z= ™*< Maharashtra State Electricity Distribution Co. Ltd.
MAHA: Office ofthe Chief Engineer (Renewable Energy)
Bae A AN “Prakashgad, th Floor, Station Road Banda (E), Mamba 400051
"(A Govt" of Maharashtra Undertaking) Tel no. (0) 26474211, Email: coremsedcl@mahadiscom.in,
CIN: U40109MH2005SGC153645, Website: www.mahadiscom.in
CE/RE/Wind/7772
To,
‘As per list attached.
Sub: Submission of invoices as per the provisions of Energy Purchase Agreement.
Ref: Billing of WTGs at common metering point No. 7316 from July-2022 onwards.
Dear Sir,
MSEDCL has entered into Energy Purchase Agreement (EPA)/Short term PPA (STPP) with
the generators as per Annexure-A attached herewith for WTGs connected at metering point No.
7316. Invoices are processed at this common metering point based on the percentage breakup.
The details of WTGs connected & the EPA executed at the said metering point is attached herewith
as an Annexure-A.
Itis to bring your attention as follows,
1. The article regarding joint meter reading of the EPA states as under,
“Wherever more than one Power Producer(s) are delivering energy produced by them using
the common evacuation system and through the common Meeting equipment, then they shall
identify a common agency responsible for Joint Meter Reading with MSEDCL. The Joint Meter
Reading taken at common evacuation system shall be supported by meter readings of
individual power producers using such common evacuation system. Based on this break up,
limited to total energy delivered, the power generated from the individual power plant shall
be certified by MSEDCL. ”
2. The article regarding billing in short term PPA (STPP) states as follows,
“For the intra-state projects, the bills shall be submitted by seller online on MSEDCL's NCE web
portal based on Joint Meter Reading (JMR) / AMR..."
Thus, the joint meter reading is to be supported by meter readings of individual wind
turbine generator. It is observed that the invoice raised by you is not supported by the meter
idual WTC.
readings of individual WTGs as no meter is installed at in
Page 1 of 4In view of the above, your invoice is not in accordance with the EPA. MSEDCL in the
| absence of meter installed at individual WTG cannot ascertain the energy generated by the
individual WTG, which is the basis for processing of your invoice as per EPA.
Moreover, in case invoice submitted by you is processed in the absence of meter being
installed to the individual WTGs connected to the aforesaid common metering point it will amount
to deviation from EPA provisions.
Accordingly, you are requested to submit the invoice duly supported by the individual
meter readings of the individual meters of the WTGs so that invoice pertaining to the
aforementioned common metering point can be processed.
‘Thanks & regards,
aoe
Chief Engineer (Renewable Energy)
Copy saw.
1. The Director (Commercial), MSEDCL, Mumbai
Copy f.w.c.s. to:
1. The Chief Engineer, LD, Kalwa, MSETCL.
2. The Chief Engineer, STU, MSETCL, Prakashganga, Mumbai.
Copy to;
1. Superintending Engineer, (O&M), Satara Circle.
Itis directed to handover this notice to concern generator and submit
acknowledgement to this office.
Page 2 of 41, Common metering Point No.
2. Name of the Substation:
Annexure-A
7316
220/33KV RATNAGIRI WIND SUB-STATION
3, Name of the MSEDCL Circle: Satara Circle
ee Contracted Valid | anit
No, | Name ofthe Wind Generator | capacityin | LocationNo. | EPA/STPP | 2 WUnit
: Mw. Dated oe
RATNAGIRI WIND POWER ;
1 48 T29&731 | 12-06-2026] 5.81
PROJECT PVTLTD. en Pare ther
RATNAGIRI WIND POWER a
2 POECe PYRLED. 32 72770728 | 31-05-2026} 5.81
Page 3 of 4List of addressee (Mailing list).
1. RATNAGIRI WIND POWER PROJECT PVT.LTD.
JJ Arcade, Final plot no.480, TPS-1, Sanivarpet, near Pankaj Hotel, NH-4, Karad,
Maharashtra-415110
Email: sunil k@greenkogroup.com
suman. kumar@greenkogroup.com
cpurushotham@greenkogroup.com
Page 4 of 4