Employer Doc. No.

NSRP Contractor Doc. No.


Complex Project Nghi Son Refinery and Petrochemical S-000-1730-0812M
Limited Liability Company
Nghi Son, Vietnam Rev. 0 Page 1 of 11

Employer Contract No.: , Contractor JOB Code: 0-6495-20 Date: 09/SEP/15

Detail Pre-commissioning Procedure for Service Test

of IA for Unit 040/041/042/043

Unit No.: 040/041/042/043

Unit Abbreviation.: NHDS/PENEX/CCR/CCRR

Document Class: Z

Issue Purpose For Construction

Rev Date Page Description Prep'd Chk'd App'd

0 09/SEP/15 All For Construction NSR SG SM


A 19/JUN/15 All For Review NSR SG SM

Operation Centre JOB Code: Operation Centre Doc. No.:


Responsible Company Prepared by Checked by Approved by
TPM N.Wisatsiri S.Gibson S. Mariotti

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 2 of 11
of Unit 040/041/042/043 S-000-1730-0812M

CONTENTS

1 INTRODUCTION .................................................................................................................................. 3
2 REFERENCE DOCUMENTS ............................................................................................................... 3
3 DEFINITIONS ....................................................................................................................................... 3
4 ABBREVATIONS ................................................................................................................................. 4
5 SCOPE OF APPLICATION.................................................................................................................. 4
6 HSE....................................................................................................................................................... 4
7 TRAINING AND COMPETENCY OF PERSONNEL............................................................................ 5
8 ROLES AND RESPONSIBILITIES ...................................................................................................... 5
9 IMPLEMENTATION OF SERVICE TESTOF PIPELINES ................................................................... 7
10 ACCEPTANCE CRITERIA ................................................................................................................. 11
11 POST WORK ...................................................................................................................................... 11
12 ATTACHMENTS................................................................................................................................. 11

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 3 of 11
of Unit 040/041/042/043 S-000-1730-0812M

1 INTRODUCTION

This document provides a general method for the Service Test of IA for Unit 040/041/042/043 by

separate to Section A is Service Test for common Utility header (IA) of Unit 040/042/043 and Section

B is Service Test for common Utility header(IA) of Unit 041. The Service test is a method of test, used

for checking of leaks at Equipment or of piping systems. Prior to the Mechanical Completion

activities, systems are subjected to a Service test such that it prevents any uncontrollable leakage of

process fluids. It is carried out after hydrostatic or pneumatic test (pressure test) these tests may also

be referred to as Tightness Test or gross air leak test.

2 REFERENCE DOCUMENTS

S-000-1710-0001V Pre-commissioning and Commissioning Execution Plan

S-000-1710-0100V Pipe Cleaning Guide

S-000-1710-0120V General Pre-commissioning & Commissioning Procedure Tightness Test

S-000-1240-0001V Project Overall HSE Plan

X-XXX-XXXX-XXXX Flange Management Procedure

X-XXX-XXXX-XXXX Bolt Tensioning and Torqueing Procedure

X-XXX-XXXX-XXXX Mechanical Isolation Procedure

3 DEFINITIONS

The following terms are defined in Project Coordination Procedure (S-000-1140-0001V)

 Employer
Nghi Son Refinery and Petrochemical Limited Liability Company

 Contractor
A Joint Venture formed by JGC Corporation, Chiyoda Corporation, GS Engineering &
Construction Corporation, SK Engineering & Construction Co., Ltd., Technip France and
Technip Geoproduction (M) Sdn. Bhd.

 JVD
Contractor's Joint Venture Directorate

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 4 of 11
of Unit 040/041/042/043 S-000-1730-0812M

4 ABBREVATIONS

HSE - Health, Safety and Environment


JHA - Job Hazard Analysis
PPE - Personnel Protective Equipment
RA - Risk Assessment
PTW - Permit to work

5 SCOPE OF APPLICATION

The scope of this document is the Service test of IA for Unit 040/041/042/043 by separate to Section

A is Service Test for common Utility header (IA) of Unit 040/042/043 and Section B is Service Test for

common Utility header (IA) of Unit 041. The Utility piping of this unit shall be subjected to a gross air

leak test prior to mechanical completion of the unit, it will also be subjected to Inerting during the

commissioning phase and there shall be separate procedures for these activities.

6 HSE

The following HSE risks are inherent in Tightness Test. All personnel shall give top priority to the

management of health, safety and the environment (HSE). All work shall be undertaken in a

responsible manner giving full consideration to the impact of the activities may have on health, safety,

and the environment.

Specific Health and Safety requirements for this Pre-commissioning Procedure are:

1. Before executing activities stated in this Pre-commissioning Procedure, a Job Hazard

Analysis (JHA), Risk Assessment (RA), and Tool Box Talk shall be carried out.

2. Appropriate Personal Protective Equipment (PPE) as determined by the JHA and Risk

Assessment which shall be worn by all personnel assigned to execute these activities.

3. Ensure to follow recommended actions given in MSDS for chemicals as applicable.

4. If motorized equipment is used, refuelling shall not take place while equipment is running.

5. If electric tools are used, they shall be powered either by a 110-volt supply or by battery.

6. Additional safety precautions are provided in the specific Tightness Test for the system.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 5 of 11
of Unit 040/041/042/043 S-000-1730-0812M

7 TRAINING AND COMPETENCY OF PERSONNEL

All activities covered in this Procedure shall be performed only by qualified and competent personnel.

In addition, all personnel must have completed the HSE training. If sub-contractors or persons, other

than commissioning personnel, will assist in the execution of activities covered by this

Pre-commissioning procedure then those person(s) also shall attend HSE training and meet the

requirements for the HSE standard. Additionally, a qualified and competent commissioning

supervisor shall indoctrinate the sub-contractor or person(s) in the Tightness Test philosophy and

methodology.

8 ROLES AND RESPONSIBILITIES

The Roles and Responsibilities of various parties are provided below.

8.1 Employers Commissioning Team

Commissioning Engineer/Manager

1. Responsible for witnessing the test.

2. Responsible for accepting or rejecting the test.

Construction Representative

Employers representative will witness all Pre-commissioning testing.

8.2 Contractor’s Pre-Commissioning Team

Commissioning Manager

1. Overall control of Sub-contractor and Contractor commissioning team during execution of

commissioning operations.

2. Liaison with Employers commissioning representatives for executing the commissioning

operations.

3. Vendor mobilisation plan will be made and HSE induction will be coordinated upon their arrival

to site.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 6 of 11
of Unit 040/041/042/043 S-000-1730-0812M

4. Commissioning Report/Dossier submission to the Employer.

5. Overall supervision of Pre-commissioning activities.

Pre-Commissioning Engineer

1. Responsible for the safety of all personnel assigned to him, ensuring that the JHA, applicable

permits and control measures are in place prior to applying the method statement.

2. Responsible for the final acceptance of test results.

3. Responsible for supporting the testing team & for setting all applicable test requirement and

conditions.

4. Responsible for ensuring all resources, tools, test equipment etc., are available at the test

site.

5. Responsible for coordinating the works with other parties that may be required and parties

affected by executing the method statement.

6. Coordinate construction Work Packs with Employers representatives.

Operators

1. Responsible for ensuring that the work as outlined in the method statement is performed

safely and all safeguards & controls are complied with.

2. Responsible for preparing the equipment, system for testing or activities as outlined in this

method statement.

3. Responsible for executing the tests/activities as outlined in the method statement and as

instructed by the Supervisor/Commissioning Vendor Engineers.

4. Vendor engineers will work in coordination with the Contractor Pre-Commissioning

(discipline) Engineer.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 7 of 11
of Unit 040/041/042/043 S-000-1730-0812M

9 IMPLEMENTATION OF TIGHTNESS TEST OF PIPELINES

9.1 PRE-CLEANING / PRESERVATION

During site installation of the equipment, piping is pre-cleaned by flushing, blowing or hydro-jetting,

depending on contamination and required cleanliness level.

9.2 DETAILED SCOPE

Service Test of IA for Unit 040/041/042/043 by separate to Section A is Service Test for common
Utility header (IA) of Unit 040/042/043 and Section B Service Test for common Utility header (IA) of
Unit 041 refer to attached P&ID’s Mark-up. The Service test shall be carried out.

Section A Common header (IA) of Unit 040/042/043

System No. System Description Service Test Attachment No.


Package No.
040-IA-01 NHDS Instrument Air 000-IA-01-SV-1 S-000-1730-0812M_0020
042-IA-01 CCR Instrument Air 000-IA-01-SV-1 S-000-1730-0812M_0020
043-IA-01 CCRR Instrument Air 000-IA-01-SV-1 S-000-1730-0812M_0020

Section B Common header (IA) of Unit 041

System No. System Description Service Test Attachment No.


Package No.
041-IA-01 PENEX Instrument Air 041-IA-01-SV-1 S-000-1730-0812M_0030

9.3 General Description & Classification

(1) Gross Air Tightness Test

This test is performed for all the hydrocarbon and utility piping systems using Air. This is done to

confirm the integrity of the Joints, Flange Gaskets, Glands and Packing of valves. Here the

system is pressurized with injection of Compressed air and then checked for leaks at all possible

points of leakage. This test is carried out at 7 barg or at the system operating pressure whichever

is less.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 8 of 11
of Unit 040/041/042/043 S-000-1730-0812M

(2) Tightness Test with Nitrogen

This test is performed for smaller systems using Nitrogen in place of Air. This test is performed for

Refrigeration and other cold service lines.

(3) Specialized Service Test Procedure

Nitrogen-Helium Service Testis one of the Specialized test procedure normally performed by a

Specialized contractor. This test is performed for hydrocarbon systems only. Helium Service Test

will use 99% Nitrogen and 1 % Helium as tracer gas. A calibrated Mass Spectrometer will be used

to detect the helium tracer gas. The Helium Service Test will be carried out at 90% of system

design pressure and will be performed after the normal Gross Air tightness test. After the Service

Testis performed, the system will be depressurized to 1 barg pressure to keep the system inerted

and preserved done during commissioning.

(4) In service test

This test is performed on low pressure systems generally utilities, where the actual operating fluid

is utilized as any leaks will not create an environmental or safety issue.

9.4 Procedure

1. Method of Testing

System is pressurized with injection of compressed air or nitrogen and then checked for leaks at all

possible points such as:


(a) Flanges
(b) Screw Connections
(c) Manholes and Handholes
(d) Valve Glands

Detection of leakage is by application of a leak detection solution (such as soap solution) and the

subsequent observation of bubble formation.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 9 of 11
of Unit 040/041/042/043 S-000-1730-0812M

2. Test Pressure

Instrument air or nitrogen at available pressure, approx 7 barg, is used to pressurize the system.

Test Pressure, therefore, shall be classified as below.

a) For systems where normal operating pressure is 7 barg or lower, Test pressure is

given in the following table, corresponding to normal operating pressure.

Normal Operating where normal operating where normal operating pressure


Pressure pressure is 2.5 barg or exceeds 2.5 barg
lower
Test Pressure Shall be design pressure or shall be Normal operating
safety valve set pressure pressure
minus 1 barg, whichever is
lower.

b) For Systems where normal operating pressure is higher than 7 barg, test pressure

shall be 7 barg. That is to say, that if leaks do not appear at a pressure of 7 barg, leaks

occurring at higher pressures can be stopped through re-tightening measures.

3. Precaution

The following precautions must be observed during System Tightness tests:

 Barricade the area and install warning signs.

 The over-pressure protection of the system must be put in service. PSV discharge

outlets shall be routed to a safe location with adequate bracing and barricading to

prevent equipment damage or personal injury.

 A local calibrated pressure gauge shall be installed in an easily accessible location.

4. Planning

1. Equipment and associated pipelines must be grouped according to their normal operating

pressure. Each grouped system is isolated using block valves.

2. Systems subjected to system leak tests must be clearly marked on P&ID including the following

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 10 of 11
of Unit 040/041/042/043 S-000-1730-0812M

items:

 Test Pressure

 Supply point and type of pressurization medium

 Location of boundary valves, sub-dividing system into groups

 Blinds and spades if applied

 Valve’s Open/Close position

 Pressure monitoring instruments to be used

 Depressurizing points to be used after the test completion or in case of emergency.

5. Preparation

 Availability of air must be confirmed prior to the test.

 Leak detection solution (such as soap solution) must be provided at site.

 Flanges with diameter of 6" or larger is wrapped with masking tape to check for

leakage via a marked puncture in tape.

 In accordance with the test plan, CONTRACTOR checks the tested portions and

confirms the readiness for the test.

 Drain free water from system prior to the test so that foaming or bubbling action of

soap solution can be clearly seen at the leakage points.

6. Implementation

1. Gradually pressurize system to the test pressure with air.

2. Maintain system under the test pressure until the test has been completed.

3. All points to be checked and shall be applied with soap solution.

4. Any leakage points found during the test shall be re-tightened until the bubble formation

stops. If leak cannot be stopped, system or part of system will be depressurized and the

joint or connection shall be remade after inspection for physical damage and then

re-tested.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 11 of 11
of Unit 040/041/042/043 S-000-1730-0812M

10 ACCEPTANCE CRITERIA

1. Any criteria given by Vendor/Licensor with regard to leakage, the test result shall fall within this
criterion.

2. If foam or bubbles are not visually detected, the test is accepted as tight.

3. Check/inspection above shall be done by CONTRACTOR with EMPLOYER's witness.

Note: Depending on the service, small leakage from valve glands may be acceptable

11 POST WORK

1. After the system passes the Tightness test, the system shall be depressurized or left with a small

nitrogen blanket as required by site conditions.

2. Piping shall be reinstated as per P&ID.

3. Signing of the test document by CONTRACTOR 's supervisor and EMPLOYER 's witness shall be

done after the test completion.

4. Test Log sheets shall be signed by the Contractor and Employer and handed over to the

Company.

12 ATTACHMENTS

- Attachment: S-000-1730-0812M_0020 Marked-up P&ID for Service Test Package 000-IA-01-SV-1.


- Attachment: S-000-1730-0812M_0030:Marked-up P&ID for Service Test Package 041-IA-01-SV-1.
- Attachment: S-000-1730-0812M_0040: Inspection Record Sheet

D R A
IN
10-SE
P - 2 0 15
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 1 of 21
127(6

SECTION A UNIT 040 / 042 / 043


3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 0.74 MPa(g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 2 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

Control system pressure at operation


pressure of IA =0.74 MPa(g)
IA supply from IA Interconnecting
Header. Permanent Supply required

040-IA-01
040-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 3 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 4 of 21

040-IA-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 5 of 21
040-IA-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-IA-01
040-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 6 of 21

040-IA-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 7 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 8 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-IA-01 040-IA-01
042-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 9 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 10 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST
042-IA-01
TEST POINT

042-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 11 of 21

042-IA-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 12 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-IA-01 042-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 13 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 14 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-IA-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 15 of 21

NSRP ComplexPERMANENT
Project (JOB No. 0-6495-20)
LINE
DOCUMENT CLASS :
SUBJECT Z TO
ISSUE PURPOSE : FOR APPROVAL
SERVICE TEST
RESULT CODE : A, B, R, F ( )

NEXT STATUS : FA, FR, FI, FC, AB ( )

RESUBMISSION DATE : TEST POINT


( )

RESPONSIBLE DEPT./ PERSON : ( )

Review Date : ( )

A : Approved without Comment ; B : Approved with Comments

R : Not Approved ; F : Not Subject to Review

Approval or review here under shall not be construed to relieve Supplier/Subcontractor of

his responsibilities and liability under the Contract.

Purchaser ORIG. PURCHASE ORDER NO. SERIAL REV.

DOC. No. V M215A-002-A- 105-29 5

Control system pressure at


operation pressure of IA =7.4 barg.
NSRP
VM215A-002-A-

MECHANICAL FLOW DIAGRAM


CCR REGENERATION UNIT (043)
INSTRUMENT AND PLANT AIR SYSTEM

043-IA-01 VM215A-002-A-105-29
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION

D R A 043
A1

0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 5
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 16 of 21

NSRP Complex Project (JOB No. 0-6495-20)


DOCUMENT CLASS : Z
ISSUE PURPOSE : FOR APPROVALLINE
PERMANENT
RESULT CODE : A, B, R, F SUBJECT TO ( )

SERVICE TEST )
NEXT STATUS : FA, FR, FI, FC, AB (

RESUBMISSION DATE : ( )

RESPONSIBLE DEPT./ PERSON : ( )

Review Date :
TEST POINT
( )

A : Approved without Comment ; B : Approved with Comments

R : Not Approved ; F : Not Subject to Review

Approval or review here under shall not be construed to relieve Supplier/Subcontractor of

his responsibilities and liability under the Contract.

Purchaser ORIG. PURCHASE ORDER NO. SERIAL REV.

DOC. No. V M215A-002-A- 105-12 5

Control system pressure at NSRP


operation pressure of IA =7.4 barg.
VM215A-002-A-

MECHANICAL FLOW DIAGRAM


CCR REGENERATION UNIT (043)
AIR DRYER AND REGENERATION COOLER

VM215A-002-A-105-12
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION

D R A 043
A1

0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 5
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 17 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

NSRP Complex Project (JOB No. 0-6495-20)


DOCUMENT CLASS : Z
ISSUE PURPOSE : FOR APPROVAL
RESULT CODE : A, B, R, F ( )

NEXT STATUS : FA, FR, FI, FC, AB ( )

RESUBMISSION DATE : ( )

RESPONSIBLE DEPT./ PERSON : ( )

Review Date : ( )

A : Approved without Comment ; B : Approved with Comments

R : Not Approved ; F : Not Subject to Review

Approval or review here under shall not be construed to relieve Supplier/Subcontractor of

his responsibilities and liability under the Contract.

Purchaser ORIG. PURCHASE ORDER NO. SERIAL REV.

DOC. No. V M215A-002-A- 105-24 5

NSRP
VM215A-002-A-

MECHANICAL FLOW DIAGRAM


CCR REGENERATION UNIT (043)
DETAIL-OIL MIST SYSTEM

VM215A-002-A-105-24
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION

D R A 043
A1

0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 5
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 18 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

NSRP Complex Project (JOB No. 0-6495-20)


DOCUMENT CLASS : Z
ISSUE PURPOSE : FOR APPROVAL
RESULT CODE : A, B, R, F ( )

NEXT STATUS : FA, FR, FI, FC, AB ( )

RESUBMISSION DATE : ( )

RESPONSIBLE DEPT./ PERSON : ( )

Review Date : ( )

A : Approved without Comment ; B : Approved with Comments

R : Not Approved ; F : Not Subject to Review

Approval or review here under shall not be construed to relieve Supplier/Subcontractor of

his responsibilities and liability under the Contract.

Purchaser ORIG. PURCHASE ORDER NO. SERIAL REV.

DOC. No. V M215A-002-A- 105-20 6

NSRP
VM215A-002-A-

MECHANICAL FLOW DIAGRAM


CCR REGENERATION UNIT (043)
LOCK HOPPER

VM215A-002-A-105-20
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION

D R A 043
A1

0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 6
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 19 of 21

NSRP Complex Project (JOB No. 0-6495-20)


DOCUMENT CLASS : Z
PERMANENT LINE
ISSUE PURPOSE : FOR APPROVAL
SUBJECT TO
RESULT CODE : A, B, R, F ( )
SERVICE TEST( )
NEXT STATUS : FA, FR, FI, FC, AB

RESUBMISSION DATE : ( )

RESPONSIBLE DEPT./ PERSON :TEST POINT( )

Review Date : ( )

A : Approved without Comment ; B : Approved with Comments

R : Not Approved ; F : Not Subject to Review

Approval or review here under shall not be construed to relieve Supplier/Subcontractor of

his responsibilities and liability under the Contract.

Purchaser ORIG. PURCHASE ORDER NO. SERIAL REV.

DOC. No. V M215A-002-A- 105-13 6

NSRP
VM215A-002-A-

MECHANICAL FLOW DIAGRAM


CCR REGENERATION UNIT (043)
REGENERATION HEATER

VM215A-002-A-105-13
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION

D R A 043
A1

0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 6
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 20 of 21

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

NSRP Complex Project (JOB No. 0-6495-20)


DOCUMENT CLASS : Z
ISSUE PURPOSE : FOR APPROVAL
RESULT CODE : A, B, R, F ( )

NEXT STATUS : FA, FR, FI, FC, AB ( )

RESUBMISSION DATE : ( )

RESPONSIBLE DEPT./ PERSON : ( )

Review Date : ( )

A : Approved without Comment ; B : Approved with Comments

R : Not Approved ; F : Not Subject to Review

Approval or review here under shall not be construed to relieve Supplier/Subcontractor of

his responsibilities and liability under the Contract.

Purchaser ORIG. PURCHASE ORDER NO. SERIAL REV.

DOC. No. V M215A-002-A- 105-22 6

NSRP
VM215A-002-A-

MECHANICAL FLOW DIAGRAM


CCR REGENERATION UNIT (043)
RESIDUAL CONTAMINANT REMOVAL SYSTEM

VM215A-002-A-105-22
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION

D R A 043
A1

0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 6
Attachment : S-000-1730-0812M_0_0020 System No. : 040-IA-01,042-IA-01,043-IA-01 Package No. : 000-IA-01-SV-1
Page 21 of 21

M NSRP Complex Project (JOB No. 0-6495-20)


DOCUMENT CLASS :
PERMANENT Z
LINE
ISSUE PURPOSE : SUBJECT TO
FOR APPROVAL
M
RESULT CODE : A, B, R, FSERVICE TEST( )

NEXT STATUS : FA, FR, FI, FC, AB ( )

RESUBMISSION DATE : ( )
TEST POINT
RESPONSIBLE DEPT./ PERSON : ( )

Review Date : ( )

A : Approved without Comment ; B : Approved with Comments

R : Not Approved ; F : Not Subject to Review

Approval or review here under shall not be construed to relieve Supplier/Subcontractor of

his responsibilities and liability under the Contract.

Purchaser ORIG. PURCHASE ORDER NO. SERIAL REV.

DOC. No. V M215A-002-A- 105-25 6

NSRP
VM215A-002-A-

MECHANICAL FLOW DIAGRAM


CCR REGENERATION UNIT (043)
DETAILS-VENT GAS TREATING SYSTEM

VM215A-002-A-105-25
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION

D R A 043
A1

0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 6
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
1 Package No. : 041-IA-01-SV-1 Page127(6
1 of 9
SECTION B UNIT 041
3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 7.4 BARG

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
2 Package No. : 041-IA-01-SV-1 Page 2 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BL
NOTE 2 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TPM SK
041 COMMON 041 041 041 041 041 0014V AND D-000-1225-0020V TO 0026V.
AA FAULT PI FI 041
PT PG FT
FE ICPA-041-UI-011
FRESH COOLING 0351 0351 0351 0352 0351 0351 FRESH COOLING
0351 MIN
A WATER SUPPLY
16"-CWS-041-3001-A2AW-NI 16"-CWS-141-3026-A2AW-NI
WATER SUPPLY
1. DELETED. A
041-3002M 141-3012S
2. ORIFICE WITH 276.7 MM HOLE.
TO UNIT 041 041 H 041 NOTE 9 FROM INTERCONNECTING
AI AT 1'' 3. ORIFICE WITH 182.1 MM HOLE.
0351 041 041
0351 NPIC-041-E-0109M PG TG
TP HC ICPA-041-UO-001 4. ORIFICE WITH 248.5 MM HOLE.
FRESH COOLING M5 NPIC-041-E-0105M 0359 0357 FRESH COOLING
0.75" - 150# MIN NPIC-041-E-0105M
WATER RETURN NPIC-041-E-0161M WATER RETURN 5. ORIFICE WITH 26.46 MM HOLE. NPIC-041-E-0162M
16"-CWR-041-3001-A2AW-NI RF NOTE 6 16"-CWR-141-3026-A2AW-NI
041-3002M 141-3012S
6. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
FROM UNIT 041 0.75"-WO-041-0007-A2AW-NI TO INTERCONNECTING
NPIC-041-E-0106M NOTE 7 NPIC-041-E-0106M 1'' 7. FLOW TRANSMITTER 041-FT-0352A TO MEASURE LP STEAM TO
B NPIC-041-E-0161M 041
FI
041
NOTE 3
ICPA-041-UI-015 INTERCONNECTING. FLOW TRANSMITTER 041-FT-0352B TO B
041 041 041 041 041 FT MEASURE LP STEAM FROM INTERCONNECTING.
PI TI 0352A 0352A 041 ICPA-041-UI-005 NPIC-041-E-0106M
PT PG TT 041
WO 0353 0353 0354 0351 0351 FI
041 FE
NPIC-041-E-0113M 1" 8. MULTITAP ORIFICE FLANGES (041-OR-0352 , 041-ORJ-0352), ORIFICE
FT 0352
LP STEAM 0352B 0352B LP STEAM FLANGE WITH JACK SCREW (041-ORJ-0352) SHALL BE LOCATED AT
10"-LPS-041-3001-A1AS-HS NOTE 8 10"-LPS-141-3006-A1AS-HS
041-3103M 141-3002S DOWNSTREAM OF ORIFICE PLATE

FROM / TO UNIT 041 MIN FROM / TO INTERCONNECTING 9. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-052
0.75" 0.75" 0.75"
NOTE 4 NPIC-041-E-0113M
041 041 041 041 041 041 041 MIN
TT TI FI FT 041 PG PT PI ICPA-041-UI-014
C 0353 0353 0353 0353 FE
0353
0356 0355 0355 1.5"
ICPA-041-UI-004 PERMANENT LINE C
MP STEAM MP STEAM
14"-MPS-041-3001-B1AS-HS 14"-MPS-141-3002-B1AS-HS SUBJECT TO SERVICE
041-3103M 141-3002S
TEST
TO UNIT 041 MIN FROM INTERCONNECTING
1'' 1'' 1'' TEST POINT
041 MIN
PG ICPA-041-UI-002
0360
DB MIN
HP BOILER FEED WATER HP BOILER FEED WATER
3"-HBFW-041-3001-M2AS-HS 3"-HBFW-141-3002-M2AS-HS
041-3201M 141-3012S
D TO UNIT 041 MIN FROM INTERCONNECTING
D
0.75" 0.75" 0.75" 0.75"
041 MIN
PG
0361 ICPA-041-UI-006
MIN
SERVICE WATER SERVICE WATER
3"-SVW-041-3001-A2AW-NI 3"-SVW-141-3005-A2AW-NI
041-3301M 141-3012S

TO UNIT 041 MIN FROM INTERCONNECTING


0.75" 0.75" 0.75"
0.75"
041
E PG
0362
MIN
ICPA-041-UI-007 E
MIN
DRINKING WATER DRINKING WATER
3"-DKW-041-3001-A0LW-HC 3"-DKW-141-3005-A0LW-HC A. DELETED.
041-3301M 141-3012S
NPIC-041-E-0162M 1. DELETED.
TO UNIT 041 0.75"-FG-041-3010-A1AD-NI MIN FROM INTERCONNECTING
0.75" 0.75" 0.75" 0.75" 2. DELETED.
MIN
LPN 0.75"-LPN-041-3007-A1AA-NI
041-3603M NPIC-041-E-0162M
F 0.75" 0.75" F
NPIC-041-E-0126M NPIC-041-E-0126M
NPIC-041-E-0162M
LPS 0.75"-LPS-041-3006-A1AS-HS E
041 041 E 041
041 041 041 E 041
041-3103M TI FI PI
TT FT PG PT
0.75" 0.75" 0358 0358 0355 0355 0364 E
0363 E 0363
E
ICPA-041-UI-001
0.75"-FG-041-3003-A1AD-HC 15D MIN MIN
REFINERY FUEL GAS 5D MIN E REFINERY FUEL GAS
2"-FG-041-3001-A1AD-STL 2"-FG-141-3017-A1AD-STL
041-3401M 141-3012S
6" FEED DWG.No.
G TO UNIT 041 0.5"
0.75" 0.75" 0.75"
FROM INTERCONNECTING G
041 MIN MIN
PG NPIC-041-E-0151M
ICPA-041-UO-003
0365
MIN
FLARE GAS 1:500 1:500 FLARE GAS DWG.No. Title
30"-FLG-041-3001-A1GP-NI 30"-FLG-141-3002-A2GQ-NI REFERENCE DRAWINGS
041-3503M 141-3002S
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
FROM UNIT 041 2" LO TO INTERCONNECTING
NPIC-041-E-0153M 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0.75"
0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
Control system pressure at operation B 11/NOV/13 FOR APPROVAL DMO RKM SMA
LPS 0.75"-LPS-041-3079-A1AS-HS 0.75"-FLG-041-3005-A1GP-HC
H 041-3103M
pressure of IA = 0.74 MPa(g) A supply from IA Interconnecting A 15/JUL/13 FOR REVIEW DMO RKM SMA H
041 Rev Date Description Prep'd Chk'd App'd
0.75" 0.75" PG
Header. Permanent Supply required
ICPA-041-UI-008 REVISIONS
0366 WO
MIN Operation Centre JOB Code:
PLANT AIR PLANT AIR Operation Centre DWG.No.:
2"-PA-041-3001-A2AA-NI 2"-PA-141-3004-A2AA-NI
041-3603M 141-3012S Contractor JOB Code Responsible Company
TO UNIT 041 MIN FROM INTERCONNECTING 0-6495-20 TPM
0.75" 0.75" 0.75" 0.75" Prepared by Checked by Approved by
041 T. T. HUONG T. NGUYEN T. N. SON
PG MIN
NPIC-041-E-0117M 0367 041-IA-01 ICPA-041-UI-009
I INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 2"-IA-141-3004-A1AA-NI
INSTRUMENT AIR I
041-3603M 141-3012S

TO UNIT 041 LO FROM INTERCONNECTING


NPIC-041-E-0151M NSRP
Complex Project
041 041 041 Nghi Son Refinery and Petrochemical
041 041 041 041
TT TI FI FT PG PI PT Nghi Son, Vietnam Limited Liability Company
0355 0354 0357 MIN ICPA-041-UI-010
0355 0354 0358 0357
5D MIN 15D MIN
LP NITROGEN LP NITROGEN Drawing Title
2"-LPN-041-3001-A1AA-NI 2"-LPN-141-3003-A1AA-NI
041-3603M 141-3012S
J TO UNIT 041
6"
1" FROM INTERCONNECTING
PIPING AND INSTRUMENT DIAGRAM J
0.75" PENEX
UNIT 041
UTILITY BATTERY LIMIT - 1
NOTE 5
041 041 041 041 041 041 041
TI FI 041 PI
TT FT PG PT ICPA-041-UI-012
0359 0356 FE 0369 MIN Issue Purpose Document Class
0359 0356 0370 0369
0356
HP NITROGEN HP NITROGEN FOR CONSTRUCTION Z
2"-HPN-041-3001-D1AA-NI 2"-HPN-141-3013-D1AA-NI
K 041-3603M 141-3012S Unit No. Unit Abbreviation PCWBS Size Scale K
6"
TO UNIT 041 FROM INTERCONNECTING 041 PENX A900 A1 NONE
0.75"

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1301M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
3 Package No. : 041-IA-01-SV-1 Page 3 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.

TO FLARE HEADER
INSTRUMENT AIR

TO CBD HEADER
1. FOR PRESSURE TEST.

TO 041-P-301A/B

TO 041-P-303A/B

TO 041-P-302A/B
041-0032M

041-0031M

041-3702M

041-0030M

041-3503M

041-0032M

041-0029M

041-0028M

041-0030M

041-1301M

041-1001M

041-1001M
A A

TO 041-AS-001

TO 041-AS-001

HP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN
N

TO 041-V-301

TO 041-V-301

TO BL AREA

TO BL AREA

TO BL AREA
2. FOR START UP.

PERMANENT LINE

AT GRADE
AT GRADE

EL.158300
EL.108000
US-013

US-014

US-021

US-023
SUBJECT TO SERVICE

1"-LPN-041-3011-A1AA-NI
2"-IA-041-0003-S0RA-NI

1"-LPN-041-0028-A1AA-NI
0.75"-LPN-041-0022-A1AA-NI

0.75"-LPN-041-3026-A1AA-NI

0.75"-LPN-041-0021-A1AA-NI

0.75"-LPN-041-0020-A1AA-NI

0.75"-LPN-041-3007-A1AA-NI

0.75"-LPN-041-0023-A1AA-NI

0.75"-LPN-041-0024-A1AA-NI
2"-HPN-041-0005-D1AA-NI
2"-LPN-041-0010-A1AA-NI
NPIC-041-E-0163M
TEST
HC HC HC HC
TEST POINT
B B

0.75"
EL.146300

0.75"-PA-041-3032-A2AA-NI

0.75"-PA-041-3033-A2AA-NI
0.75"-PA-041-3039-A2AA-NI
HC US-020

2"-PA-041-3031-A2AA-NI
EL.137700
0.75"-PA-041-3038-A2AA-NI

0.75"-PA-041-3041-A2AA-NI
HC US-019

NOTE 2

NOTE 1
EL.127750
0.75"-PA-041-3037-A2AA-NI

NPIC-041-E-0153M
C HC US-018 C
EL.116950 MIN
0.75"-PA-041-3036-A2AA-NI

NPIC-041-E-0153M
HC US-017
EL.107900
0.75"-PA-041-3035-A2AA-NI
MIN 2" HC US-016 MIN MIN

MIN NPIC-041-E-0153M
NPIC-041-E-0129M
MIN
D AT GRADE NPIC-041-E-0163M 0.75" D

1"-LPN-041-3022-A1AA-NI
0.75"-PA-041-3042-A2AA-NI

MIN
HC US-024 2"

MIN EL.108500
0.75"-PA-041-3040-A2AA-NI
HC US-022

NPIC-041-E-0129M 0.75"

MIN
PLANT AIR LPT PLANT AIR
2"-PA-041-3001-A2AA-NI 2"-PA-041-3001-A2AA-NI
041-3602M 041-1301M
E E
TO UNIT 041 FROM BL
1. DELETED.

041-IAH-004 041-IAH-003 041-IAH-022 041-IAH-001 041-IAH-002 041-IA-01


NPIC-041-E-0117M NPIC-041-E-0117M
INSTRUMENT AIR
1" 1" 1" 1" 1" INSTRUMENT AIR
22"-IA-041-3001-S0RA-NI
IA 041 3001 S0RA NI 2"-IA-041-3001-S0RA-NI
0 300 S0
041-3602M 041-1301M

F TO UNIT 041 FROM BL F


0.75"

LPT

MIN
LP NITROGEN LP NITROGEN
2"-LPN-041-3001-A1AA-NI 2"-LPN-041-3001-A1AA-NI
041-3602M 041-1301M
FEED DWG.No.
TO UNIT 041 FROM BL
G 0.75" G
LPT
NPIC-041-E-0129M
HP NITROGEN HP NITROGEN DWG.No. Title
2"-HPN-041-3001-D1AA-NI 2"-HPN-041-3001-D1AA-NI
041-3602M 041-1301M REFERENCE DRAWINGS
MIN 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
TO UNIT 041 FROM BL
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0129M 0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
NPIC-041-E-0153M B - NOT ISSUED DMO RKM SMA
H MIN A - NOT ISSUED DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75"-PA-041-3044-A2AA-NI

MIN REVISIONS
MIN
2"-LPN-041-3030-A1AA-NI Operation Centre JOB Code:
NPIC-041-E-0153M Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
0.75"

MIN

MIN

MIN
0-6495-20 TPM

0.75"-PA-041-3045-A2AA-NI
MIN Prepared by Checked by Approved by
2"-PA-041-3048-A2AA-NI

T. T. HUONG T. NGUYEN T. N. SON

I I
MIN

0.75"

NPIC-041-E-0142M
NPIC-041-E-0153M
NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Limited Liability Company

0.75"-LPN-041-2003-A1AA-NI
Nghi Son, Vietnam

1"-LPN-041-0008-A1AA-NI

1"-LPN-041-0011-A1AA-NI
1"-PA-041-0004-A2AA-NI

1"-PA-041-0003-A2AA-NI

Drawing Title

J HC HC PIPING AND INSTRUMENT DIAGRAM J


PENEX UNIT
AT GRADE
AT GRADE
US-037

US-038

UNIT 041
INSTRUMENT AIR, PLANT AIR AND NITROGEN - 3

Issue Purpose Document Class

041-0101M

041-0102M

041-2206M

TO 041-P-615A/B
041-0101M

041-0102M

FOR CONSTRUCTION Z

LP NITROGEN

LP NITROGEN

LP NITROGEN
TO 041-V-612

TO 041-V-615
TO 041-V-612

TO 041-V-615

K K
PLANT AIR

PLANT AIR

Unit No. Unit Abbreviation PCWBS Size Scale


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3603M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
9
10 11 12 13 14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
4 Package No. : 041-IA-01-SV-1 Page 4 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

SIGNAL 041-E-301 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
041-0031M ISOMERATE COOLER
1. FOR ON / OFF VALVE DETAILS, REFER TO DWG. D-041-1225-0221M.
A FROM 041-FIC-0301 CODE ASME VIII DIV 1 / API 660 A
TYPE: BJ12U 2. EMERGENCY CIRCULATION.

SIZE: 2H3 SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 510 mm / 6100 mm / 83 m² 3. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
PSET: 2.00 MPa(g) DESIGN DUTY 463 kW D-041-1225-2401M.
041 FREE DRAINING 6''-FLG-041-0051-A1AP-NI FLG SIDE SHELL TUBE
PSV 4. START-UP BY-PASS.
0306 041-3503M 2.00 MPa(g) + FV @ 120 °C
DESIGN PRESSURE 1.55 MPa(g) 5. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
NOTE 5
0.34 MPa(g) @175 °C AND FV @ 175 °C.
DESIGN TEMPERATURE 120 °C 76 °C
INSULATION TYPE NI NI 6. TO BE LOCATED CLOSE TO BATTERY LIMIT ISOLATION VALVES.

B 0.75'' TRIM SPECIFICATION B1AP04-NI A2AW-NI 7. PLUG VALVE. B

MIN
4"-P-041-0231-B1AP04-NI
8. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO

FREE DRAINING
PREVENT OVERPRESSURE DUE TO EXTERNAL FIRE AT THE
2"
COOLER.

NPIC-041-E-0109M
NPIC-041-E-0105M
9. ORIFICE WITH 80.55 MM HOLE.
TO ATM 10. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
ISOMERATE
6"-P-041-0118-B1AP04-NI AT SAFE LOCATION
041-0031M 11. LOCATED IN ANALYSER SHELTER 041-AS-001.
(V)
FROM 041-P-301A/B
C SIZE: 0.75D1 12. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-016.
C
PSET: 1.55 MPa(g) 13. 041-LT-0311 LOW LEVEL ALARM DISCRETE SIGNAL TO DRCS.
NPIC-041-E-0101M 041
TSV NPIC-041-E-0141M
0307

FREE DRAINING
1"-V-041-0017-A1AP-NI 1"-V-041-0024-A1AP-NI
PERMANENT LINE
0.75'' NPIC-041-E-0109M
SUBJECT TO SERVICE
1" 041-IA-01 TEST
1" - 150# 1" - 150#

FREE DRAINING
RF
D IA 22"-IA-041-0003-S0RA-NI
IA 041 0003 S0RA NI
FF
TP
TP
TP 1"-CWR-041-0018-A2AW-NI CWR TEST POINT D
AT GRADE 041-3603M M1 M9 041-3002M
041 TO SAFE LOCATION
TG 0.75'' 041-AS-001
0332
CWR 6"-CWR-041-0007-A2AW-NI NOTE 8 RS ANALYSER SHELTER
1" - 150# 1" - 150#
NOTE 12
041-3002M 041-E-301 RF
RF
0.75'' 6"-CWR-041-0017-A2AW-NI LPN 1"-LPN-041-0028-A1AA-NI TP TP 1"-CWS-041-0019-A2AW-NI CWS
041-3603M M2 TP TP M8 041-3002M
CWS 6"-CWS-041-0008-A2AW-NI NOTE 8 RS M6 M3

E 041-3002M
E
0.75''
1" - 150# 1" - 150#
RF RF A. DELETED.
6"-CWS-041-0018-A2AW-NI
0.75'' 041 041 H
041
TT TI FV 1"-WO-041-0008-A2AP-NI
0307 0307 0301

6"

FC
0.75'' 3" NC

FREE DRAINING
F NOTE 7 F
WO
0.75''
1"-CBD-041-0048-A2AP-NI
NPIC-041-E-0092M 6" 0.75''
0.75'' CBD
NC
041-3702M
4"-P-041-0232-B1AP04-NI FEED DWG.No.
G NOTE 4 G
DEISOHEXANIZER BOTTOMS
2"-P-041-0116-B1AP04-NI
041-0028M
953053-120-28-A1 ISOMERATE PRODUCT
FROM 041-E-303 DWG.No. Title

NPIC-041-E-0092M
REFERENCE DRAWINGS
REGENERANT
3"-P-041-0044-B1AP04-NI 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-0006M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
FROM 041-E-011A/B
0.75'' B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H LIGHT NAPHTHA
1"-P-041-0149-B1AP04-NI
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-0008M Rev Date Description Prep'd Chk'd App'd
SAMPLE RETURN REVISIONS
FROM MOISTURE ANALYSER Operation Centre JOB Code:
SIGNAL
NOTE 3
FLG 041 Operation Centre DWG.No.:
041-0029M SC Contractor JOB Code Responsible Company
041-3503M 0010 0-6495-20 TPM
FROM 041-LI-0311 TYPE L2
041 H Prepared by Checked by Approved by
041 041
FIC TI TT T. T. HUONG T. NGUYEN T. N. SON
0308 NOTE 9 0308 0308

I 041
FV 041 041
H I
0308 FE FT 041 041 NOTE 10
0308 0308 AI
ISOMERATE AT INST PIP
4" 0303 0303 RVP
4"-P-041-0062-B1AP04-NI
041-0008M
NOTE 2, 4 NOTE 2 FC LO 6"
NPIC-041-E-0109M
NPIC-041-E-0105M
NOTE 11
0.75" NPT
NSRP
TO 041-DR-001A/B INST PIP Complex Project
0.75'' 3" 0.75'' 0.75'' Nghi Son Refinery and Petrochemical
NPIC-041-E-0092M NOTE 6 NOTE 6
SIGNAL
NPIC-041-E-0141M
NOTE 6 NOTE 6 Nghi Son, Vietnam Limited Liability Company
NOTE 13 041 041 041 041 041 041 041 041 041
NY US NPIC-041-E-0141M UZ US FC UZ US FC UZ US FC UZ US FC
041-0030M
0311 0003 NPIC-041-E-0151M
1000 0309 TSO 1000 0305 TSO 1000 0306 TSO 1000 0308 TSO Drawing Title
DRCS
FROM 041-LI-0311 O O O O
041 0.75'' 041 0.75'' 041 0.75'' 0.75''
J 041
UV UV UV UV
041
UV PIPING AND INSTRUMENT DIAGRAM J
X 0304 0309 0305 0306 0308
REGENERANT C C C
2"-P-041-0046-B1AP04-NI C PENEX
041-0006M
NOTE 1 DEISOHEXANIZER SECTION
TO 041-E-012 0.75'' 0.75'' 0.75'' 0.75''
0.75'' 0.75''
ISOMERATE PRODUCT

3"-P-041-0119-B1AP04-NI 6"-P-041-0117-B1AP04-NI 6"-P-041-0125-B1AP04-NI 6"-P-041-0123-B1AP04-NI


Issue Purpose Document Class

LIGHT ISOMERATE ISOMERATE PRODUCT OFF-SPEC


FOR CONSTRUCTION Z
ISOMERATE
K TO UNIT 023 TO UNIT 153 TO UNIT 156
Unit No. Unit Abbreviation PCWBS Size Scale K
TO UNIT 152
023-E-314 153-TK-013/014 156-TK-001
041 PENX A900 A1 NONE
152-TK-001/002

DR01A
Contractor DWG.No. Sheet Rev.
A1

041-1001M 041-1001M 041-1001M 041-1001M D-041-1225-0032M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
5 Package No. : 041-IA-01-SV-1 Page 5 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NPIC-041-E-0129M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
NPIC-041-E-0160M
0014V AND D-000-1225-0020V TO 0026V.
NPIC-041-E-0163M
1. FOR PRESSURE TEST.

TO 041-P-213A/B
041-0025M

041-0023M
A A

LP NITROGEN

LP NITROGEN
N

NPIC-041-E-0129M
TO 041-V-212

AT GRADE
EL.121050

EL.102550
AT GRADE
EL.113900

EL.110000

EL.114000
2. DELETED.

EL. 12400
US-006
US-007

US-008

US-010

US-011

US-012

US-015
US-009
PERMANENT LINE
HC HC HC HC HC HC HC HC SUBJECT TO SERVICE
TEST

0.75"-PA-041-3046-A1AA-NI 0.75"

NPIC-041-E-0160M
TEST POINT

0.75"-LPN-041-0019-A1AA-NI

1"-LPN-041-0005-A1AA-NI

0.75"-PA-041-3014-A2AA-NI

0.75"-PA-041-3017-A2AA-NI

0.75"-PA-041-3016-A2AA-NI

0.75"-PA-041-3015-A2AA-NI

0.75"-PA-041-3018-A2AA-NI

0.75"-PA-041-3019-A2AA-NI

0.75"-PA-041-3034-A2AA-NI
B B

0.75"

MIN

NPIC-041-E-0160M
MIN
C 0.75" C

MIN
041-IAH-006
1"

2"-PA-041-3003-A2AA-NI

041-IAH-005
1"

2"-IA-041-3003-S0RA-NI
2 IA 041 3003 S0RA NI
D D

NPIC-041-E-0117M
MIN
1.5"
NPIC-041-E-0153M

MIN

MIN
PLANT AIR PLANT AIR
2"-PA-041-3001-A2AA-NI 2"-PA-041-3001-A2AA-NI
041-3601M 041-3603M

MIN
MIN
TO UNIT 041 FROM BL

E NPIC-041-E-0129M NPIC-041-E-0129M
E
A. DELETED.

041-IA-01 041-IAH-007 041-IAH-021 1. DELETED.


041-IA-01
NPIC-041-E-0117M NPIC-041-E-0117M
1" 1" 2. DELETED.
INSTRUMENT AIR INSTRUMENT AIR
22"-IA-041-3001-S0RA-NI
IA 041 3001 S0RA NI 22"-IA-041-3001-S0RA-NI
IA 041 3001 S0RA NI 3. DELETED.
041-3601M 041-3603M

TO UNIT 041 FROM BL

F F

NPIC-041-E-0146M
MIN

MIN

LP NITROGEN LP NITROGEN
2"-LPN-041-3001-A1AA-NI 2"-LPN-041-3001-A1AA-NI
041-3601M 041-3603M
MIN

MIN
NPIC-041-E-0129M
TO UNIT 041 FROM BL

FEED DWG.No.
G G
HP NITROGEN HP NITROGEN
2"-HPN-041-3001-D1AA-NI 2"-HPN-041-3001-D1AA-NI
041-3601M 041-3603M

MIN
TO UNIT 041 FROM BL DWG.No. Title

22"-IA-041-3006-S0RA-NI
IA 041 3006 S0RA NI
NPIC-041-E-0149M
REFERENCE DRAWINGS
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
2"
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS

NPIC-041-E-0117M
MIN

0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD


B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H A - NOT ISSUED DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
Operation Centre JOB Code:
NPIC-041-E-0129M

MIN
Operation Centre DWG.No.:
2"-LPN-041-0001-A1AA-NI

MIN Contractor JOB Code Responsible Company


2" 0-6495-20 TPM
Prepared by Checked by Approved by
MIN

T. T. HUONG T. NGUYEN T. N. SON


2"-PA-041-3004-A2AA-NI

MIN
NPIC-041-E-0160M

I I
MIN

0.75"-LPN-041-3024-A1AA-NI

0.75"-PA-041-3020-A2AA-NI
0.75"-PA-041-3022-A2AA-NI

0.75"-PA-041-3024-A2AA-NI

0.75"-PA-041-3023-A2AA-NI

0.75"-PA-041-3043-A2AA-NI
MIN
1"-LPN-041-3016-A1AA-NI

0.75" NSRP

MIN
Complex Project
Nghi Son Refinery and Petrochemical
0.75"
Nghi Son, Vietnam Limited Liability Company
1.5"-HPN-041-0001-D1AA-NI
1.5"-LPN-041-0001-A1AA-NI

1"-LPN-041-2001-A1AA-NI

1"-LPN-041-2002-A1AA-NI

1"-LPN-041-3036-A1AA-NI

Drawing Title

1"-IA-041-2001-S0RA-NI

1"-IA-041-2002-S0RA-NI
NOTE 1

J PIPING AND INSTRUMENT DIAGRAM J

0
NPIC-041-E-0141M
NPIC-041-E-0153M PENEX UNIT
UNIT 041
HC HC HC HC HC HC INSTRUMENT AIR, PLANT AIR AND NITROGEN - 2
EL.110000

EL.103000

EL.105300

AT GRADE

AT GRADE

AT GRADE
US-033

US-034

US-032

US-036

US-035

US-036

LP INSTRUMENT AIR

LP INSTRUMENT AIR
Issue Purpose Document Class
041-3502M

041-0002M

041-2101M

041-2102M

041-3502M

041-0002M

041-2101M

041-2102M
TO FLG HEADER

TO FLG HEADER
TO 041-K-051A/B

TO 041-K-051A/B

FOR CONSTRUCTION Z
TO 041-K-051A

TO 041-K-051B

TO 041-K-051A

TO 041-K-051B
HP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

K Unit No. Unit Abbreviation PCWBS Size Scale K


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3602M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
9
10 11 12 13 14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
6 Package No. : 041-IA-01-SV-1 Page 6 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

FREE DRAINING FLG A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.
LO 041-3502M
1. FOR PROCESS DETAILS, REFER TO DWG. D-041-1225-0002M.
A 0.75" A
2. TO BE LOCATED OUTSIDE COMPRESSOR SHELTER.

3. FOR DETAILS, REFER TO VENDOR DWG. VM2158-211-A-001.

FREE DRAINING
1"-FLG-041-2013-A1AP-NI 4. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO PREVENT
AN OVER PRESSURE DUE TO OVER HEATING.

5. 041-SG-6580 AND GLOBE VALVE WILL BE SUPPLIED IN LOOSE BY


1" - 150#
VENDOR.
RF NPIC-041-E-0164M
6. COOLING WATER MAKE-UP.
1" - 150#
B RF
1" - 150# NPIC-041-E-0164M
7. 041-SG-6531 AND GLOBE VALVE WILL BE SUPPLIED IN LOOSE BY B
TP RF FREE DRAINING VENDOR.
LPN 1"-LPN-041-2001-A1AA-NI TP 4A TP 2"-P-041-2016-A2AP-NI 2"-CBD-041-2003-A2AP-NI CBD
041-3602M 3A 26A 041-3701M 8. COOLING WATER TANK ROUTINE BLOWDOWN.
0.75" 0.75" 1" - 150# 2" 0.75" 9. BIRD SCREEN TO BE PROVIDED. NPIC-041-E-0164M
RF
FREE DRAINING
PURGE SYSTEM TP
27A
PERMANENT LINE
TO ATM
AT SAFE LOCATION
1" - 150# SUBJECT TO SERVICE
C NPIC-041-E-0164M
TP
RF
1" 2"-WO-041-2023-A2AP-NI
FREE DRAINING TEST C
6A
NPIC-041-E-0162M
TEST POINT
NPIC-041-E-0164M NOTE 9
NPIC-041-E-0160M
TP
NPIC-041-E-0164M
8A
1"-V-041-2001-A1AP-NI COMPRESSOR SKID 041-K-051A
0.5" NOTE 1, 3
NPIC-041-E-0164M
NPT WO
1.5"-FLG-041-2030-A1AP-NI 0.5" - 150#
D D
FREE DRAINING FREE DRAINING RF
FLG TP TP
041-3502M 21A 14A
1.5" - 300# 0.5" - 150#
0.75" RF 041-KM-051A RF
1.5"-FLG-041-2031-A1AP-NI MOTOR TP
NPIC-041-E-0164M
13A
FLG FREE DRAINING FREE DRAINING 1. DELETED.
TP
23A 0.75" 0.75"
041-3502M 2. DELETED.
1.5" - 300#
041-IA-01 0.75" RF LPT LPT 3. DELETED.
E LPT E
IA 11"-IA-041-2001-S0RA-NI
IA 041 2001 S0RA NI TP 041-K-051A
0041-3602M 7A
1" - 150# COMPRESSOR
0.75" NPIC-041-E-0164M
FF
1.5" - 300#
RF
0.75" TP 0.5" - 150#
22A RF
TP
1.5"-CBD-041-2001-A2AP-NI 15A
1.5" - 300# 0.5" - 150# 0.75"
F RF RF F
0.75" TP TP LPT
0.75"
24A 20A

1.5"-CBD-041-2002-A2AP-NI LPT COOLANT RETURN


0.5"-CWR-041-2027-A2AW-NI
041-2102M
NPIC-041-E-0153M
FROM 041-K-051B
NPIC-041-E-0164M
COOLANT SUPPLY
1" - 150# 0.75"-CWS-041-2008-A2AW-NI
041-2102M
NOTE 4 RF
CWS 1"-CWS-041-2004-A2AW-NI TP TO 041-K-051B FEED DWG.No.
G 041-3002M 9A COOLANT SUPPLY G
SIZE : 0.75 D 1 0.75"-CWS-041-2007-A2AW-NI
PSET : 1.0 MPa(g) 041 0.75" 041-2102M
TSV
0019 TO 041-K-051B
1"-V-041-2004-A1AP-NI COOLANT RETURN
0.5"-CWR-041-2005-A2AW-NI DWG.No. Title
041-2102M REFERENCE DRAWINGS
FREE DRAINING

1" LUBE OIL COOLER LUBE OIL SYSTEM FROM 041-K-051B

0.75"-CWS-041-2005-A2AW-NI

0.75"-CWS-041-2006-A2AW-NI
2 17/JUN/15 FOR CONSTRUCTION TTH TN TNS

0.5"-CWR-041-2026-A2AW-NI
FREE DRAINING

0.5-CWR-041-2004-A2AW-NI
1 31/MAR/15 FOR CONSTRUCTION TTH TN TNS
0 26/NOV/14 FOR CONSTRUCTION TTH DM TNS
041
H SG
A 20/MAY/14 FOR REVIEW TTH DM JMD H
NOTE 7 Rev Date Description Prep'd Chk'd App'd
6531
AT GRADE REVISIONS
IN VIEW
TO SAFE LOCATION Operation Centre JOB Code:
0.75" Operation Centre DWG.No.:
(V) (V)

0.75" - 150#

0.75" - 150#
CWR Contractor JOB Code Responsible Company
0.5" - 150#

0.5" - 150#
TP TP TP
SG 0-6495-20 TPM
041-3002M 10A 30A 25A

RF

RF

RF
RF
NOTE 4 Prepared by Checked by Approved by
1"-CWR-041-2003-A2AW-NI 1" - 150# T. T. HUONG T. NGUYEN T. N. SON
NPT NPIC-041-E-0164M
RF 1.5" - 150#
1"-WO-041-2028-A2AP-NI 1" 1"
RF
I NPT NPT
TP TP TP TP TP NOTE 6 1.5"-CWS-041-2034-A2AW-NI CWS I
FREE DRAINING

1"-WO-041-2001-A2AP-NI 19 18 16 17 28 041-3002M
FREE DRAINING

1" - 150# 0.75"


TP RF 1"-CWS-041-2001-A2AW-NI CWS
NSRP
11 Complex Project
CLOSED LOOP JACKET COOLING WATER SKID NOTE 4 NPIC-041-E-0164M 041-3002M Nghi Son Refinery and Petrochemical
NOTE 3 0.75" 041 SIZE : 0.75 D 1 Nghi Son, Vietnam Limited Liability Company
TSV PSET : 1.0 MPa(g)
0018 Drawing Title
1"-V-041-2003-A1AP-NI
TP
J PIPING AND INSTRUMENT DIAGRAM J

FREE DRAINING
29

WO WO 1"
PENEX

FREE DRAINING
1"-150# MAKE-UP GAS SECTION
RF
041
INTERFACE DRAWING OF 041-K-051A
DRAINING

1"-WO-041-2025-A2AP-NI SG NOTE 5
6580
FREE

IN VIEW AT GRADE
TO SAFE LOCATION Issue Purpose Document Class
NOTE 8 0.75"
(V) (V) FOR CONSTRUCTION Z
CWR
K TP
12
SG
041-3002M
Unit No. Unit Abbreviation PCWBS Size Scale K
NOTE 4 041 PENX A900 A1 NONE
WO 1" - 150# 1"-CWR-041-2001-A2AW-NI

DR01A
RF NPT Contractor DWG.No. Sheet Rev.
A1

D-041-1225-2101M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
7 Package No. : 041-IA-01-SV-1 Page 7 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.

1. FOR PROCESS DETAILS, REFER TO DWG. D-041-1225-0002M.


A A
2. TO BE LOCATED OUTSIDE COMPRESSOR SHELTER.

3. FOR DETAILS, REFER TO VENDOR DWG. VM2158-211-A-001.

4. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO PREVENT


AN OVER PRESSURE DUE TO OVER HEATING.
FREE DRAINING FLG 5. 041-SG-6571 AND GLOBE VALVE WILL BE SUPPLIED IN LOOSE BY
LO 041-3502M VENDOR.

0.75" 6. BIRD SCREEN TO BE PROVIDED. NPIC-041-E-0164M

B B
PERMANENT LINE

FREE DRAINING
1"-FLG-041-2015-A1AP-NI SUBJECT TO SERVICE
TEST
1" - 150# TEST POINT
RF
NPIC-041-E-0164M

1" - 150# 1" - 150# NPIC-041-E-0164M


C TP RF
C
RF FREE DRAINING
LPN 1"-LPN-041-2002-A1AA-NI TP 4B TP 2"-P-041-2017-A2AP-NI 2"-CBD-041-2006-A2AP-NI CBD
041-3602M 3B 26B 041-3701M
1" - 150#
0.75" 0.75" RF 2" 0.75"
FREE DRAINING
TP
27B

TO ATM 1" - 150#


PURGE SYSTEM
AT SAFE LOCATION NPIC-041-E-0164M RF
D TP 1"-WO-041-2024-A2AP-NI 2"-WO-041-2024-A2AP-NI FREE DRAINING D
6B

NPIC-041-E-0162M NOTE 6 NPIC-041-E-0160M


NPIC-041-E-0164M NPIC-041-E-0164M
1"-V-041-2002-A1AP-NI 1. DELETED.
TP
8B
COMPRESSOR SKID 041-K-051B
NOTE 1, 3 NPIC-041-E-0164M WO
0.5" - 150#
E RF E
0.5" - 150#
LPT COOLANT SUPPLY
FLG FREE DRAINING 1.5"-FLG-041-2032-A1AP-NI FREE DRAINING RF 0.75"-CWS-041-2008-A2AW-NI
TP TP
041-2101M
041-3502M 21B 14B
1.5" - 300# FROM CLOSED LOOP JACKET
0.75" 0.75"
RF 0.5" - 150# COOLING WATER SKID
041-KM-051B RF LPT COOLANT SUPPLY
FREE DRAINING FREE DRAINING TP
0.75"-CWS-041-2007-A2AW-NI
FLG 1.5"-FLG-041-2033-A1AP-NI TP MOTOR NPIC-041-E-0164M 041-2101M
23B 13B
041-3502M
1.5" - 300# 0.75" FROM CLOSED LOOP JACKET
0.75"
F 041-IA-01 RF COOLING WATER SKID
F
1" - 150#
LPT
IA 11"-IA-041-2002-S0RA-NI
IA 041 2002 S0RA NI FF TP
041-K-051B
0041-3602M 7B COMPRESSOR NPIC-041-E-0164M
0.75"
1.5" - 300#
0.5" - 150#
RF LPT COOLANT RETURN
0.75" RF 0.5"-CWR-041-2005-A2AW-NI
TP TP
22B 041-2101M
15B
FEED DWG.No.
G 1.5"-CBD-041-2004-A2AP-NI
1.5" - 300# 0.5" - 150#
0.75" TO CLOSED LOOP JACKET
COOLING WATER SKID
G
RF RF LPT COOLANT RETURN
0.75" TP TP
0.5"-CWR-041-2027-A2AW-NI
24B 041-2101M
20B
0.75" TO CLOSED LOOP JACKET
1.5"-CBD-041-2005-A2AP-NI DWG.No. Title
COOLING WATER SKID REFERENCE DRAWINGS
NPIC-041-E-0153M
2 17/JUN/15 FOR CONSTRUCTION TTH TN TNS
1 31/MAR/15 FOR CONSTRUCTION TTH TN TNS
NPIC-041-E-0164M 0 26/NOV/14 FOR CONSTRUCTION TTH DM TNS
H 1" - 150#
A 20/MAY/14 FOR REVIEW TTH DM JMD H
Rev Date Description Prep'd Chk'd App'd
NOTE 4 RF REVISIONS
CWS 1"-CWS-041-2002-A2AW-NI TP Operation Centre JOB Code:
041-3002M 9B
SIZE : 0.75 D 1 Operation Centre DWG.No.:
PSET : 1.0 MPa(g) 041 0.75" Contractor JOB Code Responsible Company
TSV 0-6495-20 TPM
0020
Prepared by Checked by Approved by
1"-V-041-2005-A1AP-NI
T. T. HUONG T. NGUYEN T. N. SON
FREE DRAINING

LUBE OIL COOLER LUBE OIL SYSTEM


I 1" I
FREE DRAINING

NOTE 5 SG
041

6571
NSRP
Complex Project
AT GRADE IN VIEW Nghi Son Refinery and Petrochemical
TO SAFE LOCATION Nghi Son, Vietnam Limited Liability Company
0.75"
(V) (V)
CWR 1"-CWR-041-2002-A2AW-NI TP Drawing Title
SG TP TP
041-3002M 10B 30B
NOTE 4 25B
J 1" - 150# PIPING AND INSTRUMENT DIAGRAM J
NPT RF PENEX
1"-WO-041-2029-A2AP-NI 1" 1"-WO-041-2002-A2AP-NI 1"
NPT NPT MAKE-UP GAS SECTION
FREE DRAINING

FREE DRAINING

INTERFACE DRAWING OF 041-K-051B

Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
WO WO Contractor DWG.No. Sheet Rev.
A1

D-041-1225-2102M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
8 Package No. : 041-IA-01-SV-1 Page 8 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NPIC-041-E-0162M
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.

1. FOR PRESSURE TEST.


A N A

TO AIR RESERVOIR

TO AIR RESERVOIR

AT GRADE

AT GRADE
ATGRADE

EL.117800
EL.117800

EL.118500
ATGRADE

ATGRADE

INSTRUMENT AIR

INSTRUMENT AIR
2. FOR START-UP.

US-001

US-002

US-003

US-004

US-039

US-003

US-004

US-005
TO CCB HEADER

TO CBD HEADER

TO FLG HEADER

TO 041-R-101A/B

TO 041-P-203A/B

TO 041-P-202A/B
041-0024M

041-3401M

041-0024M

041-3701M

041-3701M

041-0012M

041-3501M

041-0015M

041-0015M

041-0016M

041-0015M

041-0016M

041-0022M

041-0023M

041-0015M

041-0015M
TO FG HEADER

TO 041-R-101A

TO 041-R-101B

TO 041-R-101A

TO 041-R-101B

(041-R-101A/B)

(041-R-101A/B)
HP NITROGEN

HP NITROGEN
TO 041-TK-211

LP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN
TO 041-P-212

TO 041-A-111
3. PLANT AIR FOR TANK MIXING.

PLANT AIR
HC HC HC HC HC HC HC HC 4. SPARE IAH NPIC-041-E-0162M

NPIC-041-E-0149M
PERMANENT LINE

IA 041 0002 S0RA NI


0.75"-IA-041-0002-S0RA-NI
1"-PA-041-0001-A2AA-NI

0.75"-PA-041-3008-A2AA-NI
0.75"-LPN-041-3029-A1AA-NI

0.75''-PA-041-3009-A2AA-NI

0.75''-PA-041-3011-A2AA-NI
0.75''-PA-041-3006-A2AA-NI

0.75"-LPN-041-3008-A1AA-NI

0.75"-LPN-041-0018-A1AA-NI

0.75"-LPN-041-3012-A1AA-NI

0.75"-LPN-041-3023-A1AA-NI

0.75''-PA-041-3007-A2AA-NI

0.75"-LPN-041-0002-A1AA-NI

0.75''-LPN-041-3019-A1AA-NI

0.75"-LPN-041-0014-A1AA-NI

0.75"-LPN-041-0017-A1AA-NI
0.75"-LPN-041-3017-A1AA-NI

0.75"-IA-041-0001-S0RA-NI
IA 041 0001 S0RA NI
1.5"-LPN-041-0003-A1AA-NI

1.5"-LPN-041-0004-A1AA-NI

1.5"-HPN-041-0002-D1AA-NI

1.5"-HPN-041-0003-D1AA-NI

0.75"-LPN-041-0016-A1AA-NI
SUBJECT TO SERVICE

1"-LPN-041-3010-A1AA-NI
TEST
B B
NOTE 3

NOTE 2

NOTE 2

NOTE 1

NOTE 1
TEST POINT

0.75

0.75
0.75"

MIN
MIN

2"
MIN MIN
MIN

MIN

C NPIC-041-E-0153M
MIN
MIN C

NPIC-041-E-0129M
0.75"

MIN
1"-PA-041-3005-A2AA-NI

2"-LPN-041-0016-A1AA-NI
MIN

MIN

MIN
MIN
MIN
MIN
MIN
MIN

MIN
MIN
MIN

MIN

0.75"
D D
NPIC-041-E-0153M 0.75"
NPIC-041-E-0153M
NPIC-041-E-0153M

MIN
MIN

MIN

MIN
PLANT AIR
2"-PA-041-3001-A2AA-NI
041-3602M
NPIC-041-E-0128M

MIN
NPIC-041-E-0153M FROM BL
0.75"
E NPIC-041-E-0153M
E
MIN 2"-LPN-041-3033-A1AA-NI 0.75" 0.75"
A. DELETED.
NPIC-041-E-0129M NOTE 4 LPT LPT
NPIC-041-E-0162M 041-IAH-014 041-IAH-013 041-IAH-009 041-IAH-012 041-IAH-008 041-IA-01 1. DELETED.
1" NPIC-041-E-0117M
MIN 1" 1" 1" 1" 1" 2. DELETED.

MIN
INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI
2 IA 041 3001 S0RA NI 3. DELETED.
041-3602M

NPIC-041-E-0162M
NPIC-041-E-0128M

2"-LPN-041-3018-A1AA-NI
FROM BL 4. DELETED.
0.75"

F F

041-IAH-015
1"

MIN

MIN
LP NITROGEN
2"-LPN-041-3001-A1AA-NI
041-3602M
MIN

MIN

MIN
FROM BL
NPIC-041-E-0128M 0.75"

041-IAH-019
1"
FEED DWG.No.
G G
MIN

MIN
HP NITROGEN
2"-HPN-041-3001-D1AA-NI
041-3602M
MIN AT GRADE
0.75"-LPN-041-0012-A1AA-NI FROM BL

041-IAH-020
0.75''-PA-041-3028-A2AA-NI DWG.No. Title
0.75" HC US-027 1" REFERENCE DRAWINGS
NPIC-041-E-0128M MIN LP NITROGEN
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
041-0004M
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
TO 041-DR-051A/B 0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
0.75" MIN
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 2" H

041-IAH-010
A 13/JUL/13 FOR REVIEW DMO RKM SMA
1"

2"-IA-041-3004-S0RA-NI
Rev Date Description Prep'd Chk'd App'd
LPT 0.75"-LPN-041-3020-A1AA-NI

2"-LPN-041-3006-A1AA-NI
NPIC-041-E-0117M REVISIONS
EL.108050 NPIC-041-E-0149M
MIN 0.75''-PA-041-3029-A2AA-NI EL.110000 Operation Centre JOB Code:
2"-LPN-041-3031-A1AA-NI HC US-028 2"
NPIC-041-E-0129M

HC US-033 Operation Centre DWG.No.:


Contractor JOB Code Responsible Company

MIN
2"-PA-041-3027-A2AA-NI

NPIC-041-E-0149M
MIN

MIN

MIN

041-IAH-017
0-6495-20 TPM
NPIC-041-E-0129M

0.75" 1"
0.75"-LPN-041-3021-A1AA-NI Prepared by Checked by Approved by
NPIC-041-E-0153M

EL.122500 NPIC-041-E-0160M T. T. HUONG T. NGUYEN T. N. SON


0.75''-PA-041-3030-A2AA-NI EL.103000
HC US-029 HC US-034
I I

041-IAH-011
1"

075''-PA-041-3012-A2AA-NI
0.75"-LPN-041-0026-A1AA-NI

0.75"-LPN-041-0027-A1AA-NI

0.75"-LPN-041-0015-A1AA-NI

0.75"-LPN-041-3013-A1AA-NI

0.75"-LPN-041-0013-A1AA-NI 0.75"
1.5''-HPN-041-0004-D1AA-NI

MIN
2"-PA-041-3047-A2AA-NI
2"-LPN-041-3005-A1AA-NI

1"-LPN-041-3009-A1AA-NI

0.75''-PA-041-3027-A2AA-NI EL.133950 NPIC-041-E-0129M NSRP


0.75''-LPN-041-3037-A2AA-NI

075''-LPN-041-3032-A1AA-NI
NPIC-041-E-0162M

HC US-030 Complex Project


NOTE 1

MIN 2"-LPN-041-3027-A1AA-NI Nghi Son Refinery and Petrochemical

041-IAH-018
Nghi Son, Vietnam Limited Liability Company
1"
NPIC-041-E-0160M

0.75"-LPN-041-0025-A1AA-NI
MIN Drawing Title

2"
MIN
J 0.75''-PA-041-3025-A2AA-NI
EL.104000 PIPING AND INSTRUMENT DIAGRAM J
HC US-025

MIN
PENEX

041-IAH-016
1"
NPIC-041-E-0160M 0.75" UNIT 041
0.75"

MIN
MIN INSTRUMENT AIR, PLANT AIR AND NITROGEN - 1

0.75"-LPN-041-3034-A1AA-NI
AT GRADE
0.75''-PA-041-3026-A2AA-NI HC HC HC
HC US-026

ATGRADE
EL. 105100
EL.106500

US-031
NPIC-041-E-0153M
US-040

Issue Purpose Document Class


US-032
MIN
TO LPCW HEADER

TO 041-DR-001A/B

0.75" FOR CONTRUCTION Z


TO CBD HEADER

TO CBD HEADER
041-0020M

041-0020M

041-0020M

041-0019M

041-3101M

041-3701M

041-3501M

041-0011M

041-0008M

041-3701M
TO FLG HEADER
TO 041-P-201A/B

TO 041-P-001A/B
TO 041-P-201A

TO 041-P-201B

HP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN
K K
TO 041-V-201

Unit No. Unit Abbreviation PCWBS Size Scale


NPIC-041-E-0153M
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3601M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
10 11 12 13 14 15 16
Attachment : S-000-1730-0812M_0_0030 System No. : 041-IA-01
9 Package No. : 041-IA-01-SV-1 Page 9 of 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
LEAD REACTOR EFFLUENT
8"-P-041-0084-B1AH04-HC 041
041-0014M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TWO PHASE FLOW PSV 041-R-101A
0151 0014V AND D-000-1225-0020V TO 0026V.
FROM 041-E-102A/B (V) 041
0.75"-IA-041-0001-S0RA-NI UZ SIZE: 3J4 1. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
STRIPPING HYDROGEN AIR RESERVOIR 041-IA-01 041 041 PSET: 3.90 MPa(g)
REACTOR
A 4"-P-041-0048-B1AH04-HC
1000
UZ UZ
041 FREE DRAINING 8"-FLG-041-0025-A1AP-NI FLG CODE ASME VIII DIV 1
2.
3.
CATALYST WITHDRAWAL NOZZLE.
FOR PURGE AND PRESSURING.
A
041-0006M 0102 0101
NOTE 4 PSV
IA 0103 041-3501M SIZE: I.D x TT 2500 mm x 12200 mm 4. FOR SULFUR STRIPPING.
FROM 041-H-011
041 3.90 MPa(g) + FV @ 205 °C 5. BLANKETING GAS.
DESIGN PRESSURE

NPIC-041-E-0153M
0
041-3601M
PG

MIN
INST. PIP. 6. LOW RANGE GAUGE USED FOR REACTOR BLANKETING DURING
0113 DESIGN TEMPERATURE 260 °C
(V)
(V 041 041 CRI T LOADING ONLY.
041 041
PI PT
UZ HZA 0.75" 0.75" INSULATION TYPE HC 7. LINE FOR DRY-OUT.

MIN
0109 0109 0103 0101 NP P-041-0288-D1AH04-HC
L 041 041 8. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
1" NC

FREE DRAINING
ULL ULH TRIM SPECIFICATION
S P-041-0331-B1AH04-HC D-041-1225-2401M.
0101 0101
2" NOTE 14
9. 6" x 650 MM PIPING PIECE SAMPLE RECEIVER WITH PIPE SUPPORT
041 041 041 NC 4"-P-041-0165-B1AH04-HC NPIC-041-E-0152M
B 041 S FOR POSSIBLE VIBRATION.
B

MIN
UA HZS UA
041 041 UZY 10. FOR PRESSURE TEST.
0101A 0101 0101B

NOTE 5
USL USH 0101A 041 041
0101 0101 UZY UZV CIRCUIT EMERGENCY CIRCUIT 11. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
0101B 0101
TROUBLE SHUTDOWN TROUBLE PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
COMBINED FEED COIL 1 COIL 2
8"-P-041-0085-B1AH04-HC 8"-P-041-0259-B1AH04-HC SWING ELBOW TO HPN. NPIC-041-E-0115M
041-0014M 12. TO BE USED DURING DRY-OUT OPERATION ONLY.
TWO PHASE FLOW 041
FROM 041-E-103 FI FC 13. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO
0055 TSO 041 REACTORS.
HIC
8"

MIN
14. ALTERNATE DESIGN CONDITIONS DURING HOT HYDROGEN STRIPPING:
NC NOTE 18 0055
1.5"-P-041-0164-B1AH04-NI - PRESSURE: 2.70 MPa(g)
C 0.75"
041
FT
041
FE
NOTE 3 041
- TEMPERATURE: 315 °C C
0055 0055 HV 15. DEPRESSURING SYSTEM SHUTDOWNS BY-PASS SWITCH WITH LIGHT
NP 0.75" 0055
HYDROGEN PURGE FREE DRAINING FOR TESTING DEPRESSURING SYSTEM WHILE BY-PASSING
2"-P-041-0079-B1AH04-NI ASSOCIATED SHUTDOWNS.
041-0013M 041
NOTE 5

VENDOR CONTRACTOR LO FL(O) 2" LO 041 UZ


FROM 041-DR-051A/B 041 NOTE 6 041 HZS 0101
PG PG 0.75" 1" 0.75"
NOTE 17 2" MIN 0108

NPIC-041-E-0158M
0102 0118
1" NC FREE DRAINING 1.5" 041 041
LPN MW UZ HZL CRIT
041-3601M 30" 0102 0108A

FREE DRAINING
MIN

1.5"-LPN-041-0003-A1AA-NI 041
D STRIPPING HYDROGEN
4"-P-041-0047-B1AH04-HC NPIC-041-E-0115M
0.75" 0.75"
UZ D

MIN
041-0006M NOTE 16 1.5" 1.5"
041-R-101A 0103
NOTE 4 0.75" 0.75"
TO 041-H-011 IN VIEW 041 NOTE 13
1.5"-HPN-041-0002-D1AA-NI PG
NOTE 19 16. FOR START-UP.
0074
17. VALVE AND BLIND FLANGE TO BE PROVIDED BY CONTRACTOR.
1.5" 041 8" 8"
NOTE 11 VAPOR
041
PI 18. ORIFICE WITH 20.32 MM HOLE.
HPN PT
0103 0103 19. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 3.9 MPa(g)
041-3601M LIQUID TRAY COMBINED FEED
NOTE 10 FREE DRAINING FREE DRAINING 8"-P-041-0167-B1AH04-HC
NOTE 1 H NPIC-041-E-0115M
0.75" 0.75" 041 041 041-0016M
TT TI
NC TWO PHASE FLOW
0105 0105 MIN TO 041-R-101B
0.75"-SVW-041-0004-A2AW-NI SVW
E 041-3301M 041 H
0.75" 0.75" E
041
TT TI A. DELETED.
NC 1.5"-P-041-0170-D1AH04-PC 0106 0106 8"-P-041-0160-B1AH04-HC
NPIC-041-E-0097M H TWO PHASE FLOW
041 041 PERMANENT LINE
1.5"-P-041-0306-B1AH04-PC TT TI
0107 0107 SUBJECT TO SERVICE
H TEST
2"-WW-041-0001-A2AW-NI

041 041
NPIC-041-E-0158M TI
0.75"-P-041-0171-B1AH04-NI TT
0104 0104 TEST POINT
H
FREE DRAINING

F 0.75"-FLG-041-0024-A1AP-NI FLG 041


TT
041
TI
041
PDY
041
PDI F
NO POCKET 041-3501M 0108 0108 0105 0105 L
041 H
041
TT TI
FREE DRAINING

0.75" 0109 0109


1" NC
041 UC H
041 041 041
SP PG TI
1221 0.75"-P-041-0169-B1AH04-NI TT
0115 0110 0110

041 H 041
2" 041
TI PI FEED DWG.No.
TT
G 0111 0111 0104 G

041 H
953053-120-18-A1 REACTORS
TI 0.75"
WO 041 0112
DWG.No. Title
CL OF GLASS
041 LG TL REFERENCE DRAWINGS
TG
NO POCKET 2"-FLG-041-0026-A1AP-NI FLG
0102 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
150

0207 GL(R) 041-3501M


1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041 041 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
NOTE 9 NOTE 2
0.75" TT PG 041 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
6" 6"
H SIGNAL 0112 0116
H
2300 MIN

NPIC-041-E-0115M PT A 13/JUL/13 FOR REVIEW DMO RKM SMA


041-0008M NOTE 2 LPT 0104 Rev Date Description Prep'd Chk'd App'd
PIP. LAG REACTOR EFFLUENT
8"-P-041-0166-B1AH04-HC REVISIONS
TO 041-AY-0001 0.75" INST. INST. 041-0016M
NOTE 8 Operation Centre JOB Code:
041 NOTE 12 PIP. NC CIRCUIT Operation Centre DWG.No.:
FLG 041 NOTE 1 TROUBLE FROM 041-R-101B
SC AT 8"-P-041-0161-B1AH04-HC 0.75"
0.75" 0.75" 8" 8" CRIT Contractor JOB Code Responsible Company
041-3501M 0004 0001D 0.75" NPT 041 041 041 041
NPT MOIS UZ UZ HZA UA 0-6495-20 TPM
TYPE L2
NOTE 1 0103 0101 0110 0102 Prepared by Checked by Approved by
NPIC-041-E-0105M
0.75" 0.75" 300 # 300 # SAMPLE RETURN T. T. HUONG T. NGUYEN T. N. SON
NOTE 15
NOTE 1 NOTE 1 0041 0.75"-P-041-0089-B1AH04-NI
041 041-0017M
PSV
I 3"
0.75"-IA-041-0002-S0RA-NI
0152 UZ 041
HZS
NNF
TO 041-E-201A/B
I
3"-CBD-041-0026-A2AP-NI

((V) 0102
0.75"-P-041-0087-B1AH04-PG 0.75" 041
AIR RESERVOIR UA 0110
0.75"-LPN-041-0014-A1AA-NI 041-IA-01 EMERGENCY
HYDROCARBON SAMPLE MIN
0103 041
DEPRESSURIZING NSRP
FREE DRAINING

PIP. INST. CIRCUIT UZY


0.75"-P-041-0077-B1AH04-PG 0103
041-0013M LPN TROUBLE S Complex Project
IA Nghi Son Refinery and Petrochemical
TWO PHASE FLOW NC WO 041-3601M
MIN

FROM 041-E-101 NOTE 7 041-3601M Nghi Son, Vietnam Limited Liability Company
0.75" 0.75"
0.75"-LPS-041-0022-A1AS-HS 041 041 Drawing Title
NC PG UZY
0102
0117 S
J 0.75" LPS
041
((V)
PIPING AND INSTRUMENT DIAGRAM J
NP CBD 041-3101M PT
041-3701M 0.75" 0.75" 0110
H H
PENEX
NC 0.75"-P-041-0260-B1AH04-HC 041 041 041 041
MIN

ULL ULH ULH ULL REACTOR SECTION


LEAD REACTOR EFFLUENT 0102 0102 0103 0103
8"-P-041-0082-B1AH04-HC L L
041-0014M 041 REACTORS - 1
TWO PHASE FLOW PI
TO 041-E-102A/B 0110 L 041 041 041 041 041 041
START-UP PURGE USL USH UZV UZV USH USL 3"-FLG-041-0023-A1AP-NI
2"-P-041-0083-A1AP04-NI 0102 0103 Issue Purpose Document Class
0102 0102 0103 0103
041-0013M
FOR CONSTRUCTION Z
K TO 041-EJ-611
3"-P-041-0168-B1AH04-HC FREE DRAINING FLG
Unit No. Unit Abbreviation PCWBS Size Scale K
LAG REACTOR EFFLUENT
8"-P-041-0078-B1AH04-HC TWO PHASE FLOW 041-3501M
041 PENX A900 A1 NONE
LO LO

DR01A
041-0013M FC FC Contractor DWG.No. Sheet Rev.

0.75"
TWO PHASE FLOW TSO TSO
A1

TO 041-E-101 3" 3" D-041-1225-0015M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
PJ Name: NSRP Complex Project Attachment: S-000-1730-0812M_0_0040
Contractor JOB Code: 0-6495-20 Contractor Doc No.: S-000-1730-0812M_0

QC-COM-120
PRE-COMMISSIONING
TIGHTNESS TEST/ INERTING
LIST OF CONTROL VALVE/ ON-OFF VALVE/ MOTOR OPERATED VALVES TO BE FORCED OPEN
SYSTEM No : Services Test/Inerting Package No.:

SYSTEM Name : LOCATION :


Overridden by Reinstatement
Valve Tag no. Reference P&ID
DATE CONTRACTOR EMPLOYER DATE CONTRACTOR EMPLOYER

Remarks :

INSPECTORS Subcontactor (HOLD) Contractor (JGCS) Employer (NSRP)


NAME
SIGNATURE
DATE

D R A