Anchor Method Statement 20230208
Anchor Method Statement 20230208
Anchor Method Statement 20230208
Steel Anchor
Installation
Method Statement
ADEQUATE PROJECT MANAGEMENT & CONSULTANCY CO. LTD.
Flat E, 3/F, Worldwide Centre, 123 Tung Chau Street
Tai Kok Tsui,
Kowloon, H.K.
Mobile / 9741 3991
Email/adequateco@hotmail.com
Project
Install the 3 nos. of anchor blocks of the antenna tower at Peng Chau. The steel
anchor will be hanged over the R.C. Plinth (by others) by a hanger frame until the
concrete casting is finished.
Materials Transportation
All materials will be loaded on the VH vehicle, and transport from the pier to the site.
All the materials will be stored at a designated location. The materials will be
unloaded at the site and move to the construction location by workers with sufficient
hand chain hoist.
Detail of the hanging frame, refer to the drawing of the anchor AB1, AB2 & AB3
Equipment
1. 1 Ton Hand Chain Hoist
2. Dia. 8mm Steel Wire
3. Metal Scaffold
4. Shackle
5. Wire Clips
6. Turnbuckle
Appendix