Statistical Process Control For All.: N. Miyamoto 4/june/2021
Statistical Process Control For All.: N. Miyamoto 4/june/2021
N. Miyamoto
4/June/2021
FMT Confidential
© 2013 Renesas Semiconductor KL Sdn Bhd.
©2021 Confidential & all rights reserved
FUJIMI-MICRO TECHNOLOGY SDN.BHD., All rights reserved.
Statistical Process Control Flow
Machine operating at normal condition
OK Alarm NO
System Any data out of
PC re-sampling to confirm
judgment? spec limit?
Warning
YES System
Flow lot & provide info to engineer
judgment?
(email triggered by system)
Engineer judge & take action if Stop machine, Any data out of
required suspend lot & issue spec and / or
REPORT control limit?
PC Data collection
USL USL
UCL UCL
Zone A
Zone B
CL CL Zone C
Zone B
Zone A
LCL LCL
LSL LSL
3 FMT
©
©2013 Confidential
2013Renesas
RenesasSemiconductor KL Sdn
©2021
Semiconductor KL Bhd. Confidential
FUJIMI-MICRO
Sdn Bhd. & all rights
Confidential reserved
TECHNOLOGY
& all rights reserved SDN.BHD., All rights reserved.
Statistical Process Control Rules
USL : Upper Spec Limit
USL USL
USL
UCL UCL
UCL
CL CL
CL
4 FMT
©
©2013 Confidential
2013Renesas
RenesasSemiconductor KL Sdn
©2021
Semiconductor KL Bhd. Confidential
FUJIMI-MICRO
Sdn Bhd. & all rights
Confidential reserved
TECHNOLOGY
& all rights reserved SDN.BHD., All rights reserved.
Limits setting
Auto calculation formula will compute / re-compute control limit after sub-grouping.
5 FMT
©
©2013 Confidential
2013Renesas
RenesasSemiconductor KL Sdn
©2021
Semiconductor KL Bhd. Confidential
FUJIMI-MICRO
Sdn Bhd. & all rights
Confidential reserved
TECHNOLOGY
& all rights reserved SDN.BHD., All rights reserved.
Just image by Miyamoto : Electronic SPC & SBL for “Change Control ”
Machine/
Auto data capturing, alarming , e-mailing material
2 Process
2) Process Characteristics
Customer e.g Volume, Weight,
Temp, Humidity, DI
water resistibility…
UCL
8.1.2 Knowledge of basic statistical
Zone A
Upper concepts
Zone B
Zone C Zone Basic statistical concepts, such as
CL
Zone C variation, control (stability), process
Zone B Lower capability and over-adjustment shall be
Zone A Zone
LCL understood and utilized throughout the
organization
LSL
4 7 points in a row up / down across 2 sides* Warning Monitor & Follow Up Accept
By Engineer.
5 7 points in a row all on either side*
If warning alarm is
6 2 out of 3 points in upper / lower Zone A & beyond* continual, review of
process limit is
7 4 out of 5 points in upper / lower Zone B & beyond*
required
8 6 points in a row not changing*
-Review CL on
next revision (item
7 4 out of 5 points in upper / lower Zone B & beyond* 4,5)
UCL
Alarm / Warning
Zone A
CL
Zone B
Zone C
Upper Zone
Alarm
Zone C (7 point in a row up for the
Zone B Lower Zone same side)
Zone A
LCL
LSL
USL
UCL
Zone A
Warning
Zone B Upper Zone
Zone C (4 out of 5 point is
CL
Zone C beyond zone B)
Zone B Lower Zone
Zone A
LCL
LSL
USL
UCL
Zone A
Warning
Zone B Upper Zone
Zone C (2 out of 3 point is
CL
Zone C beyond zone A)
Zone B Lower Zone
Zone A
LCL
LSL
FMT Confidential
© 2013 Renesas Semiconductor KL Sdn Bhd.
©2021 Confidential & all rights reserved
FUJIMI-MICRO TECHNOLOGY SDN.BHD., All rights reserved.
Cpk Expectation of Product Parameter
Cpk
scale
1 2 3 4 5
FMT Confidential
© 2013 Renesas Semiconductor KL Sdn Bhd.
©2021 Confidential & all rights reserved
FUJIMI-MICRO TECHNOLOGY SDN.BHD., All rights reserved.
SPC control is to detect special cause and improve common cause
CL
Cpk > NO
3.13
Why Cpk > 3.13? Criteria of
YES
Area from -Z to +Z
judging
Data NO Cpk > 3.13
Accurate?
as safety
YES margin for
Stop SPC control
(maintain sampling)
-Z
1.5sigma
+Z Confidence
Every 6 mths
- Assuming a shift of 1.5 sigma (closer to real life
application and non-symmetric distribution), as Z
process control
approaches 9.4, area reaches 100% (20 decimal
accuracy).
YES Cpk still >
- When Z = 9.4 , Cpk = 9.4 / 3 = 3.13
3.13?
FMT Confidential
© 2013 Renesas Semiconductor KL Sdn Bhd.
©2021 Confidential & all rights reserved
FUJIMI-MICRO TECHNOLOGY SDN.BHD., All rights reserved.
Quality First mind-set enhancement
could aim to
Cost Competitiveness
On Time Delivery
then,
Customer satisfaction
Finally,
FMT should be more Profitable Company
and Employee Satisfaction Company.
*Quality means is not only for Product but also for all of FMT job.