E C 8 0520a Earthmoving Equipment Pre Mobilisation Checklist
E C 8 0520a Earthmoving Equipment Pre Mobilisation Checklist
E C 8 0520a Earthmoving Equipment Pre Mobilisation Checklist
Is the machine classified as a road-going ‘heavy vehicle’ If you answered ‘Yes’ to this question please
Yes ☐ No ☐
for the purposes of heavy vehicle laws? inform project person responsible for logistics.
For guidance on whether the machine is classified as a ‘heavy vehicle’ refer to E-G-8-0833d Heavy Vehicle Guidance.
Owner / Supplier LORA
PART A – Laing O’Rourke Minimum Requirements for Plant
YES NO Approved
Enclosed sealed air conditioned cabin or open cabin if so designed (where available for
that machine size and type; otherwise add reason in comments box)
Roll Over Protection (ROPS) fitted (placard with serial number)
Falling Object Protection (FOPS) fitted and certified
Note: Based on project Risk Assessment
Fire extinguisher minimum 4.5kg (class ABE) and tested and tagged within 6 months.
Date:
A small extinguisher minimum 1kg dry chemical (class ABE) located in cabin and
identification decal on door
Flashing amber beacon visible from 360 degrees
Reverse / travel / slewing alarm (beep or squawk as per client requirements)
Overhead power line signage affixed in cabin, where applicable
Lockable battery isolation switch c/w identification decal
Emergency stop (with decal) easily and safely accessible from outside plant
Guarding (lockable door and/or limit switch and/or guarding over parts)
Safety signage in place for SWL, pinch points, warnings, emergency etc.
Fully automatic, double locking hydraulic quick hitch fitted (excavators, backhoes,
integrated tool carriers)
For Excavators 3 tonne or less Automatic Double locking Manual acting type of hitches
are acceptable.
Handrails on upper decks where personnel access is required
Safe access onto machines (three points of contact)
Seatbelt fitted and in good condition
UHF radio fitted and operational
Wheel chocks with carrying mounts (for rubber tyred equipment)
Where fitted, fire suppression operable from ground and cabin
Hold Point: Confirm Project specific / Client addition requirements Signature:
The LORA Way E-C-8-0520a Earthmoving Equipment Pre- Copyright © Laing O’Rourke 2017 Page 1 of 2
Mobilisation Checklist v3 (Revised August 2017) All rights reserved. Document uncontrolled when printed
E-C-8-0520a
Process Document owner Step Gateways Document type
PART C – Compliance Documentation for Plant (either in paper form or if electronic Owner / Supplier LORA
(available at the time of mobilisation)) YES NO Approved
Comments: For items ticked No give reason in the comments section below
Notes on minimum requirements exceptions; list additional included asset or serial numbers; any further information:
I declare that this machine is in a safe condition, is free from defect and is fit for purpose:
The LORA Way E-C-8-0520a Earthmoving Equipment Pre- Copyright © Laing O’Rourke 2017 Page 2 of 2
Mobilisation Checklist v3 (Revised August 2017) All rights reserved. Document uncontrolled when printed
E-C-8-0520a