WARNING:
a. The compound operation must be carried out after the load is away from the
ground and it is forbidden telescoping with load.
b. If the slewing motion is needed when perform compound operation, the operator
must first open the slewing brake switch before slewing operation.
Lift the
hook
Lift the
hook
Operate the control levers of main hoisting mechanism and auxiliary hoisting mechanism
forward and backward at the same time, and then it can make main hoisting mechanism and
5—35
1094-300-05Y
Lift the
Raise the hook
boom
Operate the control levers of derricking mechanism and main hoisting mechanism forward
and backward at the same time, and then it can make derricking mechanism and main hoisting
mechanism of the crane work synchronously.
Lift the
hook Retract the
boom
Operate the control levers of main hoisting mechanism and telescoping mechanism forward
and backward at the same time, and then it can make main hoisting mechanism and boom
5—36
1094-300-05Y
顺时针
回转 Lift the
Slew hook
anticlockwise
逆时针回
Operate the control levers转of slewing mechanism and main hoisting mechanism forward and
backward at the same time, and then it can make slewing mechanism and main hoisting
mechanism of the crane work synchronously.
Lift the
Raise the hook
boom
Operate the control levers of derricking mechanism and auxiliary hoisting mechanism
forward and backword at the same time, and then it can make boom derricking mechanism
and auxiliary hoisting mechanism of the crane work synchronously.
5—37
1094-300-05Y
Operate the control levers of telescoping mechanism and auxiliary hoisting mechanism
forward and backward at the same time, and then it can make telescoping mechanism and
auxiliary hoisting mechanism of the crane work synchronously.
Slew
anticlockwise Lift the
hook
Operate the control levers of slewing mechanism and auxiliary hoisting mechanism forward
and backward at the same time, and then it can make slewing mechanism and auxiliary
hoisting mechanism of the crane work synchronously.
5—38
1094-300-05Y
Operate the control levers of derricking mechanism and telescoping mechanism forward and
backward at the same time, and then it can make boom derricking mechanism and telescoping
mechanism of the crane work synchronously.
Operate the control levers of slewing mechanism and derricking mechanism forward and
backward at the same time, and then it can make slewing mechanism and boom derricking
mechanism of the crane work synchronously.
5—39
1094-300-05Y
CAUTION:Prevent the lifted load from colliding with the outriggers of the crane
during operation.
Slew
anticlockwise
Retract the
boom
Operate the control levers of telescoping mechanism and slewing mechanism forward and
backward at the same time, and then it can make slewing mechanism and telescoping
mechanism of the crane work synchronously.
5—40