Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Department of Public Department of Public Department of Public

Department of Public
Works and Highways Works and Highways Works and Highways Department of Public
Works and Highways
UPMO-FCMC UPMO-FCMC UPMO-FCMC UPMO-FCMC Works and Highways
Project Name: Project Name: Project Name: Project Name:
UPMO-FCMC
Project Name:
REHABILITATION FLOOD CONTROL
REHABILITATION/
Department of Public CONSTRUCTION WORKS-
RESTORATION
and HighwaysOF Department of Public OF PAMPANGA FLOOD CONTROL
Works OF SLOPE DIKING/SLOPE WORKS-
DETERIORATED
UPMO-FCMC Works and Highways RIVER (INCLUDING
DIKES/ERODED PROTECTION
UPMO-FCMC
OF PROTECTION/ IMPROVEMENT/
Project Name: PULO) AT ARAYAT STRENGTHENING OF
ProjectSACOBIA-
RIVERBANKS
REHABILITATION/ ALONG REHABILITATION OF
PAMPANGA RIVER
Name:
AND MACABEBE, GUMAIN-PORAC WEST LATERAL DIKE
RESTORATION OF REHABILITATION/
BAMBAN RIVER, PAMPANGA RIVER AT LUBAO AND OF MEGADIKE ALONG
INCLUDING
DETERIORATED CANDABA RESTORATION OF
CUT-OFF
DIKES/ERODED CHANNEL, TARLAC
DETERIORATED
FLORIDABLANCA, PASIG-POTRERO, STA.
Department of Public Contract I.D. No.: 19C00030 PAMPANGA RITA AND PORAC,
CANDABA,
RIVERBANKS PAMPANGA DIKES/ERODED
Works and Highways PAMPANGA
ALONG I.D. No.:PAMPANGA
RIVERBANKS
Contract I.D. No.: 19C00031 19C00032
Contract 19C00043
UPMO-FCMC ORANI BUILDERS Contract I.D. No.:
RIVER INCLUDING ALONG PAMPANGA GVDPM
EDDMARI CONST. & SUPPLY Contract I.D. No.: 19C00041
Project
CANDABA
Name:
CUT-OFF RIVER
11-16 INCLUDING
CONSTRUCTION CONSTRUCTION CORP.
TRADING R.D. POLICARPIO &
CHANNEL, CANDABA CUT-OFF
FLOOD CONTROL CHANNEL, CO. INC.
CANDABA, VOLUME 3 VOLUME 3
VOLUME
WORKS- 3
VOLUME
CANDABA,3
PAMPANGA
IMPROVEMENT/ PAMPANGA VOLUME 3
REHABILITATION OF
Contract I.D. No.: 20C00047
MATERIALS
GROUNDSILLS ALONG Contract I.D. No.: 20C00047
MATERIALS MATERIALS
EDDMARI CONST. &
SACOBIA-BAMBAN
MATERIALS
CY 2019
TRADING EDDMARI CONST. & MATERIALS
RIVER, MABALACAT, TRADING CY 2019 CY 2019
MPE/21.1.5 CY 2019
PAMPANGA MPE/21.1.5 MPE/21.1.5
VOLUME 1 MPE/21.1.5 CY 2019
Contract I.D. No.: 19C00042 VOLUME 1 MPE/21.1.5
TOKWING
A
CONSTRUCTION CORP.
B
CONTRACT
VOLUME 3
DOCUMENTS CONTRACT
DOCUMENTS
MATERIALS
CY 2020
CY 2019 CY 2020
MPE/21.1.5
MPE/21.1.5
MPE/21.1.5
Department of Public Department of Public
Works and Highways Works and Highways
UPMO-FCMC UPMO-FCMC
Project Name:
Project Name:
FLOOD CONTROL FLOOD CONTROL
WORKS- SLOPE WORKS- SLOPE Department of Public
PROTECTION PROTECTION Department of Public Works and Highways
WORKS ALONG Department of WORKS
Public ALONGDepartment of Public Works and Highways UPMO-FCMC
Works
STA. FE & STA. and STA.
Highways FE & STA.
Works and Highways UPMO-FCMC Project Name:

FILOMENA UPMO-FCMC FILOMENA UPMO-FCMC Project Name: MAINTENANCE, REPAIR &


ALONG GUAGUA CONSTRUCTION OF REHABILITATION OF
ALONG GUAGUA DIKE ALONG
INFRASTRUCTURE
RIVER, GUAGUA, FACILITIES
CONSTRUCTION
RIVER, GUAGUA, CONSTRUCTION GROUNDSILLS ACROSS
PAMPANGA OF LAYAC PAMPANGA OF LAYACPASIG-POTRERO RIVER
& OTHER RELATED
ACTIVITIES- FLOOD
AT THE DOWNSTREAM CONTROL & DRAINAGE
DIVERSION
Contract I.D. No.: 19C00040
Contract I.D. No.: 19C00040 DIVERSION OF MANCATIAN SYSTEM , STRUCTURES &
RELATED FACILITIES-
CHANNEL FERDSTAR CHANNEL BRIDGE, PORAC, PINATUBO URGENT
FERDSTARHERMOSA AND PAMPANGA MITIGATION PROJECT
BUILDERS HERMOSA AND (PHUMP), MANCATIAN
BUILDERS
DINALUPIHAN DINALUPIHAN
Project Component I.D.: P00321860LZ-CW1 BRIDGE, PORAC, PAMPANGA

VOLUME 1 BATAAN VOLUME 1 BATAAN Contract I.D. No.: 19C00073 Contract I.D. No.: 19CG0202

L.R. TIQUI BUILDERS L.R. TIQUI BUILDERS


MONTHLY
A B MONTHLY VOLUME 1 VOLUME 1
PROGRESS PROGRESS
CONTRACT REPORT CONTRACT REPORT
DOCUMENTS DOCUMENTS CONTRACT CONTRACT
VOLUME 1 VOLUME 2 AGREEMENT AGREEMENT
CY 2019 CY 2019
CY 2016 CY 2016 CY 2019 CY 2019
MPE/21.1.5 MPE/21.1.5 MPE/21.1.5 MPE/21.1.5 MPE/21.1.5 MPE/21.1.5

You might also like