Professional Documents
Culture Documents
BHA - Handling 004
BHA - Handling 004
BHA - Handling 004
Job Picking and Making up / Laying and Braking out BHA’s Job No 0077 Location Ben Rinnes Worksheet 1 of
Task Description Making up BHA’s using rig tongs , iron roughneck. Picking up and laying out with the cranes. Date
Residual
Hazard Hazard Effect Existing Control Measures L S RISK Additional Control Measures By Risk ALARP
Changing Dropped objects Ensure the hole and the pipe is Be aware of pinch points. Controlled operation of
out BHA down the hole. covered. Ensure tools are secured
handling Lifting correctly. Use the correct
equipment equipment techniques for slinging elevators.
parting. Pinch
points personnel
trapped
Task Description Making up BHA’s using rig tongs , iron roughneck. Picking up and laying out with the cranes. Date
Residual
Hazard Hazard Effect Existing Control Measures L S RISK Additional Control Measures By Risk ALARP