In this group, the main functions and construction of • Surge Voltage Prevention Circuit:
the main circuit are explaned. Prevents surge voltage from occurring when the
engine is stopped.
• Electric Power Circuit: (Anti Load Dump Relay)
Supplies electric power to all electric system on this
machine. • Engine Stop Circuit:
(Key Switch, Batteries, Fuses (Fuse Box and Fu- Stops the engine with the EC motor
sible links), Battery Relay) (MC, EC Motor).
!
Key Switch
Batteries
Glow
•
" # $
Relay
Fuse Box
REGULATOR
Radio, Monitor
MC (Power Source)
MC (EC Motor)
SM6018
% %
&
' ( ) * + , - . / 0 1
2
Key Switch
Batteries
Battery
Relay
Fuse
Box
" # $
• Fuse Box
REGULATOR
Monitor
SM6019
3
4 5 5 6
5 4
!
When the key switch is turned to the ACC position, to each accessory circuit such as the horn, radio,
terminal ACC is connected to terminal B in the key cigar lighter, room lamp, and to the auxiliary circuit to
switch. operate them.
Then, the battery current flows through the fuse box
7
Key Switch
Batteries
Fuse
Box
Horn
Radio, Room Lamp
Cigar Lighter
" # $
Fuse
Box
REGULATOR
SM6020
8
& 4
9 : ; 5 4 !
When the key switch is turned to the ON or START terminal #4 is grounded, glow plug relay comes ON,
position, the key switch terminal B is connected to so that the glow plugs are heated.
terminal M in the key switch. After flowing through the
fuse box, the current from terminal G1 magnetizes the Terminal #6 of QOS controller grounds to vehicle for
glow relay, operates the monitor, and lights the pre- 8 seconds while preheat, therefore glow signal is ON.
heat indicator. (When preheat is not done, glow signal is ON for 0.3
seconds to check the blown bulb.)
The current from the terminal M flows to terminal #1
of QOS controller via the fuse #20.
When the coolant temperature switch and pressure when coolant temperature is less than 10 °C (50 °F).
switch are OFF, QOS controller allows to preheat the Pressure switch becomes OFF when lock lever is in
engine for approx. 30 seconds. When QOS controller lock position.
<
Coolant
Temperature
Switch
To Monitor
(Glow
signal)
Batteries
•
Fuse
Box
" # $
Glow
Relay
REGULATOR
Glow Plugs
SM6021
=
5 4 9 >
5 5 4 !
? . @ A . ) A B ) C @ * D ) A @ . - E F
Starter Relay
S B
R4 D3
(1) L
C
R3 (2)
(1)
C
R2 Z D2
To Alternator R Q2 M B
Terminal R Q1
(2)
C1 C
Starter
E
D4
12V
B
ST Batteries
SM4015
G
Key Switch
Batteries
Battery
Relay
Starter Fuse
Box
Starter Relay
Fuse Box
To MC
Alternator
SM6022
H
5 9 !
After the engine starts and the key switch is released, generation. Current from terminal B on the alternator
the key switch is returned to the ON position. With the flows to the batteries through the battery relay re-
key switch kept ON, key switch terminal B is con- charging the batteries.
nected to terminals ACC and M. In addition, this current from Alternator terminal R
After the engine starts, the alternator begins power flows to the monitor to turn off the charge lamp.
Key Switch
Batteries
To
Battery Monitor
Relay
" # $
REGULATOR
Alternator
SM6023
I I
: ; > ; J :
The alternator consists of field coil FC, stator coil SC, At first, the current does not flow to field coil FC.
and diodes D. When the rotor starts to rotate, alternating voltage is
The regulator consists of transistors T1 and T2, zener generated in stator coil SC due to residual magnetism
diode ZD, and resistors R1 and R2. in the rotor.
Thereby, the current starts to flow through field coil
Alternator terminal B is connected to: FC, magnetizing the rotor further and increasing
generating voltage.
B→L→RF→(R)→R1→Base B for Transistor T1 As generating voltage increases, the flowing current
through field coil FC is increased further, causing the
When the key switch BS is turned ON, the battery generating voltage to increase more. Thus, the batter-
voltage flows to base B for transistor T1 in the regu- ies are recharged.
lator, allowing current to flow from collector C to
emitter E.
Accordingly, field coil FC is grounded through transis-
tor T1.
Alternator Regulator
B L R
RF R3 R4 R5
(R)
BS
R6
D
ZD Monitor
R2
Batteries SC B
E
R1 C
T2
FC B
D1
C E
T1
(F)
(E)
E
SM4056
K L M I
J : ; N ; J :
When the generating voltage increases higher than Then, when the voltage to be applied to zener diode
the set voltage of zener diode ZD, the current from the ZD becomes lower than the set voltage of zener diode
alternator flows through the zener diode to base B for ZD, transistor T2 is turned OFF, turning transistor T1
transistor T2, connecting collector C to emitter E. ON again. Thus, the current is allowed to flow through
Accordingly, the current flowing through base B for field coil FC to increase the generating voltage by
transistor T1 is cut so that transistor T1 is turned OFF. stator coil SC. As this operation is repeated, the
Thereby, the current flowing through field coil FC is alternator generating voltage is maintained at the
cut, causing the SC generating voltage to decrease. specified level.
RF R3 R4 R5
BS
R6
ZD
R2
Batteries SC B
A E
C
T2
FC B
R1
C E
D1 T1
(F)
(E)
E
SM4057
5 > O 4 > O 9 9
When the engine is stopped (key switch is OFF), the While the batteries are being recharged, the generat-
current from key switch terminal M is cut so that ing current from terminal R on the alternator is led to
battery relay is turned OFF. terminal #42 on the monitor, turning the output tran-
The engine does not stop immediately by the key sistor ON for terminal #18 on the monitor.
switch OFF, due to inertia and the alternator contin- Thereby, the battery current is supplied to the mag-
ues to generate electricity. Because the alternator netizing circuit for the anti load dump relay to close the
generating current dose not flow to the batteries, the anti load dump relay (R3).
surge voltage (Voltage rise) is developed in the cir- Accordingly, even if the key switch is turned OFF
cuit. This is the cause of failure of electrical parts and while the engine is running, the battery current can be
components. supplied through the anti load dump relay (R3) to
On account of this, the surge voltage prevention magnetize the battery relay, holding the battery relay
circuit has been provided. ON until the alternator stops generating.
Key Switch
Batteries
To Monitor
(#18)
Battery
To Monitor
Relay
(#42)
Fuse
Anti Load Box
Dump
Relay (R3)
" # $
REGULATOR
Alternator
SM6024
3
9 > 9 5
5 !
When the key switch is turned from the ON position to Then, the MC moves the EC motor to the stop position
the OFF position, the signal instructing the MC that causing the engine to stop.
the key switch is ON is cut.
Key Switch
Batteries
Fuse
Box
Fuse Box
REGULATOR
MC (Power Source)
MC (EC Motor)
MC (Power ON Signal)