Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MISSAN OIL FIELD DEVELOPMENT PROJECT

REQUEST FOR INSPECTION (RFI)

Contract No: Contractor: RFI No:


CMIT-PRT-10.53-150188 SERT Company Limited for Oil Services CMIT-737-IIl-01-SERT-QUA-30.18-
Work Order No.: WO-01 Facility: AGJ-BUT-RE 18 inch Oil Trunk 190003
line
Inspection Date : Inspection time: 11:00 AM Intervention Contractor COMPANY
06\09\2019 points H S
ITP Name: Inspection and ITP item No. and Description: 3.3- Visual Inspection of Welds
Test Plan for Pipeline

Inspection activity description: Visual Inspection

From (AGJ-BUT-RE) : Rep No.1

Inspection findings (Tick as applicable)


Acceptable Partially acceptable RFI on hold
Cancelled Rejected Not ready for inspection
Reason for cancellation/rejection/ not ready for inspection (Tick as applicable)
Incomplete work Insufficient documents attached RFI Repeated
HSE issues No power supply at site Specification violation
Material non compliant Test crew not available Test equipments not available
Poor workmanship Unacceptable test procedure Installation not as per drawing
Other comments/Remarks:

Punch list No. (if any):

Contractor COMPANY
EPC PMC PMT
Signature

Date

You might also like