Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

PT Linde Indonesia

Linde Engineering

LE Project No.
1510A4HR
LE Project Code
JAVA
LE Doc. No.
&ASU W-LX 0801 (EN)
Page 1 of X

Confidential

Order No.(订单号):

Material Receiving and Control Report (MRCR) - Log

IFU 01 21.09.2022 H. Shah (GCITT) B. Parmar (GCIEQ) S. Koompa (PE)


Document
Status Issue Date Prepared Reviewed Approved Remarks

© Linde
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express
authorization are prohibited. Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent,
utility model or design.
Incoming Material Details
Partial Delivery No. Packaging Type Packaging No. P.O. No. P.O. Item

P LE
AM
EX
etails Quality Control
Sub Item Ident / Tag No. Material Description Checked By Accepted By

P LE
XAM
ality Control Logistics Service Provider Details
Storage Location Forwarder Number of Trucks Vehicle Registration
ogistics Service Provider Details
Brutto Weight (incl. packing) Arrival Departure Remark 1

You might also like