Professional Documents
Culture Documents
Green Power - Business Profile
Green Power - Business Profile
Green Power - Business Profile
08 Sectors Served
01 02 03 04 05
SALES OFFICE
CHILLER
PACKAGED POWER SOLUTIONS
WASTE HEAT BOILERS
GAS & DIESEL GENSETS ALONG WITH WASTE HEAT THERMIC FLUID HEATER
RECOVERY SYSTEMS IN A CONTAINERIZED OFFERS HOT AIR / HOT WATER GENERATOR
SERVICES OFFERED
E2P PLUS 02 E2P PLUS - Based on state of the art R Schmitt Enertec
(Germany) Engine Platform – 100 kWe +
07 Offer product for Natural Gas, Bio Gas, Sewage Gas, Producer
gas etc.
03 We pride ourselves on
challenging conventional
thinking at the outset,
bringing in our
operations and
construction expertise at
the earliest stage to
ensure our solutions are
safe, technically sound,
fit-for-purpose and cost
effective.
SOME SPECIALIZED
EPC PROJECTS
NETRA (NTPC Energy Technology Research Alliance)
UNDER EXECUTION
SIZE OF PLANT
20 TPD Carbon Capture plant
LOCATION
Vindhyanagar, India
YEAR OF INSTALLATION
2021
SIZE OF PLANT
5 MWe Steam turbine
LOCATION
Nigeria
Delhi Land and Finance Limited, DLF
VENTILATION SYSTEM
Pressurized Wet Ventilation
CAPACITY
13.38 Lacs CFM (Bldg. 5, 10)
6.68 Lacs CFM (Silokhera)
LOCATION
Gurgaon (Delhi NCR)
Gujarat Glass
VENTILATION SYSTEM
Pressurized Wet Ventilation
CAPACITY
90000 CFM
LOCATION
Kausamba (Gujarat)
ABOUT KINOLT (EARLIER EURO DIESEL)
NOW RE-BRANDED AS
ROLLS ROYCE SOLUTIONS LIEGE (RRSL)
ABOUT RRSL
01 KINOLT is a private company
established in 1989 in Belgium.
04 Main business activity consists of providing quality power solution and securing the critical power supply of
businesses and institutions by the means of an avant-garde Diesel Rotary UPS system.
05 KINOLT’s business network extends worldwide through its subsidiaries and distributors.
06 KINOLT has more than 600 NO-BREAK KS® working systems all over the world, securing over
10,00,000 kVA worth of electrical power.
SOME DRUPS INSTALLATIONS
R&D CENTRE
DRUPS MODEL
No-Break KS
YEAR OF INSTALLATION
2017
SIZE OF PLANT
1200 kVA x 1 No. @ 415 V
LOCATION
Greater Noida (Delhi NCR)
SOME DRUPS INSTALLATIONS
DRUPS MODEL
No-Break KS
YEAR OF INSTALLATION
2017
SIZE OF PLANT
1500 kVA x 4 Nos. @ 11 kV
LOCATION
Rohtak, Haryana
ABOUT RAILWAY ELECTRIFICATION
Green Power is engaged in the field of Railway Infrastructure development as well.
CURRENT PROJECTS
CHP : HOT AIR FOR SPRAY DRYER: 8 TONS/HR @ 500 DEG C FROM EACH SYSTEM
LOCATION : SIKANDRABAD
HEAT RECOVERY :
From Exhaust: Steam 450 kgs/hr. @10.5
kg/cm² ; Chilled Water 110 TR @ 7 Deg C ;
Hot Air 1000 Kgs/Hr @ 80 Deg C
From Jacket : Chilled Water 40 TR @ 7 Deg C
Hot Air 300 Kgs/Hr @ 60 Deg C
LOCATION : AHMEDABAD (GUJARAT)
BIRLA CENTURY
GENSET MODEL
TCG 2032 V16
SIZE OF PLANT
4300 kWe x 1 No.
LOCATION
Bhiwadi (Rajasthan)
YEAR OF INSTALLATION
2013
DIESEL GENSET :
Wartsila (5000 kVA) x 1 No.
Kirloskar (1000 kVA) x 2 Nos.
Kirloskar (500 kVA) x 1 No.
11KV substation & all allied equipments & BOP
SIZE OF PLANT
7500 kVA
LOCATION
Faridabad (Delhi NCR)
OPERATION AND MAINTENANCE
DELHI LAND AND FINANCE LIMITED, DLF
GAS TURBINE :
5 MW x 4 Nos.
SIZE OF PLANT
20 MW
LOCATION
Bld. 5, Gurgaon (Delhi NCR)
VENTILATION SYSTEM
DELHI LAND AND FINANCE LIMITED, DLF
VENTILATION SYSTEM
Pressurized Wet Ventilation
CAPACITY
13.38 Lacs CFM (Bldg. 5, 10)
6.68 Lacs CFM (Silokhera)
LOCATION
Gurgaon (Delhi NCR)
GUJARAT GLASS
VENTILATION SYSTEM
Pressurized Wet Ventilation
CAPACITY
90000 CFM
LOCATION
Kausamba (Gujarat)
SOME OVERSEAS
INSTALLATIONS
OLAM Group, Nigeria
GENSET MODEL & NOS.
1 x TCG 2016 V12C
SIZE OF PLANT
1 No. x 600 KWe @ 415 Volts &
1 No. x 300 KWe @ 415 Volts
LOCATION
Lagos, Nigeria
COMMISSIONING DATE
05.09.2014
MAJOR SCOPE
Gas Genset with Containerized Sets +
Balance of plant + Hot water heat recovery
SIZE OF PLANT
1 No. x 800 KWe @ 415 Volts
LOCATION
Lagos, Nigeria
COMMISSIONING DATE
21.10.2014
MAJOR SCOPE
Gas Genset with Containerized Sets +
Balance of plant
SIZE OF PLANT
2 Nos x 1560 KWe @ 415 Volts
LOCATION
Thailand
COMMISSIONING DATE
2019
MAJOR SCOPE
Gas Genset + Balance of plant
SIZE OF PLANT
3 Nos x 3900 KWe @ 11000 Volts
LOCATION
Tanzania
COMMISSIONING DATE
December 2018
MAJOR SCOPE
Gas Genset + Balance of Plant +
Waste Heat Recovery Boiler
CONTACT US