MINISTRY OF PUBLIC WORKS

Bangsamoro Autonomous Region in Muslim Mindanao

Contract ID No.: MPW-CW-112-2022


Contract Name: Construction of Road at Barangay RH6, Cotabato City
Location of the Contract: Cotabato City

BILL OF QUANTITIES

ITEM
DESCRIPTION UNIT QUANTITY UNIT PRICE (Pesos) AMOUNT (Pesos)
NO.
(1) (2) (3) (4) (5) (6)
PART A. FACILITIES FOR THE ENGINEER
In Words: Pesos: In Words: Pesos:
Thirty One Thousand Five Eighty Five Thousand Fifty Pesos
Provision of Field Office for the Hundred Pesos Only Only
A.1.1 (8) Month 2.70
Engineer (Rental Basis)
In Figures: In Figures:
31,500.00 85,050.00
In Words: Pesos: In Words: Pesos:
Forty Four Thousand One Hundred Fifty Nine Thousand Five Hundred
Provision of 4x4 Pick Up Type Service
A.1.2 (2) month 1.35 Pesos Only Thirty Five Pesos Only
Vehicle for the Engineer on Rental Basis
In Figures: In Figures:
44,100.00 59,535.00
In Words: Pesos:
One Hundred Forty Four Thousand
TOTAL OF PART A Five Hundred Eighty Five Pesos Only
In Figures:
144,585.00
PART B. OTHER GENERAL REQUIREMENTS
In Words: Pesos: In Words: Pesos:
Seven Thousand Six Hundred Six Thousand Six Hundred Forty Six
B.4.1 Construction Survey & Staking Km. 0.87 Forty Pesos Only & 80/100 Pesos Only
In Figures: In Figures:
7,640.00 6,646.80
In Words: Pesos: In Words: Pesos:
Twenty Eight Thousand Three One Hundred Seventy Thousand
B.4.8 Permanent Monuments and Markers each 6.00 Hundred Forty Six Pesos Only Seventy Six Pesos Only
In Figures: In Figures:
28,346.00 170,076.00
In Words: Pesos: In Words: Pesos:
Five Thousand Two Hundred Fifteen Thousand Six Hundred Eighty
B.5 Project Billboard/Signboard Ea. 3.00 Twenty Nine Pesos Only Seven Pesos Only
In Figures: In Figures:
5,229.00 15,687.00
In Words: Pesos: In Words: Pesos:
One Thousand One Hundred Ninety Seven Thousand Thirty Eight
B.7 (1) Occupational Safety and Health Program Days 81.00 Ninety Eight Pesos Only Pesos Only
In Figures: In Figures:
1,198.00 97,038.00
In Words: Pesos: In Words: Pesos:
Seven Hundred Eighty Six Pesos Sixty Three Thousand Six Hundred
B.8(1) Traffic Management (Layout 3) Days 81.00 Only Sixty Six Pesos Only
In Figures: In Figures:
786.00 63,666.00
In Words: Pesos: In Words: Pesos:
One Hundred Twenty Six One Hundred Twenty Six Thousand
B.9 Mobilization and Demobilization L.S. 1.00 Thousand Pesos Only Pesos Only
In Figures: In Figures:
126,000.00 126,000.00
In Words: Pesos:
Four Hundred Seventy Nine Thousand
One Hundred Thirteen & 80/100 Pesos
TOTAL OF PART B
Only
In Figures:
479,113.80
PART C. EARTHWORKS
In Words: Pesos: In Words: Pesos:
One Hundred Ninety Two Thousand
Two Hundred Twenty Eight Pesos
Nine Hundred Ninety Two & 88/100
102(1) Unsuitable Excavation Cu.m. 846.46 Only
Pesos Only
In Figures: In Figures:
228.00 192,992.88
In Words: Pesos: In Words: Pesos:
One Thousand Seven Hundred Ten Seventy Six Thousand Nine Hundred
Pipe Culvert and Drain Excavation
103(6)a Cu.m. 45.00 Pesos Only Fifty Pesos Only
(Common Material)
In Figures: In Figures:
1,710.00 76,950.00
In Words: Pesos: In Words: Pesos:
Three Hundred Eighty Eight
Six Hundred Thirty Seven Pesos
Embankment from Borrow (Common Thousand Eight Hundred Eighteen &
104(2)a Cu.m. 610.39 Only
Soil) 43/100 Pesos Only
In Figures: In Figures:
637.00 388,818.43
In Words: Pesos:
Six Hundred Fifty Eight Thousand
Seven Hundred Sixty One & 31/100
TOTAL OF PART C
Pesos Only
In Figures:
658,761.31
PART D. SUB-BASE AND BASE COURSE
In Words: Pesos: In Words: Pesos:
One Million Four Hundred Eighty
Nine Hundred Eighty Two Pesos
Seven Thousand Nine Hundred Eighty
200(1) Aggregate Subbase Course, 200mm thk. Cu.m. 1,515.26 Only
Five & 32/100 Pesos Only
In Figures: In Figures:
982.00 1,487,985.32
In Words: Pesos: In Words: Pesos:
One Thousand Five Hundred Three Hundred Forty Four Thousand
Aggregate base Course, 150 mm thk.
201(1) Cu.m. 226.05 Twenty Two Pesos Only Forty Eight & 10/100 Pesos Only
(Road Shoulder)
In Figures: In Figures:
1,522.00 344,048.10
In Words: Pesos:
One Million Eight Hundred Thirty
Two Thousand Thirty Three & 42/100
TOTAL OF PART D
Pesos Only
In Figures:
1,832,033.42
PART E. SURFACE COURSES
In Words: Pesos: In Words: Pesos:
Five Million Seven Hundred Seventy
One Thousand Three Hundred
Portland Cement Concrete Pavement Two Thousand Four Hundred Fifty
311(1)c1 Sq.m 4,350.00 Twenty Seven Pesos Only
(Unreinforced), 0.23 m thk Pesos Only
In Figures: In Figures:
1,327.00 5,772,450.00
In Words: Pesos:
Five Million Seven Hundred Seventy
Two Thousand Four Hundred Fifty
TOTAL OF PART E
Pesos Only
In Figures:
5,772,450.00
PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURE
In Words: Pesos: In Words: Pesos:
Twelve Thousand Eight Hundred Two Hundred Five Thousand Six
500(1)b3 Pipe Culvert, 910 mm dia. Class IV Ln.m. 16.00 Fifty Two Pesos Only Hundred Thirty Two Pesos Only
In Figures: In Figures:
12,852.00 205,632.00
In Words: Pesos: In Words: Pesos:
Three Thousand Six Hundred Seventy Five Thousand One Hundred
506(1) Stone Masonry Cu.m. 20.73 Twenty Five Pesos Only Forty Six & 25/100 Pesos Only
In Figures: In Figures:
3,625.00 75,146.25
In Words: Pesos: In Words: Pesos:
Three Thousand Eight Hundred Thirteen Thousand Seven Hundred
508(1) Hand-Laid Rock Embankment Cu.m. 3.52 Ninety Five Pesos Only Ten & 40/100 Pesos Only
In Figures: In Figures:
3,895.00 13,710.40
In Words: Pesos:
Two Hundred Ninety Four Thousand
Four Hundred Eighty Eight & 65/100
TOTAL OF PART G
Pesos Only
In Figures:
294,488.65
PART H. MISCELLANEOUS STRUCTURES
In Words: Pesos: In Words: Pesos:

One Hundred Seventy Four Thousand


Pavement Marking (Reflectorized Eight Hundred Two Pesos Only
606(1)b1 Sq.m 217.50 Four Hundred Thirty Five Pesos Only
Thermoplastic - White)
In Figures: In Figures:
802.00 174,435.00
In Words: Pesos: In Words: Pesos:

Twenty Seven Thousand Five Two Hundred Seventy Five Thousand


624(8) Solar LED Street Lights Ea 10.00 Hundred Eighty Two Pesos Only Eight Hundred Twenty Pesos Only

In Figures: In Figures:
27,582.00 275,820.00
In Words: Pesos:
Four Hundred Fifty Thousand Two
TOTAL OF PART H Hundred Fifty Five Pesos Only
In Figures:
450,255.00
In Words: Pesos:
Nine Million Six Hundred Thirty One
Thousand Six Hundred Eighty Seven
GRAND TOTAL
& 18/100 Pesos Only
In Figures:
9,631,687.18

Submitted By
Date: April 3, 2023
ENGR. EFRAIM B. AKMAD
Name & Signature of Bidder's Representative

PROPRIETOR/MANAGER
Position

LANDMARK CONSTRUCTION
Name of Firm

Santos St. Ext., Krislamville, Brgy. RH-6, Cotabato


Address