Ben Rinnes Activity Risk Assessment Worksheet

Activity ARA 224 Date: 22/12/07


Nipple Up/Down High Pressure Riser & 13 5/8” BOP’s Assessment Team: S Patterson, J Muniz

INITIAL RISK RESIDUAL RISK


Step Description of Activity Hazard, Hazardous Event, Who or What Control Measures, Actions/Measures Action Control

Probability

Probability
No. Step Potential Incident. might be for Recovery Party in place
harmed

Severity

Severity
Risk Risk

1 Remove/Install Main Falling Hatch, Falling tools Plant L L L Safety Harnesses to be worn when YES L L L
Hatch Cover on Skid Flow lines working around open hatch. Erect
deck People barriers. Use of radios for
communication Between D/Floor &
Check lifting equipment and
Certification. Use specialist-lifting
device. No personnel working in
well bay below when installing
hatch. Skid deck

2 Install High Pressure Failure of lifting equipment Plant L L L Rotary Barrier to be installed. YES L L L
Riser and Riser Valves Master Bushings removed Flow lines Production Op in attendance at well
from Rotary Table People bay. Heavy lift Tannoy/Permit
Flow lines Depressurised, only if risk
of impact, liaise with C/room.
Wellhead Barrier off around Well.
Check lifting equipment before use
(DP to Riser flange x/over). Check
certification.

3 Remove/Install 13 5/8” Failure of Equipment Plant L L L Ensure plates installed over skid YES L L L
BOP’s Falling Tools. People deck. ‘R’ clips to be installed on
Failure of Airlines hoses Ensure Permit endorsed For
work period. Barrier off BOP Deck.
Make PA announcement concerning
heavy lift operations

Install Low Pressure Failure of Lifting Equipment Plant L L L YES L L L


4
Riser. Men working at Bell nipple People
Falling objects Check lifting Equipment and Certs.
Safety harnesses to be worn when
working on BOP stack.

RESIDUAL RISK LOW