Professional Documents
Culture Documents
Indra: Detail Pre-Commissioning Procedure For Service Test of IA For Unit 040/041/042/043
Indra: Detail Pre-Commissioning Procedure For Service Test of IA For Unit 040/041/042/043
Document Class: Z
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 2 of 11
of Unit 040/041/042/043 S-000-1730-0812M
CONTENTS
1 INTRODUCTION .................................................................................................................................. 3
2 REFERENCE DOCUMENTS ............................................................................................................... 3
3 DEFINITIONS ....................................................................................................................................... 3
4 ABBREVATIONS ................................................................................................................................. 4
5 SCOPE OF APPLICATION.................................................................................................................. 4
6 HSE....................................................................................................................................................... 4
7 TRAINING AND COMPETENCY OF PERSONNEL............................................................................ 5
8 ROLES AND RESPONSIBILITIES ...................................................................................................... 5
9 IMPLEMENTATION OF SERVICE TESTOF PIPELINES ................................................................... 7
10 ACCEPTANCE CRITERIA ................................................................................................................. 11
11 POST WORK ...................................................................................................................................... 11
12 ATTACHMENTS................................................................................................................................. 11
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 3 of 11
of Unit 040/041/042/043 S-000-1730-0812M
1 INTRODUCTION
This document provides a general method for the Service Test of IA for Unit 040/041/042/043 by
separate to Section A is Service Test for common Utility header (IA) of Unit 040/042/043 and Section
B is Service Test for common Utility header(IA) of Unit 041. The Service test is a method of test, used
for checking of leaks at Equipment or of piping systems. Prior to the Mechanical Completion
activities, systems are subjected to a Service test such that it prevents any uncontrollable leakage of
process fluids. It is carried out after hydrostatic or pneumatic test (pressure test) these tests may also
2 REFERENCE DOCUMENTS
3 DEFINITIONS
Employer
Nghi Son Refinery and Petrochemical Limited Liability Company
Contractor
A Joint Venture formed by JGC Corporation, Chiyoda Corporation, GS Engineering &
Construction Corporation, SK Engineering & Construction Co., Ltd., Technip France and
Technip Geoproduction (M) Sdn. Bhd.
JVD
Contractor's Joint Venture Directorate
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 4 of 11
of Unit 040/041/042/043 S-000-1730-0812M
4 ABBREVATIONS
5 SCOPE OF APPLICATION
The scope of this document is the Service test of IA for Unit 040/041/042/043 by separate to Section
A is Service Test for common Utility header (IA) of Unit 040/042/043 and Section B is Service Test for
common Utility header (IA) of Unit 041. The Utility piping of this unit shall be subjected to a gross air
leak test prior to mechanical completion of the unit, it will also be subjected to Inerting during the
commissioning phase and there shall be separate procedures for these activities.
6 HSE
The following HSE risks are inherent in Tightness Test. All personnel shall give top priority to the
management of health, safety and the environment (HSE). All work shall be undertaken in a
responsible manner giving full consideration to the impact of the activities may have on health, safety,
Specific Health and Safety requirements for this Pre-commissioning Procedure are:
Analysis (JHA), Risk Assessment (RA), and Tool Box Talk shall be carried out.
2. Appropriate Personal Protective Equipment (PPE) as determined by the JHA and Risk
Assessment which shall be worn by all personnel assigned to execute these activities.
4. If motorized equipment is used, refuelling shall not take place while equipment is running.
5. If electric tools are used, they shall be powered either by a 110-volt supply or by battery.
6. Additional safety precautions are provided in the specific Tightness Test for the system.
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 5 of 11
of Unit 040/041/042/043 S-000-1730-0812M
All activities covered in this Procedure shall be performed only by qualified and competent personnel.
In addition, all personnel must have completed the HSE training. If sub-contractors or persons, other
than commissioning personnel, will assist in the execution of activities covered by this
Pre-commissioning procedure then those person(s) also shall attend HSE training and meet the
requirements for the HSE standard. Additionally, a qualified and competent commissioning
supervisor shall indoctrinate the sub-contractor or person(s) in the Tightness Test philosophy and
methodology.
Commissioning Engineer/Manager
Construction Representative
Commissioning Manager
commissioning operations.
operations.
3. Vendor mobilisation plan will be made and HSE induction will be coordinated upon their arrival
to site.
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 6 of 11
of Unit 040/041/042/043 S-000-1730-0812M
Pre-Commissioning Engineer
1. Responsible for the safety of all personnel assigned to him, ensuring that the JHA, applicable
permits and control measures are in place prior to applying the method statement.
3. Responsible for supporting the testing team & for setting all applicable test requirement and
conditions.
4. Responsible for ensuring all resources, tools, test equipment etc., are available at the test
site.
5. Responsible for coordinating the works with other parties that may be required and parties
Operators
1. Responsible for ensuring that the work as outlined in the method statement is performed
2. Responsible for preparing the equipment, system for testing or activities as outlined in this
method statement.
3. Responsible for executing the tests/activities as outlined in the method statement and as
(discipline) Engineer.
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 7 of 11
of Unit 040/041/042/043 S-000-1730-0812M
During site installation of the equipment, piping is pre-cleaned by flushing, blowing or hydro-jetting,
Service Test of IA for Unit 040/041/042/043 by separate to Section A is Service Test for common
Utility header (IA) of Unit 040/042/043 and Section B Service Test for common Utility header (IA) of
Unit 041 refer to attached P&ID’s Mark-up. The Service test shall be carried out.
This test is performed for all the hydrocarbon and utility piping systems using Air. This is done to
confirm the integrity of the Joints, Flange Gaskets, Glands and Packing of valves. Here the
system is pressurized with injection of Compressed air and then checked for leaks at all possible
points of leakage. This test is carried out at 7 barg or at the system operating pressure whichever
is less.
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 8 of 11
of Unit 040/041/042/043 S-000-1730-0812M
This test is performed for smaller systems using Nitrogen in place of Air. This test is performed for
Nitrogen-Helium Service Testis one of the Specialized test procedure normally performed by a
Specialized contractor. This test is performed for hydrocarbon systems only. Helium Service Test
will use 99% Nitrogen and 1 % Helium as tracer gas. A calibrated Mass Spectrometer will be used
to detect the helium tracer gas. The Helium Service Test will be carried out at 90% of system
design pressure and will be performed after the normal Gross Air tightness test. After the Service
Testis performed, the system will be depressurized to 1 barg pressure to keep the system inerted
This test is performed on low pressure systems generally utilities, where the actual operating fluid
9.4 Procedure
1. Method of Testing
System is pressurized with injection of compressed air or nitrogen and then checked for leaks at all
Detection of leakage is by application of a leak detection solution (such as soap solution) and the
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 9 of 11
of Unit 040/041/042/043 S-000-1730-0812M
2. Test Pressure
Instrument air or nitrogen at available pressure, approx 7 barg, is used to pressurize the system.
a) For systems where normal operating pressure is 7 barg or lower, Test pressure is
b) For Systems where normal operating pressure is higher than 7 barg, test pressure
shall be 7 barg. That is to say, that if leaks do not appear at a pressure of 7 barg, leaks
3. Precaution
The over-pressure protection of the system must be put in service. PSV discharge
outlets shall be routed to a safe location with adequate bracing and barricading to
4. Planning
1. Equipment and associated pipelines must be grouped according to their normal operating
2. Systems subjected to system leak tests must be clearly marked on P&ID including the following
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 10 of 11
of Unit 040/041/042/043 S-000-1730-0812M
items:
Test Pressure
5. Preparation
Flanges with diameter of 6" or larger is wrapped with masking tape to check for
In accordance with the test plan, CONTRACTOR checks the tested portions and
Drain free water from system prior to the test so that foaming or bubbling action of
6. Implementation
2. Maintain system under the test pressure until the test has been completed.
4. Any leakage points found during the test shall be re-tightened until the bubble formation
stops. If leak cannot be stopped, system or part of system will be depressurized and the
joint or connection shall be remade after inspection for physical damage and then
re-tested.
D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0
Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 11 of 11
of Unit 040/041/042/043 S-000-1730-0812M
10 ACCEPTANCE CRITERIA
1. Any criteria given by Vendor/Licensor with regard to leakage, the test result shall fall within this
criterion.
2. If foam or bubbles are not visually detected, the test is accepted as tight.
Note: Depending on the service, small leakage from valve glands may be acceptable
11 POST WORK
1. After the system passes the Tightness test, the system shall be depressurized or left with a small
3. Signing of the test document by CONTRACTOR 's supervisor and EMPLOYER 's witness shall be
4. Test Log sheets shall be signed by the Contractor and Employer and handed over to the
Company.
12 ATTACHMENTS
D R A
IN
10-SE
P - 2 0 15
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 1 of 21
127(6
PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 0.74 MPa(g)
3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03DJ
TEST POINT
7(6732,17
FULLY
)8//<23(1OPEN
CLOSE
&/26(
TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE
(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6
35(3$5(' $33529('
1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<
7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0
TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(
N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 2 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
040-IA-01
040-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 3 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
040-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 4 of 21
040-IA-01
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
040-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 5 of 21
040-IA-01
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
040-IA-01
040-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 6 of 21
040-IA-01
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 7 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
040-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 8 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
042-IA-01 040-IA-01
042-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 9 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
042-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 10 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
042-IA-01
TEST POINT
042-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 11 of 21
042-IA-01
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 12 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
042-IA-01 042-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 13 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
042-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 14 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
040-IA-01
D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 15 of 21
NSRP ComplexPERMANENT
Project (JOB No. 0-6495-20)
LINE
DOCUMENT CLASS :
SUBJECT Z TO
ISSUE PURPOSE : FOR APPROVAL
SERVICE TEST
RESULT CODE : A, B, R, F ( )
Review Date : ( )
043-IA-01 VM215A-002-A-105-29
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION
D R A 043
A1
0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 5
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 16 of 21
SERVICE TEST )
NEXT STATUS : FA, FR, FI, FC, AB (
RESUBMISSION DATE : ( )
Review Date :
TEST POINT
( )
VM215A-002-A-105-12
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION
D R A 043
A1
0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 5
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 17 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
RESUBMISSION DATE : ( )
Review Date : ( )
NSRP
VM215A-002-A-
VM215A-002-A-105-24
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION
D R A 043
A1
0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 5
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 18 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
RESUBMISSION DATE : ( )
Review Date : ( )
NSRP
VM215A-002-A-
VM215A-002-A-105-20
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION
D R A 043
A1
0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 6
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 19 of 21
RESUBMISSION DATE : ( )
Review Date : ( )
NSRP
VM215A-002-A-
VM215A-002-A-105-13
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION
D R A 043
A1
0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 6
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 20 of 21
PERMANENT LINE
SUBJECT TO
SERVICE TEST
TEST POINT
RESUBMISSION DATE : ( )
Review Date : ( )
NSRP
VM215A-002-A-
VM215A-002-A-105-22
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION
D R A 043
A1
0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 6
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 21 of 21
RESUBMISSION DATE : ( )
TEST POINT
RESPONSIBLE DEPT./ PERSON : ( )
Review Date : ( )
NSRP
VM215A-002-A-
VM215A-002-A-105-25
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION
D R A 043
A1
0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 6
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
1 Package No. : 041-IA-01-SV-1 Page127(6
1 of 9
SECTION B UNIT 041
3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03DJ
PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 7.4 BARG
3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03DJ
TEST POINT
7(6732,17
FULLY
)8//<23(1OPEN
CLOSE
&/26(
TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE
(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6
35(3$5(' $33529('
1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<
7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0
TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(
N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
2 Package No. : 041-IA-01-SV-1 Page 2 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BL
NOTE 2 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TPM SK
041 COMMON 041 041 041 041 041 0014V AND D-000-1225-0020V TO 0026V.
AA FAULT PI FI 041
PT PG FT
FE ICPA-041-UI-011
FRESH COOLING 0351 0351 0351 0352 0351 0351 FRESH COOLING
0351 MIN
A WATER SUPPLY
16"-CWS-041-3001-A2AW-NI 16"-CWS-141-3026-A2AW-NI
WATER SUPPLY
1. DELETED. A
041-3002M 141-3012S
2. ORIFICE WITH 276.7 MM HOLE.
TO UNIT 041 041 H 041 NOTE 9 FROM INTERCONNECTING
AI AT 1'' 3. ORIFICE WITH 182.1 MM HOLE.
0351 041 041
0351 NPIC-041-E-0109M PG TG
TP HC ICPA-041-UO-001 4. ORIFICE WITH 248.5 MM HOLE.
FRESH COOLING M5 NPIC-041-E-0105M 0359 0357 FRESH COOLING
0.75" - 150# MIN NPIC-041-E-0105M
WATER RETURN NPIC-041-E-0161M WATER RETURN 5. ORIFICE WITH 26.46 MM HOLE. NPIC-041-E-0162M
16"-CWR-041-3001-A2AW-NI RF NOTE 6 16"-CWR-141-3026-A2AW-NI
041-3002M 141-3012S
6. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
FROM UNIT 041 0.75"-WO-041-0007-A2AW-NI TO INTERCONNECTING
NPIC-041-E-0106M NOTE 7 NPIC-041-E-0106M 1'' 7. FLOW TRANSMITTER 041-FT-0352A TO MEASURE LP STEAM TO
B NPIC-041-E-0161M 041
FI
041
NOTE 3
ICPA-041-UI-015 INTERCONNECTING. FLOW TRANSMITTER 041-FT-0352B TO B
041 041 041 041 041 FT MEASURE LP STEAM FROM INTERCONNECTING.
PI TI 0352A 0352A 041 ICPA-041-UI-005 NPIC-041-E-0106M
PT PG TT 041
WO 0353 0353 0354 0351 0351 FI
041 FE
NPIC-041-E-0113M 1" 8. MULTITAP ORIFICE FLANGES (041-OR-0352 , 041-ORJ-0352), ORIFICE
FT 0352
LP STEAM 0352B 0352B LP STEAM FLANGE WITH JACK SCREW (041-ORJ-0352) SHALL BE LOCATED AT
10"-LPS-041-3001-A1AS-HS NOTE 8 10"-LPS-141-3006-A1AS-HS
041-3103M 141-3002S DOWNSTREAM OF ORIFICE PLATE
FROM / TO UNIT 041 MIN FROM / TO INTERCONNECTING 9. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-052
0.75" 0.75" 0.75"
NOTE 4 NPIC-041-E-0113M
041 041 041 041 041 041 041 MIN
TT TI FI FT 041 PG PT PI ICPA-041-UI-014
C 0353 0353 0353 0353 FE
0353
0356 0355 0355 1.5"
ICPA-041-UI-004 PERMANENT LINE C
MP STEAM MP STEAM
14"-MPS-041-3001-B1AS-HS 14"-MPS-141-3002-B1AS-HS SUBJECT TO SERVICE
041-3103M 141-3002S
TEST
TO UNIT 041 MIN FROM INTERCONNECTING
1'' 1'' 1'' TEST POINT
041 MIN
PG ICPA-041-UI-002
0360
DB MIN
HP BOILER FEED WATER HP BOILER FEED WATER
3"-HBFW-041-3001-M2AS-HS 3"-HBFW-141-3002-M2AS-HS
041-3201M 141-3012S
D TO UNIT 041 MIN FROM INTERCONNECTING
D
0.75" 0.75" 0.75" 0.75"
041 MIN
PG
0361 ICPA-041-UI-006
MIN
SERVICE WATER SERVICE WATER
3"-SVW-041-3001-A2AW-NI 3"-SVW-141-3005-A2AW-NI
041-3301M 141-3012S
DR01A
Contractor DWG.No. Sheet Rev.
A1
IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
3 Package No. : 041-IA-01-SV-1 Page 3 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
TO FLARE HEADER
INSTRUMENT AIR
TO CBD HEADER
1. FOR PRESSURE TEST.
TO 041-P-301A/B
TO 041-P-303A/B
TO 041-P-302A/B
041-0032M
041-0031M
041-3702M
041-0030M
041-3503M
041-0032M
041-0029M
041-0028M
041-0030M
041-1301M
041-1001M
041-1001M
A A
TO 041-AS-001
TO 041-AS-001
HP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
N
TO 041-V-301
TO 041-V-301
TO BL AREA
TO BL AREA
TO BL AREA
2. FOR START UP.
PERMANENT LINE
AT GRADE
AT GRADE
EL.158300
EL.108000
US-013
US-014
US-021
US-023
SUBJECT TO SERVICE
1"-LPN-041-3011-A1AA-NI
2"-IA-041-0003-S0RA-NI
1"-LPN-041-0028-A1AA-NI
0.75"-LPN-041-0022-A1AA-NI
0.75"-LPN-041-3026-A1AA-NI
0.75"-LPN-041-0021-A1AA-NI
0.75"-LPN-041-0020-A1AA-NI
0.75"-LPN-041-3007-A1AA-NI
0.75"-LPN-041-0023-A1AA-NI
0.75"-LPN-041-0024-A1AA-NI
2"-HPN-041-0005-D1AA-NI
2"-LPN-041-0010-A1AA-NI
NPIC-041-E-0163M
TEST
HC HC HC HC
TEST POINT
B B
0.75"
EL.146300
0.75"-PA-041-3032-A2AA-NI
0.75"-PA-041-3033-A2AA-NI
0.75"-PA-041-3039-A2AA-NI
HC US-020
2"-PA-041-3031-A2AA-NI
EL.137700
0.75"-PA-041-3038-A2AA-NI
0.75"-PA-041-3041-A2AA-NI
HC US-019
NOTE 2
NOTE 1
EL.127750
0.75"-PA-041-3037-A2AA-NI
NPIC-041-E-0153M
C HC US-018 C
EL.116950 MIN
0.75"-PA-041-3036-A2AA-NI
NPIC-041-E-0153M
HC US-017
EL.107900
0.75"-PA-041-3035-A2AA-NI
MIN 2" HC US-016 MIN MIN
MIN NPIC-041-E-0153M
NPIC-041-E-0129M
MIN
D AT GRADE NPIC-041-E-0163M 0.75" D
1"-LPN-041-3022-A1AA-NI
0.75"-PA-041-3042-A2AA-NI
MIN
HC US-024 2"
MIN EL.108500
0.75"-PA-041-3040-A2AA-NI
HC US-022
NPIC-041-E-0129M 0.75"
MIN
PLANT AIR LPT PLANT AIR
2"-PA-041-3001-A2AA-NI 2"-PA-041-3001-A2AA-NI
041-3602M 041-1301M
E E
TO UNIT 041 FROM BL
1. DELETED.
LPT
MIN
LP NITROGEN LP NITROGEN
2"-LPN-041-3001-A1AA-NI 2"-LPN-041-3001-A1AA-NI
041-3602M 041-1301M
FEED DWG.No.
TO UNIT 041 FROM BL
G 0.75" G
LPT
NPIC-041-E-0129M
HP NITROGEN HP NITROGEN DWG.No. Title
2"-HPN-041-3001-D1AA-NI 2"-HPN-041-3001-D1AA-NI
041-3602M 041-1301M REFERENCE DRAWINGS
MIN 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
TO UNIT 041 FROM BL
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0129M 0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
NPIC-041-E-0153M B - NOT ISSUED DMO RKM SMA
H MIN A - NOT ISSUED DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75"-PA-041-3044-A2AA-NI
MIN REVISIONS
MIN
2"-LPN-041-3030-A1AA-NI Operation Centre JOB Code:
NPIC-041-E-0153M Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
0.75"
MIN
MIN
MIN
0-6495-20 TPM
0.75"-PA-041-3045-A2AA-NI
MIN Prepared by Checked by Approved by
2"-PA-041-3048-A2AA-NI
I I
MIN
0.75"
NPIC-041-E-0142M
NPIC-041-E-0153M
NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Limited Liability Company
0.75"-LPN-041-2003-A1AA-NI
Nghi Son, Vietnam
1"-LPN-041-0008-A1AA-NI
1"-LPN-041-0011-A1AA-NI
1"-PA-041-0004-A2AA-NI
1"-PA-041-0003-A2AA-NI
Drawing Title
US-038
UNIT 041
INSTRUMENT AIR, PLANT AIR AND NITROGEN - 3
041-0101M
041-0102M
041-2206M
TO 041-P-615A/B
041-0101M
041-0102M
FOR CONSTRUCTION Z
LP NITROGEN
LP NITROGEN
LP NITROGEN
TO 041-V-612
TO 041-V-615
TO 041-V-612
TO 041-V-615
K K
PLANT AIR
PLANT AIR
DR01A
Contractor DWG.No. Sheet Rev.
A1
IN
10-SE
5
P-2 1 2 3 4 5 6 7
8
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
9
10 11 12 13 14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
4 Package No. : 041-IA-01-SV-1 Page 4 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
SIZE: 2H3 SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 510 mm / 6100 mm / 83 m² 3. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
PSET: 2.00 MPa(g) DESIGN DUTY 463 kW D-041-1225-2401M.
041 FREE DRAINING 6''-FLG-041-0051-A1AP-NI FLG SIDE SHELL TUBE
PSV 4. START-UP BY-PASS.
0306 041-3503M 2.00 MPa(g) + FV @ 120 °C
DESIGN PRESSURE 1.55 MPa(g) 5. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
NOTE 5
0.34 MPa(g) @175 °C AND FV @ 175 °C.
DESIGN TEMPERATURE 120 °C 76 °C
INSULATION TYPE NI NI 6. TO BE LOCATED CLOSE TO BATTERY LIMIT ISOLATION VALVES.
MIN
4"-P-041-0231-B1AP04-NI
8. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO
FREE DRAINING
PREVENT OVERPRESSURE DUE TO EXTERNAL FIRE AT THE
2"
COOLER.
NPIC-041-E-0109M
NPIC-041-E-0105M
9. ORIFICE WITH 80.55 MM HOLE.
TO ATM 10. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
ISOMERATE
6"-P-041-0118-B1AP04-NI AT SAFE LOCATION
041-0031M 11. LOCATED IN ANALYSER SHELTER 041-AS-001.
(V)
FROM 041-P-301A/B
C SIZE: 0.75D1 12. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-016.
C
PSET: 1.55 MPa(g) 13. 041-LT-0311 LOW LEVEL ALARM DISCRETE SIGNAL TO DRCS.
NPIC-041-E-0101M 041
TSV NPIC-041-E-0141M
0307
FREE DRAINING
1"-V-041-0017-A1AP-NI 1"-V-041-0024-A1AP-NI
PERMANENT LINE
0.75'' NPIC-041-E-0109M
SUBJECT TO SERVICE
1" 041-IA-01 TEST
1" - 150# 1" - 150#
FREE DRAINING
RF
D IA 22"-IA-041-0003-S0RA-NI
IA 041 0003 S0RA NI
FF
TP
TP
TP 1"-CWR-041-0018-A2AW-NI CWR TEST POINT D
AT GRADE 041-3603M M1 M9 041-3002M
041 TO SAFE LOCATION
TG 0.75'' 041-AS-001
0332
CWR 6"-CWR-041-0007-A2AW-NI NOTE 8 RS ANALYSER SHELTER
1" - 150# 1" - 150#
NOTE 12
041-3002M 041-E-301 RF
RF
0.75'' 6"-CWR-041-0017-A2AW-NI LPN 1"-LPN-041-0028-A1AA-NI TP TP 1"-CWS-041-0019-A2AW-NI CWS
041-3603M M2 TP TP M8 041-3002M
CWS 6"-CWS-041-0008-A2AW-NI NOTE 8 RS M6 M3
E 041-3002M
E
0.75''
1" - 150# 1" - 150#
RF RF A. DELETED.
6"-CWS-041-0018-A2AW-NI
0.75'' 041 041 H
041
TT TI FV 1"-WO-041-0008-A2AP-NI
0307 0307 0301
6"
FC
0.75'' 3" NC
FREE DRAINING
F NOTE 7 F
WO
0.75''
1"-CBD-041-0048-A2AP-NI
NPIC-041-E-0092M 6" 0.75''
0.75'' CBD
NC
041-3702M
4"-P-041-0232-B1AP04-NI FEED DWG.No.
G NOTE 4 G
DEISOHEXANIZER BOTTOMS
2"-P-041-0116-B1AP04-NI
041-0028M
953053-120-28-A1 ISOMERATE PRODUCT
FROM 041-E-303 DWG.No. Title
NPIC-041-E-0092M
REFERENCE DRAWINGS
REGENERANT
3"-P-041-0044-B1AP04-NI 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-0006M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
FROM 041-E-011A/B
0.75'' B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H LIGHT NAPHTHA
1"-P-041-0149-B1AP04-NI
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-0008M Rev Date Description Prep'd Chk'd App'd
SAMPLE RETURN REVISIONS
FROM MOISTURE ANALYSER Operation Centre JOB Code:
SIGNAL
NOTE 3
FLG 041 Operation Centre DWG.No.:
041-0029M SC Contractor JOB Code Responsible Company
041-3503M 0010 0-6495-20 TPM
FROM 041-LI-0311 TYPE L2
041 H Prepared by Checked by Approved by
041 041
FIC TI TT T. T. HUONG T. NGUYEN T. N. SON
0308 NOTE 9 0308 0308
I 041
FV 041 041
H I
0308 FE FT 041 041 NOTE 10
0308 0308 AI
ISOMERATE AT INST PIP
4" 0303 0303 RVP
4"-P-041-0062-B1AP04-NI
041-0008M
NOTE 2, 4 NOTE 2 FC LO 6"
NPIC-041-E-0109M
NPIC-041-E-0105M
NOTE 11
0.75" NPT
NSRP
TO 041-DR-001A/B INST PIP Complex Project
0.75'' 3" 0.75'' 0.75'' Nghi Son Refinery and Petrochemical
NPIC-041-E-0092M NOTE 6 NOTE 6
SIGNAL
NPIC-041-E-0141M
NOTE 6 NOTE 6 Nghi Son, Vietnam Limited Liability Company
NOTE 13 041 041 041 041 041 041 041 041 041
NY US NPIC-041-E-0141M UZ US FC UZ US FC UZ US FC UZ US FC
041-0030M
0311 0003 NPIC-041-E-0151M
1000 0309 TSO 1000 0305 TSO 1000 0306 TSO 1000 0308 TSO Drawing Title
DRCS
FROM 041-LI-0311 O O O O
041 0.75'' 041 0.75'' 041 0.75'' 0.75''
J 041
UV UV UV UV
041
UV PIPING AND INSTRUMENT DIAGRAM J
X 0304 0309 0305 0306 0308
REGENERANT C C C
2"-P-041-0046-B1AP04-NI C PENEX
041-0006M
NOTE 1 DEISOHEXANIZER SECTION
TO 041-E-012 0.75'' 0.75'' 0.75'' 0.75''
0.75'' 0.75''
ISOMERATE PRODUCT
DR01A
Contractor DWG.No. Sheet Rev.
A1
IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
5 Package No. : 041-IA-01-SV-1 Page 5 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NPIC-041-E-0129M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
NPIC-041-E-0160M
0014V AND D-000-1225-0020V TO 0026V.
NPIC-041-E-0163M
1. FOR PRESSURE TEST.
TO 041-P-213A/B
041-0025M
041-0023M
A A
LP NITROGEN
LP NITROGEN
N
NPIC-041-E-0129M
TO 041-V-212
AT GRADE
EL.121050
EL.102550
AT GRADE
EL.113900
EL.110000
EL.114000
2. DELETED.
EL. 12400
US-006
US-007
US-008
US-010
US-011
US-012
US-015
US-009
PERMANENT LINE
HC HC HC HC HC HC HC HC SUBJECT TO SERVICE
TEST
0.75"-PA-041-3046-A1AA-NI 0.75"
NPIC-041-E-0160M
TEST POINT
0.75"-LPN-041-0019-A1AA-NI
1"-LPN-041-0005-A1AA-NI
0.75"-PA-041-3014-A2AA-NI
0.75"-PA-041-3017-A2AA-NI
0.75"-PA-041-3016-A2AA-NI
0.75"-PA-041-3015-A2AA-NI
0.75"-PA-041-3018-A2AA-NI
0.75"-PA-041-3019-A2AA-NI
0.75"-PA-041-3034-A2AA-NI
B B
0.75"
MIN
NPIC-041-E-0160M
MIN
C 0.75" C
MIN
041-IAH-006
1"
2"-PA-041-3003-A2AA-NI
041-IAH-005
1"
2"-IA-041-3003-S0RA-NI
2 IA 041 3003 S0RA NI
D D
NPIC-041-E-0117M
MIN
1.5"
NPIC-041-E-0153M
MIN
MIN
PLANT AIR PLANT AIR
2"-PA-041-3001-A2AA-NI 2"-PA-041-3001-A2AA-NI
041-3601M 041-3603M
MIN
MIN
TO UNIT 041 FROM BL
E NPIC-041-E-0129M NPIC-041-E-0129M
E
A. DELETED.
F F
NPIC-041-E-0146M
MIN
MIN
LP NITROGEN LP NITROGEN
2"-LPN-041-3001-A1AA-NI 2"-LPN-041-3001-A1AA-NI
041-3601M 041-3603M
MIN
MIN
NPIC-041-E-0129M
TO UNIT 041 FROM BL
FEED DWG.No.
G G
HP NITROGEN HP NITROGEN
2"-HPN-041-3001-D1AA-NI 2"-HPN-041-3001-D1AA-NI
041-3601M 041-3603M
MIN
TO UNIT 041 FROM BL DWG.No. Title
22"-IA-041-3006-S0RA-NI
IA 041 3006 S0RA NI
NPIC-041-E-0149M
REFERENCE DRAWINGS
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
2"
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0117M
MIN
MIN
Operation Centre DWG.No.:
2"-LPN-041-0001-A1AA-NI
MIN
NPIC-041-E-0160M
I I
MIN
0.75"-LPN-041-3024-A1AA-NI
0.75"-PA-041-3020-A2AA-NI
0.75"-PA-041-3022-A2AA-NI
0.75"-PA-041-3024-A2AA-NI
0.75"-PA-041-3023-A2AA-NI
0.75"-PA-041-3043-A2AA-NI
MIN
1"-LPN-041-3016-A1AA-NI
0.75" NSRP
MIN
Complex Project
Nghi Son Refinery and Petrochemical
0.75"
Nghi Son, Vietnam Limited Liability Company
1.5"-HPN-041-0001-D1AA-NI
1.5"-LPN-041-0001-A1AA-NI
1"-LPN-041-2001-A1AA-NI
1"-LPN-041-2002-A1AA-NI
1"-LPN-041-3036-A1AA-NI
Drawing Title
1"-IA-041-2001-S0RA-NI
1"-IA-041-2002-S0RA-NI
NOTE 1
0
NPIC-041-E-0141M
NPIC-041-E-0153M PENEX UNIT
UNIT 041
HC HC HC HC HC HC INSTRUMENT AIR, PLANT AIR AND NITROGEN - 2
EL.110000
EL.103000
EL.105300
AT GRADE
AT GRADE
AT GRADE
US-033
US-034
US-032
US-036
US-035
US-036
LP INSTRUMENT AIR
LP INSTRUMENT AIR
Issue Purpose Document Class
041-3502M
041-0002M
041-2101M
041-2102M
041-3502M
041-0002M
041-2101M
041-2102M
TO FLG HEADER
TO FLG HEADER
TO 041-K-051A/B
TO 041-K-051A/B
FOR CONSTRUCTION Z
TO 041-K-051A
TO 041-K-051B
TO 041-K-051A
TO 041-K-051B
HP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
DR01A
Contractor DWG.No. Sheet Rev.
A1
IN
10-SE
5
P-2 1 2 3 4 5 6 7
8
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
9
10 11 12 13 14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
6 Package No. : 041-IA-01-SV-1 Page 6 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
FREE DRAINING FLG A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.
LO 041-3502M
1. FOR PROCESS DETAILS, REFER TO DWG. D-041-1225-0002M.
A 0.75" A
2. TO BE LOCATED OUTSIDE COMPRESSOR SHELTER.
FREE DRAINING
1"-FLG-041-2013-A1AP-NI 4. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO PREVENT
AN OVER PRESSURE DUE TO OVER HEATING.
0.75"-CWS-041-2005-A2AW-NI
0.75"-CWS-041-2006-A2AW-NI
2 17/JUN/15 FOR CONSTRUCTION TTH TN TNS
0.5"-CWR-041-2026-A2AW-NI
FREE DRAINING
0.5-CWR-041-2004-A2AW-NI
1 31/MAR/15 FOR CONSTRUCTION TTH TN TNS
0 26/NOV/14 FOR CONSTRUCTION TTH DM TNS
041
H SG
A 20/MAY/14 FOR REVIEW TTH DM JMD H
NOTE 7 Rev Date Description Prep'd Chk'd App'd
6531
AT GRADE REVISIONS
IN VIEW
TO SAFE LOCATION Operation Centre JOB Code:
0.75" Operation Centre DWG.No.:
(V) (V)
0.75" - 150#
0.75" - 150#
CWR Contractor JOB Code Responsible Company
0.5" - 150#
0.5" - 150#
TP TP TP
SG 0-6495-20 TPM
041-3002M 10A 30A 25A
RF
RF
RF
RF
NOTE 4 Prepared by Checked by Approved by
1"-CWR-041-2003-A2AW-NI 1" - 150# T. T. HUONG T. NGUYEN T. N. SON
NPT NPIC-041-E-0164M
RF 1.5" - 150#
1"-WO-041-2028-A2AP-NI 1" 1"
RF
I NPT NPT
TP TP TP TP TP NOTE 6 1.5"-CWS-041-2034-A2AW-NI CWS I
FREE DRAINING
1"-WO-041-2001-A2AP-NI 19 18 16 17 28 041-3002M
FREE DRAINING
FREE DRAINING
29
WO WO 1"
PENEX
FREE DRAINING
1"-150# MAKE-UP GAS SECTION
RF
041
INTERFACE DRAWING OF 041-K-051A
DRAINING
1"-WO-041-2025-A2AP-NI SG NOTE 5
6580
FREE
IN VIEW AT GRADE
TO SAFE LOCATION Issue Purpose Document Class
NOTE 8 0.75"
(V) (V) FOR CONSTRUCTION Z
CWR
K TP
12
SG
041-3002M
Unit No. Unit Abbreviation PCWBS Size Scale K
NOTE 4 041 PENX A900 A1 NONE
WO 1" - 150# 1"-CWR-041-2001-A2AW-NI
DR01A
RF NPT Contractor DWG.No. Sheet Rev.
A1
IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
7 Package No. : 041-IA-01-SV-1 Page 7 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
B B
PERMANENT LINE
FREE DRAINING
1"-FLG-041-2015-A1AP-NI SUBJECT TO SERVICE
TEST
1" - 150# TEST POINT
RF
NPIC-041-E-0164M
NOTE 5 SG
041
6571
NSRP
Complex Project
AT GRADE IN VIEW Nghi Son Refinery and Petrochemical
TO SAFE LOCATION Nghi Son, Vietnam Limited Liability Company
0.75"
(V) (V)
CWR 1"-CWR-041-2002-A2AW-NI TP Drawing Title
SG TP TP
041-3002M 10B 30B
NOTE 4 25B
J 1" - 150# PIPING AND INSTRUMENT DIAGRAM J
NPT RF PENEX
1"-WO-041-2029-A2AP-NI 1" 1"-WO-041-2002-A2AP-NI 1"
NPT NPT MAKE-UP GAS SECTION
FREE DRAINING
FREE DRAINING
DR01A
WO WO Contractor DWG.No. Sheet Rev.
A1
IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
8 Package No. : 041-IA-01-SV-1 Page 8 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NPIC-041-E-0162M
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.
TO AIR RESERVOIR
TO AIR RESERVOIR
AT GRADE
AT GRADE
ATGRADE
EL.117800
EL.117800
EL.118500
ATGRADE
ATGRADE
INSTRUMENT AIR
INSTRUMENT AIR
2. FOR START-UP.
US-001
US-002
US-003
US-004
US-039
US-003
US-004
US-005
TO CCB HEADER
TO CBD HEADER
TO FLG HEADER
TO 041-R-101A/B
TO 041-P-203A/B
TO 041-P-202A/B
041-0024M
041-3401M
041-0024M
041-3701M
041-3701M
041-0012M
041-3501M
041-0015M
041-0015M
041-0016M
041-0015M
041-0016M
041-0022M
041-0023M
041-0015M
041-0015M
TO FG HEADER
TO 041-R-101A
TO 041-R-101B
TO 041-R-101A
TO 041-R-101B
(041-R-101A/B)
(041-R-101A/B)
HP NITROGEN
HP NITROGEN
TO 041-TK-211
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
TO 041-P-212
TO 041-A-111
3. PLANT AIR FOR TANK MIXING.
PLANT AIR
HC HC HC HC HC HC HC HC 4. SPARE IAH NPIC-041-E-0162M
NPIC-041-E-0149M
PERMANENT LINE
0.75"-PA-041-3008-A2AA-NI
0.75"-LPN-041-3029-A1AA-NI
0.75''-PA-041-3009-A2AA-NI
0.75''-PA-041-3011-A2AA-NI
0.75''-PA-041-3006-A2AA-NI
0.75"-LPN-041-3008-A1AA-NI
0.75"-LPN-041-0018-A1AA-NI
0.75"-LPN-041-3012-A1AA-NI
0.75"-LPN-041-3023-A1AA-NI
0.75''-PA-041-3007-A2AA-NI
0.75"-LPN-041-0002-A1AA-NI
0.75''-LPN-041-3019-A1AA-NI
0.75"-LPN-041-0014-A1AA-NI
0.75"-LPN-041-0017-A1AA-NI
0.75"-LPN-041-3017-A1AA-NI
0.75"-IA-041-0001-S0RA-NI
IA 041 0001 S0RA NI
1.5"-LPN-041-0003-A1AA-NI
1.5"-LPN-041-0004-A1AA-NI
1.5"-HPN-041-0002-D1AA-NI
1.5"-HPN-041-0003-D1AA-NI
0.75"-LPN-041-0016-A1AA-NI
SUBJECT TO SERVICE
1"-LPN-041-3010-A1AA-NI
TEST
B B
NOTE 3
NOTE 2
NOTE 2
NOTE 1
NOTE 1
TEST POINT
0.75
0.75
0.75"
MIN
MIN
2"
MIN MIN
MIN
MIN
C NPIC-041-E-0153M
MIN
MIN C
NPIC-041-E-0129M
0.75"
MIN
1"-PA-041-3005-A2AA-NI
2"-LPN-041-0016-A1AA-NI
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
0.75"
D D
NPIC-041-E-0153M 0.75"
NPIC-041-E-0153M
NPIC-041-E-0153M
MIN
MIN
MIN
MIN
PLANT AIR
2"-PA-041-3001-A2AA-NI
041-3602M
NPIC-041-E-0128M
MIN
NPIC-041-E-0153M FROM BL
0.75"
E NPIC-041-E-0153M
E
MIN 2"-LPN-041-3033-A1AA-NI 0.75" 0.75"
A. DELETED.
NPIC-041-E-0129M NOTE 4 LPT LPT
NPIC-041-E-0162M 041-IAH-014 041-IAH-013 041-IAH-009 041-IAH-012 041-IAH-008 041-IA-01 1. DELETED.
1" NPIC-041-E-0117M
MIN 1" 1" 1" 1" 1" 2. DELETED.
MIN
INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI
2 IA 041 3001 S0RA NI 3. DELETED.
041-3602M
NPIC-041-E-0162M
NPIC-041-E-0128M
2"-LPN-041-3018-A1AA-NI
FROM BL 4. DELETED.
0.75"
F F
041-IAH-015
1"
MIN
MIN
LP NITROGEN
2"-LPN-041-3001-A1AA-NI
041-3602M
MIN
MIN
MIN
FROM BL
NPIC-041-E-0128M 0.75"
041-IAH-019
1"
FEED DWG.No.
G G
MIN
MIN
HP NITROGEN
2"-HPN-041-3001-D1AA-NI
041-3602M
MIN AT GRADE
0.75"-LPN-041-0012-A1AA-NI FROM BL
041-IAH-020
0.75''-PA-041-3028-A2AA-NI DWG.No. Title
0.75" HC US-027 1" REFERENCE DRAWINGS
NPIC-041-E-0128M MIN LP NITROGEN
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
041-0004M
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
TO 041-DR-051A/B 0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
0.75" MIN
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 2" H
041-IAH-010
A 13/JUL/13 FOR REVIEW DMO RKM SMA
1"
2"-IA-041-3004-S0RA-NI
Rev Date Description Prep'd Chk'd App'd
LPT 0.75"-LPN-041-3020-A1AA-NI
2"-LPN-041-3006-A1AA-NI
NPIC-041-E-0117M REVISIONS
EL.108050 NPIC-041-E-0149M
MIN 0.75''-PA-041-3029-A2AA-NI EL.110000 Operation Centre JOB Code:
2"-LPN-041-3031-A1AA-NI HC US-028 2"
NPIC-041-E-0129M
MIN
2"-PA-041-3027-A2AA-NI
NPIC-041-E-0149M
MIN
MIN
MIN
041-IAH-017
0-6495-20 TPM
NPIC-041-E-0129M
0.75" 1"
0.75"-LPN-041-3021-A1AA-NI Prepared by Checked by Approved by
NPIC-041-E-0153M
041-IAH-011
1"
075''-PA-041-3012-A2AA-NI
0.75"-LPN-041-0026-A1AA-NI
0.75"-LPN-041-0027-A1AA-NI
0.75"-LPN-041-0015-A1AA-NI
0.75"-LPN-041-3013-A1AA-NI
0.75"-LPN-041-0013-A1AA-NI 0.75"
1.5''-HPN-041-0004-D1AA-NI
MIN
2"-PA-041-3047-A2AA-NI
2"-LPN-041-3005-A1AA-NI
1"-LPN-041-3009-A1AA-NI
075''-LPN-041-3032-A1AA-NI
NPIC-041-E-0162M
041-IAH-018
Nghi Son, Vietnam Limited Liability Company
1"
NPIC-041-E-0160M
0.75"-LPN-041-0025-A1AA-NI
MIN Drawing Title
2"
MIN
J 0.75''-PA-041-3025-A2AA-NI
EL.104000 PIPING AND INSTRUMENT DIAGRAM J
HC US-025
MIN
PENEX
041-IAH-016
1"
NPIC-041-E-0160M 0.75" UNIT 041
0.75"
MIN
MIN INSTRUMENT AIR, PLANT AIR AND NITROGEN - 1
0.75"-LPN-041-3034-A1AA-NI
AT GRADE
0.75''-PA-041-3026-A2AA-NI HC HC HC
HC US-026
ATGRADE
EL. 105100
EL.106500
US-031
NPIC-041-E-0153M
US-040
TO 041-DR-001A/B
TO CBD HEADER
041-0020M
041-0020M
041-0020M
041-0019M
041-3101M
041-3701M
041-3501M
041-0011M
041-0008M
041-3701M
TO FLG HEADER
TO 041-P-201A/B
TO 041-P-001A/B
TO 041-P-201A
TO 041-P-201B
HP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
LP NITROGEN
K K
TO 041-V-201
DR01A
Contractor DWG.No. Sheet Rev.
A1
IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
10 11 12 13 14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
9 Package No. : 041-IA-01-SV-1 Page 9 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
LEAD REACTOR EFFLUENT
8"-P-041-0084-B1AH04-HC 041
041-0014M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TWO PHASE FLOW PSV 041-R-101A
0151 0014V AND D-000-1225-0020V TO 0026V.
FROM 041-E-102A/B (V) 041
0.75"-IA-041-0001-S0RA-NI UZ SIZE: 3J4 1. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
STRIPPING HYDROGEN AIR RESERVOIR 041-IA-01 041 041 PSET: 3.90 MPa(g)
REACTOR
A 4"-P-041-0048-B1AH04-HC
1000
UZ UZ
041 FREE DRAINING 8"-FLG-041-0025-A1AP-NI FLG CODE ASME VIII DIV 1
2.
3.
CATALYST WITHDRAWAL NOZZLE.
FOR PURGE AND PRESSURING.
A
041-0006M 0102 0101
NOTE 4 PSV
IA 0103 041-3501M SIZE: I.D x TT 2500 mm x 12200 mm 4. FOR SULFUR STRIPPING.
FROM 041-H-011
041 3.90 MPa(g) + FV @ 205 °C 5. BLANKETING GAS.
DESIGN PRESSURE
NPIC-041-E-0153M
0
041-3601M
PG
MIN
INST. PIP. 6. LOW RANGE GAUGE USED FOR REACTOR BLANKETING DURING
0113 DESIGN TEMPERATURE 260 °C
(V)
(V 041 041 CRI T LOADING ONLY.
041 041
PI PT
UZ HZA 0.75" 0.75" INSULATION TYPE HC 7. LINE FOR DRY-OUT.
MIN
0109 0109 0103 0101 NP P-041-0288-D1AH04-HC
L 041 041 8. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
1" NC
FREE DRAINING
ULL ULH TRIM SPECIFICATION
S P-041-0331-B1AH04-HC D-041-1225-2401M.
0101 0101
2" NOTE 14
9. 6" x 650 MM PIPING PIECE SAMPLE RECEIVER WITH PIPE SUPPORT
041 041 041 NC 4"-P-041-0165-B1AH04-HC NPIC-041-E-0152M
B 041 S FOR POSSIBLE VIBRATION.
B
MIN
UA HZS UA
041 041 UZY 10. FOR PRESSURE TEST.
0101A 0101 0101B
NOTE 5
USL USH 0101A 041 041
0101 0101 UZY UZV CIRCUIT EMERGENCY CIRCUIT 11. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
0101B 0101
TROUBLE SHUTDOWN TROUBLE PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
COMBINED FEED COIL 1 COIL 2
8"-P-041-0085-B1AH04-HC 8"-P-041-0259-B1AH04-HC SWING ELBOW TO HPN. NPIC-041-E-0115M
041-0014M 12. TO BE USED DURING DRY-OUT OPERATION ONLY.
TWO PHASE FLOW 041
FROM 041-E-103 FI FC 13. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO
0055 TSO 041 REACTORS.
HIC
8"
MIN
14. ALTERNATE DESIGN CONDITIONS DURING HOT HYDROGEN STRIPPING:
NC NOTE 18 0055
1.5"-P-041-0164-B1AH04-NI - PRESSURE: 2.70 MPa(g)
C 0.75"
041
FT
041
FE
NOTE 3 041
- TEMPERATURE: 315 °C C
0055 0055 HV 15. DEPRESSURING SYSTEM SHUTDOWNS BY-PASS SWITCH WITH LIGHT
NP 0.75" 0055
HYDROGEN PURGE FREE DRAINING FOR TESTING DEPRESSURING SYSTEM WHILE BY-PASSING
2"-P-041-0079-B1AH04-NI ASSOCIATED SHUTDOWNS.
041-0013M 041
NOTE 5
NPIC-041-E-0158M
0102 0118
1" NC FREE DRAINING 1.5" 041 041
LPN MW UZ HZL CRIT
041-3601M 30" 0102 0108A
FREE DRAINING
MIN
1.5"-LPN-041-0003-A1AA-NI 041
D STRIPPING HYDROGEN
4"-P-041-0047-B1AH04-HC NPIC-041-E-0115M
0.75" 0.75"
UZ D
MIN
041-0006M NOTE 16 1.5" 1.5"
041-R-101A 0103
NOTE 4 0.75" 0.75"
TO 041-H-011 IN VIEW 041 NOTE 13
1.5"-HPN-041-0002-D1AA-NI PG
NOTE 19 16. FOR START-UP.
0074
17. VALVE AND BLIND FLANGE TO BE PROVIDED BY CONTRACTOR.
1.5" 041 8" 8"
NOTE 11 VAPOR
041
PI 18. ORIFICE WITH 20.32 MM HOLE.
HPN PT
0103 0103 19. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 3.9 MPa(g)
041-3601M LIQUID TRAY COMBINED FEED
NOTE 10 FREE DRAINING FREE DRAINING 8"-P-041-0167-B1AH04-HC
NOTE 1 H NPIC-041-E-0115M
0.75" 0.75" 041 041 041-0016M
TT TI
NC TWO PHASE FLOW
0105 0105 MIN TO 041-R-101B
0.75"-SVW-041-0004-A2AW-NI SVW
E 041-3301M 041 H
0.75" 0.75" E
041
TT TI A. DELETED.
NC 1.5"-P-041-0170-D1AH04-PC 0106 0106 8"-P-041-0160-B1AH04-HC
NPIC-041-E-0097M H TWO PHASE FLOW
041 041 PERMANENT LINE
1.5"-P-041-0306-B1AH04-PC TT TI
0107 0107 SUBJECT TO SERVICE
H TEST
2"-WW-041-0001-A2AW-NI
041 041
NPIC-041-E-0158M TI
0.75"-P-041-0171-B1AH04-NI TT
0104 0104 TEST POINT
H
FREE DRAINING
041 H 041
2" 041
TI PI FEED DWG.No.
TT
G 0111 0111 0104 G
041 H
953053-120-18-A1 REACTORS
TI 0.75"
WO 041 0112
DWG.No. Title
CL OF GLASS
041 LG TL REFERENCE DRAWINGS
TG
NO POCKET 2"-FLG-041-0026-A1AP-NI FLG
0102 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
150
((V) 0102
0.75"-P-041-0087-B1AH04-PG 0.75" 041
AIR RESERVOIR UA 0110
0.75"-LPN-041-0014-A1AA-NI 041-IA-01 EMERGENCY
HYDROCARBON SAMPLE MIN
0103 041
DEPRESSURIZING NSRP
FREE DRAINING
FROM 041-E-101 NOTE 7 041-3601M Nghi Son, Vietnam Limited Liability Company
0.75" 0.75"
0.75"-LPS-041-0022-A1AS-HS 041 041 Drawing Title
NC PG UZY
0102
0117 S
J 0.75" LPS
041
((V)
PIPING AND INSTRUMENT DIAGRAM J
NP CBD 041-3101M PT
041-3701M 0.75" 0.75" 0110
H H
PENEX
NC 0.75"-P-041-0260-B1AH04-HC 041 041 041 041
MIN
DR01A
041-0013M FC FC Contractor DWG.No. Sheet Rev.
0.75"
TWO PHASE FLOW TSO TSO
A1
IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
PJ Name: NSRP Complex Project Attachment: S-000-1730-0812M_0_0040
Contractor JOB Code: 0-6495-20 Contractor Doc No.: S-000-1730-0812M_0
QC-COM-120
PRE-COMMISSIONING
TIGHTNESS TEST/ INERTING
LIST OF CONTROL VALVE/ ON-OFF VALVE/ MOTOR OPERATED VALVES TO BE FORCED OPEN
SYSTEM No : Services Test/Inerting Package No.:
Remarks :