Please refer to all the relevant Geotechnical Please refer to the response to
reports which have been provided as a part of Item above.
NPP 0085 tender document. Geotechnical Design
1(b) The tender stage data reviewed
Engineer is to described the Subsurface condition
and used is given in the
and justify the need of Ground improvement with
Assessment Report.
High Energy dynamic compaction method.
1(c) As mentioned that Ground improvement by High This approach was based on the
Energy Dynamic compaction shall be carried out experienced gained from other
after phase -1 of Ground investigation works while projects at Hamad Port.
this activity is ongoing parallel to phase
Phase-2 (a) “depth of borehole shall be 30m” – At some stage the JEC team had
Please justify large difference in borehole depths in realized that deep foundations
phase 1 & 2 were to be used for some
structures.
2(d) There is a balance to be struck
between number and length of
piles. Piles longer than 25.0 m
are not economical and therefore
the borehole depth of 30.0 m.
Phase-2 (b & e): item “b” and “e” are not clear. The Method Statement has been
2(f) Please clarify. revised.
3rd Bullet point: please provide the reference of The Method Statement has been
3(b) Guideline for review of Geotechnical Reports and revised.
preliminary plans and specifications.
4 Page 15 / 23 Table 1
ASTM 4380: Soil Unit Weight:
Soil unit weight varies with reference to The Method Statement has been
4(a)
soil strata type and depth. Please specify revised.
the locations and depth for taking sample
ASTM Cl27: Soil Specific Gravity:
Soil specific gravity varies with
The Method Statement has been
4(b) reference to soil strata type and depth.
revised.
Please specify the locations and depth
for taking sample
Existing Ground Water & Seasonal high The Method Statement has been
ground water elevation (Test Standard revised.
"SHWT")
Please specify the standard method / test
4(c)
reference for measuring Existing and
seasonal ground water elevation.
Also specify location, frequency and over
all duration for taking observations.
Water Table readings The Method Statement has been
revised.
Please specify the standard method / test
reference for measuring water table
4(d) reading.
Also specify location, frequency and over
all duration for taking observations.
4(e) ITEM N0.1 Soil Shear strength (Drained The Method Statement has been
condition and Saturated case) revised.
Please specify / refer test method as per
BS 1377 Part-7.as there are many test
methods are available in BS 1377-7 for
Soil Shear strength test.
Please mention the location and method
Modulus of subgrade reaction ASTM D1196 The Method Statement has been
revised.
Please specify the diameter of the plate
to be used and provide justifications.
4(h)
As per the table, 25 nos. tests shall be
performed. Please confirm the quantity
as well as the locations.
ASTM D4428: Seismic site classification and The Method Statement has been
corresponding recommended response revised.
spectra for both period and displacement.
This test is ln-situ (onsite) test. The
scope of work as described in item 1.2
4(i) does not covers this test. If AJE is
intending to do this test, please describe
in the scope of Geotechnical works.
As per the table 25 nos. tests shall be
performed. Please confirm the quantity
as well as the locations.
5 Page 16 / 23 Table 2
Horizontal, Earthquake coefficient in Earth The Method Statement has been
pressure. Test standard reference revised.
"Mononope Okabe Method of Underground
5(a) Building structure"
This method provides a design
calculation method not test method.