This document is a piping and instrumentation diagram for an LNG marine unloading system. It was last revised on August 8th, 2022 and issued for design by engineers HDY, VV, and KN. The diagram is part of a front-end engineering design project for an Northern Vietnam LNG terminal being developed by ITECO Joint Stock Company.
This document is a piping and instrumentation diagram for an LNG marine unloading system. It was last revised on August 8th, 2022 and issued for design by engineers HDY, VV, and KN. The diagram is part of a front-end engineering design project for an Northern Vietnam LNG terminal being developed by ITECO Joint Stock Company.
This document is a piping and instrumentation diagram for an LNG marine unloading system. It was last revised on August 8th, 2022 and issued for design by engineers HDY, VV, and KN. The diagram is part of a front-end engineering design project for an Northern Vietnam LNG terminal being developed by ITECO Joint Stock Company.
0 8/08/2022 ISSUED FOR DESIGN HDY VV KN ITECO JOINT STOCK COMPANY STAGE: F 14/07/2022 RE-ISSUED FOR APPROVAL HDY VV KN
16/06/2022 ISSUED FOR APPROVAL MPV VV KN
FEED E
D 20/04/2022 ISSUED FOR HAZOP HDY VV KN ENGINEERING CONTRACTOR: DOCUMENT TITLE:
C 11/04/2022 RE - ISSUED FOR REVIEW HDY VV KN PIPING AND INSTRUMENTATION DIAGRAM LNG MARINE UNLOADING SYSTEM B 22/03/2022 ISSUED FOR REVIEW HDY VV KN JOB. SCALE DWG No. SHEET REV. - - A 10/03/2022 ISSUED FOR SQUAD CHECK HDY VV KN
REFERENCE DOCUMENTS REV. DATE DESCRIPTION PREP. CHKED PM ........ NTS NVLNG-FEED-01-PR-PID-0001 1 OF 3 0