlet temperature - hot side 78 °C 351
T2 Outlet temperature - hot side 60 °C 333
T3 Inlet temperature - cold side 34 °C 307
T4 Outlet temperature - cold side 45 °C 318
ΔT1 = T1–T4 33
ΔT2 = T2–T3 26
LMTD = 29.3610584730991

Surface Area LO Heat Exchanger


A= P/U . LMTD
A= 0.0784306977529004 M2

Heat exchanger For Fuel Cooling (Cooling system)


Code = Fuel oil cooler
Hot Stream
Sources = Fuel Oil (Petrolium)
Inlet (T1) = 82 C
Outlet (T2) = 34 C
Capacity = 0.84 m3/h 0.000233333
Density = 900 KG/m3
Flow = 0.21 Kg/s
Fuel specific heat capacity = 1.96 KJ/(kg K)
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

Cold Stream
Heater sources = Fresh Water
Inlet (T3) = 33 C
Outlet (T4) = 35 C
Capacity = 7 m3/h 0.001944444
Density = 1000 kg/m3
Flow = 1.9444 Kg/s
FW specific heat capacity = 4.19 KJ/(kg K)

Heat Load
P= m x Cp x δt (at Fuel oil)
where :
m = Mass flow 0.21 [Kg/s]
Cp = Specific Heat 1.67 [kJ/kg°C]
δt = T1-T2 48 °C
So,
P= 16.8336 KW

Heat Load
P= m x Cp x δt (at LT fresh water system)
where :
m = Mass flow 1.9444 [Kg/s]
Cp = Specific Heat 4.19 [kJ/kg°C]
δt = T4-T3 2 °C
So,
P= 16.2944444444444 KW

LMTD =ΔT1-ΔT2/(ln(ΔT1/ΔT2))
where :
T1 Inlet temperature - hot side 82 °C 355
T2 Outlet temperature - hot side 34 °C 307
T3 Inlet temperature - cold side 33 °C 306
T4 Outlet temperature - cold side 35 °C 308
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

ΔT1 = T1–T4 47
ΔT2 = T2–T3 1
LMTD = 11.9475938999245

Surface Area LO Heat Exchanger


A= P/U . LMTD
A= 0.0991795733000891 M2

Heat exchanger For HT cooling system


Code = HT cooling water
Hot Stream
Sources = Fresh water
Inlet (T1) = 91 C
Outlet (T2) = 81 C
Capacity = 35 m3/h 0.009722222
Density = 1000 KG/m3
Flow = 9.7222 Kg/s
FW specific heat capacity = 4.19 KJ/(kg K)

Cold Stream
Heater sources = Sea Water
Inlet (T3) = 30 C
Outlet (T4) = 35 C
Capacity = 40 m3/h 0.011111111
Density = 1025 kg/m3
Flow = 11.389 Kg/s
SW specific heat capacity = 3.93 KJ/(kg K)

Heat Load
P= m x Cp x δt (at FW Hot Temperature cooling )
where :
m = Mass flow 9.7222 [Kg/s]
Cp = Specific Heat 2.13 [kJ/kg°C]
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

δt = T1-T2 10 °C
So,
P= 207.083333333333 KW

Heat Load
P= m x Cp x δt (at SW cooling)
where :
m = Mass flow 11.389 [Kg/s]
Cp = Specific Heat 3.93 [kJ/kg°C]
δt = T4-T3 5 °C
So,
P= 223.791666666667 KW

LMTD =ΔT1-ΔT2/(ln(ΔT1/ΔT2))
where :
T1 Inlet temperature - hot side 91 °C
T2 Outlet temperature - hot side 81 °C
T3 Inlet temperature - cold side 30 °C
T4 Outlet temperature - cold side 35 °C
ΔT1 = T1–T4 56
ΔT2 = T2–T3 51
LMTD = 53.461036489118

Surface Area HT Heat Exchanger


A= P/U . LMTD
A= 0.686885517625278 M2

Heat exchanger For LT cooling system


Code = LT cooling water
Hot Stream
Sources = Fresh water
Inlet (T1) = 45 C
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

Outlet (T2) = 32 C
Capacity = 19 m3/h 0.005277778
Density = 1000 KG/m3
Flow = 5.2778 Kg/s
FW specific heat capacity = 4.19 KJ/(kg K)

Cold Stream
Heater sources = Sea Water
Inlet (T3) = 28 C
Outlet (T4) = 30 C
Capacity = 65 m3/h 0.018055556
Density = 1025 kg/m3
Flow = 18.507 Kg/s
SW specific heat capacity = 3.93 KJ/(kg K)

Heat Load
P= m x Cp x δt (at FW Low Temperature cooling )
where :
m= Mass flow 5.2778 [Kg/s]
Cp = Specific Heat 2.13 [kJ/kg°C]
δt = T1-T2 13 °C
So,
P= 146.141666666667 KW

Heat Load
P= m x Cp x δt (at SW cooling)
where :
m= Mass flow 18.507 [Kg/s]
Cp = Specific Heat 3.93 [kJ/kg°C]
δt = T4-T3 2 °C
So,
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

P= 145.464583333333 KW

LMTD =ΔT1-ΔT2/(ln(ΔT1/ΔT2))
where :
T1 Inlet temperature - hot side 45 °C
T2 Outlet temperature - hot side 32 °C
T3 Inlet temperature - cold side 28 °C
T4 Outlet temperature - cold side 30 °C
ΔT1 = T1–T4 15
ΔT2 = T2–T3 4
LMTD = 8.32226321023643

Surface Area HT Heat Exchanger


A= P/U . LMTD
A= 0.178808961036564 M2

Preheater
Known that :
Capacity = 46 m3/hou0.0128 m3/s
Denstity of FW = 1000 kg/m3
FW heat specific = 4.19 KJ/(Kg °K)
Determine the temperature rise by subtracting the incoming LO temperature :
T1 = 32 °C
T2 = 60 °C
(ΔT) = 28 °C
= 59 °F
Time Heating = 0.5 Hour
Heat Load
P= m x Cp x δt
where :
m= Mass flow 12.778 kg/s
(Nama Kapal)
(Jenis Kapal)

(Dimensi Utama)

Cp = Specific Heat 2.13 KJ/(Kg °K)


δt = |T2-T1| 28 °C
So,
P= 762.066666666667 KW

Thermal Oil Capacity


T1 = Temperature inlet 110 °C = 230
T2 = Temperature Outlet 80 °C
(ΔT) = 30 °C
Cp = Specific Heat 2.27 KJ/(Kg °K)
m= Mass flow 12.778 kg/s
density = 797.2 kg/m3
Capacity = 0.016 m3/s 57.70195685
Fluid Velocity = 2.5 m/s
Pipe diameter 0.0903 m
90.332 mm
Nama Dosen :
Nama Asisten:

Member grup:

mm
mm
mm
Nama Dosen :
Nama Asisten:

Member grup:

m3/s

m3/s
Nama Dosen :
Nama Asisten:

Member grup:

K
K
K
K

m3/s
Nama Dosen :
Nama Asisten:

Member grup:

m3/s

K
K
K
K
Nama Dosen :
Nama Asisten:

Member grup:

m3/s

m3/s

Temperature cooling )
Nama Dosen :
Nama Asisten:

Member grup:

364 K
354 K
303 K
308 K
Nama Dosen :
Nama Asisten:

Member grup:

m3/s

m3/s

Temperature cooling )
Nama Dosen :
Nama Asisten:

Member grup:

318 K
305 K
301 K
303 K
Nama Dosen :
Nama Asisten:

Member grup:

°F

m3/h
Nama Dosen :
Nama Asisten:

Member grup:

1. Steps of Calculation
a. Calculation of main fire pipe diameter.
b. Calculation of main fire pump capacity.
c. Calculation of main fire pump head.
d. Calculation of emergency fire pump.
e. Pump Selection.

2. Detail of calculation
Ship Dimension
Lpp = Length between perpendiculars = #REF! m
B = Breadht of ship = #REF! m
H = Height of ship = #REF! m
T = Draught of ship = #REF! m

a. Calculation of main fire pipe diameter.


Based on BKI Volume III Section 12 E.2.3.1
Calculation of minimum main fire pipe diameter
dF = 0.8 dH

So, the value of inside diameter of main fire pipe.


dH = Inside diameter of bilge main pipe
dH = 90.1 mm
= 3.548 inch
= 0.09012 m
dF = 72.10 mm

Maximum diameter based on BKI Volume III Section 12 E.2.3.2


For cargo ship is dF = 175 mm

Based on BKI Volume III Section 11 C.1 table 11.6


Calculation of wall thickness and elasticity, minimum wall thickness.
from,
117.8 > da > 76.1
the mimimum wall thickness for steel pipes,
s = Nominal minimum wall thickness
s = 4.5 mm
Nama Dosen :
Nama Asisten:

Member grup:

in the market supply, the pipes which are used :


Inside diameter = 90.119 mm = 0.0901 m
Outside diameter = 101.6 mm
Nominal wall thickness = 5.7404 mm (SCH 40)
Nominal pipe size = 101.6 (According to ASME B36.10)
Galvanized Steel Pipe
Grade STD
Pipe Code = ASME B36.10-40S

b. Calculation of main fire pump capacity.


Based on BKI Volume III Section 12 table 12.2
Calculation for main fire pump capacity.

3.8∗ 〖 10 〗 ^(−3)∗ m3/h


𝑑_𝐻^2
So, the value of main fire pump capacity:
Vmin = Minimum capacity of pump
V = 30.862 m3/h
= 0.0086 m3/s
the pipe area can we calculate,
AH = Pipe Area
AH = 0.25 x π x dH2
AH = 6375.3541138 mm2
= 0.00974 m2
velocity of water in pipe could also be calculated,
VH = Velocity of water in pipe
VH = Q/A
VH = 0.880 m/s
VH = 1 m/s

c. Calculation of main fire pump head.


- Calculation of installation in engine room

Head static of bilge pump (hs) = Tmin


= #REF! m
Nama Dosen :
Nama Asisten:

Member grup:

Head of pressure difference (hp)


pressure discharge = 0.25 N/mm2
= 250000
pressure suction = #REF! N/m2
Head of pressure difference (hp) = #REF! m
Head of velocity difference (hv) = 0m

- Calculation of head in suction


caused by friction,
Rn = Reynould number
Based on Pompa dan Kompresor by Sularso Haruo Tahara
Chapter 2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢

assuming the temperature of water which flowing through the pipe


is in 30˚C, So
u = kinematic viscocity
u = 0.000000822 m2/s
RnH = 96494.443268

Based on Pompa dan Kompresor by Sularso Haruo Tahara


Chapter 2 Spesifikasi Page. 29

So,
λ = Friction loss coefficient
λH = 0.0255482073

the major losses in suction pipe could be determined by,

L = Length of pipe
D = Diameter of pipe
V = Flow velocity
Nama Dosen :
Nama Asisten:

Member grup:

Main bilge pipe was designed,


L = 20 m
D = 0.0901192 m
Hf = 0.2892791 m

So, the total head of major losses in suction


Hf1 = Total head of major losses in suction
Hf1 = 0.2892791 m

the minor losses in suction pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 2 0.75 1.5
2 Butterfly 4 0.6 2.4
3 Gate Valve 0 1.2 0
4 T Joint 4 1.8 7.2
5 Strainer 2 0.58 1.16
6 NRV 1 2 2
Total 14.26

So, the total head of minor losses in suction


Hl1 = Total head of minor losses in suction
Hl1 = 0.5636079 m

- Calculation of head in discharge


the friction losses and diameters are same,
the difference is on the length of pipe,
the major losses in discharge pipe could be determined by,

Main bilge pipe was designed,


L = 20 m
D = 0.0901192 m
Hf = 0.2892791 m
Nama Dosen :
Nama Asisten:

Member grup:

So, the total head of major losses in discharge


Hf2 = Total head of major losses in discharge
Hf2 = 0.2892791 m

the minor losses in discharge pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 2 0.75 1.5
2 Butterfly 1 0.6 0.6
3 Gate Valve 0 1.2 0
4 T Joint 1 1.8 1.8
5 Strainer 0 0.58 0
6 NRV 1 2 2
Total 5.9

So, the total head of minor losses in discharge


Hl2 = Total head of minor losses in discharge
Hl2 = 0.2331898 m

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2

So, the total head is


HTOTAL = Total head
HTOTAL = #REF! m

d. Calculation of emergency fire pump.


Based on BKI Volume III Section 12 E.1.4
emergency fire pump is capable to deliver at least 40% of total capacity
specified for main fire pump.
So, the value of minimum emergency fire pump capacity:
VE min = Minimum capacity of pump
VE = 40% x V
VE = 12.345 m3/h
= 0.0034 m3/s
Nama Dosen :
Nama Asisten:

Member grup:

- Calculation of installation in engine room

Head static of bilge pump (hs) = Tmin


= #REF! m
Head of pressure difference (hp) = #REF! m
Head of velocity difference (hv) = 0m

- Calculation of head in suction


caused by friction,
Rn = Reynould number
Based on Pompa dan Kompresor by Sularso Haruo Tahara
Chapter 2 Spesifikasi Page. 28
𝑅𝑛=(𝑉 𝑥 𝑑_𝐻)/𝑢

assuming the temperature of water which flowing through the pipe


is in 30˚C, So
u = kinematic viscocity
u = 0.000000822 m2/s
RnH = 109634.06326

Based on Pompa dan Kompresor by Sularso Haruo Tahara


Chapter 2 Spesifikasi Page. 29

So,
λ = Friction loss coefficient
λ = 0.0255482073

the major losses in suction pipe could be determined by,

L = Length of pipe
D = Diameter of pipe
V = Flow velocity
Nama Dosen :
Nama Asisten:

Member grup:

Main bilge pipe was designed,


L = 25 m
D = 0.0901192 m
Hf = 0.3615988 m

So, the total head of major losses in suction


Hf1 = Total head of major losses in suction
Hf1 = 0.3615988 m

the minor losses in suction pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 2 0.75 1.5
2 Butterfly 2 0.6 1.2
3 Gate Valve 0 1.2 0
4 T Joint 4 1.8 7.2
5 Strainer 2 0.58 1.16
6 NRV 1 2 2
Total 13.06

So, the total head of minor losses in suction


Hl1 = Total head of minor losses in suction
Hl1 = 0.6663265 m

- Calculation of head in discharge


the friction losses and diameters are same,
the difference is on the length of pipe,
the major losses in discharge pipe could be determined by,

Main bilge pipe was designed,


L = 25 m
D = 0.0901192 m
Hf = 0.3615988 m
Nama Dosen :
Nama Asisten:

Member grup:

So, the total head of major losses in discharge


Hf2 = Total head of major losses in discharge
Hf2 = 0.3615988 m

the minor losses in discharge pipe could be determined by,

No Type N k Nxk
1 Elbow 90˚ 2 0.75 1.5
2 Butterfly 1 0.6 0.6
3 Gate Valve 0 1.2 0
4 T Joint 1 1.8 1.8
5 Strainer 0 0.58 0
6 NRV 1 2 2
Total 5.9

So, the total head of minor losses in discharge


Hl2 = Total head of minor losses in discharge
Hl2 = 0.3010204 m

- Total head

𝐻_𝑇𝑂𝑇𝐴𝐿=𝐻𝑠+𝐻𝑝+𝐻𝑣+𝐻𝑓1+𝐻𝑙1+𝐻𝑓2+𝐻𝑙2

So, the total head is


HTOTAL = Total head
HTOTAL = #REF! m

e. Pump selection.
From the calculation above, we can choose the suitable pump for bilge system.
Based on calculation, minimum specification of pump below :

Fire Main Pump


Head = #REF! m
Capacity = 30.86 m3/h
- Bilge-Ballast-Fire Pump
Nama Dosen :
Nama Asisten:

Member grup:

Brand = TAIKO
Type = RVA-75EN
Capacity = 30-350 m3/h
Head = 0-85 m
RPM = 1800 rpm

Emergency fire pump


Head = #REF!
Capacity = 12.34 m3/h
- Emergency fire pump
Brand = TAIKO
Type = VC-10F
Capacity = 4-110 m3/h
Head = 0-35 m
RPM = 1700 rpm

You might also like