Employer Doc. No.

NSRP Contractor Doc. No.


Complex Project Nghi Son Refinery and Petrochemical S-000-1730-0811M
Limited Liability Company
Nghi Son, Vietnam Rev. 0 Page 1 of 11

Employer Contract No.: , Contractor JOB Code: 0-6495-20 Date: 08/SEP/15

Detail Pre-commissioning Procedure for Service Test

of Nitrogen for Unit 040/041/042/043

Unit No.: 040/041/042/043

Unit Abbreviation.: NHDS/PENEX/CCR/CCRR

Document Class: Z

Issue Purpose For Construction

Rev Date Page Description Prep'd Chk'd App'd

0 08/SEP/15 All For Construction NSR SG SM


A 06/JUL/15 All For Review NSR SG SM

Operation Centre JOB Code: Operation Centre Doc. No.:


Responsible Company Prepared by Checked by Approved by
TPM N.Wisatsiri S.Gibson S. Mariotti

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 2 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

CONTENTS

1 INTRODUCTION ................................................................................................................................... 3
2 REFERENCE DOCUMENTS ................................................................................................................ 3
3 DEFINITIONS ........................................................................................................................................ 3
4 ABBREVATIONS.................................................................................................................................. 4
5 SCOPE OF APPLICATION .................................................................................................................. 4
6 HSE ....................................................................................................................................................... 4
7 TRAINING AND COMPETENCY OF PERSONNEL ............................................................................ 5
8 ROLES AND RESPONSIBILITIES....................................................................................................... 5
9 IMPLEMENTATION OF SERVICE TESTOF PIPELINES .................................................................... 7
10 ACCEPTANCE CRITERIA.................................................................................................................. 10
11 POST WORK ...................................................................................................................................... 10
12 ATTACHMENTS ................................................................................................................................. 10

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 3 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

1 INTRODUCTION

This document provides a general method for the Service Test of Nitrogen for Unit 040/041/042/043 by

separate to Section A is Service Test for common Utility header (Nitrogen) of Unit 040/042/043 and

Section B is Service Test for common Utility header (Nitrogen) of Unit 041. The Service test is a method

of test, used for checking of leaks at Equipment or of piping systems. Prior to the Mechanical

Completion activities, systems are subjected to a Service test such that it prevents any uncontrollable

leakage of process fluids. It is carried out after hydrostatic or pneumatic test (pressure test) these tests

may also be referred to as Tightness Test or gross air leak test.

2 REFERENCE DOCUMENTS

S-000-1710-0001V Pre-commissioning and Commissioning Execution Plan

S-000-1710-0100V Pipe Cleaning Guide

S-000-1710-0120V General Pre-commissioning & Commissioning Procedure Tightness Test

S-000-1240-0001V Project Overall HSE Plan

X-XXX-XXXX-XXXX Flange Management Procedure

X-XXX-XXXX-XXXX Bolt Tensioning and Torqueing Procedure

X-XXX-XXXX-XXXX Mechanical Isolation Procedure

3 DEFINITIONS

The following terms are defined in Project Coordination Procedure (S-000-1140-0001V)

 Employer
Nghi Son Refinery and Petrochemical Limited Liability Company

 Contractor
A Joint Venture formed by JGC Corporation, Chiyoda Corporation, GS Engineering &
Construction Corporation, SK Engineering & Construction Co., Ltd., Technip France and
Technip Geoproduction (M) Sdn. Bhd.

 JVD
Contractor's Joint Venture Directorate

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 4 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

4 ABBREVATIONS

HSE - Health, Safety and Environment


JHA - Job Hazard Analysis
PPE - Personnel Protective Equipment
RA - Risk Assessment
PTW - Permit to work

5 SCOPE OF APPLICATION

The scope of this document is the Service test of Nitrogen for Unit 040/041/042/043 by separate to

Section A is Service Test for Common Utility header (Nitrogen) of Unit 040/042/043 and Section B is

Service Test for Common Utility header (Nitrogen) of Unit 041. The Utility piping of this unit shall be

subjected to a gross air leak test If required with Nitrogen or Dry Air prior to mechanical completion of

the unit, it will also be subjected to Inerting / Passivation during the commissioning phase and there

shall be separate procedures for these activities, Header where possible the process medium shall be

use on completion. The system can be put into service.

6 HSE

The following HSE risks are inherent in Tightness Test. All personnel shall give top priority to the

management of health, safety and the environment (HSE). All work shall be undertaken in a responsible

manner giving full consideration to the impact of the activities may have on health, safety, and the

environment.

Specific Health and Safety requirements for this Pre-commissioning Procedure are:

1. Before executing activities stated in this Pre-commissioning Procedure, a Job Hazard Analysis

(JHA), Risk Assessment (RA), and Tool Box Talk shall be carried out.

2. Appropriate Personal Protective Equipment (PPE) as determined by the JHA and Risk

Assessment which shall be worn by all personnel assigned to execute these activities.

3. Ensure to follow recommended actions given in MSDS for chemicals as applicable.

4. If motorized equipment is used, refuelling shall not take place while equipment is running.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 5 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

5. If electric tools are used, they shall be powered either by a 110-volt supply or by battery.

6. Additional safety precautions are provided in the specific Tightness Test for the system.

7 TRAINING AND COMPETENCY OF PERSONNEL

All activities covered in this Procedure shall be performed only by qualified and competent personnel.

In addition, all personnel must have completed the HSE training. If sub-contractors or persons, other

than commissioning personnel, will assist in the execution of activities covered by this

Pre-commissioning procedure then those person(s) also shall attend HSE training and meet the

requirements for the HSE standard. Additionally, a qualified and competent commissioning supervisor

shall indoctrinate the sub-contractor or person(s) in the Tightness Test philosophy and methodology.

8 ROLES AND RESPONSIBILITIES

The Roles and Responsibilities of various parties are provided below.

8.1 Employers Commissioning Team

Commissioning Engineer/Manager

1. Responsible for witnessing the test.

2. Responsible for accepting or rejecting the test.

Construction Representative

Employers representative will witness all Pre-commissioning testing.

8.2 Contractor’s Pre-Commissioning Team

Commissioning Manager

1. Overall control of Sub-contractor and Contractor commissioning team during execution of

commissioning operations.

2. Liaison with Employers commissioning representatives for executing the commissioning

operations.

3. Vendor mobilisation plan will be made and HSE induction will be coordinated upon their arrival to

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 6 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

site.

4. Commissioning Report/Dossier submission to the Employer.

5. Overall supervision of Pre-commissioning activities.

Pre-Commissioning Engineer

1. Responsible for the safety of all personnel assigned to him, ensuring that the JHA, applicable

permits and control measures are in place prior to applying the method statement.

2. Responsible for the final acceptance of test results.

3. Responsible for supporting the testing team & for setting all applicable test requirement and

conditions.

4. Responsible for ensuring all resources, tools, test equipment etc., are available at the test site.

5. Responsible for coordinating the works with other parties that may be required and parties

affected by executing the method statement.

6. Coordinate construction Work Packs with Employers representatives.

Operators

1. Responsible for ensuring that the work as outlined in the method statement is performed safely

and all safeguards & controls are complied with.

2. Responsible for preparing the equipment, system for testing or activities as outlined in this

method statement.

3. Responsible for executing the tests/activities as outlined in the method statement and as

instructed by the Supervisor/Commissioning Vendor Engineers.

4. Vendor engineers will work in coordination with the Contractor Pre-Commissioning (discipline)

Engineer.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 7 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

9 IMPLEMENTATION OF TIGHTNESS TEST OF PIPELINES

9.1 PRE-CLEANING / PRESERVATION

During site installation of the equipment, piping is pre-cleaned by flushing, blowing or hydro-jetting,

depending on contamination and required cleanliness level.

9.2 DETAILED SCOPE

Service Test of Nitrogen for Unit 040/041/042/043 by separate to Section A is Service Test for common
Utility header (Nitrogen) of Unit 040/042/043 and Section B Service Test for common Utility header
(Nitrogen) of Unit 041 refer to attached P&ID’s Mark up.The Service test shall be carried out.

Section A Common header (Nitrogen) of Unit 040/042/043

System No. System Description Test Pressure Service Test Attachment No.
MPa(g). Package No.
NHDS Low Pressure
040-LPN-01
Nitrogen
CCR Low Pressure
042-LPN-01 0.69 000-LPN-01-SV-1 S-000-1730-0811M_0020
Nitrogen
CCRR Low Pressure
043-LPN-01
Nitrogen
NHDS High Pressure
040-HPN-01
Nitrogen
3.43 000-HPN-01-SV-1 S-000-1730-0811M_0030
CCR High Pressure
042-HPN-01
Nitrogen

Section B Common header (Nitrogen) of Unit 041

System No. System Description Test Pressure Service Test Attachment No.
MPa(g). Package No.
NHDS Low Pressure
041-LPN-01 0.69 041-LPN-01-SV-1 S-000-1730-0812M_0040
Nitrogen
NHDS Low Pressure
041-HPN-01 3.43 041-HPN-01-SV-1 S-000-1730-0812M_0050
Nitrogen

9.3 General Description & Classification

(1) Gross Air Tightness Test

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 8 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

This test is performed for all the hydrocarbon and utility piping systems using Air. This is done to

confirm the integrity of the Joints, Flange Gaskets, Glands and Packing of valves. Here the system is

pressurized with injection of Compressed air and then checked for leaks at all possible points of

leakage. This test is carried out at 7 barg or at the system operating pressure whichever is less.

(2) Tightness Test with Nitrogen

This test is performed for smaller systems using Nitrogen in place of Air. This test is performed for

Refrigeration and other cold service lines.

(3) Specialized Service Test Procedure

Nitrogen-Helium Service Testis one of the Specialized test procedure normally performed by a

Specialized contractor. This test is performed for hydrocarbon systems only. Helium Service Test will

use 99% Nitrogen and 1 % Helium as tracer gas. A calibrated Mass Spectrometer will be used to

detect the helium tracer gas. The Helium Service Test will be carried out at 90% of system design

pressure and will be performed after the normal Gross Air tightness test. After the Service Testis

performed, the system will be depressurized to 1 barg pressure to keep the system inerted and

preserved done during commissioning.

(4) In service test

This test is performed on low pressure systems generally utilities, where the actual operating fluid is

utilized as any leaks will not create an environmental or safety issue.

9.4 Procedure

1. Method of Testing

System is pressurized with injection of compressed air or nitrogen and then checked for leaks at all

possible points such as:


(a) Flanges
(b) Screw Connections
(c) Manholes and Handholes
(d) Valve Glands

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 9 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

Detection of leakage is by application of a leak detection solution (such as soap solution) and the

subsequent observation of bubble formation.

2. Test Pressure

Shall Be the normal operating pressure of the fluid system .

3. Precaution

The following precautions must be observed during System Service tests:

 Barricade the area and install warning signs.

 The over-pressure protection of the system must be put in service. PSV discharge

outlets shall be routed to a safe location with adequate bracing and barricading to

prevent equipment damage or personal injury.

 A local calibrated pressure gauge shall be installed in an easily accessible location.

4. Planning

1. Equipment and associated pipelines must be grouped according to their normal operating

pressure. Each grouped system is isolated using block valves.

2. Systems subjected to system leak tests must be clearly marked on P&ID including the following

items:

 Test Pressure

 Supply point and type of pressurization medium

 Location of boundary valves, sub-dividing system into groups

 Blinds and spades if applied

 Valve’s Open/Close position

 Pressure monitoring instruments to be used

 Depressurizing points to be used after the test completion or in case of emergency.

5. Preparation

 Availability of air must be confirmed prior to the test.

 Leak detection solution (such as soap solution) must be provided at site.

 Flanges with diameter of 6" or larger is wrapped with masking tape to check for leakage

via a marked puncture in tape.

 In accordance with the test plan, CONTRACTOR checks the tested portions and

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 10 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

confirms the readiness for the test.

 Drain free water from system prior to the test so that foaming or bubbling action of soap

solution can be clearly seen at the leakage points.

6. Implementation

1. Gradually pressurize system to the test pressure with process fluid.

2. Maintain system under the test pressure until the test has been completed.

3. All points to be checked and shall be applied with soap solution.

4. Any leakage points found during the test shall be re-tightened until the bubble formation

stops. If leak cannot be stopped, system or part of system will be depressurized and the joint

or connection shall be remade after inspection for physical damage and then re-tested.

10 ACCEPTANCE CRITERIA

1. Any criteria given by Vendor/Licensor with regard to leakage, the test result shall fall within this
criterion.

2. If foam or bubbles are not visually detected, the test is accepted as tight.

3. Check/inspection above shall be done by CONTRACTOR with EMPLOYER's witness.

Note: Depending on the service, small leakage from valve glands may be acceptable

11 POST WORK

1. After the system passes the Tightness test, the system shall be depressurized or left with a small

nitrogen blanket as required by site conditions.

2. Piping shall be reinstated as per P&ID.

3. Signing of the test document by CONTRACTOR 's supervisor and EMPLOYER 's witness shall be

done after the test completion.

4. Test Log sheets shall be signed by the Contractor and Employer and handed over to the Company.

12 ATTACHMENTS

- Attachment: S-000-1730-0811M_0020 Marked-up P&ID for Service Test Package 000-LPN-01-SV-1.


- Attachment: S-000-1730-0811M_0030 Marked-up P&ID for Service Test Package 000-HPN-01-SV-1.
- Attachment: S-000-1730-0811M_0040 Marked-up P&ID for Service Test Package 041-LPN-01-SV-1.
- Attachment: S-000-1730-0811M_0050 Marked-up P&ID for Service Test Package 041-HPN-01-SV-1.
- Attachment: S-000-1730-0811M_0060: Inspection Record Sheet.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 11 of 11
of Nitrogen Unit 040/041/042/043 S-000-1730-0811M

D R A
IN
10-SE
P - 2 0 15
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 1 of 47
127(6

SECTION A UNIT 040 / 042 / 043


3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 3.43 MPa(g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 2 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

Control system pressure at operation LPN supply from LPN Interconnecting


pressure of LPN = 0.69 MPa(g) Header. Permanent Supply required

040-LPN-01 141-LPN-01S
040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 3 of 47

040-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01 040-LPN-01

D R A 040-LPN-01 040-LPN-01

N
I P 5
-
10-SE
2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 4 of 47
040-LPN-01 040-LPN-01 040-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

040-LPN-01

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 5 of 47
042-LPN-01 042-LPN-01
042-LPN-01

042-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

042-LPN-01 040-LPN-01
042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
042-LPN-01
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 6 of 47

042-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01 042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 7 of 47
042-LPN-01 042-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

043-LPN-01

042-LPN-01

D R A 043-LPN-01 042-LPN-01 042-LPN-01


N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 8 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

043-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 9 of 47

NSRP Complex Project (JOB No. 0-6495-20)


PERMANENT LINE
DOCUMENT CLASS : SUBJECTZ TO
ISSUE PURPOSE : FOR APPROVAL
SERVICE TEST
RESULT CODE : A, B, R, F ( )

NEXT STATUS : FA, FR, FI, FC, AB ( )


TEST POINT
RESUBMISSION DATE : ( )

RESPONSIBLE DEPT./ PERSON : ( )

Review Date : ( )

A : Approved without Comment ; B : Approved with Comments

R : Not Approved ; F : Not Subject to Review

Approval or review here under shall not be construed to relieve Supplier/Subcontractor of

his responsibilities and liability under the Contract.

Purchaser ORIG. PURCHASE ORDER NO. SERIAL REV.

DOC. No. V M215A-002-A- 105-30 5

043-LPN-01
Control system pressure at operation NSRP
pressure of LPN = 0.69 MPa(g)
VM215A-002-A-

MECHANICAL FLOW DIAGRAM


CCR REGENERATION UNIT (043)
NITROGEN SYSTEM
043-LPN-01
VM215A-002-A-105-30
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION

D R A 043
A1

0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 5
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 10 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

NSRP Complex Project (JOB No. 0-6495-20)


DOCUMENT CLASS : Z
ISSUE PURPOSE : FOR APPROVAL
RESULT CODE : A, B, R, F ( )

NEXT STATUS : FA, FR, FI, FC, AB ( )

RESUBMISSION DATE : ( )

RESPONSIBLE DEPT./ PERSON : ( )

Review Date : ( )

A : Approved without Comment ; B : Approved with Comments

R : Not Approved ; F : Not Subject to Review

Approval or review here under shall not be construed to relieve Supplier/Subcontractor of

his responsibilities and liability under the Contract.

043-LPN-01 Purchaser ORIG. PURCHASE ORDER NO. SERIAL REV.

DOC. No. V M215A-002-A 105-31 5

NSRP
VM215A-002-A-

MECHANICAL FLOW DIAGRAM


CCR REGENERATION UNIT (043)
FLARE SYSTEM

VM215A-002-A-105-31
FOR APPROVAL 980393
PM215A-002-A100
Z CCR REGENERATION

D R A 043
A1

0-6495-20
N
I 10-SEP 5
- 2 0 1 NTS 5
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 11 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 12 of 47

040-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 13 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 14 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 15 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

040-LPN-01 TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 16 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 17 of 47

040-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 18 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 19 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 20 of 47

040-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 21 of 47

040-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 22 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 23 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 24 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 25 of 47

040-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 26 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPN-01
040-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 27 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 28 of 47

042-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 29 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 30 of 47

042-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 31 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 32 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 33 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 34 of 47

042-LPN-01 PERMANENT LINE


SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 35 of 47

042-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

042-LPN-01 TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 36 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT
042-LPN-01

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 37 of 47

042-LPN-01
PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 38 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 39 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

042-LPN-01
042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 40 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 41 of 47

042-LPN-01

042-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 42 of 47

042-LPN-01

042-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 43 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 44 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 45 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 46 of 47

042-LPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0020 System No. : 040-LPN-01,042-LPN-01,043-LPN-01
Package No. : 000-LPN-01-SV-1 Page 47 of 47

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPN-01
042-LPN-01

042-LPN-01

042-LPN-01 042-LPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 1 of 12
127(6

SECTION A UNIT 040 / 042 / 043


3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 3.43 MPa(g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 2 of 12

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

HPN supply from HPN Interconnecting


Control system pressure at operation
Header. Permanent Supply required
pressure of HPN = 3.43 MPa(g)

040-HPN-01 141-HPN-01
040-HPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 3 of 12

040-HPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-HPN-01
040-HPN-01

D R A 040-HPN-01

N
I P 5
-
10-SE
2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 4 of 12

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-HPN-01 040-HPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 5 of 12
042-HPN-01

Control system pressure at operation


pressure of HPN = 3.43 MPa(g)
PERMANENT LINE
SUBJECT TO
SERVICE TEST
Change to open
TEST POINT

042-HPN-01 040-HPN-01

D R A 042-HPN-01
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 6 of 12

040-HPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 7 of 12

040-HPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 8 of 12

040-HPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 9 of 12

042-HPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 10 of 12

042-HPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 11 of 12

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-HPN-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0030 System No. : 040-HPN-01,042-HPN-01
Package No. : 000-HPN-01-SV-1 Page 12 of 12

042-
HPN-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
1 of 28
Page 127(6
SECTION B UNIT 041
3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 0.69 MPa(g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 2 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BL
NOTE 2 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TPM SK
041 COMMON 041 041 041 041 041 0014V AND D-000-1225-0020V TO 0026V.
AA FAULT PI FI 041
PT PG FT
FE ICPA-041-UI-011
FRESH COOLING 0351 0351 0351 0352 0351 0351 FRESH COOLING
0351 MIN
A WATER SUPPLY
16"-CWS-041-3001-A2AW-NI 16"-CWS-141-3026-A2AW-NI
WATER SUPPLY
1. DELETED. A
041-3002M 141-3012S
2. ORIFICE WITH 276.7 MM HOLE.
TO UNIT 041 041 H 041 NOTE 9 FROM INTERCONNECTING
AI AT 1'' 3. ORIFICE WITH 182.1 MM HOLE.
0351 041 041
0351 NPIC-041-E-0109M PG TG
TP HC ICPA-041-UO-001 4. ORIFICE WITH 248.5 MM HOLE.
FRESH COOLING M5 NPIC-041-E-0105M 0359 0357 FRESH COOLING
0.75" - 150# MIN NPIC-041-E-0105M
WATER RETURN NPIC-041-E-0161M WATER RETURN 5. ORIFICE WITH 26.46 MM HOLE. NPIC-041-E-0162M
16"-CWR-041-3001-A2AW-NI RF NOTE 6 16"-CWR-141-3026-A2AW-NI
041-3002M 141-3012S
6. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
FROM UNIT 041 0.75"-WO-041-0007-A2AW-NI TO INTERCONNECTING
NPIC-041-E-0106M NOTE 7 NPIC-041-E-0106M 1'' 7. FLOW TRANSMITTER 041-FT-0352A TO MEASURE LP STEAM TO
B NPIC-041-E-0161M 041
FI
041
NOTE 3
ICPA-041-UI-015 INTERCONNECTING. FLOW TRANSMITTER 041-FT-0352B TO B
041 041 041 041 041 FT MEASURE LP STEAM FROM INTERCONNECTING.
PI TI 0352A 0352A 041 ICPA-041-UI-005 NPIC-041-E-0106M
PT PG TT 041
WO 0353 0353 0354 0351 0351 FI
041 FE
NPIC-041-E-0113M 1" 8. MULTITAP ORIFICE FLANGES (041-OR-0352 , 041-ORJ-0352), ORIFICE
FT 0352
LP STEAM 0352B 0352B LP STEAM FLANGE WITH JACK SCREW (041-ORJ-0352) SHALL BE LOCATED AT
10"-LPS-041-3001-A1AS-HS NOTE 8 10"-LPS-141-3006-A1AS-HS
041-3103M 141-3002S DOWNSTREAM OF ORIFICE PLATE

FROM / TO UNIT 041 MIN FROM / TO INTERCONNECTING 9. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-052
0.75" 0.75" 0.75"
NOTE 4 NPIC-041-E-0113M
041 041 041 041 041 041 041 MIN
TT TI FI FT 041 PG PT PI ICPA-041-UI-014 PERMANENT LINE
C 0353 0353 0353 0353 FE
0353
0356 0355 0355 1.5"
ICPA-041-UI-004 SUBJECT TO C
MP STEAM MP STEAM
14"-MPS-041-3001-B1AS-HS 14"-MPS-141-3002-B1AS-HS SERVICE TEST
041-3103M 141-3002S

TO UNIT 041 MIN FROM INTERCONNECTING


1'' 1'' TEST POINT
1''
041 MIN
PG ICPA-041-UI-002
0360
DB MIN
HP BOILER FEED WATER HP BOILER FEED WATER
3"-HBFW-041-3001-M2AS-HS 3"-HBFW-141-3002-M2AS-HS
041-3201M 141-3012S
D TO UNIT 041 MIN FROM INTERCONNECTING
D
0.75" 0.75" 0.75" 0.75"
041 MIN
PG
0361 ICPA-041-UI-006
MIN
SERVICE WATER SERVICE WATER
3"-SVW-041-3001-A2AW-NI 3"-SVW-141-3005-A2AW-NI
041-3301M 141-3012S

TO UNIT 041 MIN FROM INTERCONNECTING


0.75" 0.75" 0.75"
0.75"
041
E PG
0362
MIN
ICPA-041-UI-007 E
MIN
DRINKING WATER DRINKING WATER
3"-DKW-041-3001-A0LW-HC 3"-DKW-141-3005-A0LW-HC A. DELETED.
041-3301M 141-3012S
NPIC-041-E-0162M 1. DELETED.
TO UNIT 041 0.75"-FG-041-3010-A1AD-NI MIN FROM INTERCONNECTING
0.75" 0.75" 0.75" 0.75" 2. DELETED.
MIN
LPN 0.75"-LPN-041-3007-A1AA-NI
041-3603M NPIC-041-E-0162M
F 0.75" 0.75" F
NPIC-041-E-0126M NPIC-041-E-0126M
NPIC-041-E-0162M
LPS 0.75"-LPS-041-3006-A1AS-HS E
041 041 E 041
041 041 041 E 041
041-3103M TI FI PI
TT FT PG PT
0.75" 0.75" 0358 0358 0355 0355 0364 E
0363 E 0363
E
ICPA-041-UI-001
0.75"-FG-041-3003-A1AD-HC 15D MIN MIN
REFINERY FUEL GAS 5D MIN E REFINERY FUEL GAS
2"-FG-041-3001-A1AD-STL 2"-FG-141-3017-A1AD-STL
041-3401M 141-3012S
6" FEED DWG.No.
G TO UNIT 041 0.5"
0.75" 0.75" 0.75"
FROM INTERCONNECTING G
041 MIN MIN
PG NPIC-041-E-0151M
ICPA-041-UO-003
0365
MIN
FLARE GAS 1:500 1:500 FLARE GAS DWG.No. Title
30"-FLG-041-3001-A1GP-NI 30"-FLG-141-3002-A2GQ-NI REFERENCE DRAWINGS
041-3503M 141-3002S
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
FROM UNIT 041 2" LO TO INTERCONNECTING
NPIC-041-E-0153M 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0.75"
0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
LPS 0.75"-LPS-041-3079-A1AS-HS 0.75"-FLG-041-3005-A1GP-HC
H 041-3103M
A 15/JUL/13 FOR REVIEW DMO RKM SMA H
041 Rev Date Description Prep'd Chk'd App'd
0.75" 0.75" PG ICPA-041-UI-008 REVISIONS
0366 WO
MIN Operation Centre JOB Code:
PLANT AIR PLANT AIR Operation Centre DWG.No.:
2"-PA-041-3001-A2AA-NI 2"-PA-141-3004-A2AA-NI
041-3603M 141-3012S Contractor JOB Code Responsible Company
TO UNIT 041 MIN FROM INTERCONNECTING 0-6495-20 TPM
0.75" 0.75" 0.75" 0.75" Prepared by Checked by Approved by
041 T. T. HUONG T. NGUYEN T. N. SON
PG MIN
NPIC-041-E-0117M 0367 ICPA-041-UI-009
I INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI LPN supply from LPN Interconnecting Header. 2"-IA-141-3004-A1AA-NI
INSTRUMENT AIR I
041-3603M Control Operation pressure = 0.69 MPa(g) , 141-3012S

TO UNIT 041 Permanent Supply required LO FROM INTERCONNECTING


NPIC-041-E-0151M NSRP
Complex Project
041 041 041 041-LPN-01 141-LPN-01S Nghi Son Refinery and Petrochemical
041 041 041 041
TT TI FI FT PG PI PT Nghi Son, Vietnam Limited Liability Company
041-LPN-01 0355 0354 0357 MIN ICPA-041-UI-010
0355 0354 0358 0357
5D MIN 15D MIN
LP NITROGEN LP NITROGEN Drawing Title
2"-LPN-041-3001-A1AA-NI 2"-LPN-141-3003-A1AA-NI
041-3603M 141-3012S
J TO UNIT 041
6"
1" FROM INTERCONNECTING
PIPING AND INSTRUMENT DIAGRAM J
0.75" PENEX
UNIT 041
UTILITY BATTERY LIMIT - 1
NOTE 5
041 041 041 041 041 041 041
TI FI 041 PI
TT FT PG PT ICPA-041-UI-012
0359 0356 FE 0369 MIN Issue Purpose Document Class
0359 0356 0370 0369
0356
HP NITROGEN HP NITROGEN FOR CONSTRUCTION Z
2"-HPN-041-3001-D1AA-NI 2"-HPN-141-3013-D1AA-NI
K 041-3603M 141-3012S Unit No. Unit Abbreviation PCWBS Size Scale K
6"
TO UNIT 041 FROM INTERCONNECTING 041 PENX A900 A1 NONE
0.75"

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1301M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 3 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.

TO FLARE HEADER
INSTRUMENT AIR

TO CBD HEADER
1. FOR PRESSURE TEST.

TO 041-P-301A/B

TO 041-P-303A/B

TO 041-P-302A/B
041-0032M

041-0031M

041-3702M

041-0030M

041-3503M

041-0032M

041-0029M

041-0028M

041-0030M

041-1301M

041-1001M

041-1001M
A A

TO 041-AS-001

TO 041-AS-001

HP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN
N

TO 041-V-301

TO 041-V-301

TO BL AREA

TO BL AREA

TO BL AREA
2. FOR START UP.

AT GRADE
AT GRADE
PERMANENT LINE

EL.158300
EL.108000
US-013

US-014

US-021

US-023
SUBJECT TO

1"-LPN-041-3011-A1AA-NI
2"-IA-041-0003-S0RA-NI

1"-LPN-041-0028-A1AA-NI
0.75"-LPN-041-0022-A1AA-NI

0.75"-LPN-041-3026-A1AA-NI

0.75"-LPN-041-0021-A1AA-NI

0.75"-LPN-041-0020-A1AA-NI

LPN 041 3007 A1AA NI


0.75"-LPN-041-3007-A1AA-NI

LPN 041 0023 A1AA NI


0.75"-LPN-041-0023-A1AA-NI

LPN 041 0024 A1AA NI


0.75"-LPN-041-0024-A1AA-NI
2"-HPN-041-0005-D1AA-NI
2"-LPN-041-0010-A1AA-NI
NPIC-041-E-0163M
SERVICE TEST
HC HC HC HC

0 30
TEST POINT
B B

0.75"

0.75

0.75

0.75
EL.146300

0.75"-PA-041-3032-A2AA-NI

0.75"-PA-041-3033-A2AA-NI
0.75"-PA-041-3039-A2AA-NI
HC US-020

2"-PA-041-3031-A2AA-NI
EL.137700
0.75"-PA-041-3038-A2AA-NI

0.75"-PA-041-3041-A2AA-NI
HC US-019

NOTE 2

NOTE 1
EL.127750
0.75"-PA-041-3037-A2AA-NI

NPIC-041-E-0153M
C HC US-018 C
EL.116950 MIN
0.75"-PA-041-3036-A2AA-NI

NPIC-041-E-0153M
HC US-017
EL.107900
0.75"-PA-041-3035-A2AA-NI
MIN 2" HC US-016 MIN MIN

MIN NPIC-041-E-0153M
NPIC-041-E-0129M
MIN
D AT GRADE NPIC-041-E-0163M 0.75" D

11"-LPN-041-3022-A1AA-NI
LPN 041 3022 A1AA NI
0.75"-PA-041-3042-A2AA-NI

MIN
HC US-024 22"

MIN EL.108500
0.75"-PA-041-3040-A2AA-NI
HC US-022

NPIC-041-E-0129M 0.75"

MIN
PLANT AIR LPT PLANT AIR
2"-PA-041-3001-A2AA-NI 2"-PA-041-3001-A2AA-NI
041-3602M 041-1301M
E E
TO UNIT 041 FROM BL
1. DELETED.

041-IAH-004 041-IAH-003 041-IAH-022 041-IAH-001 041-IAH-002


NPIC-041-E-0117M NPIC-041-E-0117M
INSTRUMENT AIR
1" 1" 1" 1" 1" INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 2"-IA-041-3001-S0RA-NI
041-3602M 041-1301M

F TO UNIT 041 FROM BL F


0.75"

LPT
041-LPN-01 041-LPN-01

MIN
LP NITROGEN LP NITROGEN
2"-LPN-041-3001-A1AA-NI 22"-LPN-041-3001-A1AA-NI
LPN 041 3001 A1AA NI
041-3602M 041-1301M
FEED DWG.No.
TO UNIT 041 FROM BL
G 0.75" G
LPT
NPIC-041-E-0129M
HP NITROGEN HP NITROGEN DWG.No. Title
2"-HPN-041-3001-D1AA-NI 2"-HPN-041-3001-D1AA-NI
041-3602M 041-1301M REFERENCE DRAWINGS
MIN 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
TO UNIT 041 FROM BL
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0129M 0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
NPIC-041-E-0153M B - NOT ISSUED DMO RKM SMA
H MIN A - NOT ISSUED DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75"-PA-041-3044-A2AA-NI

MIN REVISIONS
MIN
2"-LPN-041-3030-A1AA-NI Operation Centre JOB Code:
NPIC-041-E-0153M Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
0.75"

MIN

MIN

MIN
0-6495-20 TPM

0.75"-PA-041-3045-A2AA-NI
MIN Prepared by Checked by Approved by
2"-PA-041-3048-A2AA-NI

T. T. HUONG T. NGUYEN T. N. SON

I I
MIN

0.75"

NPIC-041-E-0142M
NPIC-041-E-0153M
NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Limited Liability Company

0.75"-LPN-041-2003-A1AA-NI
LPN 041 2003 A1AA NI
Nghi Son, Vietnam

11"-LPN-041-0008-A1AA-NI
LPN 041 0008 A1AA NI

11"-LPN-041-0011-A1AA-NI
LPN 041 0011 A1AA NI
1"-PA-041-0004-A2AA-NI

1"-PA-041-0003-A2AA-NI

Drawing Title

J HC HC PIPING AND INSTRUMENT DIAGRAM J


PENEX UNIT
AT GRADE
AT GRADE
US-037

US-038

UNIT 041

0.75
INSTRUMENT AIR, PLANT AIR AND NITROGEN - 3

Issue Purpose Document Class

041-0101M

041-0102M

041-2206M

TO 041-P-615A/B
041-0101M

041-0102M

FOR CONSTRUCTION Z

LP NITROGEN

LP NITROGEN

LP NITROGEN
TO 041-V-612

TO 041-V-615
TO 041-V-612

TO 041-V-615

K K
PLANT AIR

PLANT AIR

Unit No. Unit Abbreviation PCWBS Size Scale


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3603M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
9
10 11 12 13 14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 4 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NPIC-041-E-0129M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
NPIC-041-E-0160M
0014V AND D-000-1225-0020V TO 0026V.
NPIC-041-E-0163M
1. FOR PRESSURE TEST.

TO 041-P-213A/B
041-0025M

041-0023M
A A

LP NITROGEN

LP NITROGEN
N

NPIC-041-E-0129M
TO 041-V-212

AT GRADE
EL.121050

EL.102550
AT GRADE
EL.113900

EL.110000

EL.114000
2. DELETED.

EL. 12400
US-006
US-007

US-008

US-010

US-011

US-012

US-015
US-009
HC HC HC HC HC HC HC HC
PERMANENT LINE
SUBJECT TO

0.75"-PA-041-3046-A1AA-NI 0.75"
SERVICE TEST

NPIC-041-E-0160M
LPN 041 0019 A1AA NI
0.75"-LPN-041-0019-A1AA-NI

11"-LPN-041-0005-A1AA-NI
LPN 041 0005 A1AA NI

0.75"-PA-041-3014-A2AA-NI

0.75"-PA-041-3017-A2AA-NI

0.75"-PA-041-3016-A2AA-NI

0.75"-PA-041-3015-A2AA-NI

0.75"-PA-041-3018-A2AA-NI

0.75"-PA-041-3019-A2AA-NI

0.75"-PA-041-3034-A2AA-NI
TEST POINT
B B

0.75"

MIN

NPIC-041-E-0160M
0.75
MIN
C 0.75" C

MIN
041-IAH-006
1"

2"-PA-041-3003-A2AA-NI

041-IAH-005
1"

2"-IA-041-3003-S0RA-NI
D D

NPIC-041-E-0117M
MIN
1.5"
NPIC-041-E-0153M

MIN

MIN
PLANT AIR PLANT AIR
2"-PA-041-3001-A2AA-NI 2"-PA-041-3001-A2AA-NI
041-3601M 041-3603M

MIN
MIN
TO UNIT 041 FROM BL

E NPIC-041-E-0129M NPIC-041-E-0129M
E
A. DELETED.

041-IAH-007 041-IAH-021 1. DELETED.


NPIC-041-E-0117M NPIC-041-E-0117M
1" 1" 2. DELETED.
INSTRUMENT AIR INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 2"-IA-041-3001-S0RA-NI 3. DELETED.
041-3601M 041-3603M

TO UNIT 041 FROM BL

F F

041-LPN-01 NPIC-041-E-0146M
041-LPN-01
MIN

MIN

LP NITROGEN LP NITROGEN
2"-LPN-041-3001-A1AA-NI 2"-LPN-041-3001-A1AA-NI
041-3601M 041-3603M
MIN

MIN
NPIC-041-E-0129M
TO UNIT 041 FROM BL

FEED DWG.No.
G G
HP NITROGEN HP NITROGEN
2"-HPN-041-3001-D1AA-NI 2"-HPN-041-3001-D1AA-NI
041-3601M 041-3603M

MIN
TO UNIT 041 FROM BL DWG.No. Title

2"-IA-041-3006-S0RA-NI
NPIC-041-E-0149M
REFERENCE DRAWINGS
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
2"
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS

NPIC-041-E-0117M
MIN

0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD


B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H A - NOT ISSUED DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
Operation Centre JOB Code:
NPIC-041-E-0129M

MIN
Operation Centre DWG.No.:
22"-LPN-041-0001-A1AA-NI
LPN 041 0001 A1AA NI

MIN Contractor JOB Code Responsible Company


2" 0-6495-20 TPM
Prepared by Checked by Approved by
MIN

T. T. HUONG T. NGUYEN T. N. SON


2"-PA-041-3004-A2AA-NI

MIN
NPIC-041-E-0160M

I I
MIN

0.75"-LPN-041-3024-A1AA-NI
LPN 041 3024 A1AA NI

0.75"-PA-041-3020-A2AA-NI
0.75"-PA-041-3022-A2AA-NI

0.75"-PA-041-3024-A2AA-NI

0.75"-PA-041-3023-A2AA-NI

0.75"-PA-041-3043-A2AA-NI
MIN
11"-LPN-041-3016-A1AA-NI
LPN 041 3016 A1AA NI

0.75" NSRP

MIN
Complex Project
Nghi Son Refinery and Petrochemical
0.75"
Nghi Son, Vietnam Limited Liability Company
1.5"-HPN-041-0001-D1AA-NI
1.5"-LPN-041-0001-A1AA-NI

1"-LPN-041-2001-A1AA-NI

1"-LPN-041-2002-A1AA-NI

11"-LPN-041-3036-A1AA-NI
LPN 041 3036 A1AA NI

Drawing Title

1"-IA-041-2001-S0RA-NI

1"-IA-041-2002-S0RA-NI
NOTE 1
0.75

J NPIC-041-E-0141M
PIPING AND INSTRUMENT DIAGRAM J
NPIC-041-E-0153M PENEX UNIT
UNIT 041
HC HC HC HC HC HC INSTRUMENT AIR, PLANT AIR AND NITROGEN - 2
EL.110000

EL.103000

EL.105300

AT GRADE

AT GRADE

AT GRADE
US-033

US-034

US-032

US-036

US-035

US-036

LP INSTRUMENT AIR

LP INSTRUMENT AIR
Issue Purpose Document Class
041-3502M

041-0002M

041-2101M

041-2102M

041-3502M

041-0002M

041-2101M

041-2102M
TO FLG HEADER

TO FLG HEADER
TO 041-K-051A/B

TO 041-K-051A/B

FOR CONSTRUCTION Z
TO 041-K-051A

TO 041-K-051B

TO 041-K-051A

TO 041-K-051B
HP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

K Unit No. Unit Abbreviation PCWBS Size Scale K


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3602M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
9
10 11 12 13 14 15 16
J

K
A1

I
F
E
B
A

H
D
C

IN
NPIC-041-E-0153M

10-SE
0.75"

P-2 1
1

0.75"

MIN
MIN
LP NITROGEN MIN MIN

5
0.75"-LPN-041-0026-A1AA-NI
0.75 LPN 041 0026 A1AA NI 1"-PA-041-3005-A2AA-NI

041-LPN-01
041-0020M

NPIC-041-E-0128M
NPIC-041-E-0162M

MIN
MIN

DR01A
NPIC-041-E-0129M
PLANT AIR

NPIC-041-E-0128M
NPIC-041-E-0128M
TO 041-P-201A 1"-PA-041-0001-A2AA-NI
041-0024M

MIN
NOTE 3
LP NITROGEN MIN TO 041-TK-211

0.75"
0.75"
0.75"-LPN-041-0027-A1AA-NI
0.75 LPN 041 0027 A1AA NI

1"

0.75"
041-0020M MIN
ATGRADE

MIN
NPIC-041-E-0153M
0.75''-PA-041-3006-A2AA-NI

NPIC-041-E-0128M
TO 041-P-201B NPIC-041-E-0160M US-001
HC

NOTE 4
NPIC-041-E-0153M

2
2

LP NITROGEN MIN
0.75"-LPN-041-0015-A1AA-NI
0.75 LPN 041 0015 A1AA NI

2"-LPN-041-3031-A1AA-NI
MIN
041-0020M

0.75"
TO 041-P-201A/B

NPIC-041-E-0153M
MIN LP NITROGEN
HP NITROGEN 0.75"-LPN-041-3008-A1AA-NI
0.75 LPN 041 3008 A1AA NI
1.5''-HPN-041-0004-D1AA-NI 041-3401M
041-0019M

3
3

NOTE 1 TO FG HEADER

2"
TO 041-V-201
NPIC-041-E-0129M MIN LP NITROGEN
0.75"-LPN-041-0018-A1AA-NI
0.75 LPN 041 0018 A1AA NI
041-0024M
LP NITROGEN NPIC-041-E-0129M TO 041-P-212
2"-LPN-041-3005-A1AA-NI
041-3101M MIN LP NITROGEN
0.75"-LPN-041-3012-A1AA-NI
0.75 LPN 041 3012 A1AA NI

2"-LPN-041-3033-A1AA-NI
TO LPCW HEADER 041-3701M

LP NITROGEN MIN TO CCB HEADER


0.75"-LPN-041-3013-A1AA-NI
0.75 LPN 041 3013 A1AA NI
041-3701M
NPIC-041-E-0153M

1"
MIN LP NITROGEN

4
4

041-IAH-014
TO CBD HEADER
0.75"-LPN-041-3023-A1AA-NI
0.75 LPN 041 3023 A1AA NI
NPIC-041-E-0162M 041-3701M

LP NITROGEN MIN TO CBD HEADER


MIN

0.75"

11"-LPN-041-3009-A1AA-NI
LPN 041 3009 A1AA NI

NPIC-041-E-0153M
041-3501M

TO FLG HEADER

1"
041-IAH-013
MIN
2"-PA-041-3047-A2AA-NI MIN ATGRADE
0.75''-PA-041-3007-A2AA-NI
HC

US-002

MIN
MIN

5
5

0.75"
NPIC-041-E-0129M

LPT
MIN

MIN LP NITROGEN
2"-PA-041-3027-A2AA-NI 0.75"-LPN-041-0002-A1AA-NI
0.75 LPN 041 0002 A1AA NI
041-0012M

TO 041-A-111 NPIC-041-E-0162M

MIN

NPIC-041-E-0153M
LP NITROGEN

0.75"
11"-LPN-041-3010-A1AA-NI
LPN 041 3010 A1AA NI
041-3501M

TO FLG HEADER
LP NITROGEN

6
6

MIN
N

22" 1.5"-LPN-041-0003-A1AA-NI
1.5 LPN 041 0003 A1AA NI
041-0015M
M

NOTE 2
MIN

TO 041-R-101A

EL.117800
0.75''-LPN-041-3019-A1AA-NI
0.75 LPN 041 3019 A1AA NI
HC

US-003
MIN
0.75"-LPN-041-3017-A1AA-NI ATGRADE
LPT
HC

US-004
22"-LPN-041-3018-A1AA-NI
LPN 041 3018 A1AA NI

0.75''-PA-041-3030-A2AA-NI
0.75''-PA-041-3029-A2AA-NI
0.75''-PA-041-3028-A2AA-NI

0.75''-PA-041-3026-A2AA-NI
0.75''-PA-041-3025-A2AA-NI
0.75''-PA-041-3027-A2AA-NI

7
7

MIN LP NITROGEN
0.75"

0.75"-LPN-041-0014-A1AA-NI
0.75 LPN 041 0014 A1AA NI
041-0015M

NPIC-041-E-0160M
TO 041-R-101A/B

HC
HC
HC
MIN LP NITROGEN
1.5"-LPN-041-0004-A1AA-NI
041-0016M
NPIC-041-E-0153M

NOTE 2
TO 041-R-101B

US-026
HC US-025
US-030
US-029
HC US-028
HC US-027
MIN

EL.104000
EL.133950
EL.122500
EL.108050

AT GRADE
AT GRADE
0.75"

HP NITROGEN

8
8

1.5"-HPN-041-0002-D1AA-NI
041-0015M
NOTE 1
MIN TO 041-R-101A
LPT

HP NITROGEN
1.5"-HPN-041-0003-D1AA-NI
041-0016M
NPIC-041-E-0162M NOTE 1
TO 041-R-101B
0.75"

MIN
EL.118500
0.75"-LPN-041-3029-A1AA-NI
0.75 LPN 041 3029 A1AA NI
HC

US-039
LP NITROGEN MIN

9
9

0.75"-LPN-041-0013-A1AA-NI
0.75 LPN 041 0013 A1AA NI
041-0011M

TO 041-P-001A/B
EL.106500 0.75''-LPN-041-3037-A2AA-NI LP NITROGEN
0.75"-LPN-041-0016-A1AA-NI
0.75 LPN 041 0016 A1AA NI

HC
US-040 041-0022M

EL. 105100 TO 041-P-203A/B


075''-LPN-041-3032-A1AA-NI
075 LPN 041 3032 A1AA NI MIN

HC
US-032 NPIC-041-E-0149M
MIN

22"-LPN-041-0016-A1AA-NI
LPN 041 0016 A1AA NI

10
10

LP NITROGEN
MIN

NPIC-041-E-0160M

0.75"-LPN-041-0025-A1AA-NI
0.75 LPN 041 0025 A1AA NI
0.75"

041-0008M
LP NITROGEN
TO 041-DR-001A/B 0.75"-LPN-041-0017-A1AA-NI
0.75 LPN 041 0017 A1AA NI
041-0023M
1"
041-IAH-009

MIN
NPIC-041-E-0149M

MIN
N

22" TO 041-P-202A/B
MIN
M

INSTRUMENT AIR
MIN
MIN

0.75"-IA-041-0002-S0RA-NI
2"-LPN-041-3006-A1AA-NI 041-0015M
MIN
N

0.75"

LP NITROGEN
MIN

TO AIR RESERVOIR
041-3701M (041-R-101A/B)
MIN

MIN

11
11

0.75"

TO CBD HEADER INSTRUMENT AIR


22"

0.75"-LPN-041-3034-A1AA-NI 0.75"-IA-041-0001-S0RA-NI
041-0015M

TO AIR RESERVOIR
1"

(041-R-101A/B)
041-IAH-012

2"-LPN-041-3027-A1AA-NI

EL.117800
0.75''-PA-041-3009-A2AA-NI
HC

US-003
2"-PA-041-3001-A2AA-NI

NPIC-041-E-0129M
LP NITROGEN
1"

041-0004M
041-IAH-008

TO 041-DR-051A/B

12
12

MIN
0.75"-LPN-041-0012-A1AA-NI

AT GRADE
NPIC-041-E-0149M
MIN

0.75"-PA-041-3008-A2AA-NI
0.75"-LPN-041-3021-A1AA-NI

US-004
HC

2"-LPN-041-3001-A1AA-NI

2"-HPN-041-3001-D1AA-NI

HC US-034
HC US-033

EL.103000
EL.110000

MIN
0.75"-LPN-041-3020-A1AA-NI

ATGRADE 075''-PA-041-3012-A2AA-NI
HC

US-031
MIN AT GRADE
0.75''-PA-041-3011-A2AA-NI
US-005
HC

041-IAH-016 041-IAH-018 041-IAH-011 041-IAH-017 041-IAH-010 041-IAH-020 041-IAH-019 041-IAH-015


1"
1"
1"
1"
1"
1"
1"
1"

MIN
13
13

2"-IA-041-3004-S0RA-NI
NPIC-041-E-0153M
NPIC-041-E-0117M

2"-IA-041-3001-S0RA-NI

0.75"
FROM BL
FROM BL
FROM BL
FROM BL
PLANT AIR

LP NITROGEN

HP NITROGEN

NPIC-041-E-0117M
041-3602M
041-3602M
041-3602M
041-3602M

041-LPN-01
INSTRUMENT AIR
N

14
14

0
1
2

A
B

Rev
1.

1.
3.
2.

4.

3.

4.
2.
A.

A.

041
Prepared by

Drawing Title
Date

Issue Purpose
13/JUL/13
08/JUN/15

11/APR/14
11/NOV/13
28/NOV/14
DWG.No.
DELETED.

DELETED.
DELETED.
DELETED.
DELETED.
SPARE IAH

Complex Project

Contractor DWG.No.
Contractor JOB Code

Nghi Son, Vietnam


FEED DWG.No.

T. T. HUONG

NSRP
FOR START-UP.

Unit No. Unit Abbreviation


Operation Centre DWG.No.:

PENX
Operation Centre JOB Code:

15
15

FOR REVIEW
FOR PRESSURE TEST.

FOR APPROVAL

D-041-1225-3601M
FOR CONTRUCTION
Checked by
PLANT AIR FOR TANK MIXING.

FOR CONSTRUCTION
FOR CONSTRUCTION
FOR CONSTRUCTION

0-6495-20

PCWBS
Description

A900
NPIC-041-E-0162M

PENEX
REVISIONS

UNIT 041
TEST POINT

T. NGUYEN
SUBJECT TO
0014V AND D-000-1225-0020V TO 0026V.

Size

Sheet
SERVICE TEST

REFERENCE DRAWINGS
Title

A1
PERMANENT LINE

Document Class

001 OF 001
TTH
TTH
TTH

16
16

Approved by

PIPING AND INSTRUMENT DIAGRAM


Limited Liability Company

Rev.
Scale

NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
TPM
TN
DM

2
Nghi Son Refinery and Petrochemical
T. N. SON

INSTRUMENT AIR, PLANT AIR AND NITROGEN - 1


Responsible Company

NONE
FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO

TNS
TNS

RKM JMD

DMO RKM SMA


DMO RKM SMA

Prep'd Chk'd App'd


Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 5 of 28

J
F

K
E
B
A

H
D
C

G
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 6 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

0.75"-LPN-041-0023-A1AA-NI A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


LPN 0014V AND D-000-1225-0020V TO 0026V.

041-3603M 1. CONNECTION TO BE USED FOR WATER FLUSHING DURING


A SHUT-DOWN. A
0.75" 0.75"
BL 2. LIGHT ISOMERATE TO RFCC UNIT.

041 041 TPM SK 3. OFF-SPEC. ISOMERATE TO FRN TANK.


FI FT
0321 0321 041 4. OFF-SPEC. ISOMERATE TO SLOP TANK.
PG MIN MIN
5D MIN 15D MIN 0321 MIN. ICPA-041-PI-001
MAKE-UP GAS MAKE-UP GAS
3"-P-041-0001-B1AH04-NI 3"-P-140-3020-B1AH-NI
041-0001M 140-3021S PERMANENT LINE
B TO 041-V-051 2"
0.75" 0.75" 0.75" 0.75"
FROM UNIT 042 SUBJECT TO B
NPIC-041-E-0158M SERVICE TEST
041
PG
0322 MIN MIN MIN. ICPA-041-PO-001 TEST POINT
DRIER PURGE DRIER PURGE
2"-P-041-0038-B2AH04-PG 2"-P-140-3025-B2AH04-PG
041-0004M 140-3001S
FROM 041-DR-051A/B
TO UNIT 042
0.75" 0.75" 0.75" 0.75"
0.75"-LPN-041-0024-A1AA-NI
LPN
C C
041-3603M

0.75" 0.75"
0.75"-LPS-041-0033-A1AS-HS
LPS
041
041-3103M PG
0323
MIN MIN MIN.
0.75"-P-041-0272-B1AP04-HC 0.75" 0.75" ICPA-041-PI-002
LIGHT NAPHTHA LIGHT NAPHTHA
6"-P-041-0049-B1AP04-NI 6"-P-140-3034-B1AP-NI
D 041-0007M 140-3001S
D
TO 041-E-001 FROM UNIT 040
0.75" 0.75" 0.75" 0.75"
041
PG 4"-P-041-0276-B1AP-STL
0324
MIN MIN MIN.
NPIC-041-E-0126M ICPA-041-PO-007
SWEET-OFF GAS SWEET-OFF GAS
4"-P-041-0104-A1AH04-STL 4"-P-140-3026-B1AP-STL
041-0021M 140-3001S
FROM 041-C-202
TO UNIT 124
0.75" 0.75" 0.75" 0.75"
E 041 NPIC-041-E-0151M E
PG
0325 MIN MIN MIN. ICPA-041-PI-003 A. DELETED.
CAUSTIC CAUSTIC
3"-FCAU-041-0006-A2AN04-NI 3"-FCAU-140-3002-A2AN-NI
041-0024M 140-3021S

TO 041-TK-211 FROM UNIT 130


0.75" 0.75" 0.75" 0.75"
CAUSTIC BLOWDOWN
2"-SCAU-041-0002-A2AN04-NI NPIC-041-E-0151M
041-0102M NPIC-041-E-0151M

FROM 041-V-615
F 041 F
PG
0326
MIN MIN MIN. ICPA-041-PO-008
SPENT CAUSTIC SPENT CAUSTIC
3"-SCAU-041-0007-A2AN04-NI 3"-SCAU-140-3001-A2AN-NI
041-0025M 140-3021S
FROM 041-P-213A/B
TO UNIT 190
1" NOTE 1 0.75" 0.75" 0.75"
041
PG NPIC-041-E-0151M
0327 MIN MIN MIN. ICPA-041-PO-002 FEED DWG.No.
G ISOMERATE PRODUCT
6"-P-041-0117-B1AP04-NI 6"-P-140-3104-B1AP-NI
ISOMERATE PRODUCT
G
041-0032M 140-3011S
FROM 041-E-301
TO UNIT 153
0.75" 0.75" 0.75" 0.75"
041 DWG.No. Title
PG
0328
MIN MIN MIN. REFERENCE DRAWINGS
ICPA-041-PO-005 2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
OFF-SPEC OFF-SPEC
6"-P-041-0125-B1AP04-NI 6"-P-140-3080-B4AR-NI 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041-0032M 140-3011S 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
FROM 041-E-301 TO UNIT 156 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0.75" 1" 1" 1" NOTE 4 A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
LIGHT SLOP 6"-P-041-0275-B4AR-NI Operation Centre JOB Code:
4"-P-041-0242-A2AP-NI Operation Centre DWG.No.:
041-0101M
Contractor JOB Code Responsible Company
FROM 041-V-612
0-6495-20 TPM
041 4"-WO-041-0002-B2AP-NI
PG Prepared by Checked by Approved by
NPIC-041-E-0090M MIN MIN MIN.
0329 ICPA-041-PO-009 T. T. HUONG T. NGUYEN T. N. SON
WASTE WATER WASTE WATER
4"-WO-041-0001-A2AP-NI 4"-WO-140-3016-B2AP-NI
I 041-0101M
FROM 041-V-612
140-3021S
I
TO UNIT 190
0.75" 0.75" 0.75" 0.75"

041
PG
NSRP
0330
MIN MIN MIN. Complex Project
ICPA-041-PO-006 Nghi Son Refinery and Petrochemical
ISOMERATE ISOMERATE
6"-P-041-0123-B1AP04-NI 6"-P-140-3097-B1AP-NI Nghi Son, Vietnam Limited Liability Company
041-0032M 140-3011S
FROM 041-E-301 Drawing Title
TO UNIT 152
0.75" 0.75" 0.75" 0.75" NOTE 3
J PIPING AND INSTRUMENT DIAGRAM J
6"-P-041-0317-B1AP-NI
PENEX
041
PG UNIT 041
0331
MIN MIN MIN. ICPA-041-PO-003 PROCESS BATTERY LIMIT
LIGHT ISOMERATE LIGHT ISOMERATE
3"-P-041-0119-B1AP04-NI 3"-P-140-3095-B1AP-NI
041-0032M 140-3011S
FROM 041-E-301 Issue Purpose Document Class
TO UNIT 023
0.75" 0.75" 0.75" 0.75" NOTE 2 FOR CONSTRUCTION Z
K NPIC-041-E-0151M Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1001M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 7 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

START-UP PURGE
041-K-051A/B 2"-P-041-0017-A1AP04-NI A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041-0013M 0014V AND D-000-1225-0020V TO 0026V.
MAKE - UP COMPRESSORS TO 041-EJ-611
A TO ATM
1. FOR COMPRESSOR INTERFACE DETAILS, REFER TO DWG. A
CODE API 618 D-041-1225-2101M / 2102M.
AT SAFE LOCATION
TYPE / NO. OF STAGES RECIPROCATING / 1 NOTE 2 2. TO BE LOCATED OUTSIDE OF COMPRESSOR SHELTER.
RATED CAPACITY 2960 Nm3 /hr 300#
3. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
SUCTION / DISCHARGE PRESSURE 2.45 / 3.86 MPa(g) NOTE 3
4. DELETED.
MOTOR SIZE 75 kW
TRIM SPECIFICATION B1AH04 - PG NC 5. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE

E
NPIC-041-E-0158M
1"-V-041-0001-A1AP04-NI PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING

E
NPIC-041-E-0158M SWING ELBOW TO HPN.
MAKE - UP GAS NPIC-041-E-0098M
B B

E
3"-P-041-0003-B1AH04-ET 6. FOR PRESSURE TEST.
041-0001M E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
NO POCKET 1"
7. DELETED.

E
FROM 041-V-051

E
NPIC-041-E-0153M 0.75"
0.75"

E
0.75" 0.75" 8. FOR START-UP.

E
E

MIN

E
E

MIN
NPIC-041-E-0153M NPIC-041-E-0098M

E
9. DELETED.
0.75" NC

E
10. CONNECTION FOR TEMPORARY PSV. SET PRESSURE TO BE 3.50
NC

E
0.75"

E
MPa(g).

E
1"

E
1.5"-LPN-041-0001-A1AA-NI
E E 1"
C C

E
NC

E
NPIC-041-E-0153M E E
PERMANENT LINE

E
0.75" NC NC

E
SUBJECT TO

E
MAX
450
E
LPN
0.75" SERVICE TEST

E
E
041-3602M
0 NOTE 8 E E 0.75" NC
NPIC-041-E-0153M NC NC

E
E
0.75" 0.75"

MAX
450
0.75" TEST POINT

E
E
3"-P-041-0009-B1AH04-ET E E

E
E
NC NC 3"-P-041-0005-B1AH04-ET

E
E
1.5"-HPN-041-0001-D1AA-NI E E E E 041 E E E E 041
D E SP E SP D

E
E
NPIC-041-E-0098M
NPIC-041-E-0126M 041 5101 NPIC-041-E-0126M 041 5102

E
E

E
PDG PDG

E
E

E
NPIC-041-E-0155M

E
041 6500 (V) 6540
PG NPIC-041-E-0119M
E (V) NPIC-041-E-0119M
E (V) (V)

E
E E
IN VIEW 0073 NOTE 10 NPIC-041-E-0155M

E
E

E
1.5" 041 041 E E E E E E E E 041
UZ UZ UZ
HPN NOTE 5 2"-300# 2"-300#
1000 6502 1000
PUCS NPIC-041-E-0150M

E
041-3602M NOTE 6 041 NPIC-041-E-0150M
RF RF 041 041
0.75" 0.75" UZ UZ UZ
NOTE 3 NOTE 2 0005 0005 6542
PUCS
1.5"-P-041-0015-D1AH04-NI TP TP 041
E 1.5"
041
UZ
1A 1B UZ
0101
E
0101
A. DELETED.

041
HZS 041 041-K-051A 041-K-051B 041 041
UZ UZ HZS
0051B NOTE 1 NOTE 1
0001 0002 0052B

041 041
HZS HZS
0051A CRIT 0052A
CRIT
F EMERGENCY
041
HZA TP TP
041
HZA EMERGENCY F
SHUTDOWN 0051 2A 2B 0052 SHUTDOWN

CRIT
CRI T
2"-300# 2"-300# 041
041 UA
UA
RF RF 0112
0111
1.5"-P-041-0012-D1AH04-NI

FEED DWG.No.
041 041
G PG PG G
0062 0063
SIZE: 1D2 SIZE: 1D2
PSET: 4.25 MPa(g) PSET: 4.25 MPa(g) 953053-120-05-A1 MAKE-UP COMPRESSOR
3"-FLG-041-0003-A1AP-NI 3"-FLG-041-0002-A1AP-NI
DWG.No. Title
REFERENCE DRAWINGS
041 041
PSV PSV 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
FLG FREE DRAINING 0002
FLG FREE DRAINING 0003 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-3502M 041-3502M B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H H
NPIC-041-E-0116M

NPIC-041-E-0116M

A 13/JUL/13 FOR REVIEW DMO RKM SMA


Rev Date Description Prep'd Chk'd App'd
650 MAX

650 MAX
REVISIONS
MIN

MIN

Operation Centre JOB Code:


0.75" 0.75"
Operation Centre DWG.No.:
2" 2"
Contractor JOB Code Responsible Company
0-6495-20 TPM
FREE DRAINING

FREE DRAINING

Prepared by Checked by Approved by


T. T. HUONG T. NGUYEN T. N. SON

I I
MAX

MAX
450

450

3"-P-041-0128-B1AH04-PG 3"-P-041-0129-B1AH04-PG NSRP


Complex Project
Nghi Son Refinery and Petrochemical
(V) (V) Nghi Son, Vietnam Limited Liability Company

Drawing Title
NC NC
1"-P-041-0014-B1AH04-NI
J 1"-P-041-0008-B1AH04-NI PIPING AND INSTRUMENT DIAGRAM J
PENEX
MIN
MIN

MAKE-UP GAS SECTION


0.75"
0.75" MAKE-UP COMPRESSOR
0.75" 3"-P-041-0013-B1AH04-PG
HPT
NC NC
0.75" MAKE - UP GAS Issue Purpose Document Class
3"-P-041-0011-B1AH04-PG
041-0003M FOR CONSTRUCTION Z
K TO 041-E-051 Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0002M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 8 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
041-DR-051A
1"-V-041-0023-A1AP-NI NPIC-041-E-0158M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
MAKE-UP GAS DRIER
TO ATM 041 0014V AND D-000-1225-0020V TO 0026V.
SIZE: 1.5F2 CODE ASME VIII DIV 1 FI
AT SAFE 0054 SIGNAL 1. RESTRICTION ORIFICE WITH 5 MM HOLE.
PSET: 4.30 MPa(g) SIZE:I.D x TT
A 6"-FLG-041-0005-A1AP-NI 041
600 mm x 6900 mm LOCATION L
041-0008M
A
MODE NORMAL REGEN. 2. SIGHT GLASS TO BE LOCATED ABOVE DRIER.

PIP.
PSV
0005 4.30 MPa(g) + FV @ 40 °C 2.00 MPa(g) TO 041-AY-0001
DESIGN PRESSURE 3. RESTRICTION ORIFICE WITH 3 MM HOLE.

INST.
FLG FREE DRAINING DESIGN TEMPERATURE 200 °C 345 °C 3"-P-041-0036-B1AH04-NI 4. START-UP PRESSURING.
INSULATION TYPE HC 041 041 MAKE-UP GAS
041-3501M 5. RESTRICTION ORIFICE WITH 8 MM HOLE.
FT AT 041-0005M
TRIM SPECIFICATION P-041-0281-B2AH04-HC 0054 0001A
MOIS NPIC-041-E-0141M 6. LIQUID FILLING AND REGENERANT CIRCULATION.
FLG 1.5"-FLG-041-0065-A1AP-NI MIN NPIC-041-E-0141M MIN TO 041-E-101
041-3501M FREE DRAINING FREE DRAINING 1"-P-041-0037-B1AH04-NI 7. VACUUM PURGE CONNECTION TO BE DISCONNECTED AND
VALVE MODE
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E INDICATION VALVE COMMAND BLANK-OFF WHEN NOT IN USE.
B B

E
NOTE 8 NOTE 8 (LOCAL/SEQUENCE) INDICATION

MIN
041
UV Z LOCAL 8. ELECTRICAL TRACING.

E
041 041
041 0.75" 0081 XA XI MODE MAINTAINING TEMPERATURE: 43°C.
PDI 0.75"-LPN-041-0012-A1AA-NI

E
E
041 Y 2" 0079 L 0080 041
0054 HS 9. 041-DR-051A/B TO BE LOCATED AS CLOSE AS POSSIBLE TO 041-E-012

E
E
UV
0071A LPN 1" 0053B AND 041-H-011 (DWG. D-041-1225-0006M).

E
NPIC-041-E-0151M

E
041 041-3601M 10. VALVE SWITCHING MANIFOLD TO BE ACCESSIBLE FROM PLATFORM.

E
041 UV
041 041 0.75" 0.75"

NPIC-041-E-0141M
US PDT RO 0072A NPIC-041-E-0151M 11. FOR ON / OFF VALVE DETAILS, REFER TO DWG. D-041-1225-0221M.

E
3"-P-041-0133-B2AH04-HC
0003 0054 0051 0.75"
DRCS X 0.75"-LPS-041-0020-A1AS-HS 0.75"-P-041-0257-B1AH04-HC X

E
12. DELETED.
NOTE 1 041
C 041 C

E
UV 13. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO DRIERS.
NOTE 2 LPS US

E
0072B

MIN.
E
041-3101M 0003 14. HIGH LEVEL AT 041-LI-0056 SHALL STOP FILLING UP STEP IN DRCS
1" DRCS

E
041
1.5"-P-041-0294-B2AH04-HC
SG 041 041

E
SG 0.75" 0.75" 1" FC SEQUENCE DURING REGENERATION.
NOTE 14 UV UV

E
1009 041

E
041 041 0064A 0064B UV 041 041 15. VALVE TO BE PROVIDED WITH SPRING LOADED STUFFING BOX WITH

3"-P-041-0033-B2AP04-HC
E
041 UV UV 041 0.75"
LI 0063 HIC HS

E
0070A 0065A X X OPTION CODE "4604".
UV

NPIC-041-E
NPIC-041-E-0105M

E
0053 0053A

-0141M
0056 Y 0065B

E
VALVE COMMAND 16. ORIFICE WITH 7.7 MM HOLE. NPIC-041-E-0158M
SEQUENCE
FREE DRAINING

3" 3"

E
(LOCAL MODE) MODE
041 041 17. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.

E
041 TYPE 1 Y UV UV Y
041 18. CENTER OF RANGE.
US
D D

E
0056B 0056A NPIC-041-E-0151M

E
LT NPIC-041-E-0090M
DRCS
0003 NOTE 18 0056 X
1" X 1"

E
GWR
NPIC-041-E-0105M Y 1" Y 1" NPIC-041-E-0105M 041
FREE DRAINING 041 041

E
041
NPIC-041-E-0151M

NPIC-041-E-0158M

UV IFO US FAL
041 041 0066B FT

E
041 0051 0003 0051

FREE DRAINING

FREE DRAINING
PI UV UV NOTE 16 DRCS

NPIC-041-E-0105M
0061A 0061B

NPIC-041-E-0105M
CBD

E
0055 X X 041
1000

041 041
041 041 041 FE FI
041 041 UV

INST.

INST.
UV UV UV

MIN.
MIN.
0051 0051
PG PT 0.75" 0062A 0059A 0059B 0062B 0.75"
NPIC-041-E-0090M 0067 0055 041
MIN.

MIN.
2" UV X X X X

PIP.
PIP.
NOTE 17 NOTE 17 MAKE - UP GAS
0066A 3" 3" 3"-P-041-0035-B2AH04-HC
E 041-0005M E
TOP CONNECTION TOP CONNECTION FROM / TO 041-DR-051B A. DELETED.
NOTE 15 NOTE 15
Y 1" Y 1"
3"-P-041-0131-B2AH04-HC

041 041
FREE DRAINING

FREE DRAINING
UV UV
MW 0060A 0060B

FREE DRAINING

FREE DRAINING
INERT CERAMIC BALLS FREE DRAINING
F WIRE MESH SCREEN F
REGENERATION DRAIN
FREE DRAINING 1.5"-P-041-0034-A1AH04-PG
041-0010M

TO 041-V-112
041-DR-051A 3"-P-041 C
2AH04-P
-0132-B2A NPIC-041-E-0097M
H04-PC -0032-B
MOLECULAR SIEVES NOTE 9,10,11,13 3"-P-041 NPIC-041-E-0097M
041 041
UV UV 300 #
0058A NPIC-041-E-0151M 0058B FEED DWG.No.
NOTE 7
G Y
041 041
Y G
HH US PDI 041
300 # UV NC
0003 0058 1"
12" NOTE 7 1" X DRCS 0057B
X START-UP PURGE
INERT CERAMIC BALLS NC 041 2"-P-041-0031-A1AP04-NI 953053-120-07-A1 MAKE-UP GAS DRIER A
041 041-0013M DWG.No. Title

FREE DRAINING
UV
FREE DRAINING

PDT
TL 0057A 0058 REFERENCE DRAWINGS
TO 041-EJ-611
041 041 041 041 041 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
UV UV UV UV
MIN

MIN
PG 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0068 0054A 0053A 0053B 0054B
SCREEN 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
8" MIN X X X X MIN B 11/NOV/13 FOR APPROVAL DMO RKM SMA
MAKE - UP GAS
3000 MIN

H 3" 3" 3"-P-041-0028-B2AH04-HC


041-0005M
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
041 NOTE 15
NPIC-041-E-0141M

NPIC-041-E-0158M 041 NOTE 15 041 041


FROM / TO 041-DR-051B REVISIONS
UV UV UV UV
2" 0069A LPT LPT Operation Centre JOB Code:
0055A 0055B 0069B
X 3" Y NC 0.75" NC 0.75" X 3" Operation Centre DWG.No.:

FREE DRAINING
Y 1" Y 1" Y
0.75" 0.75" Contractor JOB Code Responsible Company
3"-P-041-0022-B2AH04-HC 041 041
NPIC-041-E-0153M

041
UV 041 041 0-6495-20 TPM
FREE DRAINING

UV
FREE DRAINING
FREE DRAINING

1" RO UV
FREE DRAINING

0067A 0073A UV 0067B Prepared by Checked by Approved by

FREE DRAINING
0055 0073B
1"
X 2" NOTE 3 X 2" T. T . HUONG T. NGUYEN T. N. SON
0.75" 041
UV NPIC-041-E-0153M
I 0068B
X
I
NC REGENERATION DRAIN
X 1"-P-041-0333-A1AH04-PG
041-0010M

041
UV
NOTE 4 TO 041-V-112 NSRP
REGENERATION DRAIN Complex Project
0068A FREE DRAINING Nghi Son Refinery and Petrochemical
041-0010M Limited Liability Company
Nghi Son, Vietnam
041 041 1.5"-P-041-0025-A1AH04-PG
DRAINING

041 TO 041-V-112
UV 041 UV X TI
0075A UV Drawing Title
0075B Y
FOR 041-LT-0056
FREE

Y 0058
0074A 041
J X UV NPIC-041-E-0151M
041
UV NOTE 6
REGENERANT PIPING AND INSTRUMENT DIAGRAM J

MIN
0.75" 1" 0074B 6"
0.75" 1" NOTE 5 0078 041-0006M
041 041 PENEX
MIN 041 US TT 3"-P-041-0029-B2AP04-HC FROM 041-H-011
FREE DRAINING CBD X
041 041 041 041 RO 0003
DRCS 0058 MAKE-UP GAS SECTION

MIN
US PDT UV UV 0056
041-3701M X REGENERANT
0003 0059 0076 0077 NPIC-041-E-0141M MAKE - UP GAS DRIERS - 1
CLOSED BLOWDOWN DRCS Y 1.5"
2"-CBD-041-0041-A2AP-NI 041-0006M
041-0005M 041 041 3"-P-041-0030-B2AP04-PP
FREE DRAINING
NPIC-041-E-0154M

US PDT CBD TO 041-E-011A/B


FROM 041-LT-0057 0003 DRCS 0099 2"-P-041-0038-B2AH04-PG 041-3701M Issue Purpose Document Class
041 NPIC-041-E-0090M
PDI 0.75"
FOR CONSTRUCTION Z
2"-CBD-041-0004-A2AP-NI
K MAKE-UP GAS
NPIC-041-E-0153M 0059 DRIER PURGE NPIC-041-E-0153M Unit No. Unit Abbreviation PCWBS Size Scale K
3"-P-041-0021-B1AH04-NI TO UNIT 042 REGENERANTION DRAIN 041 PENX A900 A1 NONE
041-0003M 041
1"-P-041-0059-A1AP04-PG

DR01A
PDI 042-AC-101 041-0008M Contractor DWG.No. Sheet Rev.
FROM 041-V-052
A1

0099
041-1001M FROM 041-DR-001A/B D-041-1225-0004M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
11 12 13 14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 9 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
SIGNAL
041-0015M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.
041 FROM 041-AT-0001D
FI 0.75"
NPTF 1. DELETED.
NPIC-041-E-0105M
A SIGNAL
MAKE-UP GAS DRIERS 0002 L LIGHT NAPHTHA 2. ELECTRICAL TRACING. MAINTAINING TEMPERATURE: 43°C
A
NPIC-041-E-0109M 0.25" 041 1"-P-041-0149-B1AP04-NI
041-0004M 041 H FT 041-0032M
AI NPIC-041-E-0155M 0002 0.75" SAMPLE RETURN 3. START-UP BY-PASS AND EMERGENCY CIRCULATION.
FROM 041-AT-0001A NOTE 15 0001A TO BL
MAKE-UP GAS DRIERS INST. PIP. 4. LINE FOR COOLING.
FEED DRIERS 041 041
FAL US
CRI T 0001 0003 5. 041-DR-001A/B TO BE LOCATED AS CLOSE AS POSSIBLE TO 041-E-012
041 041 041 H DRCS AND 041-H-011 (DWG. D-041-1225-0006M).
TAH AI
041-DR-001A AY
NOTE 13 NOTE 9 6. VALVE SWITCHING MANIFOLD TO BE ACCESSIBLE FROM PLATFORM.
0008A 0001 0001B
FEED DRIERS
041 041 041 041
FEED DRIER DRYOUT
FI FT FE RO 7. FACE PLATE ONLY.
CRI T 0001 0001 0001 0006
041 041 8. FOR ON / OFF VALVE DETAILS, REFER TO DWG. D-041-1225-0221M.
B CODE ASME VIII DIV 1 TAH AI 2"-P-041-0058-B1AP04-NI B
SIZE:I.D x TT 2300 mm x 4300 mm 0008B 0001D 9. RESTRICTION ORIFICE WITH 19.3 MM HOLE.

DESIGN PRESSURE 2.00 MPa(g) + FV @ 40 °C 10. FILLING LINE.


041
DESIGN TEMPERATURE 345 °C 041 NPIC-041-E-0141M AT NPIC-041-E-0141M 041
UV UV 11. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO DRIERS.
0001B MOIS
INSULATION TYPE HC 0016 0031 12. PLUG VALVE.
MIN MIN

E
TRIM SPECIFICATION P-041-0284-B2AP04-HC X E X
NPIC-041-E-0105M
13. ORIFICE WITH 27.9 MM HOLE.

E
SIZE: 3K4 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E LIGHT NAPHTHA
6"-P-041-0057-B1AP04-NI 14. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.

E
NOTE 2

E
PSET: 2.00 MPa(g) INST. PIP. 041-0011M
NPIC-041-E-0105M NPIC-041-E-0109M
15. LOCATED IN ANALYZER SHELTER 041-AS-001.

E
NC

E
C 041
PSV 0.75"-LPN-041-0025-A1AA-NI E E E NOTE 14 TO 041-V-001
C

E
0.75" 16. BLANK OFF WHEN NOT IN USE. NPIC-041-E-0158M
FLG FREE DRAINING 0009 MIN NPIC-041-E-0105M
8"-FLG-041-0013-A1AP-NI

E
6"-P-041-0148-B2AP04-HC
041-3501M LPN

E
0041-3601M PERMANENT LINE

E
0.75" 0.75" SUBJECT TO

E
0.75"-LPS-041-0034-A1AS-HS 0.75"-P-041-0273-B1AP04-HC SERVICE TEST

E
0.75"
MIN

E
LPS
TEST POINT

MIN.
E

E
D 2" 041-3101M
D

E
0.75" 0.75"

E
E

E
041
H X 4" NPIC-041-E-0105M NPIC-041-E-0155M UV
041
E

E
PI 041
UV 0028
041 NOTE 7
E

E
0005
FREE DRAINING

Y 0012 041
6"-P-041-0145-B2AP04-HC
UV Y 2" 041 Y 2" NPIC-041-E-0105M X 4"
041 FO NOTE 12 UV
E

E
0010 PDIK US PDT 6'' Y 0030
041
0.75"

041 041 0001 0003 0001 INST.


1" INST. UV DRCS UV 0.75" 041
VENDOR CONTRACTOR 041 UV 041 0.75" 041 UV
041 UV 0026 0024 UV PIP.
MIN

E PIP. X 0020 PDV X FREE 0029 1" E


DRAINING

PT

MIN
0011 0001 0004 DRAINING
0005 041 041 041 041
LPT 6"
FREE

2" X UV UV UV UV X A. DELETED.
X 0007 0008 X X 0023 X 0025 LIGHT NAPHTHA
NOTE 14 6"-P-041-0056-B2AP04-HC
041-0009M
NOTE 14 041

MIN
TOP CONNECTION
MIN

24" TOP CONNECTION UV 041 FROM / TO 041-DR-001B


041-DR-001A NPIC-041-E-0105M 0009
UV NPIC-041-E-0105M
NPIC-041-E-0130M 041 0027
NOTE 5, 6, 8, 11 UV Y 1" Y 1" 041 041
0022 UV UV 2"
2" 0005 0006
Y 1" NOTE 16
2" NOTE 16 041 FREE DRAINING X Y 1"
F INERT CERAMIC BALLS 0.75"
UV
X
FREE DRAINING NPIC-041-E-0158M F
NPIC-041-E-0158M 0021 REGENERATION DRAIN
FREE DRAINING 1.5"-P-041-0055-A1AP04-PG
041-0010M
WIRE MESH SCREEN
FREE DRAINING

TO 041-V-112
WO NPIC-041-E-0153M
C
NPIC-041-E-0153M 6"-P-04 NPIC-041-E-0097M P04-P
1-0146 4-B2A NPIC-041-E-0097M
-B2AP0
4-PC 4 1-005 2"-P-041-0147-B2AP04-HC
MOLECULAR SIEVES 2"-CBD-041-0024-A2AP-NI 6"-P-0
LPS
FEED DWG.No.
G CBD NPIC-041-E-0097M
041-3101M
G
0.75" 0.75"
041-3701M NPIC-041-E-0097M 2"-LPS-041-0006-A1AS-HS
NPIC-041-E-0097M
MH 1.5"-P-041-0053-B2AP04-PC
24" 953053-120-11-A1 FEED DRIER A
2"-FLG-041-0012-A1AP-NI FLG DWG.No. Title
INERT CERAMIC BALLS NPIC-041-E-0158M NPIC-041-E-0158M
NO POCKET 041-3501M REFERENCE DRAWINGS
TL NPIC-041-E-0153M 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041
NOTE 16 NOTE 16 0.75" 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
PG 041 041 041 041 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
LPT 0006 1.5" UV UV UV UV 1.5" B 11/NOV/13 FOR APPROVAL DMO RKM SMA
0002 X 0001 X X 0017 X 0018 LIGHT NAPHTHA
H 6"-P-041-0051-B2AP04-HC 6"-P-041-0052-B2AP04-HC
041-0009M
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Description Prep'd Chk'd App'd
3000 MIN

SCREEN Rev Date


041 041
UV 041 041 UV REVISIONS
FROM / TO 041-DR-001B
0013 UV 0.75" UV 2" 041 0032 NPIC-041-E-0153M Operation Centre JOB Code:
2" 041 NOTE 10
UV 0003 0019 UV Operation Centre DWG.No.:
4"
3"-CBD-041-0023-A2AP-NI

X 0034 X 4"
0014 Y 1" Y 1" Contractor JOB Code Responsible Company
3" X 0.75" 0.75" X 0-6495-20 TPM
0.75" 041 Prepared by Checked by Approved by
UV T. T. HUONG T. NGUYEN T. N. SON
FREE DRAINING

0015
Y 1"
Y 1"
I 2" 041 I
WO UV
FREE DRAINING

NPIC-041-E-0153M
0033
NPIC-041-E-0158M
FREE DRAINING
REGERATION DRAIN
1"-P-041-0059-A1AP04-PG FREE DRAINING
NSRP
041-0004M Complex Project
Nghi Son Refinery and Petrochemical
041
TO 041-DR-051A/B
UV Nghi Son, Vietnam Limited Liability Company
041 X
NPIC-041-E-0155M UV 0038 4"-P-041-0060-B2AP04-HC NPIC-041-E-0153M
CBD H Drawing Title
041 041 0037
041-3701M TI TT NOTE 4
J 041
TI
041
US
041
0002 0002 X 4" 041
UV PIPING AND INSTRUMENT DIAGRAM J
TT X 0036
0003
DRCS 0003 0003 4"-P-041-0061-B2AP04-HC PENEX
NOTE 4 FEED AND REGENERATION SECTION
REGENERANT MIN
4"-P-041-0045-B2AP04-PP HC
041-0006M 041 FEED DRIERS - 1
MIN UV
TO 041-E-011A/B 6" 0035
REGENERANT X
Issue Purpose Document Class
4"-P-041-0029-B2AP04-HC
041-0006M FOR CONSTRUCTION Z
K FROM 041-H-011 ISOMERATE Unit No. Unit Abbreviation PCWBS Size Scale K
4"-P-041-0062-B1AP04-NI
LIGHT NAPHTHA 041-0032M 041 PENX A900 A1 NONE
6"-P-041-0143-B1AP04-NI NOTE 3

DR01A
041-0007M Contractor DWG.No. Sheet Rev.
FROM 041-E-301
A1

FROM 041-E-001 D-041-1225-0008M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 10 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
041-V-001 041-P-001A/B
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V
TO 0014V AND D-000-1225-0020V TO 0026V.
FEED SURGE DRUM CHARGE PUMPS
1. START-UP / EMERGENCY SPILLBACK.
A 041
PIC
041
PIC
CODE ASME VIII DIV 1 CODE API 610 A
0002A L NPIC-041-E-0107M 0002B
SIZE:I.D x TT 3200 mm x 9600 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 5 2. DELETED.

041 041 DESIGN PRESSURE 2.00 MPa(g) + FV @ 40 °C RATED CAPACITY/NPSHr 176 m 3/hr/8.5m 3. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2201M.
PV PV
0002A 0002B DESIGN TEMPERATURE 120 °C DIFF.HEAD/SHUT-OFF PRESSURE 515.3 m / 5.89 MPa(g)
MAKE-UP GAS 4. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE 0.34 MPa(g)
1.5"-P-041-0040-B1AH04-NI FREE DRAINING 1.5" FREE DRAINING FREE DRAINING 1.5"-FG-041-0001-A1AD-NI FG INSULATION TYPE NI SPECIFIC GRAVITY @ PUMPING TEMP. 0.63 @ 175°C AND FV @ 175°C.
041-0005M
FC FC NNF 041-3401M TRIM SPECIFICATION P-041-0304-B1AH04-NI MOTOR SIZE 315 kW
5. VALVE USED FOR LIQUID FILLING DURING START-UP. ACCESS TO
FROM 041-DR-051A/B INSULATION TYPE NI
0.75" 1" 0.75" 0.75" 1" 0.75" BE PROVIDED.
NOTE 4
TRIM SPECIFICATION D1AP04-NI NPIC-041-E-0158M
SIZE: 4L6 6. ORIFICE WITH 107.2 MM HOLE.
1.5" 041 1.5" PSET: 2.00 MPa(g)
B PT
041 FREE DRAINING 10"-FLG-041-0016- A1AP-NI FLG
7. DO NOT CLOSE UNTIL DISCHARGE VALVE IS CLOSED B
0002
PSV
IN VIEW 0011 041-3501M
IN VIEW
041
PG PERMANENT LINE
0009 NOTE 5 SUBJECT TO

FREE DRAINING
SERVICE TEST

MIN
FREE DRAINING
1.5"-P-041-0247-B1AH04-NI
0.75"
C 2"
TEST POINT C

6"-P-041-0156-B1AH04-NI

2"
2"
8" VH
041
D FIC D
0003
041-V-001 041 L
FV
0003
6"-P-041-0067-B1AP04-NI
NOTE 1 FO
3" 0.75"

041 H
E LI E

NPIC-041-E-0090M
0001 L
A. DELETED.

0.75"-LPS-041-0021-A1AS-HS 6"-P-041-0152-D1AP04-NI 1. DELETED.

041 CRIT NPIC-041-E-0090M NOTE 6


LZAHH NPIC-041-E-0158M LPS 041
041
0005 041-3101M FT
HH 041 TYPE 1 TYPE 1 FE
0003
041 041 041 0003
LZT UZ 0.75" 0.75"
0004 LT LG 0.75"-P-041-0258-D1AP04-HC
0005 L Z AH 0001 0002A REACTOR CHARGE
DP
F 041
LZI DP
MAG
6"-P-041-0071-D1AP04-NI
041-0013M F
0005
LIGHT NAPHTHA TO 041-E-101
6"-P-041-0057-B1AP04-NI LPN
041-0008M
041-3601M
FROM 041-DR-001A/B 0.75" 0.75"
TYPE 1
041

MIN
MH
24" LG 0.75"-LPN-041-0013-A1AA-NI
0002B

MAG
FEED DWG.No.
G LPS 3"-LPS-041-0007- A1AS-HS
G

MIN
0.75"
041-3101M 0.75"

MIN
0.75" 0.75" TL
953053-120-14-A1 FEED SURGE DRUM
3"-P-041-0159-B1AP04-HC 0.75" DWG.No. Title

MIN
REFERENCE DRAWINGS
CBD
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
LPT NPIC-041-E-0090M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
5200 MIN

0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD


10"-P-041-0068-B1AP04-NI B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75" NP REVISIONS
NPIC-041-E-0158M Operation Centre JOB Code:
0.75"

MIN
NPIC-041-E-0158M Operation Centre DWG.No.:
H NPIC-041-E-0123M Contractor JOB Code Responsible Company
041 NOTE 7 NPIC-041-E-0158M
PDI NOTE 7 0-6495-20 TPM
0003 6"-P-041-0153-D1AP04-NI Prepared by Checked by Approved by
NPIC-041-E-0100M 0.75"
3" 10"-P-041-0070-D1AP04-NI T. T. HUONG T. NGUYEN T. N. SON
0.75"
041 0.75" 4" - 600# NPIC-041-E-0100M
I 041
PDT
STR RF
041
PG 041
041
STR
041
PG I
1035 0010 PDT 0011
0003
6" - 600# (V) 0004 1036 4" - 600#
0.75" (V) 0.75"
FREE DRAINING

RF RF
WO
041 041
NSRP
PG H PG Complex Project

NPIC-041-E-0158M
041 041 041
0012 UZ 0013 UZ Nghi Son Refinery and Petrochemical
3"-CBD-041-0007-A2AP-NI M 1000
PDI M 1000 Limited Liability Company
A,B,C,E 0004 A,B,C,E Nghi Son, Vietnam
10"-P-041-0069-D1AP04-NI M-2 6" - 600# M-2
RF Drawing Title
041-P-001A 041-P-001B
0.75" CBD NOTE 3 NPIC-041-E-0100M NOTE 3
J 0.75"
041-3701M
041
MGL
041
MGL
PIPING AND INSTRUMENT DIAGRAM J
MIN
NPIC-041-E-0158M (V) 0001A 0.75"-CBD-041-0008-A2AP-NI 0002A PENEX
(V) RUN
RUN FEED AND REGENERATION SECTION
0.75" - 600#
FREE DRAINING CBD 0.75"-P-041-0155-D1AP04-NI FREE DRAINING CBD
RF FEED SURGE DRUM
0.75" 0.75" 041-3701M 041-3701M
0.75"-P-041-0154-D1AP04-NI 0.75" - 600#
MIN 2" 0.75" 0.75" 0.75"-CBD-041-0009-A2AP-NI
FREE DRAINING CBD RF Issue Purpose Document Class
041-3701M
2"-CBD-041-0039-A2AP-NI NPIC-041-E-0158M
FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
WO WO 041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0011M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 11 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


SIZE: 3L4 041-A-111
0014V AND D-000-1225-0020V TO 0026V.
PSET: 0.35 MPa(g)
CHLORIDE INJECTION PACKAGE 1. FOR START - UP ONLY. NPIC-041-E-0158M
A A
CODE ASME VIII DIV 1 / API 675 / ASME B 31.3 2. FOR DETAILS, REFER TO VENDOR DWG. VM215A-004-A-054.
041
PSV SIZE OR CAPACITY 0.035 m ³ / hr 3. ANHYDROUS HCL CYLINDER TO BE PROVIDED FOR START - UP.
6804 8"-FLG-041-0017-A1AP-NI FREE DRAINING FLG
AFTER START - UP, HCL TRANSFER LINE TO BE PURGED AND
(V) 041-3501M FILLED WITH NITROGEN.
NPIC-041-E-0093M

6"-C-041-0011-A1AY04-NI
FLG 4. VALVE TO BE LOCATED IN PIT. EXTENDED STEM FOR VALVE
OPERATION TO BE PROVIDED AT GRADE LEVEL, VALVE MATERIAL
041-3501M
TO S0CW PIPE CLASS. NPIC-041-E-0158M

5. TRUCK UNLOADING.
B B

1"-FLG-041-0018-A1AP-NI
NPIC-041-E-0093M 6. TEN NOS. OF DRUMS ARE IN CLIENT SCOPE.
0.75"

NO POCKET
2"
PERMANENT LINE

FREE DRAINING
SUBJECT TO
041
UZ SERVICE TEST
1000
6"- 150# 1"-150#
WNRF SWRF TEST POINT
C 0.75"-150# NPIC-041-E-0093M C
SWRF TP
TP TP
003
004 005
LPN 0.75"-LPN-041-0002-A1AA-NI
0.75 LPN 041 0002 A1AA NI
041-3601M
0
0.75"

NPIC-041-E-0111M

D D

2"-150#
WNRF TP
NOTE 5 002
TP
006 CHLORIDE
041-A-111 0.75"-C-041-0007-B1AY04-NI
041-0014M
NOTE 2
041 TO 041-E-103
0.75"-300# PG
E 0114 E
WNRF
A. DELETED.
NPIC-041-E-0111M MIN. HCL
(V) 0.75"-C-041-0008-D1AY04-NI
041-0013M 1. DELETED.
0.75"-150# NOTE 1
TP TP 0.75" TO 041-E-101
SWRF 0.75" 2. DELETED.
009A 009B
0.75"-C-041-0012-A1AY04-NI 3. DELETED. NPIC-041-E-0158M

0.75"-150# 4. DELETED.
CHLORIDE DRUM AREA NPIC-041-E-0111M
SWRF
F NOTE 2, 6
3"-150#
5. DELETED.
F
3"-150# (V) 6. DELETED.
TP TP NPIC-041-E-0093M
WNRF WNRF
001A 001B
3"-C-041-0013-A1AY04-NI
2"-150#
NOTE 3
WNRF
TP TP TP
FREE DRAINING 2"-CBD-041-0047-A2AP-NI CBD
007A 007B 013 041-3701M

NPIC-041-E-0111M
2"-150# 2"-150# FEED DWG.No.
G WNRF WNRF G
NPIC-041-E-0111M 2"-WO-041-0004-A2AP-NI FREE DRAINING
953053-120-15-A1 CHLORIDE INJECTION
DWG.No. Title
REFERENCE DRAWINGS
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H FREE DRAINING NPIC-041-E-0140M
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
NPIC-041-E-0140M Operation Centre JOB Code:
4" Operation Centre DWG.No.:
TO COC Contractor JOB Code Responsible Company
UG UG
NOTE 4 (BY CIVIL) 0-6495-20 TPM
Prepared by Checked by Approved by
T. T. HUONG T. NGUYEN T. N. SON

I I

NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title

J PIPING AND INSTRUMENT DIAGRAM J


PENEX
REACTOR SECTION
CHLORIDE INJECTION PACKAGE

Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0012M 001 OF 001 2

IN
10-SE
5
1
P-2 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 12 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
LEAD REACTOR EFFLUENT
8"-P-041-0084-B1AH04-HC 041
041-0014M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TWO PHASE FLOW PSV 041-R-101A
0151 0014V AND D-000-1225-0020V TO 0026V.
FROM 041-E-102A/B (V) 041
0.75"-IA-041-0001-S0RA-NI UZ SIZE: 3J4 1. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
STRIPPING HYDROGEN AIR RESERVOIR 041 041 PSET: 3.90 MPa(g)
REACTOR
A 4"-P-041-0048-B1AH04-HC
1000
UZ UZ
041 FREE DRAINING 8"-FLG-041-0025-A1AP-NI FLG CODE ASME VIII DIV 1
2.
3.
CATALYST WITHDRAWAL NOZZLE.
FOR PURGE AND PRESSURING.
A
041-0006M 0102 0101
NOTE 4 PSV
IA 0103 041-3501M SIZE: I.D x TT 2500 mm x 12200 mm 4. FOR SULFUR STRIPPING.
FROM 041-H-011
041 3.90 MPa(g) + FV @ 205 °C 5. BLANKETING GAS.
DESIGN PRESSURE

NPIC-041-E-0153M
041-3601M
PG

MIN
INST. PIP. 6. LOW RANGE GAUGE USED FOR REACTOR BLANKETING DURING
0113 DESIGN TEMPERATURE 260 °C
(V) 041 041 CRI T LOADING ONLY.
041 041
PI PT
UZ HZA 0.75" 0.75" INSULATION TYPE HC 7. LINE FOR DRY-OUT.

MIN
0109 0109 0103 0101 NP P-041-0288-D1AH04-HC
L 041 041 8. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
1" NC

FREE DRAINING
ULL ULH TRIM SPECIFICATION
S P-041-0331-B1AH04-HC D-041-1225-2401M.
0101 0101
2" NOTE 14
9. 6" x 650 MM PIPING PIECE SAMPLE RECEIVER WITH PIPE SUPPORT
041 041 041 NC 4"-P-041-0165-B1AH04-HC NPIC-041-E-0152M
B 041 S FOR POSSIBLE VIBRATION.
B

MIN
UA HZS UA
041 041 UZY 10. FOR PRESSURE TEST.
0101A 0101 0101B

NOTE 5
USL USH 0101A 041 041
0101 0101 UZY UZV CIRCUIT EMERGENCY CIRCUIT 11. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
0101B 0101
TROUBLE SHUTDOWN TROUBLE PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
COMBINED FEED COIL 1 COIL 2
8"-P-041-0085-B1AH04-HC 8"-P-041-0259-B1AH04-HC SWING ELBOW TO HPN. NPIC-041-E-0115M
041-0014M 12. TO BE USED DURING DRY-OUT OPERATION ONLY.
TWO PHASE FLOW 041
FROM 041-E-103 FI FC 13. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO
0055 TSO 041 REACTORS.
HIC
8"

MIN
14. ALTERNATE DESIGN CONDITIONS DURING HOT HYDROGEN STRIPPING:
NC NOTE 18 Control system pressure 0055
at operation pressure of 1.5"-P-041-0164-B1AH04-NI - PRESSURE: 2.70 MPa(g)
C 0.75"
041
FT
041
FE
LPN = 0.69 MPa(g) NOTE 3 041
- TEMPERATURE: 315 °C C
0055 0055 HV 15. DEPRESSURING SYSTEM SHUTDOWNS BY-PASS SWITCH WITH LIGHT
NP 0.75" 0055
HYDROGEN PURGE FREE DRAINING FOR TESTING DEPRESSURING SYSTEM WHILE BY-PASSING
2"-P-041-0079-B1AH04-NI ASSOCIATED SHUTDOWNS.
041-0013M 041
NOTE 5

VENDOR CONTRACTOR LO FL(O) 2" LO 041 UZ


FROM 041-DR-051A/B 0041 NOTE 6
N 041 HZS 0101
PG PG 0.75" 1" 0.75"
NOTE 17 2" MIN 0108

NPIC-041-E-0158M
0102 0118
1" NC FREE DRAINING 1.5" 041 041
LPN MW UZ HZL CRIT
041-3601M 30" 0102 0108A

FREE DRAINING
MIN

1.5"-LPN-041-0003-A1AA-NI 041
D STRIPPING HYDROGEN
4"-P-041-0047-B1AH04-HC NPIC-041-E-0115M
0.75" 0.75"
UZ D

MIN
041-0006M NOTE 16 1.5" 1.5"
041-R-101A 0103
NOTE 4 0.75" 0.75"
TO 041-H-011 IN VIEW 041 NOTE 13
1.5"-HPN-041-0002-D1AA-NI PG
NOTE 19 16. FOR START-UP.
0074
17. VALVE AND BLIND FLANGE TO BE PROVIDED BY CONTRACTOR.
1.5" 041 8" 8"
NOTE 11 VAPOR
041
PI 18. ORIFICE WITH 20.32 MM HOLE.
HPN PT
0103 0103 19. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 3.9 MPa(g)
041-3601M LIQUID TRAY COMBINED FEED
NOTE 10 FREE DRAINING FREE DRAINING 8"-P-041-0167-B1AH04-HC
NOTE 1 H NPIC-041-E-0115M
0.75" 0.75" 041 041 041-0016M
TT TI
NC TWO PHASE FLOW
0105 0105 MIN TO 041-R-101B
0.75"-SVW-041-0004-A2AW-NI SVW
E 041-3301M 041 H
0.75" 0.75" E
041
TT TI A. DELETED.
NC 1.5"-P-041-0170-D1AH04-PC 0106 0106 8"-P-041-0160-B1AH04-HC
NPIC-041-E-0097M H TWO PHASE FLOW PERMANENT LINE
041 041
1.5"-P-041-0306-B1AH04-PC TT TI
SUBJECT TO
0107 0107
SERVICE TEST
H
2"-WW-041-0001-A2AW-NI

041 041
NPIC-041-E-0158M TI
0.75"-P-041-0171-B1AH04-NI TT
0104 0104 TEST POINT
H
FREE DRAINING

F 0.75"-FLG-041-0024-A1AP-NI FLG 041


TT
041
TI
041
PDY
041
PDI F
NO POCKET 041-3501M 0108 0108 0105 0105 L
041 H
041
TT TI
FREE DRAINING

0.75" 0109 0109


1" NC
041 UC H
041 041 041
SP PG TI
1221 0.75"-P-041-0169-B1AH04-NI TT
0115 0110 0110

041 H 041
2" 041
TI PI FEED DWG.No.
TT
G 0111 0111 0104 G

041 H
953053-120-18-A1 REACTORS
TI 0.75"
WO 041 0112
DWG.No. Title
CL OF GLASS
041 LG TL REFERENCE DRAWINGS
TG
NO POCKET 2"-FLG-041-0026-A1AP-NI FLG
0102 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
150

0207 GL(R) 041-3501M


1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041 041 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
NOTE 9 NOTE 2
0.75" TT PG 041 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
6" 6"
H SIGNAL 0112 0116
H
2300 MIN

NPIC-041-E-0115M PT A 13/JUL/13 FOR REVIEW DMO RKM SMA


041-0008M NOTE 2 LPT 0104 Rev Date Description Prep'd Chk'd App'd
PIP. LAG REACTOR EFFLUENT
8"-P-041-0166-B1AH04-HC REVISIONS
TO 041-AY-0001 0.75" INST. INST. 041-0016M
NOTE 8 Operation Centre JOB Code:
041 NOTE 12 PIP. NC CIRCUIT Operation Centre DWG.No.:
FLG 041 NOTE 1 TROUBLE FROM 041-R-101B
SC AT 8"-P-041-0161-B1AH04-HC 0.75"
0.75" 0.75" 8" 8" CRIT Contractor JOB Code Responsible Company
041-3501M 0004 0001D 0.75" NPT 041 041 041 041
NPT MOIS UZ UZ HZA UA 0-6495-20 TPM
TYPE L2
NOTE 1 0103 0101 0110 0102 Prepared by Checked by Approved by
NPIC-041-E-0105M
0.75" 0.75" 300 # 300 # SAMPLE RETURN T. T. HUONG T. NGUYEN T. N. SON
NOTE 15
NOTE 1 NOTE 1 041 0.75"-P-041-0089-B1AH04-NI
041 041-0017M
PSV
I 3"
0.75"-IA-041-0002-S0RA-NI
0152 UZ 041
HZS
NNF
TO 041-E-201A/B
I
3"-CBD-041-0026-A2AP-NI

(V) 0102
0.75"-P-041-0087-B1AH04-PG 0.75" 041
AIR RESERVOIR UA 0110
0.75"-LPN-041-0014-A1AA-NI EMERGENCY
HYDROCARBON SAMPLE MIN
0103 041
DEPRESSURIZING NSRP
FREE DRAINING

PIP. INST. CIRCUIT UZY


0.75"-P-041-0077-B1AH04-PG 0103
041-0013M LPN TROUBLE S Complex Project
IA Nghi Son Refinery and Petrochemical
TWO PHASE FLOW NC WO 041-3601M
MIN

FROM 041-E-101 NOTE 7 041-3601M Nghi Son, Vietnam Limited Liability Company
0.75" 0.75"
0.75"-LPS-041-0022-A1AS-HS 041 041 Drawing Title
NC PG UZY
0102
0117 S
J 0.75" LPS
041
(V)
PIPING AND INSTRUMENT DIAGRAM J
NP CBD 041-3101M PT
041-3701M 0.75" 0.75" 0110
H H
PENEX
NC 0.75"-P-041-0260-B1AH04-HC 041 041 041 041
MIN

ULL ULH ULH ULL REACTOR SECTION


LEAD REACTOR EFFLUENT 0102 0102 0103 0103
8"-P-041-0082-B1AH04-HC L L
041-0014M 041 REACTORS - 1
TWO PHASE FLOW PI
TO 041-E-102A/B 0110 L 041 041 041 041 041 041
START-UP PURGE USL USH UZV UZV USH USL 3"-FLG-041-0023-A1AP-NI
2"-P-041-0083-A1AP04-NI 0102 0103 Issue Purpose Document Class
0102 0102 0103 0103
041-0013M
FOR CONSTRUCTION Z
K TO 041-EJ-611
3"-P-041-0168-B1AH04-HC FREE DRAINING FLG
Unit No. Unit Abbreviation PCWBS Size Scale K
LAG REACTOR EFFLUENT
8"-P-041-0078-B1AH04-HC TWO PHASE FLOW 041-3501M
041 PENX A900 A1 NONE
LO LO

DR01A
041-0013M FC FC Contractor DWG.No. Sheet Rev.

0.75"
TWO PHASE FLOW TSO TSO
A1

TO 041-E-101 3" 3" D-041-1225-0015M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 13 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

041-R-101B A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.

REACTOR 1. CATALYST WITHDRAWAL NOZZLE.


A CODE ASME VIII DIV 1 2. VALVE FOR LOW RANGE PG CONNECTION. 041-PG-0102 (DWG. A
SIZE:I.D x TT 2500 mm x 12200 mm D-041-1225-0015M) IS USED FOR BOTH REACTORS AS CATALYST
DESIGN PRESSURE 3.90 MPa(g) + FV @ 205 °C LOADING MAY NOT BE DONE AT SAME TIME ON BOTH REACTORS.
DESIGN TEMPERATURE 260 °C 3. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO
INSULATION TYPE HC REACTORS.
P-041-0289-D1AH04-HC 4. ALTERNATE DESIGN CONDITIONS DURING HOT HYDROGEN
TRIM SPECIFICATION STRIPPING:
P-041-0332-B1AH04-HC
- PRESSURE: 2.70 MPa(g)
NOTE 4 NPIC-041-E-0152M
B - TEMPERATURE: 315 °C
B
5. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
SWING ELBOW TO HPN.
NPIC-041-E-0115M
6. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
SIZE: 3J4 7. FOR PRESSURE TEST
PSET: 3.90 MPa(g)
041 FREE DRAINING 8. FOR START-UP.
8"-FLG-041-0027- A1AP-NI FLG
PSV
041-3501M 9. VALVE AND BLIND FLANGE TO BE PROVIDED BY CONTRACTOR.
0104
10. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 3.9 MPa(g).
C NPIC-041-E-0115M
C
NOTE 2
0.75"

MIN
PERMANENT LINE
4"-P-041-0172-B1AH04-HC 1.5"-LPN-041-0004-A1AA-NI LPN
SUBJECT TO
2" NOTE 8 041-3601M
0
SERVICE TEST
0.75" 0.75"

FREE DRAINING
NPIC-041-E-0115M

TEST POINT
D 041 IN VIEW D
PG
NOTE 10 0075
1.5"
NOTE 5
1.5"-HPN-041-0003-D1AA-NI HPN

041 CONTRACTOR VENDOR NOTE 7 041-3601M


PG NOTE 6 0.75" 0.75"
0120 NOTE 9
2"
COMBINED FEED
8"-P-041-0167-B1AH04-HC FREE DRAINING FREE DRAINING
041-0015M 1.5"-P-041-0173-D1AH04-PC
TWO PHASE FLOW MW NPIC-041-E-0097M
E FROM 041-E-103 8" 30"
1.5"-P-041-0305-B1AH04-PC
E
A. DELETED.

041-R-101B
NOTE 3 VAPOR
041 LIQUID TRAY
041
PI PT
0106 0106
H 041 041
F TI TT F
0116 0116
H 041 041
TI TT
0117 0117
H 041 041
TI TT
0118 0118
H 041 041
TI TT FEED DWG.No.
G 041 041
0115 0115 G
PDI PDY H 041 041
TI TT
0108 L 0108
0119 0119
953053-120-18-A1 REACTORS
H 041 041 DWG.No. Title
TI TT REFERENCE DRAWINGS
0120 0120
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
H 041 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041
TI TT 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
0121 0121 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H H 041 041
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
TI Rev Date Description Prep'd Chk'd App'd
TT
041 0122 REVISIONS
PI 0122
0107 Operation Centre JOB Code:
Operation Centre DWG.No.:
H Contractor JOB Code Responsible Company
041
0.75" TI 0-6495-20 TPM
0123 Prepared by Checked by Approved by
FLG 2"-FLG-041-0028-A1AP-NI NO POCKET TL
T. T. HUONG T. NGUYEN T. N. SON
041-3501M

I 0.75" 041
PT
041
PG
041
TT
I
0107 0119 0123 6" 6"

2300 MIN
LPT NOTE 1 NOTE 1
LAG REACTOR EFFLUENT
041-0015M
8"-P-041-0166-B1AH04-HC NSRP
Complex Project
Nghi Son Refinery and Petrochemical
TO 041-E-102A/B
Nghi Son, Vietnam Limited Liability Company

Drawing Title
0.75"
J 3" PIPING AND INSTRUMENT DIAGRAM J
PENEX
REACTOR SECTION
FREE DRAINING

WO
REACTORS - 2

Issue Purpose Document Class


3"-CBD-041-0027-A2AP-NI FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
CBD 041 PENX A900 A1 NONE

DR01A
041-3701M Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0016M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 14 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-P-201A/B 0014V AND D-000-1225-0020V TO 0026V.
1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2201M.
STABILIZER REFLUX PUMPS
A 2. DELETED. A
CODE API 610
PUMP TYPE / NO. OF STAGE CENTRIFUGAL / 1 3. CONNECTION FOR START-UP FILLING. VALVE TO BE ACCESSIBLE AT
SIGNAL GRADE.
041 041 RATED CAPACITY / NPSHR 79.6 m³/hr / 1.6 m
041-0013M FY FFY
0004 0212 DIFF. HEAD / SHUT-OFF PRESSURE 84.7 m / 2.29 MPa(g) 4. WASH WATER CONNECTION TO PREVENT FeS FIRE DURING
FROM 041-FIC-0004 0.55 TURNAROUND
SPECIFIC GRAVITY @ PUMPING TEMP
SIGNAL
MOTOR SIZE 30 kW 5. LOCATION TO BE ABLE FOR FLEXIBLE HOSE CONNECTION WITH
041-0013M NI NEARBY FIRE WATER. NPIC-041-E-0101M
041 INSULATION TYPE
FFI
FROM 041-FI-0052 TRIM SPECIFICATION B1AP04-NI 6. RESTRICTION ORIFICE WITH 6.108 MM HOLE.
0212
B NPIC-041-E-0158M
B
REFLUX / FEED RATIO 7. PLUG VALVE.

8. DELETED. NPIC-041-E-0155M
9. EMERGENCY SHUTDOWN PUSH BUTTON TO BE LOCATED AT SAFE
FLG
DISTANCE (MINIMUM 15 METERS) FROM PUMPS.
041-3501M FLG
041 NPIC-041-E-0158M
FIC 041-3501M 10. UPON ACTIVATION OF THE INTERLOCKS THE PUMPS WILL BE
0313 STOPPED AND CLOSED THE EIV'S WITHOUT TIME DELAY.
L

0.75"-FLG-041-0060-A1AP-NI
11. ORIFICE WITH 74.03 MM HOLE

0.75"-FLG-041-0061-A1AP-NI
041
C FV
12. ORIFICE WITH 71.12 MM HOLE C

NO POCKET
0313
MINI FLOW 3"
3"-P-041-0180-B1AP04-NI

NO POCKET
13. DELETED. NPIC-041-E-0107M
041-0019M
MINI FLOW FO
TO 041-V-201
0.75" 2" 0.75" PERMANENT LINE
SIGNAL NOTE 7
SUBJECT TO
041-0019M SERVICE TEST
FROM 041-LIC-0203
NOTE 4, 5
BY VENDOR 0.75" TEST POINT
D HC 0.75"
D
2.5" 041
FIC
NPIC-041-E-0098M 0203 0.75"
L
NPIC-041-E-0101M
0.75"
3"-P-041-0322-A0RA-NI NOTE 11 NOTE 12
NOTE 9
041 041 041 041 041
041 FT FE FT FE HZS
FV
3" 0203
0203 0203 0313 0313 0208A
REFLUX
4"-P-041-0096-B1AP04-NI 4"
E 041-0017M
FO NOTE 9 0.75" E
TO 041-C-201 A. DELETED.
0.75" 4" 0.75" 041
0.75" 041 041
4"
HZS UZ UZ
NOTE 7 1000 0203 FC
0207A
041
O TSO 1. DELETED.

041 041
NOTE 10 UZV
2. DELETED.
4" 0206 C NPIC-041-E-0155M
UZ UZ
1000 0203 FC, TSO LPN 0.75"-LPN-041-0015-A1AA-NI 3. DELETED.
O
041 0.75" 0.75"
NOTE 10 UZV 041-3601M
0204

MIN
041 C 0.75" 0.75" MIN
F HZS 041
HZS F
0207B 0208B
NPIC-041-E-0155M 0.75" NPIC-041-E-0107M 0.75"

MIN

MIN
NPIC-041-E-0107M LPS 0.75"-LPS-041-0023-A1AS-HS
041-3101M
041 H
041 0.75" 0.75"
TI
NOTE 6

NOTE 6
TT 041 041
0208 0208 RO RO
0204
0.75"-P-041-0261-B1AP04-HC 0205
REFLUX FREE DRAINING
8"-P-041-0101-B1AP04-NI 0.75"
041-0019M 0.75" 0.75" FEED DWG.No.
1"
G FROM 041-V-201 G
NOTE 3 0.75"
8" 8"
041 FC, TSO FC, TSO
UZV 041 953053-120-20-A1 STABILIZER RECEIVER
0203 UZV
C 0205 DWG.No. Title
NPIC-041-E-0155M 0.75" C 0.75"

MIN
NPIC-041-E-0155M REFERENCE DRAWINGS
MIN

2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS


1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H LPN 0.75"-LPN-041-0026-A1AA-NI
0.75" A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75"
041-3601M 0.75" 0.75" NPIC-041-E-0152M
REVISIONS
Operation Centre JOB Code:
0.75"-LPN-041-0027-A1AA-NI
0.75" 0.75"
041 Operation Centre DWG.No.:
PG 041 Contractor JOB Code Responsible Company
0225
8"-P-041-0099-B1AP04-NI

STR 0-6495-20 TPM


4"-P-041-0181-B1AP04-NI

NPIC-041-E-0152M 1061
NPIC-041-E-0100M Prepared by Checked by Approved by
041
041 PG T. T. HUONG T. NGUYEN T. N. SON
041 PG 041-P-201B 0212
0228 4" - 300#
STR NOTE 1
I 1060 RF I
NPIC-041-E-0100M
041 8"-P-041-0100-B1AP04-NI
PG 041-P-201A M-2
M
0227 NOTE 1
4" - 300#
RF LPN 6" - 300# A, B, C, E
NSRP
Complex Project
041-3601M RF Nghi Son Refinery and Petrochemical
M-2 Nghi Son, Vietnam Limited Liability Company
NPIC-041-E-0100M 041
M (V) MGL
6" - 300# A, B, C, E 0202A Drawing Title
NPIC-041-E-0158M
RF 0.75" - 300# RUN
J NPIC-041-E-0100M 041 RF PIPING AND INSTRUMENT DIAGRAM J
(V) MGL
0201A 0.75"-P-041-0024-B1AP04-NI PENEX
0.75" - 300# RUN STABILIZER AND SCRUBBER SECTION
RF FREE DRAINING FREE DRAINING
0.75"-P-041-0023-B1AP04-NI CBD CBD STABILIZER REFLUX PUMPS
NPIC-041-E-0158M 041-3701M 041-3701M
0.75" 0.75" 0.75"-CBD-041-0021-A2AP-NI 0.75" 0.75" 0.75"-CBD-041-0022-A2AP-NI
Issue Purpose Document Class
FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
WO WO Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0020M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 15 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
SIZE: 1E2
PSET: 1.45 MPa(g) 041-P-203A/B 041-E-204 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041 CAUSTIC CIRCULATION PUMPS CAUSTIC HEATER 0014V AND D-000-1225-0020V TO 0026V.
PSV
0203 CODE ASME VIII DIV 1 / API 660
A CODE API 610
TYPE: MULTITUBE
1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2202M. A
PUMP TYPE / NO. OF STAGE CENTRIFUGAL / 1 2. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
041 SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 203 mm/ 2745 mm/ 8.98 m²
3"-P-041-0196-A2AN04-NI FI RATED CAPACITY / NPSHR 17 m 3/hr/ 2 m D-041-1225-2401M.
0205 31.6 m / 1.40 MPa(g) DESIGN DUTY 495 kW
L DIFF. HEAD / SHUT-OFF PRESSURE 3. RESTRICTION ORIFICE WITH 27 MM HOLE.
1.13 SIDE SHELL TUBE
041 SPECIFIC GRAVITY @ PUMPING TEMP
FI DESIGN PRESSURE 0.81 MPa(g) + FV @ 120°C 1.45 MPa(g) + FV @ 100°C 4. WASH WATER CONNECTION TO PREVENT FeS FIRE DURING
0205L MOTOR SIZE 7.5 kW
TURNAROUND.

FREE DRAINING
NI DESIGN TEMPERATURE 265°C 100°C
INSULATION TYPE
INSULATION TYPE HS NI 5. EQUIPMENT AND PIPING IN CAUSTIC SERVICE SHALL BE FLUSHED

2"-P-041-0195-A2AN04-NI
TRIM SPECIFICATION B2AN04-NI
TRIM SPECIFICATION A2AS-HS A2AN04-NI WITH WATER PRIOR TO STEAM-OUT.

B NOTE 6 6. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE B


IN VIEW 0.34 MPa(g) @ 175 °C AND FV @ 175 °C.

FREE DRAINING
7. HOT CONDENSATE TO BE COOLED USING SERVICE WATER
NOTE 3 BEFORE DISCHARGE TO COC.
NOTE 12 041
RO 8. LOCATION TO BE ABLE FOR FLEXIBLE HOSE CONNECTION WITH
041 0202 NEARBY UTILITY STATION.
FT
RECIRCULATING 041 0205
FE 6" 3"-LPS-041-0009-A1AS-HS LPS 9. INLET AND OUTLET PIPING TO BE SYMMETRICAL.
CAUSTIC 0205
3"-P-041-0186-A2AN04-NI 041-3101M
041-0021M 0.75" 10. FULL OPENING OF GLOBE VALVE MAY FLOOD THE FLOOR. GLOBE
C TO 041-C-202
VALVE TO BE ADJUSTED TO ACHIEVE SUFFICIENTLY COOL C
NPIC-041-E-0153M TEMPERATURE AT 041-TG-0219 (40°C RECOMMENDED).
NPIC-041-E-0153M NPIC-041-E-0153M
3" 0.75" 041 11. ORIFICE WITH 18.23 MM HOLE.
FI
2"
041 H 0.75"-LPCW-041-0026-A2AS-PG LPCW
12. ORIFICE WITH 40.45 MM HOLE.
0204 TI NPIC-041-E-0158M ST
L TWO PHASE FLOW
041 0209 041-E-204 NOTE 9
041-3101M
2.5" L 13. SELF-VENTING PUMP CASING. NPIC-041-E-0158M
FI NOTE 5 0.75"-LPS-041-0035-A1AS-HS
HC
0204L 0.75'' 041
IN VIEW 041 NPIC-041-E-0158M 041 8" 8" TG
BY VENDOR NOTE 11
FT TT 0214
RECIRCULATING NOTE 4, 8 0204 041 0209 3"-300#
0.75"
D CAUSTIC
2"-P-041-0187-A2AN04-NI
FE
0204 3" RS RS
PERMANENT LINE D
041-0021M
SUBJECT TO
SERVICE TEST
TO 041-C-202 6" 6"
3"-300# 0.75"

6" 6" TEST POINT


NOTE 9
FLG 6"-LPCW-041-0010-A2AS-PG
SVW 2"-SVW-041-0005-A2AW-NI
041-3502M
041-3301M
E 041 E

MIN
0.75" 0.75" TG
0219 A. DELETED.
IN VIEW 1. DELETED.
NOTE 2 NOTE 10
041 2. DELETED.
SC
0012
WO 3. DELETED.
TYPE L3
TO COC
(BY CIVIL)
NOTE 7
F 3"-P-041-0194-A2AN04-NI F

RECIRCULATING
CAUSTIC
4"-P-041-0188-A2AN04-NI
041-0021M
3"-P-041-0193-A2AN04-NI
FROM 041-C-202
DMW
041-3301M
NPIC-041-E-0123M
0.75" 0.75" 1"-DMW-041-0003-A0JP-NI FEED DWG.No.
G G
MIN

0.75"-LPN-041- 0.75" 0.75"


0016-A1AA-NI
MIN

MIN
LPN
953053-120-22-A1 CAUSTIC CIRCULATION AND WATER INJECTION
041-3601M DWG.No. Title
MIN

0.75" 0.75"
4"-P-041-0191-A2AN04-NI

REFERENCE DRAWINGS

4"-P-041-0192-A2AN04-NI
0.75"-LPS-041-
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
0024-A1AS-HS
1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS

MIN
MIN

LPS 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD


0.75"
MIN

DMW 041-3101M B 11/NOV/13 FOR APPROVAL DMO RKM SMA


MIN

H 041-3301M 0.75" HC 0.75" DMW 0.75"-CCB-041-0023-A2AN04-NI FREE DRAINING CCB


A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75" 0.75" 0.75" 041-3301M 041-3701M REVISIONS
0.75" 041
041 PG
PG 0.75" 0.75" 0.75" 0.75" Operation Centre JOB Code:
0.75"-DMW-041-0004-A0JP-NI 0215

NPIC-041-E-0158M
0214 Operation Centre DWG.No.:
NPIC-041-E-0158M

041-P-203A 0.75"-DMW-041-0005-A0JP-NI
041-P-203B Contractor JOB Code Responsible Company
041 NOTE 1, 13 NOTE 1, 13 0-6495-20 TPM
NPIC-041-E-0158M

NPIC-041-E-0158M

STR 041
STR Prepared by Checked by Approved by
1071 2"-300# 2"-300# 0.75"-CBD-041-0032-A2AP-NI FREE DRAINING CBD
1072 T. T. HUONG T. NGUYEN T. N. SON
041 RF RF 041-3701M
PG 041
PG
I 0229
0230 I
M M-2 M M-2
3"-300# A, B, C, E 3"-300# A, B, C, E
RF RF NSRP
041 041 041 041 Complex Project
(V) MGL (V) MGL Nghi Son Refinery and Petrochemical
UZ UZ
NPIC-041-E-0158M NPIC-041-E-0158M
0203A 1000 0204A 1000 Nghi Son, Vietnam Limited Liability Company
0.75"-300# RUN 0.75"-300# RUN
RF 0.75" RF 0.75" WO Drawing Title

0.75"-P-041-0197-A2AN04-NI 0.75"-P-041-0198-A2AN04-NI
J PIPING AND INSTRUMENT DIAGRAM J
NPIC-041-E-0122M
NPIC-041-E-0098M
PENEX
STABILIZER AND SCRUBBER SECTION
WO WO
CAUSTIC CIRCULATION
FREE DRAINING

FREE DRAINING

0.75"-CCB-041-0001-A2AN04-NI 0.75"-CCB-041-0002-A2AN04-NI Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
CCB CCB

DR01A
Contractor DWG.No. Sheet Rev.
A1

041-3701M 041-3701M
D-041-1225-0022M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 16 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
041 041 1. DELETED.
PIC PIC
A 0216A 0216B
2. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2202M.
A
041 041 3. 041-P-211B IS A WAREHOUSE SPARE.
NPIC-041-E-0098M PV NPIC-041-E-0098M PV
NPIC-041-E-0098M 0216A 0216B 4. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.

FREE DRAINING
D-041-1225-2401M.
LPN 1"-P-041-0324-A1AP04-NI FREE DRAINING FREE DRAINING 1" FREE DRAINING FLG
5. 10 MM WEEP HOLE TO BE PROVIDED AT LOW POINT.
041-3602M 041-3502M 3"-V-041-0011-A1AP-NI
FC SIZE: 1.5G3 FC
1" 1" 6. SAMPLE CONNECTION DRAIN TO BE COLLECTED IN PORTABLE
0.75" 0.75" 0.75" 0.75" 041 PSET: 0.35 MPa(g) 0.75" 0.75"
PT DEVICE.
041 NPIC-041-E-0152M
0216 1" 2"-FLG-041-0038-A1AP-NI
B 1"-LPN-041-0005-A1AA-NI NPIC-041-E-0098M 2"
PSV
0206 FREE DRAINING 7. ORIFICE WITH 35.88 MM HOLE. B

FREE DRAINING
8. FOR DETAILS, REFER TO VENDOR DWG. VM2158-111-A-003.
1"
NPIC-041-E-0134M
WEEP HOLE 9. MAXIMUM ALLOWED CV : 7.6 WHICH IS THE GOVERNING CASE FOR
NOTE 9 NPIC-041-E-0158M NOTE 5 041-PSV-0206. NPIC-041-E-0098M
2"
NPIC-041-E-0098M 10. MAXIMUM ALLOWED CV : 3.5 TO NOT EXCEED THE 041-PSV-0206's
3"-P-041-0204-A1AP04-NI RELIEVING CAPACITY. NPIC-041-E-0108M
FREE DRAINING 11. SELF-VENTING PUMP CASING. NPIC-041-E-0158M

C 3" RS 1.5" 3"-P-041-0205-A1AP04-NI C


MW
041-V-212 PERMANENT LINE
041
SUBJECT TO
UZ SERVICE TEST
1000
(v) NPIC-041-E-0090M
SIZE: 1D2 TEST POINT
PSET: 1.35 MPa(g) TYPE 1
NPIC-041-E-0090M 041 H
041 041
LT LIC
PSV
D 7500 0.5" 041
TYPE 1 0212
DP
0212 L
041
NPIC-041-E-0098M D
LG NPIC-041-E-0098M LV
0213 0212
GL(R)
NPIC-041-E-0107M

NPIC-041-E-0152M
NPIC-041-E-0158M
2"-P-041-0265-A2AP04-NI 2"-CLBFW-041-0001-B2AS-NI

FREE DRAINING
CLBFW
1"-P-041-0203-A2AN04-NI NPIC-041-E-0158M 041-3201M
0.5" 1" FC

FREE DRAINING
0.75" 0.75"
NPIC-041-E-0107M 041-P-211A TL
041 NOTE 3, 8 NPIC-041-E-0098M
PG
7500 0.5"
E E

750 MIN
0.5" LC
0.5" NOTE 10 NPIC-041-E-0108M
A. DELETED.
041 H
FI 0.75" 0.75" 1. DELETED.
1.5"
0206 L M
041
FI NPIC-041-E-0115M
M-2 1.5"-P-041-0202-A2AP04-NI NPIC-041-E-0122M
0206L NOTE 7 A, B, C, E
IN VIEW 041 041
FT 041 SC
3"-P-041-0185-A2AN04-NI 0206
FE
0013
TYPE J1
0206 NOTE 4, 6 WO
F WASH WATER
041 041
F
041-0021M UZ MGL
1000 0205A
TO 041-C-202 0.75" RUN

3"-P-041-0201-A2AN04-NI
WASH WATER
3"-P-041-0189-A2AN04-NI
041-0021M

FROM 041-C-202 FEED DWG.No.


G 0.75"-LPN-041-0017-A1AA-NI G
NPIC-041-E-0098M 0.75" LPN 0.75" 0.75"
041-V-212
041-3601M 953053-120-22-A1 CAUSTIC CIRCULATION AND WATER INJECTION
MIN

MIN

MIN
0.75" WATER BREAK TANK
MIN

DWG.No. Title
0.75" 0.75"
0.75"-LPS-041-0025-A1AS-HS REFERENCE DRAWINGS
CODE ASME VIII DIV 1 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
LPS SIZE: I.D x TT 750 mm x 1500 mm 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0.75" 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-3101M DESIGN PRESSURE 0.35 MPa(g) + FV @ 40 °C
MIN

MIN
3"-P-041-0200-A2AN04-NI B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0.75" HC 0.75" 0.75" 0.75" DESIGN TEMPERATURE 70 °C A 13/JUL/13 FOR REVIEW DMO RKM SMA H
NI Rev Date Description Prep'd Chk'd App'd
INSULATION TYPE
FREE DRAINING 0.75"-CCB-041-0024-A2AN04-NI

3"-P-041-0199-A2AN04-NI FREE DRAINING REVISIONS


FREE DRAINING 0.75"-CBD-041-0033-A2AP-NI

CCB P-041-0312-A1AP04-NI
TRIM SPECIFICATION Operation Centre JOB Code:
041 041
041 041 041-3701M P-041-0313-B2AP04-NI Operation Centre DWG.No.:
STR 041-P-202A PG
STR
041-P-202B PG
1080 NOTE 2, 11 0218
NOTE 2, 11 0219 0.75" 0.75"-CCB-041-0025-A2AN04-NI Contractor JOB Code Responsible Company
WO 1081 0-6495-20 TPM
NPIC-041-E-0158M NPIC-041-E-0158M
041-P-211A/B Prepared by Checked by Approved by
2"-300# 2"-300# T. T. HUONG T. NGUYEN T. N. SON
FREE DRAINING CBD
RF 041 RF WATER INJECTION PUMPS
PG 041-3701M
I 041
PG
0232
0.75"-CBD-041-0034-A2AP-NI
CODE API 675 I
0231 M M-2 M M-2 PUMP TYPE / NO. OF STAGE PROPORTIONING / 1
3" - 300# A, B, C, E 3" - 300# A, B, C, E NPIC-041-E-0122M RATED CAPACITY / NPSHR 0.053 m 3/hr/0.56 m
RF RF
NPIC-041-E-0098M
DIFF. HEAD / SHUT-OFF PRESSURE 108.7 m NPIC-041-E-0158M NSRP
SPECIFIC GRAVITY @ PUMPING TEMP 0.99 Complex Project
NPIC-041-E-0158M (V) 041 041 NPIC-041-E-0158M (V) 041
Nghi Son Refinery and Petrochemical
MGL UZ 041 0.37 kW
MGL UZ MOTOR SIZE Nghi Son, Vietnam Limited Liability Company
0206A 1000
0.75"-300# 0.75"-300# 0207A 1000 INSULATION TYPE NI
RF 0.75" RUN RF 0.75" RUN Drawing Title
TRIM SPECIFICATION A2AP04-NI
CCB CBD WO
J 041-3701M 041-3701M 0.75"-P-041-0207-A2AN04-NI PIPING AND INSTRUMENT DIAGRAM J
0.75"-P-041-0206-A2AN04-NI 041-P-202A/B
PENEX
WATER CIRCULATION PUMPS STABILIZER AND SCRUBBER SECTION
WO WO CODE API 610 WATER INJECTION
FREE DRAINING

FREE DRAINING

PUMP TYPE / NO. OF STAGE CENTRIFUGAL / 1


RATED CAPACITY / NPSHR 14.0 m 3/hr/2.1 m
0.75"-CCB-041-0003-A2AN04-NI 0.75"-CCB-041-0004-A2AN04-NI Issue Purpose Document Class
DIFF. HEAD / SHUT-OFF PRESSURE 24.2 m / 1.33 MPa(g)
SPECIFIC GRAVITY @ PUMPING TEMP 0.99 FOR CONSTRUCTION Z
K MOTOR SIZE 5.5 kW
Unit No. Unit Abbreviation PCWBS Size Scale K
INSULATION TYPE NI 041 PENX A900 A1 NONE
CCB CCB

DR01A
Contractor DWG.No. Sheet Rev.
TRIM SPECIFICATION B2AN04-NI
A1

041-3701M 041-3701M
D-041-1225-0023M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 17 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-TK-211 041-P-212
0014V AND D-000-1225-0020V TO 0026V.

CAUSTIC DILUTION TANK CAUSTIC TRANSFER PUMP


A CODE API 650 CODE ISO 5199
1. VALVE TO BE LOCATED IN PIT. EXTENDED STEM FOR VALVE
OPERATION TO BE PROVIDED AT GRADE LEVEL. VALVE
A
TYPE CONED ROOF PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 1 MATERIAL AS PER S0CW PIPING CLASS SPEC.

SIZE:I.D x HEIGHT 5000 mm x 5000 mm RATED CAPACITY/NPSHr 24 m3/hr/2.3 m 2. FOR PUMP AUXILIARY DETAILS, REFER TO DWG.
WORKING CAPACITY 65.4 m³ DIFF.HEAD/SHUT-OFF PRESSURE 83.8 m/ 1.18 MPa(g) D-041-1225-2203M

DESIGN PRESSURE 1.448 / 0.7584 KPa(g) (INTERNAL / EXTERNAL) SPECIFIC GRAVITY @ PUMPING TEMP. 1.13 3. SIPHON BREAKER TO BE PROVIDED.
DESIGN TEMPERATURE 70°C MOTOR SIZE 22 kW 4. RESTRICTION ORIFICE WITH 16 MM HOLE.
INSULATION TYPE NI INSULATION TYPE NI
5. PLANT AIR IS FOR TANK MIXING.
TRIM SPECIFICATION P-041-0314-A2AN04-NI TRIM SPECIFICATION A2AN04-NI
B 6. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG. B
NPIC-041-E-0107M D-041-1225-2401M.
CAUSTIC
3"-FCAU-041-0004-A2AN04-NI 7. DELETED.
041-0021M
8. GAUGING HATCH.
TO 041-P-203A/B TO ATM NPIC-041-E-0107M
9. DELETED.
041
LI 10. PIPING IN CAUSTIC SERVICE FROM 041-P-212 SHALL BE
(V) 0209L FLUSHED WITH WATER PRIOR TO STEAM-OUT. STEAM-OUT
CONDITIONS ARE 0.34MPa(g) @ 175 ºC AND FV@175 ºC.
C (V) 11. SAMPLE CONNECTION DRAIN TO BE COLLECTED IN A
C
041 H
041 PORTABLE DEVICE.
6" LT LI
0209 0209 L 12. BLOCK / GLOBE VALVE SHOULD BE LOCATED OUTSIDE THE
FLT
NOTE 8 TANK BLINDWALL.
041 041
FQI
FI
8"
13. ORIFICE WITH 22.04 MM HOLE.
0207 0207L 24" MH
14. ORIFICE WITH 24.93 MM HOLE. NPIC-041-E-0098M
NOTE 13 041 IN
041 FT 15. STEAM OUT CONDENSATE SHALL BE ROUTED TO CBD.
VIEW

MIN
FE 0207
D 0207 NOTE 3 16. SELF-VENTING PUMP CASING. NPIC-041-E-0158M D
CLBFW 2"-CLBFW-041-0002-B2AS-NI
041-3201M NOTE 4 PERMANENT LINE
NOTE 12
041 0.75" SUBJECT TO
RO
0203 SERVICE TEST
NOTE 10

305
NPIC-041-E-0107M
PA 1"-PA-041-0001-A2AA-NI
041-3601M NOTE 5 600 MIN TEST POINT

(V)
E E
A. DELETED.
NPIC-041-E-0098M
1"-DMW-041-0002-A0JP-NI
1"-PA-041-0002-A2AN04-NI

NOTE 6, 11 TOP CONNECTION


1. DELETED.
041
SC DMW 2. DELETED.
0014
041-3301M
TYPE J1 MIN
0.75" 0.75"
4" 0.75"-LPN-041-0018-A1AA-NI

MIN
F NPIC-041-E-0098M TOP CONNECTION F
NC MIN
041

1000
041 LPN NPIC-041-E-0158M
TT TI
0210 0210 041-3601M
NOTE 15

MIN
3" MH 0.75" 0.75"
UC 24" 4"

MIN
FREE DRAINING

0.75"
1:120 1:120 HC

4"-FCAU-041-0010-A2AN04-NI
LPS 0.75"

MIN
FEED DWG.No.

FREE DRAINING
G 041-3101M G
4" 041-TK-211 0.75" 0.75"

FREE DRAINING 0.75"-CCB-041-0022-A2AN04-NI


NPIC-041-E-0107M NPIC-041-E-0098M
0.75"-LPS-041-0026-A1AS-HS

FREE DRAINING 0.75"-CBD-041-0046-A2AP-NI


041 953053-120-23-A1 CAUSTIC DILUTION TANK
PG DWG.No. Title
0221 REFERENCE DRAWINGS
FREE DRAINING
WO 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
NPIC-041-E-0140M
1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
0.75" B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H IN VIEW 12" UG
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
NOTE 12 AOC
UG REVISIONS
NPIC-041-E-0140M
(BY CIVIL ) NOTE 1 Operation Centre JOB Code:
0.75"-DMW-041-0001-A0JP-NI Operation Centre DWG.No.:
NOTE 14 TOP CONNECTION
041 Contractor JOB Code Responsible Company

MIN
FI 041 0-6495-20 TPM
0211L FE DMW Prepared by Checked by Approved by
0211
041-3301M T. T. HUONG T. NGUYEN T. N. SON
041 MIN
FT NPIC-041-E-0098M 0.75" 0.75" NPIC-041-E-0158M
I 0211 041
STR NPIC-041-E-0100M
CBD I
1083
0.75" 041-3701M
041
FQI
041-P-212 1" - 150#
0211
041 NOTE 2, 16 RF NSRP
3"-FCAU-041-0006-A2AN04-NI

PG Complex Project
0220 Nghi Son Refinery and Petrochemical
A, B, C, E 041 Nghi Son, Vietnam Limited Liability Company
4"-FCAU-041-0007-A2AN04-NI MGL
M
1.5" - 150# M-2 0208A Drawing Title
RF RUN
J NPIC-041-E-0100M PIPING AND INSTRUMENT DIAGRAM J
0.75" - 300# (V) PENEX
RF
STABILIZER AND SCRUBBER SECTION
NPIC-041-E-0146M 0.75"-FCAU-041-0011-A2AN04-NI FREE DRAINING CCB
CAUSTIC CAUSTIC DILUTION TANK
041-3701M
FROM UNIT 130 0.75" 0.75"-CCB-041-0005-A2AN04-NI
0.75"
130-P-003A/B Issue Purpose Document Class
041-1001M FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
WO

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0024M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 18 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

041-V-211 041-P-213A/B A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
CAUSTIC DEGASSING DRUM SPENT CAUSTIC PUMPS 1. DELETED.
A CODE ASME VIII DIV 1 CODE ISO 5199
A
2. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2203M.
SIZE:I.D x TT 900 mm x 3000 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 1
3. MIN 600 MM ABOVE FLARE HEADER.
0.35 MPa(g) + FV @ 100 °C RATED CAPACITY/NPSHr 23 m3/hr/2.2 m
DESIGN PRESSURE 4. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
DIFF.HEAD/SHUT-OFF PRESSURE 60.2 m / 1.20 MPa(g)
DESIGN TEMPERATURE 100 °C 0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
SPECIFIC GRAVITY @ PUMPING TEMP. 1.16
INSULATION TYPE NI MOTOR SIZE 11 kW 5. EQUIPMENT AND PIPING IN CAUSTIC SERVICE SHALL BE FLUSHED
P-041-0293-A1AP04-NI WITH WATER PRIOR STEAM-OUT.
TRIM SPECIFICATION INSULATION TYPE NI
SCAU-041-0013-B2AN04-NI 6. SPENT CAUSTIC PUMPS 041-P-213A/B ARE INTERMITTENT SERVICE.
TRIM SPECIFICATION A2AN04-NI
B NOTE 4 NPIC-041-E-0158M
LOW FLOW ALARM SHALL BE ACTIVATED ONLY WHEN THE PUMPS
ARE IN SERVICE.
B
MIN
FREE DRAINING 7. ORIFICE WITH 49.27 MM HOLE.
3"-FLG-041-0040-A1AP-NI
LO 8. MAXIMUM ALLOWED CV : 45 WHICH IS THE GOVERNING FOR

NOTE 3
600 MIN
041-V-211 SIZING CASE.
0.75"
NPIC-041-E-0108M
9. SELF-VENTING PUMP CASING.

FREE DRAINING
NPIC-041-E-0158M
3"-P-041-0105-A1AP04-NI
FLG

C 041-V-211 041-3502M PERMANENT LINE


C
NOTE 5 SUBJECT TO
041
LZY SERVICE TEST
0210 2"
041 041
UZ UZ MW
S TEST POINT
1000 0201 041
LZV
0210 RS NPIC-041-E-0158M
SPENT CAUSTIC C
3"-SCAU-041-0001-A2AN04-NI 3"
041-0021M
FC 1
FROM 041-C-202 TSO
D 0.75" 1.5" 0.75" D
2
2''

LC NOTE 8 NPIC-041-E-0090M
NPIC-041-E-0108M
NPIC-041-E-0090M

TYPE 1 TYPE 1 TYPE 1


041 H 041 H 041
041 041 041
LI LT LT LIC LG LY
0216 0216 0210 0210 0211 0210B
NPIC-041-E-0090M

L L
DP MAG
E DP 041
FI
E
041
1"-SCAU-041-0003-A2AN04-HC LY 0209 NOTE 6 A. DELETED.
L
HH 0210A 041
LOW
8" FI
LEVEL STOP 0209L
NOTE 7
041
041 FT
LPS 1"-LPS-041-0004-A1AS-HS FE 0209
IN VIEW
041-3102M 0209
TL
4"-SCAU-041-0011-A2AN04-NI
0.75" 0.75"
F LPT NPIC-041-E-0090M CCB
F
FREE DRAINING
900 MIN

3"-SCAU-041-0006-A2AN04-NI

0.75"-LPN-041- 0.75" 0.75"


0019-A1AA-NI

MIN
LPN

MIN
0041-3602M FEED DWG.No.
G G

MIN
0.75" 0.75"

4"-SCAU-041-0005-A2AN04-NI
4"-SCAU-041-0004-A2AN04-NI

0.75" 0.75"-LPS-041- 0.75" NPIC-041-E-0122M


0027-A1AS-HS

MIN
NPIC-041-E-0100M
NPIC-041-E-0158M
LPS
953053-120-24-A1 CAUSTIC DEGASSING DRUM
NPIC-041-E-0123M 0.75"
041 MIN HC 041-3102M 041 DWG.No. Title
STR 0.75" 0.75" 0.75" STR REFERENCE DRAWINGS
1089 1090 FREE DRAINING CCB 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
NPIC-041-E-0100M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0158M 041-3701M
041 041 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-P-213A PG 041-P-213B PG 0.75" 0.75"-CCB-041-0026-A2AN04-NI B 11/NOV/13 FOR APPROVAL DMO RKM SMA
NOTE 2, 9 0222 0223
H NOTE 2, 9 A 13/JUL/13 FOR REVIEW DMO RKM SMA H
1" - 150# 1" - 150# Rev Date Description Prep'd Chk'd App'd
041 041
PG RF PG RF REVISIONS
1.5" - 150# FREE DRAINING CBD
0233 0234 Operation Centre JOB Code:
RF 041-3701M Operation Centre DWG.No.:
0.75"-CBD-041-0036-A2AP-NI Contractor JOB Code Responsible Company
M M 0-6495-20 TPM
1.5" - 150#
Prepared by Checked by Approved by
M-2 RF M-2
0.75" NPIC-041-E-0100M T. T. HUONG T. NGUYEN T. N. SON
1.5" A, B, C, E A, B, C, E
(V) (V)
041
I UZ
041
MGL
041
UZ
041
MGL I
0.5" - 150# 1000 0209A 0.5" - 150# 1000 0210A
WNRF WNRF
NPIC-041-E-0158M RUN NPIC-041-E-0158M RUN
WO
0.75"-SCAU-041-0008-A2AN04-NI 0.75"-SCAU-041-0009-A2AN04-NI
WO NSRP
1.5"-CCB-041-0011-A2AN04-NI

0.75" Complex Project


1.5"-CBD-041-0030-A2AP-NI

Nghi Son Refinery and Petrochemical


0.75" 0.75"
Nghi Son, Vietnam Limited Liability Company

3"-SCAU-041-0007-A2AN04-NI
0.75"
Drawing Title

J PIPING AND INSTRUMENT DIAGRAM J


WO PENEX
WO STABILIZER AND SCRUBBER SECTION
CAUSTIC DEGASSING DRUM
FREE DRAINING

FREE DRAINING

FREE DRAINING

FREE DRAINING
Issue Purpose Document Class
0.75"-CCB-041-0006-A2AN04-NI 0.75"-CCB-041-0007-A2AN04-NI
FOR CONTRUCTION Z
SPENT CAUSTIC
K Unit No. Unit Abbreviation PCWBS Size Scale K
TO UNIT 190
CCB CBD CCB CCB
041 PENX A900 A1 NONE
190-TK-101

DR01A
Contractor DWG.No. Sheet Rev.
041-3702M 041-3702M 041-3702M 041-3702M
A1

041-1001M
D-041-1225-0025M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 19 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

041-P-302A/B 041-E-303 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO

DEISOHEXANIZER BOTTOMS COOLER SIZE: 1.5F2 0014V AND D-000-1225-0020V TO 0026V.


PSET: 1.75 MPa(g)
DEISOHEXANIZER BOTTOMS PUMPS CODE ASME VII DIV 1 / API 660 FREE DRAINING
1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2204M.
A CODE NPIC-041-E-0158M API 660 TYPE: MULTITUBE
041
PSV
4''-FLG-041-0044-A1AP-NI FLG
2. RESTRICTION ORIFICE WITH 9.1 MM HOLE.
A
0304 041-3503M
PUMP TYPE/NO. OF STAGES HIGH SPEED CENTRIFUGAL / 1 SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 154.1 mm / 5795 mm / 11.03 m² 3. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
3 D-041-1225-2401M.
RATED CAPACITY/NPSHr 6.1 m /hr/ 1.4m (WATER) DESIGN DUTY 69x2 kW
DIFF.HEAD/SHUT-OFF PRESSURE 158.9 m/ 1.65 MPa(g) SIDE SHELL TUBE 4. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
SPECIFIC GRAVITY @ PUMPING TEMP. 0.65 1.75 MPa(g) + FV @ 140 °C 1.35 MPa(g)
DESIGN PRESSURE
MOTOR SIZE 15 kW NOTE 4 0.75" 5. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO

MIN
PREVENT OVER PRESSURE DUE TO EXTERNAL FIRE AT THE
INSULATION TYPE PG DESIGN TEMPERATURE 170 °C 76 °C
COOLER. NPIC-041-E-0151M
TRIM SPECIFICATION B1AP04-PG / D1AP04-PG INSULATION TYPE PP NI

FREE DRAINING
6. GLOBE VALVE TO BE FULLY OPEN IN NORMAL OPERATION.
B TRIM SPECIFICATION B1AP04-PG A2AW-NI 2"
7. ORIFICE WITH 16.43 MM HOLE.
B
NPIC-041-E-0158M
8. METAL SEATED BUTTERFLY VALVE WITH OPTION CODE "4617".
SIZE: 0.75D1
PSET: 1.35 MPa(g) NPIC-041-E-0121M
3''-P-041-0212-B1AP04-PG
NPIC-041-E-0151M 041
TSV
0305
1''-V-041-0016-A1AP-NI PERMANENT LINE

FREE DRAINING
SUBJECT TO
2"-P-041-0114-B1AP04-PG SERVICE TEST
C NOTE 2
TEST POINT
C
041
RO
NPIC-041-E-0090M 0301 0.75"

FREE DRAINING
NPIC-041-E-0130M 3"-CWR-041-0013-A2AW-NI AT GRADE
DIH BOTTOMS
2"-P-041-0108-A1AP04-PG 1" 1" TO SAFE LOCATION
041-0026M 041
MINI FLOW TG
TO 041-C-301 NOTE 6 0.75" 0327
NPIC-041-E-0121M
041-E-303 0.75" NPIC-041-E-0158M
2"-P-041-0211-B1AP04-PG
D RS NOTE 5, 8
3"-CWR-041-0004-A2AW-NI CWR D
0.75"-LPN-041-0020-A1AA-NI 041-3002M
3" - 300# 6" LPT
NPIC-041-E-0158M
LPN 0.75''
RS NPIC-041-E-0130M NOTE 5
041-3603M 3"-CWS-041-0005-A2AW-NI CWS

0.75" 0.75" 041-3002M

0.75"-LPS-041-0028-A1AS-HS 3" - 300# 0.75" 3"-CWS-041-0014-A2AW-NI


MIN

LPS NPIC-041-E-0158M
041-3103M 0.75"
E 0.75" E

MIN
0.75" 0.75"
0.75"-P-041-0267-B1AP04-HC
A. DELETED.
2"
0.75" 1. DELETED.
MIN

MIN
041
FIC
0.75" 0305

041 041 041


PG PG FT
DIH BOTTOMS 0309 0310 0305
F 041-0026M
3"-P-041-0109-A1AP04-PG F
0.75" 041
FROM 041-C-301 NOTE 7 FE
0305
MIN

0.75" 6" 1.5"


MIN

041 H
041
TI TT
0313 0313
041
3"-P-041-0209-B1AP04-PG

3"-P-041-0210-B1AP04-PG

0.75" 0.75" FV
0305
DEISOHEXANIZER BOTTOMS
2" 2"-P-041-0116-B1AP04-NI FEED DWG.No.
G FC
041-0032M G
0.75" 1" 0.75" TO BL

041 041
STR 953053-120-27-A1 DEISOHEXANIZER BOTTOMS AND SIDE DRAW
STR
1098 1099 041 DWG.No. Title
SC REFERENCE DRAWINGS
0007 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041 NOTE 3 TYPE L3 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
PG 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041 0.75" (V) 0317 0.75" (V)
PG
3" - 600# 2" - 600# 3" - 600# 2" - 600# B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0316 RF RF RF RF
FLG A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-3503M Rev Date Description Prep'd Chk'd App'd
041 041
UZ UZ REVISIONS
NPIC-041-E-0152M M 1000 NPIC-041-E-0152M M 1000
NPIC-041-E-0158M Operation Centre JOB Code:
M-2 NPIC-041-E-0158M
041-P-302A A, B, C, E
041-P-302B M-2 A, B, C, E Operation Centre DWG.No.:
PG PG Contractor JOB Code Responsible Company
NOTE 1 NOTE 1 0-6495-20 TPM
041 0.75" - 300# 041 Prepared by Checked by Approved by
(V) MGL (V) MGL
WNRF T. T. HUONG T. NGUYEN T. N. SON
0303A 0304A

0.75" - 300# RUN NPIC-041-E-0158M RUN


I NPIC-041-E-0158M WNRF
0.75"-P-041-0214-B1AP04-NI I
0.75" 0.75"
0.75"-P-041-0213-B1AP04-NI NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title
WO WO
J PIPING AND INSTRUMENT DIAGRAM J
FREE DRAINING

FREE DRAINING

0.75"-CBD-041-0013-A2AP-NI 0.75"-CBD-041-0014-A2AP-NI PENEX


DEISOHEXANIZER SECTION
DEISOHEXANIZER BOTTOMS

Issue Purpose Document Class


FOR CONSTRUCTION Z
K CBD CBD Unit No. Unit Abbreviation PCWBS Size Scale K
041-3702M 041-3702M 041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0028M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 20 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

041-P-303A/B 041-AC-302 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
DEISOHEXANIZER SIDE DRAW PUMPS DEISOHEXANIZER SIDE DRAW COOLER
1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2205M.
A CODE API 610 CODE ASME VIII DIV 1 / API 661 A
PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 1 SIZE: H.T. AREA 2643 m 2 (FINNED) 2. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
NPIC-041-E-0158M D-041-1225-2401M.
RATED CAPACITY/NPSHr 79 m3/hr/4.2 m DESIGN DUTY 1609 kW
DIFF.HEAD/SHUT-OFF PRESSURE 158.7 m/ 1.57 MPa(g) DESIGN PRESSURE 1.65 MPa(g) + FV @ 101 °C 3. FOR AIR COOLER DETAILS, REFER TO DWG. D-041-1225-2321M.

SPECIFIC GRAVITY @ PUMPING TEMP. 0.59 DESIGN TEMPERATURE 130 °C 4. CONNECTION FOR START-UP (FILLING THE DEISOHEXANIZER
SIGNAL
MOTOR SIZE 55 kW NO. OF FANS 2 OVERHEAD SYSTEM). VALVE TO BE ACCESSIBLE AT GRADE.
041-0026M
INSULATION TYPE PG TRIM SPECIFICATION A1AP04-PG 5. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE 0.34 MPa(g)
FROM 041-LIC-0303 @ 175°C AND FV @ 175°C.
TRIM SPECIFICATION B1AP04-PG
NOTE 5
B 041 041 H 041-AC-302 6. PLUG VALVE. B
FIC TI NOTE 3 7. ORIFICE WITH 69.76 MM HOLE.
0306 L 0311
8. ORIFICE WITH 70.95 MM HOLE. NPIC-041-E-0105M

NOTE 7 9. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.


041
041 FT 041 041 10. LOCATED IN ANALYSER SHELTER 041-AS-001.
041 FE 0306 TT TG NPIC-041-E-0109M
FV 0311 0326
0306 0306 11. SELF-VENTING PUMP CASING. NPIC-041-E-0158M
DIH SIDE DRAW
4"-P-041-0050-A1AP04-NI 4"
041-0007M
C TO 041-E-001
FC
6" 6" PERMANENT LINE
C
4"
NOTE 6 0.75" SUBJECT TO
SERVICE TEST
M
2.2-DIMETHYLBUTANE 2.3-DIMETHYLBUTANE TEST POINT
FLG
NOTE 2 041-3502M SIGNAL
041 041
041 AI AIC 041-0031M
SC 0302 0302
D 0008 TO 041-AY-0302B D
TYPE L3 NPIC-041-E-0105M 041 041
NPIC-041-E-0106M FIC
041 FV
AY 0312 0312 L
DIH SIDE DRAW 0302A 300# 300#
3"-P-041-0301-A1AP04-PG CHROMATOGRAPH 3"
041-0026M
MINI FLOW FO
TO 041-C-301 041
AT 1.5"
0302 0.75" 0.75"
NPIC-041-E-0105M
NOTE 10 NPIC-041-E-0109M 2"
E 4"-P-041-0115-A1AP04-PG E
NOTE 8
041 A. DELETED.
041 FT
NPIC-041-E-0105M 0.75" INST. 0312
FE
PIP. 0312
NOTE 9
NPIC-041-E-0105M

LPN 0.75"-LPN-041-0021-A1AA-NI
0.75 LPN 041 0021 A1AA NI
041-3603M
0
F 0.75" 0.75"
MIN 4"-P-041-0217-A1AP04-PG F

LPS 0.75"-LPS-041-0029-A1AS-HS

MIN
0.75"
041-3103M
0.75" 0.75"
0.75"-P-041-0268-A1AP04-HC

MIN
0.75" FEED DWG.No.
0.75"
MIN

G G
NPIC-041-E-0105M 0.75"
NPT NPIC-041-E-0105M
041
INST. PG
041 0312 953053-120-27-A1 DEISOHEXANIZER BOTTOMS AND SIDE DRAW
PIP. 0.75" PG DWG.No. Title
0311 REFERENCE DRAWINGS
DIH SIDE DRAW
8"-P-041-0107-A1AP04-PG 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-0026M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
2"
FROM 041-C-301 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
NOTE 4 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
0.75"
H H
MIN
MIN

A 13/JUL/13 FOR REVIEW DMO RKM SMA


Rev Date Description Prep'd Chk'd App'd
REVISIONS
Operation Centre JOB Code:
0.75" 0.75"
Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
NPIC-041-E-0158M

NPIC-041-E-0158M
0-6495-20 TPM
041 041 Prepared by Checked by Approved by
STR 041-P-303A STR
041-P-303B T. T. HUONG T. NGUYEN T. N. SON
1102 1103
NOTE 1, 11 NOTE 1, 11
I 8"-P-041-0215-A1AP04-PG 8"-P-041-0216-A1AP04-PG I
041 2"-300# 041 2"-300#
PG PG
0318 4"-300# 0319 4"-300#

M-2
NSRP
041 041 Complex Project
UZ UZ Nghi Son Refinery and Petrochemical
M A, B, C, E 1000 M A, B, C, E 1000 Nghi Son, Vietnam Limited Liability Company
M-2 Drawing Title
PG PG

J 041
MGL
041
MGL PIPING AND INSTRUMENT DIAGRAM J
0305A 0306A
(V) (V) PENEX
NPIC-041-E-0158M RUN NPIC-041-E-0158M RUN
DEISOHEXANIZER SECTION
0.75" - 300# FREE DRAINING 0.75" - 300# FREE DRAINING
0.75"-P-041-0218-A1AP04-NI CBD 0.75"-P-041-0219-A1AP04-NI 0.75"-CBD-041-0016-A2AP-NI CBD
DEISOHEXANIZER SIDE DRAW
RF RF
041-3702M 041-3702M
0.75" 0.75" 0.75" 0.75"
0.75"-CBD-041-0015-A2AP-NI
Issue Purpose Document Class
FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
WO WO

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0029M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 21 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

SIZE: 6Q8 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-AC-301 041-V-301 PSET: 0.40 MPa(g)
0014V AND D-000-1225-0020V TO 0026V.
041
PSV
DEISOHEXANIZER CONDENSER DEISOHEXANIZER RECEIVER 1. FOR START - UP.
A 0302 FREE DRAINING 8''-FLG-041-0047-A1AP-NI FLG A
CODE ASME VIII DIV 1 / API 661 CODE ASME VIII DIV 1 NPIC-041-E-0093M 2. DELETED.
NPIC-041-E-0158M 041-3503M
SIZE: H.T. AREA 64533 m 2 (FINNED) SIZE: I.D x TT 3000 mm x 10200 mm 3. FOR AIRCOOLER DETAILS, REFER TO DWG. D-041-1225-2311M /
DESIGN DUTY 25986 kW 2312M.
DESIGN PRESSURE 0.40 MPa(g) + FV @ 120°C
0.40 MPa(g) + FV @ 120°C 4. TO BE USED FOR DEGASSING DURING START-UP AND TO VENT
DESIGN PRESSURE DESIGN TEMPERATURE 120°C NOTE 4 NON-CONDENSIBLES. ACCESS TO BE PROVIDED.
DESIGN TEMPERATURE 120°C INSULATION TYPE NI
5. EQUALIZING LINE. REFER TO DWG D-041-1225-2311M/2312M FOR

MIN
NO OF FANS 16 P-041-0303-A1AP04-NI IN VIEW
TRIM SPECIFICATION LAYOUT REQUIREMENT. NPIC-041-E-0158M
TRIM SPECIFICATION A1AP04 - PG P-041-0316-B1AP04-NI 0.75''
B NOTE 6 NOTE 6
2" 6. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
B

FREE DRAINING
7. 50% OF THE FANS SHALL BE PROVIDED WITH VARIABLE SPEED
DRIVE.

8. FOR PRESSURE TEST.


NPIC-041-E-0153M
9. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
12''-P-041-0224-A1AP04-PG CONNECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
SWING ELBOW TO HPN.
NPIC-041-E-0115M
10. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
C C
11. PLUG VALVE

12. LOW LEVEL OF 041-LI-0311 SHALL CLOSE THE VALVES 041-UV-0304


041 AND 041-UV-0309. NPIC-041-E-0115M
PDT
0305 13. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 0.4 MPa(g).
2"-P-041-0249-D1AP04-NI 2"-HPN-041-0005-D1AA-NI HPN
NOTE 8 041-3602M 14. NON-CONDENSIBLE VENT. NPIC-041-E-0158M
041 H
PDIC 0.75'' 0.75''
0305 NPIC-041-E-0153M NPIC-041-E-0115M
PERMANENT LINE
041
D 041 PG IN VIEW 041 SUBJECT TO D
PDV 0320 PG
0305
0076 NOTE 13 SERVICE TEST
DIH OVERHEAD
10"-P-041-0220-A1AP04-PG FREE DRAINING 12" 2"
041-0026M NOTE 9
FC 2"-LPN-041-0010-A1AA-NI LPN TEST POINT
FROM 041-C-301
0.75'' 6'' NOTE 1 041-3603M
NPIC-041-E-0158M NOTE 11
SIGNAL
041 H 1"-P-041-0221-A1AP04-NI NOTE 14 0.75'' 0.75''
041-0026M PIC
041 H NOTE 10
0302
TI
TO 041-PDY-0303
0305B
12"-P-041-0122-A1AP04-NI
E E
041
041 041
PT 041 A. DELETED.
0302 PV
TT TT MIN
0302 0305A 0305B
DIH OVERHEAD
FREE DRAINING 1. DELETED.
041-0026M NPIC-041-E-0093M
FO MINIMUM RUN OF 2. DELETED.
TOP CONNECTION

3"-P-041-0222-A1AP04-NI
FROM 041-C-301
0.75'' 24" HORIZONTAL PIPE

FREE DRAINING
30"-P-041-0106-A1AP04-PG NPIC-041-E-0091M

NOTE 5
F F

FREE DRAINING
M M

MIN
041 H
TIC
041-AC-301 0305A SIGNAL
041 H
NOTE 3, 7
3" 041-V-301 LIC

10"
041-0031M
0305 L
TO 041-FIC-0303
8" VH
FEED DWG.No.
G G
NPIC-041-E-0090M
NPIC-041-E-0158M
NPIC-041-E-0090M
953053-120-29-A1 DEISOHEXANIZER RECEIVER
TYPE 1
041 H 041 041 041 TYPE 1 DWG.No. Title
LI LT TYPE 1 MH LT LG REFERENCE DRAWINGS
NPIC-041-E-0098M NOTE 12 0311 NPIC-041-E-0098M NPIC-041-E-0090M 24" 0305 0306
L 0311 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
DP MAG
3''-LPS-041-0015-A1AS-HS DP 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H LPS A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-3103M Rev Date Description Prep'd Chk'd App'd
CBD REVISIONS
0.75'' 0.75'' NPIC-041-E-0090M
Operation Centre JOB Code:
3''-P-041-0250-A1AP04-HC FREE DRAINING
ISOMERATE
Operation Centre DWG.No.:
14"-P-041-0120-A1AP04-NI
041-0031M
7800 MIN

Contractor JOB Code Responsible Company


TO 041-P-301A/B 0-6495-20 TPM
Prepared by Checked by Approved by
CLOSED BLOWDOWN
2"-P-041-0121-A1AP04-NI T. T. HUONG T. NGUYEN T. N. SON
041-0031M

I FROM 041-P-301B
I
0.75" SIGNAL
041-0032M
3"
TO DRCS CONTROL NSRP
OF 041-UV-0304 Complex Project
Nghi Son Refinery and Petrochemical
SIGNAL Nghi Son, Vietnam Limited Liability Company
041-0032M
FREE DRAINING

WO Drawing Title
TO 041-US-0309
J PIPING AND INSTRUMENT DIAGRAM J
3"-CBD-041-0017-A2AP-NI NPIC-041-E-0098M PENEX

FOR 041-LG-0306
DEISOHEXANIZER SECTION
CBD DEISOHEXANIZER RECEIVER
041-3702M
0.75" 0.75"
CLOSED BLOWDOWN MIN Issue Purpose Document Class
2"-CBD-041-0045-A2AP-NI FREE DRAINING
041-0026M FOR CONSTRUCTION Z
K FROM 041-LG-302, 304
Unit No. Unit Abbreviation PCWBS Size Scale K
MANIFOLD NPIC-041-E-0127M 041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0030M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 22 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

041-P-301A/B A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
DEISOHEXANIZER OVERHEAD PUMPS
A 1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2204M.
A
CODE API 610 2. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 2 D-041-1225-2401M.
RATED CAPACITY/NPSHr 497 m3/hr/2.8 m 3. CONNECTION FOR START-UP FILLING. VALVE TO BE ACCESSIBLE.
DIFF.HEAD/SHUT-OFF PRESSURE 205.8 m/ 1.82 MPa(g)
4. ORIFICE WITH 162.1 MM HOLE.
SPECIFIC GRAVITY @ PUMPING TEMP. 0.60
5. ORIFICE WITH 84.52 MM HOLE. NPIC-041-E-0105M
MOTOR SIZE 315 kW
INSULATION TYPE NI 6. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
TRIM SPECIFICATION B1AP04-NI
B 7. LOCATED IN ANALYSER SHELTER 041-AS-001. NPIC-041-E-0109M
B

SIGNAL PERMANENT LINE


041 041
041-0030M FIC FY SUBJECT TO
0303 0303 SERVICE TEST
FROM 041-LIC-0305

FLG
TEST POINT
041-3503M 041
FI
0302
C C
NOTE 2 TYPE L3
041
SC NOTE 4
0009 041
041 FT
041 FE 0302
FV NPIC-041-E-0092M
0303 0302
DIH REFLUX
8"-P-041-0110-A1AP04-NI 8" 10"-P-041-0228-B1AP04-NI
041-0026M
FO
TO 041-C-301 10"
6"
0.75" 0.75"
D D
SIGNAL
041-0026M

FROM 041-TIC-0302
SWITCH SWITCH

SIGNAL SIGNAL
041 041 041
041-0029M AY HY FIC 041-0032M
E FROM 041-AIC-0302
0302B 0302 0301 L
TO 041-FV-0301
E
3- METHYLPENTANE 2- METHYLPENTANE
A. DELETED.
H 041 041 1. DELETED.
AI AIC
0301 0301

NPIC-041-E-0105M
041
AY
0301
F CHROMATOGRAPH NPIC-041-E-0105M F
0.75" 041
NPT AT
0301
NPIC-041-E-0109M
INST. NOTE 7 NOTE 5 041
NPIC-041-E-0105M PIP. NPIC-041-E-0105M FT
0.75" 0.75" 041
INST. FE 0301
PIP. 0301
ISOMERATE
10" NOTE 6 6"-P-041-0118-B1AP04-NI
041-0032M FEED DWG.No.
G 14"-P-041-0120-A1AP04-NI TO 041-E-301 G
ISOMERATE
FREE DRAINING
041-0030M
LPT 10"-P-041-0227-B1AP04-NI 953053-120-29-A1 DEISOHEXANIZER RECEIVER
FROM 041-V-301 DWG.No. Title
0.75"-LPN-041- REFERENCE DRAWINGS
2" 0022-A1AA-NI 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
LPN 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
NOTE 3 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-3603M
0.75"

MIN
MIN

B 11/NOV/13 FOR APPROVAL DMO RKM SMA


0.75" 0.75" 0.75"
H H
MIN

MIN
0.75"-LPS-041- A 13/JUL/13 FOR REVIEW DMO RKM SMA
Rev Date Description Prep'd Chk'd App'd
0030-A1AS-HS
REVISIONS
LPS
Operation Centre JOB Code:
041-3103M
MIN

MIN
Operation Centre DWG.No.:
0.75" 0.75" 0.75" Contractor JOB Code Responsible Company
0.75"
0.75" 0.75" 0-6495-20 TPM
0.75"-P-041-0269-B1AP04-HC Prepared by Checked by Approved by
041 041
041 041 T. T. HUONG T. NGUYEN T. N. SON
STR STR PG
PG
1109 0313 14"-P-041-0226-B1AP04-NI 1110 0314
I 14"-P-041-0225-B1AP04-NI I
041-P-301A 041-P-301B
NOTE 1 NOTE 1
041
PG
0.75" (V) 8" 041
PG
0.75" (V) 8" NSRP
0333 0334 Complex Project
Nghi Son Refinery and Petrochemical
12" 12" Nghi Son, Vietnam Limited Liability Company
A, B, C, E 041 A, B, C, E 041
MGL MGL
NPIC-041-E-0132M M NPIC-041-E-0132M M Drawing Title
0307A 0308A
M-2 M-2
RUN RUN
J PIPING AND INSTRUMENT DIAGRAM J
CLOSED BLOWDOWN NPIC-041-E-0158M
041 041
041-0030M (V) UZ 2"-P-041-0121-A1AP04-NI 0.75" - 300# (V) UZ PENEX
1000 RF 1000
TO 041-V-301 DRAIN DEISOHEXANIZER SECTION
0.75" - 300# FREE DRAINING FREE DRAINING
NPIC-041-E-0158M 0.75"-P-041-0229-B1AP04-NI CBD 0.75"-P-041-0230-B1AP04-NI CBD DEISOHEXANIZER OVERHEAD PUMPS
RF
041-3702M 041-3702M
0.75" 0.75" 0.75" 0.75"
Issue Purpose Document Class
0.75"-CBD-041-0018-A2AP-NI 0.75"-CBD-041-0019-A2AP-NI
FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
WO WO

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0031M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 23 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

SIGNAL 041-E-301 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
041-0031M ISOMERATE COOLER
1. FOR ON / OFF VALVE DETAILS, REFER TO DWG. D-041-1225-0221M.
A FROM 041-FIC-0301 CODE ASME VIII DIV 1 / API 660 A
TYPE: BJ12U 2. EMERGENCY CIRCULATION.

SIZE: 2H3 SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 510 mm / 6100 mm / 83 m² 3. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
PSET: 2.00 MPa(g) DESIGN DUTY 463 kW D-041-1225-2401M.
041 FREE DRAINING 6''-FLG-041-0051-A1AP-NI FLG SIDE SHELL TUBE
PSV 4. START-UP BY-PASS.
0306 041-3503M 2.00 MPa(g) + FV @ 120 °C
DESIGN PRESSURE 1.55 MPa(g) 5. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
NOTE 5
0.34 MPa(g) @175 °C AND FV @ 175 °C.
DESIGN TEMPERATURE 120 °C 76 °C
INSULATION TYPE NI NI 6. TO BE LOCATED CLOSE TO BATTERY LIMIT ISOLATION VALVES.

B 0.75'' TRIM SPECIFICATION B1AP04-NI A2AW-NI 7. PLUG VALVE. B

MIN
4"-P-041-0231-B1AP04-NI
8. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO

FREE DRAINING
PREVENT OVERPRESSURE DUE TO EXTERNAL FIRE AT THE
2"
COOLER.

NPIC-041-E-0109M
NPIC-041-E-0105M
9. ORIFICE WITH 80.55 MM HOLE.
TO ATM 10. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
ISOMERATE
6"-P-041-0118-B1AP04-NI AT SAFE LOCATION
041-0031M 11. LOCATED IN ANALYSER SHELTER 041-AS-001.
(V)
FROM 041-P-301A/B
C SIZE: 0.75D1 12. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-016.
C
PSET: 1.55 MPa(g) 13. 041-LT-0311 LOW LEVEL ALARM DISCRETE SIGNAL TO DRCS.
NPIC-041-E-0101M 041
TSV NPIC-041-E-0141M
0307

FREE DRAINING
1"-V-041-0017-A1AP-NI 1"-V-041-0024-A1AP-NI
PERMANENT LINE
0.75'' NPIC-041-E-0109M SUBJECT TO
SERVICE TEST
1" 1" - 150#
1" - 150#

FREE DRAINING
RF
D IA 2"-IA-041-0003-S0RA-NI
FF
TP
TP
TP 1"-CWR-041-0018-A2AW-NI CWR TEST POINT D
AT GRADE 041-3603M M1 M9 041-3002M
041 TO SAFE LOCATION
TG 0.75'' 041-AS-001
0332
CWR 6"-CWR-041-0007-A2AW-NI NOTE 8 RS ANALYSER SHELTER
1" - 150# 1" - 150#
NOTE 12
041-3002M 041-E-301 RF
RF
0.75'' 6"-CWR-041-0017-A2AW-NI LPN 11"-LPN-041-0028-A1AA-NI
LPN 041 0028 A1AA NI TP TP 1"-CWS-041-0019-A2AW-NI CWS
041-3603M M2 TP TP M8 041-3002M
CWS 6"-CWS-041-0008-A2AW-NI NOTE 8 RS M6 M3

E 041-3002M
E
0.75''
1" - 150# 1" - 150#
RF RF A. DELETED.
6"-CWS-041-0018-A2AW-NI
0.75'' 041 041 H
041
TT TI FV 1"-WO-041-0008-A2AP-NI
0307 0307 0301

6"

FC
0.75'' 3" NC

FREE DRAINING
F NOTE 7 F
WO
0.75''
1"-CBD-041-0048-A2AP-NI
NPIC-041-E-0092M 6" 0.75''
0.75'' CBD
NC
041-3702M
4"-P-041-0232-B1AP04-NI FEED DWG.No.
G NOTE 4 G
DEISOHEXANIZER BOTTOMS
2"-P-041-0116-B1AP04-NI
041-0028M
953053-120-28-A1 ISOMERATE PRODUCT
FROM 041-E-303 DWG.No. Title

NPIC-041-E-0092M
REFERENCE DRAWINGS
REGENERANT
3"-P-041-0044-B1AP04-NI 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-0006M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
FROM 041-E-011A/B
0.75'' B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H LIGHT NAPHTHA
1"-P-041-0149-B1AP04-NI
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-0008M Rev Date Description Prep'd Chk'd App'd
SAMPLE RETURN REVISIONS
FROM MOISTURE ANALYSER Operation Centre JOB Code:
SIGNAL
NOTE 3
FLG 041 Operation Centre DWG.No.:
041-0029M SC Contractor JOB Code Responsible Company
041-3503M 0010 0-6495-20 TPM
FROM 041-LI-0311 TYPE L2
041 H Prepared by Checked by Approved by
041 041
FIC TI TT T. T. HUONG T. NGUYEN T. N. SON
0308 NOTE 9 0308 0308

I 041
FV 041 041
H I
0308 FE FT 041 041 NOTE 10
0308 0308 AI
ISOMERATE AT INST PIP
4" 0303 0303 RVP
4"-P-041-0062-B1AP04-NI
041-0008M
NOTE 2, 4 NOTE 2 FC LO 6"
NPIC-041-E-0109M
NPIC-041-E-0105M
NOTE 11
0.75" NPT
NSRP
TO 041-DR-001A/B INST PIP Complex Project
0.75'' 3" 0.75'' 0.75'' Nghi Son Refinery and Petrochemical
NPIC-041-E-0092M NOTE 6 NOTE 6
SIGNAL
NPIC-041-E-0141M
NOTE 6 NOTE 6 Nghi Son, Vietnam Limited Liability Company
NOTE 13 041 041 041 041 041 041 041 041 041
NY US NPIC-041-E-0141M UZ US FC UZ US FC UZ US FC UZ US FC
041-0030M
0311 0003 NPIC-041-E-0151M
1000 0309 TSO 1000 0305 TSO 1000 0306 TSO 1000 0308 TSO Drawing Title
DRCS
FROM 041-LI-0311 O O O O
041 0.75'' 041 0.75'' 041 0.75'' 0.75''
J 041
UV UV UV UV
041
UV PIPING AND INSTRUMENT DIAGRAM J
X 0304 0309 0305 0306 0308
REGENERANT C C C
2"-P-041-0046-B1AP04-NI C PENEX
041-0006M
NOTE 1 DEISOHEXANIZER SECTION
TO 041-E-012 0.75'' 0.75'' 0.75'' 0.75''
0.75'' 0.75''
ISOMERATE PRODUCT

3"-P-041-0119-B1AP04-NI 6"-P-041-0117-B1AP04-NI 6"-P-041-0125-B1AP04-NI 6"-P-041-0123-B1AP04-NI


Issue Purpose Document Class

LIGHT ISOMERATE ISOMERATE PRODUCT OFF-SPEC


FOR CONSTRUCTION Z
ISOMERATE
K TO UNIT 023 TO UNIT 153 TO UNIT 156
Unit No. Unit Abbreviation PCWBS Size Scale K
TO UNIT 152
023-E-314 153-TK-013/014 156-TK-001
041 PENX A900 A1 NONE
152-TK-001/002

DR01A
Contractor DWG.No. Sheet Rev.
A1

041-1001M 041-1001M 041-1001M 041-1001M D-041-1225-0032M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 24 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
SIZE: 2J3
PSET: 1.34 MPa(g) 6"-FLG-041-0067-A1AP-NI FREE DRAINING FLG
041-V-612 NOTE 12 041-P-612 041
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041-3503M
PSV 0014V AND D-000-1225-0020V TO 0026V.
CLOSED BLOWDOWN DRUM CLOSED BLOWDOWN DRUM PUMP 0624 SIZE: 0.75D1
A CODE ASME VIII DIV 1 CODE API 610
PSET: 1.00MPa(g) 1. VALVE TO BE LOCATED IN PIT. EXTENDED STEM FOR VALVE A

4"-P-041-0321-A2AP-PG
FREE DRAINING
041 OPERATION TO BE PROVIDED AT GRADE LEVEL.
SIZE: I.D x TT 2000 mm x 6000 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL VERTICAL / 1 0.75" TSV

MIN
0623 2. LI TO BE READABLE FROM PUMP LOCAL START / STOP BUTTONS

1"-V-041-0018-A1AP-NI
DESIGN PRESSURE 0.34 MPa(g)+FV@175°C RATED CAPACITY/NPSHr 33 m3/hr/ 2.9m

FREE DRAINING
85.6 m/ 1.32 MPa(g) 3. DELETED.
DESIGN TEMPERATURE 175 °C DIFF.HEAD/SHUT-OFF PRESSURE
2"
INSULATION TYPE NI SPECIFIC GRAVITY @ PUMPING TEMP. 0.6 - 1.0 NPIC-041-E-0158M 4. RESTRICTION ORIFICE WITH 2.2 MM HOLE.
TRIM SPECIFICATION P-041-0318-A2AP-NI MOTOR SIZE 37 kW 5. RESTRICTION ORIFICE WITH 14.81 MM HOLE.

FREE DRAINING
INSULATION TYPE PG 1"
6. LINE REQUIRED TO ENSURE ADEQUATE COOLING OF DRUM LIQUID.
041-EJ-612 TRIM SPECIFICATION A2AP - PG
B EJECTOR
7. 000P-612A IS PROVIDED AS A WAREHOUSE COMMON SPARE FOR B
040-P-612 AND 041-P-612.
AT GRADE
CODE ASME VIII DIV 1 TO SAFE LOCATION 8. PIT COVERED BY GALVANIZED METAL GRATING.
041
CAPACITY 4.1 m3/hr LPS 0.75"-LPS-041-0031-A1AS-HS 0.75"-P-041-0270-A2AP-HC 8"-300# TG
9. 40 x 5MM HOLES TO BE PROVIDED ON THE BOTTOM OF PIPE FOR
DESIGN PRESSURE 0.7 MPa(g)+FV@265°C 041-3103M 041-E-613 0624 0.75"
AIR PURGE.
0.75" 0.75" RS NOTE 14 CWR
DESIGN TEMPERATURE 265°C 6"-CWR-041-0010-A2AW-NI
LPT 10. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2203M.
INSULATION TYPE PG 041-3002M
RS NOTE 14 0.75"
TRIM SPECIFICATION A2AP - PG 6"-CWS-041-0011-A2AW-NI CWS 11. DELETED.
041-3002M 12. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
C 041-E-612
4" 8"-300# 0.75" 0.34 MPa(g) @ 175 °C AND FV @ 175 °C. C
6" 13. PORTABLE PUMP WILL BE CONNECTED TO THE VALVE FOR
041 041 H 041
CBD FLASH GAS COOLER RO NOTE 5
TI TT DRAIN-OUT OF ACCUMULATED LIQUID AT BOOT.
0622 0623 0623
CODE ASME VIII DIV 1 / API 660 0.75" 14. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO
TYPE: BEU 2" PREVENT OVER PRESSURE DUE TO EXTERNAL FIRE AT THE
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 1250 mm / 3658 mm / 180 m² 4"-P-041-0319-A2AP-NI COOLER.

DESIGN DUTY NPIC-041-E-0158M 14610 kW 15. ORIFICE WITH 57 MM HOLE.


0.75" 041
SIDE SHELL TUBE TO ATM FA 16. NOZZLE LENGTH SHALL BE 150MM.

4"-P-041-0246-A2AP-PG
AT SAFE LOCATION 1173
D 0.77 MPa(g) NPIC-041-E-0146M
D

MIN
DESIGN PRESSURE 1.00 MPa(g)
NOTE 12 SIZE : 0.75D1
DESIGN TEMPERATURE 175°C 76°C 041 PSET: 1.00 MPa(g) NPIC-041-E-0158M PERMANENT LINE
TSV 0.75" 4''-V-041-0008-A1AP-NI
INSULATION TYPE PG NI 0622 SUBJECT TO
1"-V-041-0019-A1AP-NI
TRIM SPECIFICATION A2AP-PG A2AW - NI SERVICE TEST

FREE DRAINING
2"-P-041-0243-A2AP-NI
0.75" HPT
041-E-613 TEST POINT

FREE DRAINING
FREE DRAINING

NOTE 6
FREE DRAINING 4"-P-041-0245-A2AP-PG FLG
CBD SLOP COOLER 041-3503M
E CODE ASME VIII DIV 1 / API 660 1"
LO
0.75"
LO E
NPIC-041-E-0129M 4"-FLG-041-0057-A1AP-PG

NPIC-041-E-0120M
TYPE: MULTITUBE NPIC-041-E-0158M AT GRADE A. DELETED.
TO SAFE LOCATION 041 18"
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 388 mm / 4880 mm / 101 m² TG B. DELETED.
DESIGN DUTY 2245 kW 8" 0.75" 0622 041
US
SIDE SHELL TUBE CWR RS
0621
1.34 MPa(g) 041-3002M LPT 041 O
DESIGN PRESSURE 1.00 MPa(g) NOTE 14

2''-P-041-0255-A2AP-PG
NOTE 12 NOTE 14 UV
0.75" CWS RS 0621
1. DELETED.
DESIGN TEMPERATURE 175°C 76°C C

MIN
041-3002M 2. DELETED.
041-E-612 041-EJ-612
F INSULATION TYPE PP NI F

16"-P-041-0240-A2AP-PG
Control system pressure 14"-CWR-041-0009-A2AW-NI 0.75" 0.75" LPS 1.5"
TRIM SPECIFICATION A2AP-PP A2AW-NI at operation pressure of
SIZE: 3L4 041-3103M
LPN =0.69 MPa(g) 14"-CWS-041-0010-A2AW-NI
PSET: 0.34 MPa(g) 0.75" 0.75" FC
TSO

NPIC-041-E-0151M
1''-LPS-041-0017-A1AS-HS
1"-P-041-0251-A2AP-NI NOTE 4 041 1''-P-041-0253-A2AP-HC NPIC-041-E-0129M
PSV 6"-FLG-041-0056-A1AP-NI
041

4"-P-041-0241-A2AP-PG
041
RO PG 0621 041
NPIC-041-E-0137M NPIC-041-E-0129M

NPIC-041-E-0158M
0621 0621 FREE DRAINING PG
FLG 0623
041-3503M
8"-P-041-0238-A2AP-NI

LPN 1"-LPN-041-0008-A1AA-NI 041


FEED DWG.No.

FREE DRAINING
FI
NPIC-041-E-0158M ST
G 041-3603M 0622
WO G

0.75''-LPCW-041-0045-A2AS-PG
0.75" 0.75"" 0.75" RUN
1" 041 START/STOP 041
US MGL

TWO PHASE FLOW


0.75"
MIN

0622 0621A

NPIC-041-E-0120M
0.75"

NPIC-041-E-0141M
DWG.No. Title
NOTE 15
LPS 2"-LPS-041-0016-A1AS-HS 2" REFERENCE DRAWINGS
041 2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-3103M FE
FREE DRAINING

041 H 041 H 0621 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS


0.75" 0.75" 041 H
LI LI
2"-P-041-0252-A2AP-HC PI 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
2"-P-041-0244-A2AP-HC

0622 041 H 0622 L 0621 L


M-2 041 H 041 041 041 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
TI FI FT

4"-P-041-0325-A2AP-NI
H 0621
A, B, C, D, E
RS 041
LI
0623
US
0621 0621 0621 A 13/JUL/13 FOR REVIEW DMO RKM SMA H
PG L Rev Date Description Prep'd Chk'd App'd

FREE DRAINING
M 0624 LPCW REVISIONS

NPIC-041-E-0120M

NPIC-041-E-0120M
PA 1"-PA-041-0004-A2AA-NI

FREE DRAINING
3" -300# 041-3103M 041 Operation Centre JOB Code:
041-3603M FI
041 041 041 041 041 0621L Operation Centre DWG.No.:
0.75" 041
PT TT LI LT LT LT 2''-P-041-0254-A2AP-NI Contractor JOB Code Responsible Company
0622 0621 0622L 0622 GWR 0621 GWR 0623
GWR 0-6495-20 TPM
SVW 2"-CBD-041-0028-A2AP-NI NOTE 13 IN VIEW
2" 6" NOTE 2 0.75" Prepared by Checked by Approved by
041-3301M
2" T. T. HUONG T. NGUYEN T. N. SON
NPIC-041-E-0120M

0.75" 0.75" 8" VH NOTE 8 NOTE 16


4" 4"
I 2"-SVW-041-0006-A2AW-NI I

NPIC-041-E-0146M
NPIC-041-E-0120M

NSRP
CLOSED BLOWDOWN 1:500 041-V-612 Complex Project
LO Nghi Son Refinery and Petrochemical
10''-CBD-041-0020-A2AP-NI MH
041-3702M
24" Nghi Son, Vietnam Limited Liability Company
FROM HEADER NOTE 1 0.75"
Drawing Title

4"-WO-041-0001-A2AP-NI
J PIPING AND INSTRUMENT DIAGRAM J

4"-P-041-0242-A2AP-NI
PENEX
UNIT 041

NPIC-041-E-0158M
NOTE 9
041-P-612
NOTE 7, 10 CLOSED BLOWDOWN DRAIN DRUM

Issue Purpose Document Class


FOR CONTRUCTION Z
K LIGHT SLOP WASTE WATER Unit No. Unit Abbreviation PCWBS Size Scale K
TO UNIT 156 TO UNIT 190
041 PENX A900 A1 NONE
156-TK-001 190-TK-201A/B

DR01A
Contractor DWG.No. Sheet Rev.
A1

041-1001M 041-1001M D-041-1225-0101M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
11 12 13 14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 25 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-EJ-613 041-V-615 041-Y-620 041-P-615A/B
0014V AND D-000-1225-0020V TO 0026V.

EJECTOR CANISTER FILTER 1. VALVE TO BE LOCATED IN PIT. EXTENDED STEM FOR VALVE
A CAUSTIC CLOSED BLOWDOWN DRUM CAUSTIC CLOSED BLOWDOWN DRUM PUMPS OPERATION TO BE PROVIDED AT GRADE LEVEL. A
CODE ASME VIII DIV 1 CODE ASME VIII DIV 1
CODE ASME VIII DIV 1 CODE API 610
CAPACITY 4.1 m 3/hr CAPACITY 19 Nm³/hr 2. LI TO BE READABLE FROM PUMP LOCAL START / STOP BUTTONS.
SIZE: I.D x TT 2000 mm x 4000 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL VERTICAL / 1
DESIGN PRESSURE 0.7 MPa(g)+FV@265°C DESIGN PRESSURE 0.34 MPa(g) 3. CANISTER FILTER MEDIUM TO BE PERIODICALLY REPLACED.
DESIGN PRESSURE 0.34 MPa(g) RATED CAPACITY/NPSHr 11.9 m3/hr/1.4m
DESIGN TEMPERATURE 265°C DESIGN TEMPERATURE 100°C 4. 40 x 5MM HOLES TO BE PROVIDED ON THE BOTTOM OF PIPE FOR
DESIGN TEMPERATURE 100 °C DIFF.HEAD/SHUT-OFF PRESSURE 68.3 m/ 1.43 MPa(g)
INSULATION TYPE PG INSULATION TYPE NI AIR PURGE.
INSULATION TYPE NI SPECIFIC GRAVITY @ PUMPING TEMP. 1.16 NPIC-041-E-0158M
TRIM SPECIFICATION A2AN04-PG TRIM SPECIFICATION A2AN04 5. 041-P-615B IS A WAREHOUSE SPARE.
TRIM SPECIFICATION CCB-041-0020-A2AN04-NI MOTOR SIZE 18.5 kW
NPIC-041-E-0158M
NOTE 10 INSULATION TYPE NI 6. DELETED.
B TRIM SPECIFICATION A2AN04-NI 7. PIT COVERED BY GALVANIZED METAL GRATING. B
8. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
TO ATM
AT SAFE LOCATION D-041-1225-2401M.

9. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2206M.

10. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE


0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
TO ATM 11. EQUIPMENT AND PIPING IN CAUSTIC SERVICE SHALL BE FLUSHED
2"-V-041-0004-A1AP-NI AT SAFE LOCATION
C WITH WATER PRIOR TO STEAM-OUT.
C
12. RESTRICTION ORIFICE WITH 2.21 MM HOLE .

13. PORTABLE PUMP WILL BE CONNECTED TO THE VALVE FOR


DRAIN-OUT OF ACCUMULATED LIQUID AT BOOT.

14. SAMPLE CONNECTION DRAIN SHALL BE COLLECTED IN A POTABLE


DEVICE.
2"-V-041-0010-A1AP-NI 15. NOZZLE LENGTH SHALL BE 150MM. NPIC-041-E-0146M
1"
16. FILTER TO BE REMOVED PRIOR TO STEAM OUT.
D NPIC-041-E-0152M NOTE 3 17. MEDIUM WITHDRAWAL.
NPIC-041-E-0158M D
NPIC-041-E-0158M RS

PERMANENT LINE
4" 041-Y-620
NOTE 17 NOTE 16 SUBJECT TO
SIZE: 2J3 SERVICE TEST
PSET: 0.34 MPa(g)
0.75" 0.75" TEST POINT
FLG 4"-FLG-041-0059-A1AP-NI FREE DRAINING 041
PSV
041-3503M 0631
TYPE J1
E LO NOTE 8, 14 E
041 041 A. DELETED.
PG SC
0632 0631 B. DELETED.
MIN

1. DELETED.
0.75" 041
PG
2" 0631 0.75" 041
2. DELETED.
US
0631

O
F F

2"-CCB-041-0008-A2AN04-NI
041
UV
6"-CCB-041-0018-A2AN04-NI 1''-LPS-041-0019-A1AS-HS 0631 NPIC-041-E-0151M
C

LPS
LPS 2"-LPS-041-0018-A1AS-HS 2"-CCB-041-0013-A2AN04-HC
041-3103M
041-3103M 1.5"
NPIC-041-E-0158M FC 041-EJ-613
FREE DRAINING

0.75" 0.75" NPIC-041-E-0158M NPIC-041-E-0158M


0.75" 0.75" TSO
NPIC-041-E-0129M
NOTE
O 12 041
041 PG RUN
RO 0633 041 START/STOP 041 FEED DWG.No.
0.75''-LPCW-041-0044-A2AS-PG LPCW
G 0631 1"-CCB-041-0017-A2AN04-HC US
0632
MGL
0631A
ST
TWO PHASE FLOW 041-3103M
G

2"-CCB-041-0016-A2AN04-PG
LPN 11"-LPN-041-0011-A1AA-NI
LPN 041 0011 A1AA NI 041

NPIC-041-E-0141M

NPIC-041-E-0120M
FI
041-3603M 0631 0.75"
NOTE 2
0.75" 0.75"" 1" DWG.No. Title
041 H 041 041 H WO
LI LI REFERENCE DRAWINGS

FREE DRAINING
LI
0631
L 0631L 0632
L
M-2 H
2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
NPIC-041-E-0137M 041 041

4"-P-041-0326-A2AN04-NI
A, B, C, D, E LI US 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0158M
0633 0631 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
041 H L
PI M RS B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H PA 1"-PA-041-0003-A2AA-NI 0634 300# A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-3603M Rev Date Description Prep'd Chk'd App'd
041 041 041 2''-CCB-041-0015-A2AN04-NI
LT LT REVISIONS
0.75" 0631 0632
041-V-615 LT
0633 Operation Centre JOB Code:
041 GWR GWR GWR
PT 4" NOTE 13 NOTE 11 Operation Centre DWG.No.:
2" 0634 MH
SVW Contractor JOB Code Responsible Company
2"-SVW-041-0007-A2AW-NI 2"-CCB-041-0012-A2AN04-NI 24" 2"
NPIC-041-E-0120M

VH NOTE 7 NOTE 15 0-6495-20 TPM


041-3301M 4" 4"
8" Prepared by Checked by Approved by
0.75" 0.75"
T. T. HUONG T. NGUYEN T. N. SON

2"-SCAU-041-0002-A2AN04-NI
NPIC-041-E-0146M
NPIC-041-E-0120M
I I
CAUSTIC CLOSED BLOWDOWN 1:500 LO
041-3702M
3"-CCB-041-0009-A2AN04-NI
NSRP
FROM HEADER NOTE 1 Complex Project
0.75" Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title

J NPIC-041-E-0158M
PIPING AND INSTRUMENT DIAGRAM J
NOTE 4 041-P-615A PENEX
NOTE 5, 9
UNIT 041
CAUSTIC CLOSED BLOWDOWN DRAIN DRUM

CAUSTIC BLOWDOWN Issue Purpose Document Class

TO UNIT 190 FOR CONSTRUCTION Z


K 190-TK-101 Unit No. Unit Abbreviation PCWBS Size Scale K
041-1001M
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0102M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 26 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

FREE DRAINING FLG A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.
LO 041-3502M
1. FOR PROCESS DETAILS, REFER TO DWG. D-041-1225-0002M.
A 0.75" A
2. TO BE LOCATED OUTSIDE COMPRESSOR SHELTER.

3. FOR DETAILS, REFER TO VENDOR DWG. VM2158-211-A-001.

FREE DRAINING
1"-FLG-041-2013-A1AP-NI 4. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO PREVENT
AN OVER PRESSURE DUE TO OVER HEATING.

5. 041-SG-6580 AND GLOBE VALVE WILL BE SUPPLIED IN LOOSE BY


1" - 150#
VENDOR.
RF NPIC-041-E-0164M
6. COOLING WATER MAKE-UP.
1" - 150#
B RF
1" - 150# NPIC-041-E-0164M
7. 041-SG-6531 AND GLOBE VALVE WILL BE SUPPLIED IN LOOSE BY B
TP RF FREE DRAINING VENDOR.
LPN 11"-LPN-041-2001-A1AA-NI
LPN 041 2001 A1AA NI TP 4A TP 2"-P-041-2016-A2AP-NI 2"-CBD-041-2003-A2AP-NI CBD
041-3602M 3A 26A 041-3701M 8. COOLING WATER TANK ROUTINE BLOWDOWN.
0.75" 0.75" 1" - 150# 2" 0.75" 9. BIRD SCREEN TO BE PROVIDED. NPIC-041-E-0164M
RF
FREE DRAINING
PURGE SYSTEM TP
27A PERMANENT LINE
TO ATM SUBJECT TO
1" - 150#
AT SAFE LOCATION SERVICE TEST
C NPIC-041-E-0164M
TP
RF
1" 2"-WO-041-2023-A2AP-NI
FREE DRAINING C
6A
NPIC-041-E-0162M TEST POINT
NPIC-041-E-0164M NOTE 9
NPIC-041-E-0160M
TP
NPIC-041-E-0164M
8A
1"-V-041-2001-A1AP-NI COMPRESSOR SKID 041-K-051A
0.5" NOTE 1, 3
NPIC-041-E-0164M
NPT WO
1.5"-FLG-041-2030-A1AP-NI 0.5" - 150#
D D
FREE DRAINING FREE DRAINING RF
FLG TP TP
041-3502M 21A 14A
1.5" - 300# 0.5" - 150#
0.75" RF 041-KM-051A RF
1.5"-FLG-041-2031-A1AP-NI MOTOR TP
NPIC-041-E-0164M
13A
FLG FREE DRAINING FREE DRAINING 1. DELETED.
TP
23A 0.75" 0.75"
041-3502M 2. DELETED.
1.5" - 300#
0.75" RF LPT LPT 3. DELETED.
E LPT E
IA 1"-IA-041-2001-S0RA-NI TP 041-K-051A
041-3602M 7A
1" - 150# COMPRESSOR
0.75" NPIC-041-E-0164M
FF
1.5" - 300#
RF
0.75" TP 0.5" - 150#
22A RF
TP
1.5"-CBD-041-2001-A2AP-NI 15A
1.5" - 300# 0.5" - 150# 0.75"
F RF RF F
0.75" TP TP LPT
0.75"
24A 20A

1.5"-CBD-041-2002-A2AP-NI LPT COOLANT RETURN


0.5"-CWR-041-2027-A2AW-NI
041-2102M
NPIC-041-E-0153M
FROM 041-K-051B
NPIC-041-E-0164M
COOLANT SUPPLY
1" - 150# 0.75"-CWS-041-2008-A2AW-NI
041-2102M
NOTE 4 RF
CWS 1"-CWS-041-2004-A2AW-NI TP TO 041-K-051B FEED DWG.No.
G 041-3002M 9A COOLANT SUPPLY G
SIZE : 0.75 D 1 0.75"-CWS-041-2007-A2AW-NI
PSET : 1.0 MPa(g) 041 0.75" 041-2102M
TSV
0019 TO 041-K-051B
1"-V-041-2004-A1AP-NI COOLANT RETURN
0.5"-CWR-041-2005-A2AW-NI DWG.No. Title
041-2102M REFERENCE DRAWINGS
FREE DRAINING

1" LUBE OIL COOLER LUBE OIL SYSTEM FROM 041-K-051B

0.75"-CWS-041-2005-A2AW-NI

0.75"-CWS-041-2006-A2AW-NI
2 17/JUN/15 FOR CONSTRUCTION TTH TN TNS

0.5"-CWR-041-2026-A2AW-NI
FREE DRAINING

0.5-CWR-041-2004-A2AW-NI
1 31/MAR/15 FOR CONSTRUCTION TTH TN TNS
0 26/NOV/14 FOR CONSTRUCTION TTH DM TNS
041
H SG
A 20/MAY/14 FOR REVIEW TTH DM JMD H
NOTE 7 Rev Date Description Prep'd Chk'd App'd
6531
AT GRADE REVISIONS
IN VIEW
TO SAFE LOCATION Operation Centre JOB Code:
0.75" Operation Centre DWG.No.:
(V) (V)

0.75" - 150#

0.75" - 150#
CWR Contractor JOB Code Responsible Company
0.5" - 150#

0.5" - 150#
TP TP TP
SG 0-6495-20 TPM
041-3002M 10A 30A 25A

RF

RF

RF
RF
NOTE 4 Prepared by Checked by Approved by
1"-CWR-041-2003-A2AW-NI 1" - 150# T. T. HUONG T. NGUYEN T. N. SON
NPT NPIC-041-E-0164M
RF 1.5" - 150#
1"-WO-041-2028-A2AP-NI 1" 1"
RF
I NPT NPT
TP TP TP TP TP NOTE 6 1.5"-CWS-041-2034-A2AW-NI CWS I
FREE DRAINING

1"-WO-041-2001-A2AP-NI 19 18 16 17 28 041-3002M
FREE DRAINING

1" - 150# 0.75"


TP RF 1"-CWS-041-2001-A2AW-NI CWS
NSRP
11 Complex Project
CLOSED LOOP JACKET COOLING WATER SKID NOTE 4 NPIC-041-E-0164M 041-3002M Nghi Son Refinery and Petrochemical
NOTE 3 0.75" 041 SIZE : 0.75 D 1 Nghi Son, Vietnam Limited Liability Company
TSV PSET : 1.0 MPa(g)
0018 Drawing Title
1"-V-041-2003-A1AP-NI
TP
J PIPING AND INSTRUMENT DIAGRAM J

FREE DRAINING
29

WO WO 1"
PENEX

FREE DRAINING
1"-150# MAKE-UP GAS SECTION
RF
041
INTERFACE DRAWING OF 041-K-051A
DRAINING

1"-WO-041-2025-A2AP-NI SG NOTE 5
6580
FREE

IN VIEW AT GRADE
TO SAFE LOCATION Issue Purpose Document Class
NOTE 8 0.75"
(V) (V) FOR CONSTRUCTION Z
CWR
K TP
12
SG
041-3002M
Unit No. Unit Abbreviation PCWBS Size Scale K
NOTE 4 041 PENX A900 A1 NONE
WO 1" - 150# 1"-CWR-041-2001-A2AW-NI

DR01A
RF NPT Contractor DWG.No. Sheet Rev.
A1

D-041-1225-2101M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 27 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.

1. FOR PROCESS DETAILS, REFER TO DWG. D-041-1225-0002M.


A A
2. TO BE LOCATED OUTSIDE COMPRESSOR SHELTER.

3. FOR DETAILS, REFER TO VENDOR DWG. VM2158-211-A-001.

4. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO PREVENT


AN OVER PRESSURE DUE TO OVER HEATING.
FREE DRAINING FLG 5. 041-SG-6571 AND GLOBE VALVE WILL BE SUPPLIED IN LOOSE BY
LO 041-3502M VENDOR.

0.75" 6. BIRD SCREEN TO BE PROVIDED. NPIC-041-E-0164M

B B
PERMANENT LINE

FREE DRAINING
1"-FLG-041-2015-A1AP-NI SUBJECT TO
SERVICE TEST
1" - 150#
TEST POINT
RF
NPIC-041-E-0164M

1" - 150# 1" - 150# NPIC-041-E-0164M


C TP RF
C
RF FREE DRAINING
LPN 11"-LPN-041-2002-A1AA-NI
LPN 041 2002 A1AA NI TP 4B TP 2"-P-041-2017-A2AP-NI 2"-CBD-041-2006-A2AP-NI CBD
041-3602M 3B 26B 041-3701M
1" - 150#
0.75" 0.75" RF 2" 0.75"
FREE DRAINING
TP
27B

TO ATM 1" - 150#


PURGE SYSTEM
AT SAFE LOCATION NPIC-041-E-0164M RF
D TP 1"-WO-041-2024-A2AP-NI 2"-WO-041-2024-A2AP-NI FREE DRAINING D
6B

NPIC-041-E-0162M NOTE 6 NPIC-041-E-0160M


NPIC-041-E-0164M NPIC-041-E-0164M
1"-V-041-2002-A1AP-NI 1. DELETED.
TP
8B
COMPRESSOR SKID 041-K-051B
NOTE 1, 3 NPIC-041-E-0164M WO
0.5" - 150#
E RF E
0.5" - 150#
LPT COOLANT SUPPLY
FLG FREE DRAINING 1.5"-FLG-041-2032-A1AP-NI FREE DRAINING RF 0.75"-CWS-041-2008-A2AW-NI
TP TP
041-2101M
041-3502M 21B 14B
1.5" - 300# FROM CLOSED LOOP JACKET
0.75" 0.75"
RF 0.5" - 150# COOLING WATER SKID
041-KM-051B RF LPT COOLANT SUPPLY
FREE DRAINING FREE DRAINING TP
0.75"-CWS-041-2007-A2AW-NI
FLG 1.5"-FLG-041-2033-A1AP-NI TP MOTOR NPIC-041-E-0164M 041-2101M
23B 13B
041-3502M
1.5" - 300# 0.75" FROM CLOSED LOOP JACKET
0.75"
F RF COOLING WATER SKID
F
1" - 150#
LPT
IA 1"-IA-041-2002-S0RA-NI FF TP
041-K-051B
041-3602M 7B COMPRESSOR NPIC-041-E-0164M
0.75"
1.5" - 300#
0.5" - 150#
RF LPT COOLANT RETURN
0.75" RF 0.5"-CWR-041-2005-A2AW-NI
TP TP
22B 041-2101M
15B
FEED DWG.No.
G 1.5"-CBD-041-2004-A2AP-NI
1.5" - 300# 0.5" - 150#
0.75" TO CLOSED LOOP JACKET
COOLING WATER SKID
G
RF RF LPT COOLANT RETURN
0.75" TP TP
0.5"-CWR-041-2027-A2AW-NI
24B 041-2101M
20B
0.75" TO CLOSED LOOP JACKET
1.5"-CBD-041-2005-A2AP-NI DWG.No. Title
COOLING WATER SKID REFERENCE DRAWINGS
NPIC-041-E-0153M
2 17/JUN/15 FOR CONSTRUCTION TTH TN TNS
1 31/MAR/15 FOR CONSTRUCTION TTH TN TNS
NPIC-041-E-0164M 0 26/NOV/14 FOR CONSTRUCTION TTH DM TNS
H 1" - 150#
A 20/MAY/14 FOR REVIEW TTH DM JMD H
Rev Date Description Prep'd Chk'd App'd
NOTE 4 RF REVISIONS
CWS 1"-CWS-041-2002-A2AW-NI TP Operation Centre JOB Code:
041-3002M 9B
SIZE : 0.75 D 1 Operation Centre DWG.No.:
PSET : 1.0 MPa(g) 041 0.75" Contractor JOB Code Responsible Company
TSV 0-6495-20 TPM
0020
Prepared by Checked by Approved by
1"-V-041-2005-A1AP-NI
T. T. HUONG T. NGUYEN T. N. SON
FREE DRAINING

LUBE OIL COOLER LUBE OIL SYSTEM


I 1" I
FREE DRAINING

NOTE 5 SG
041

6571
NSRP
Complex Project
AT GRADE IN VIEW Nghi Son Refinery and Petrochemical
TO SAFE LOCATION Nghi Son, Vietnam Limited Liability Company
0.75"
(V) (V)
CWR 1"-CWR-041-2002-A2AW-NI TP Drawing Title
SG TP TP
041-3002M 10B 30B
NOTE 4 25B
J 1" - 150# PIPING AND INSTRUMENT DIAGRAM J
NPT RF PENEX
1"-WO-041-2029-A2AP-NI 1" 1"-WO-041-2002-A2AP-NI 1"
NPT NPT MAKE-UP GAS SECTION
FREE DRAINING

FREE DRAINING

INTERFACE DRAWING OF 041-K-051B

Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
WO WO Contractor DWG.No. Sheet Rev.
A1

D-041-1225-2102M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0811M_0_0040 System No. : 041-LPN-01 Package No. : 041-LPN-01-SV-1
Page 28 of 28
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
1. 041-P-615B IS A WAREHOUSE SPARE.

A 2. FOR PROCESS DETAILS, REFER TO DWG. D-041-1225-0102M. A

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT
B B

C C

D D
NOTE 2

PUMP OUTLET LINE


1. DELETED.

2. DELETED.

E E

TP
1

041-P-615A/B
NOTE 1
NON-API PUMP
F SEAL PLAN N° - 32 + 61 F
PUMP VENDOR DWG. VM 2158-102-A-117
0.75" - 150#
RF TP
LPN 0.75"-LPN-041-2003-A1AA-NI
0.75 LPN 041 2003 A1AA NI 2
041-3603M

FEED DWG.No.
G G

DWG.No. Title
REFERENCE DRAWINGS

2 17/JUN/15 FOR CONSTRUCTION TTH TN TNS


1 06/FEB/15 FOR CONSTRUCTION TTH DM TNS
0 26/NOV/14 FOR CONSTRUCTION TTH DM TNS
H A 09/JUN/14 FOR REVIEW TTH DM JMD H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
Operation Centre JOB Code:
Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
0-6495-20 TPM
Prepared by Checked by Approved by
T. T. HUONG T. NGUYEN T. N. SON

I I

NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title

J PIPING AND INSTRUMENT DIAGRAM J


PENEX
UNIT 041
PUMP AUXILIARY DETAILS - 6

Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-2206M 001 OF 001 2

IN
10-SE
5
1
P-2 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 1127(6of 10
SECTION B UNIT 041
3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 3.43 MPa(g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 2 of 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BL
NOTE 2 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TPM SK
041 COMMON 041 041 041 041 041 0014V AND D-000-1225-0020V TO 0026V.
AA FAULT PI FI 041
PT PG FT
FE ICPA-041-UI-011
FRESH COOLING 0351 0351 0351 0352 0351 0351 FRESH COOLING
0351 MIN
A WATER SUPPLY
16"-CWS-041-3001-A2AW-NI 16"-CWS-141-3026-A2AW-NI
WATER SUPPLY
1. DELETED. A
041-3002M 141-3012S
2. ORIFICE WITH 276.7 MM HOLE.
TO UNIT 041 041 H 041 NOTE 9 FROM INTERCONNECTING
AI AT 1'' 3. ORIFICE WITH 182.1 MM HOLE.
0351 041 041
0351 NPIC-041-E-0109M PG TG
TP HC ICPA-041-UO-001 4. ORIFICE WITH 248.5 MM HOLE.
FRESH COOLING M5 NPIC-041-E-0105M 0359 0357 FRESH COOLING
0.75" - 150# MIN NPIC-041-E-0105M
WATER RETURN NPIC-041-E-0161M WATER RETURN 5. ORIFICE WITH 26.46 MM HOLE. NPIC-041-E-0162M
16"-CWR-041-3001-A2AW-NI RF NOTE 6 16"-CWR-141-3026-A2AW-NI
041-3002M 141-3012S
6. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
FROM UNIT 041 0.75"-WO-041-0007-A2AW-NI TO INTERCONNECTING
NPIC-041-E-0106M NOTE 7 NPIC-041-E-0106M 1'' 7. FLOW TRANSMITTER 041-FT-0352A TO MEASURE LP STEAM TO
B NPIC-041-E-0161M 041
FI
041
NOTE 3
ICPA-041-UI-015 INTERCONNECTING. FLOW TRANSMITTER 041-FT-0352B TO B
041 041 041 041 041 FT MEASURE LP STEAM FROM INTERCONNECTING.
PI TI 0352A 0352A 041 ICPA-041-UI-005 NPIC-041-E-0106M
PT PG TT 041
WO 0353 0353 0354 0351 0351 FI
041 FE
NPIC-041-E-0113M 1" 8. MULTITAP ORIFICE FLANGES (041-OR-0352 , 041-ORJ-0352), ORIFICE
FT 0352
LP STEAM 0352B 0352B LP STEAM FLANGE WITH JACK SCREW (041-ORJ-0352) SHALL BE LOCATED AT
10"-LPS-041-3001-A1AS-HS NOTE 8 10"-LPS-141-3006-A1AS-HS
041-3103M 141-3002S DOWNSTREAM OF ORIFICE PLATE

FROM / TO UNIT 041 MIN FROM / TO INTERCONNECTING 9. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-052
0.75" 0.75" 0.75"
NOTE 4 NPIC-041-E-0113M
041 041 041 041 041 041 041 MIN
TT TI FI FT 041 PG PT PI ICPA-041-UI-014
C 0353 0353 0353 0353 FE
0353
0356 0355 0355 1.5"
ICPA-041-UI-004 C
MP STEAM MP STEAM
14"-MPS-041-3001-B1AS-HS 14"-MPS-141-3002-B1AS-HS PERMANENT LINE
041-3103M 141-3002S
SUBJECT TO
TO UNIT 041 MIN FROM INTERCONNECTING
1'' 1'' SERVICE TEST
1''
041 MIN
PG ICPA-041-UI-002 TEST POINT
0360
DB MIN
HP BOILER FEED WATER HP BOILER FEED WATER
3"-HBFW-041-3001-M2AS-HS 3"-HBFW-141-3002-M2AS-HS
041-3201M 141-3012S
D TO UNIT 041 MIN FROM INTERCONNECTING
D
0.75" 0.75" 0.75" 0.75"
041 MIN
PG
0361 ICPA-041-UI-006
MIN
SERVICE WATER SERVICE WATER
3"-SVW-041-3001-A2AW-NI 3"-SVW-141-3005-A2AW-NI
041-3301M 141-3012S

TO UNIT 041 MIN FROM INTERCONNECTING


0.75" 0.75" 0.75"
0.75"
041
E PG
0362
MIN
ICPA-041-UI-007 E
MIN
DRINKING WATER DRINKING WATER
3"-DKW-041-3001-A0LW-HC 3"-DKW-141-3005-A0LW-HC A. DELETED.
041-3301M 141-3012S
NPIC-041-E-0162M 1. DELETED.
TO UNIT 041 0.75"-FG-041-3010-A1AD-NI MIN FROM INTERCONNECTING
0.75" 0.75" 0.75" 0.75" 2. DELETED.
MIN
LPN 0.75"-LPN-041-3007-A1AA-NI
041-3603M NPIC-041-E-0162M
F 0.75" 0.75" F
NPIC-041-E-0126M NPIC-041-E-0126M
NPIC-041-E-0162M
LPS 0.75"-LPS-041-3006-A1AS-HS E
041 041 E 041
041 041 041 E 041
041-3103M TI FI PI
TT FT PG PT
0.75" 0.75" 0358 0358 0355 0355 0364 E
0363 E 0363
E
ICPA-041-UI-001
0.75"-FG-041-3003-A1AD-HC 15D MIN MIN
REFINERY FUEL GAS 5D MIN E REFINERY FUEL GAS
2"-FG-041-3001-A1AD-STL 2"-FG-141-3017-A1AD-STL
041-3401M 141-3012S
6" FEED DWG.No.
G TO UNIT 041 0.5"
0.75" 0.75" 0.75"
FROM INTERCONNECTING G
041 MIN MIN
PG NPIC-041-E-0151M
ICPA-041-UO-003
0365
MIN
FLARE GAS 1:500 1:500 FLARE GAS DWG.No. Title
30"-FLG-041-3001-A1GP-NI 30"-FLG-141-3002-A2GQ-NI REFERENCE DRAWINGS
041-3503M 141-3002S
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
FROM UNIT 041 2" LO TO INTERCONNECTING
NPIC-041-E-0153M 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0.75"
0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
LPS 0.75"-LPS-041-3079-A1AS-HS 0.75"-FLG-041-3005-A1GP-HC
H 041-3103M
A 15/JUL/13 FOR REVIEW DMO RKM SMA H
041 Rev Date Description Prep'd Chk'd App'd
0.75" 0.75" PG ICPA-041-UI-008 REVISIONS
0366 WO
MIN Operation Centre JOB Code:
PLANT AIR PLANT AIR Operation Centre DWG.No.:
2"-PA-041-3001-A2AA-NI 2"-PA-141-3004-A2AA-NI
041-3603M 141-3012S Contractor JOB Code Responsible Company
TO UNIT 041 MIN FROM INTERCONNECTING 0-6495-20 TPM
0.75" 0.75" 0.75" 0.75" Prepared by Checked by Approved by
041 T. T. HUONG T. NGUYEN T. N. SON
PG MIN
NPIC-041-E-0117M 0367 ICPA-041-UI-009
I INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 2"-IA-141-3004-A1AA-NI
INSTRUMENT AIR I
041-3603M 141-3012S

TO UNIT 041 LO FROM INTERCONNECTING


NPIC-041-E-0151M NSRP
Complex Project
041 041 041 Nghi Son Refinery and Petrochemical
041 041 041 041
TT TI FI FT PG PI PT Nghi Son, Vietnam Limited Liability Company
0355 0354 0357 MIN ICPA-041-UI-010
0355 0354 0358 0357
5D MIN 15D MIN
LP NITROGEN LP NITROGEN Drawing Title
2"-LPN-041-3001-A1AA-NI 2"-LPN-141-3003-A1AA-NI
041-3603M 141-3012S
J TO UNIT 041
6"
1" FROM INTERCONNECTING
PIPING AND INSTRUMENT DIAGRAM J
HPN supply from HPN Interconnecting Header. 0.75" PENEX
Control Operation pressure = 3.43 MPa(g) ,
Permanent Supply required UNIT 041
UTILITY BATTERY LIMIT - 1
NOTE 5
041-HPN-01 141-HPN-01
0
041 041 041 041 0041 041 041
TI FI 0
041 PI
041-HPN-01 TT FT PG PT ICPA-041-UI-012
0359 0356 FE 0369 MIN Issue Purpose Document Class
0359 0356 0370 0369
0356
HP NITROGEN HP NITROGEN FOR CONSTRUCTION Z
2"-HPN-041-3001-D1AA-NI 2"-HPN-141-3013-D1AA-NI
K 041-3603M 141-3012S Unit No. Unit Abbreviation PCWBS Size Scale K
6"
TO UNIT 041 FROM INTERCONNECTING 041 PENX A900 A1 NONE
0.75"

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1301M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 3 of 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.

TO FLARE HEADER
INSTRUMENT AIR

TO CBD HEADER
1. FOR PRESSURE TEST.

TO 041-P-301A/B

TO 041-P-303A/B

TO 041-P-302A/B
041-0032M

041-0031M

041-3702M

041-0030M

041-3503M

041-0032M

041-0029M

041-0028M

041-0030M

041-1301M

041-1001M

041-1001M
A A

TO 041-AS-001

TO 041-AS-001

HP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN
N

TO 041-V-301

TO 041-V-301

TO BL AREA

TO BL AREA

TO BL AREA
2. FOR START UP.

AT GRADE
AT GRADE

EL.158300
EL.108000
US-013

US-014

US-021

US-023
PERMANENT LINE

1"-LPN-041-3011-A1AA-NI
2"-IA-041-0003-S0RA-NI

1"-LPN-041-0028-A1AA-NI
0.75"-LPN-041-0022-A1AA-NI

0.75"-LPN-041-3026-A1AA-NI

0.75"-LPN-041-0021-A1AA-NI

0.75"-LPN-041-0020-A1AA-NI

0.75"-LPN-041-3007-A1AA-NI

0.75"-LPN-041-0023-A1AA-NI

0.75"-LPN-041-0024-A1AA-NI
2"-HPN-041-0005-D1AA-NI
2"-LPN-041-0010-A1AA-NI
NPIC-041-E-0163M
SUBJECT TO
HC HC HC HC
SERVICE TEST

0005
B TEST POINT B

0.75"
EL.146300

0.75"-PA-041-3032-A2AA-NI

0.75"-PA-041-3033-A2AA-NI
0.75"-PA-041-3039-A2AA-NI
HC US-020

2"-PA-041-3031-A2AA-NI
EL.137700
0.75"-PA-041-3038-A2AA-NI

0.75"-PA-041-3041-A2AA-NI
HC US-019

NOTE 2

NOTE 1
EL.127750
0.75"-PA-041-3037-A2AA-NI

NPIC-041-E-0153M
C HC US-018 C
EL.116950 MIN
0.75"-PA-041-3036-A2AA-NI

NPIC-041-E-0153M
HC US-017
EL.107900
0.75"-PA-041-3035-A2AA-NI
MIN 2" HC US-016 MIN MIN

MIN NPIC-041-E-0153M
NPIC-041-E-0129M
MIN
D AT GRADE NPIC-041-E-0163M 0.75" D

1"-LPN-041-3022-A1AA-NI
0.75"-PA-041-3042-A2AA-NI

MIN
HC US-024 2"

MIN EL.108500
0.75"-PA-041-3040-A2AA-NI
HC US-022

NPIC-041-E-0129M 0.75"

MIN
PLANT AIR LPT PLANT AIR
2"-PA-041-3001-A2AA-NI 2"-PA-041-3001-A2AA-NI
041-3602M 041-1301M
E E
TO UNIT 041 FROM BL
1. DELETED.

041-IAH-004 041-IAH-003 041-IAH-022 041-IAH-001 041-IAH-002


NPIC-041-E-0117M NPIC-041-E-0117M
INSTRUMENT AIR
1" 1" 1" 1" 1" INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 2"-IA-041-3001-S0RA-NI
041-3602M 041-1301M

F TO UNIT 041 FROM BL F


0.75"

LPT

MIN
LP NITROGEN LP NITROGEN
2"-LPN-041-3001-A1AA-NI 2"-LPN-041-3001-A1AA-NI
041-3602M 041-1301M
FEED DWG.No.
TO UNIT 041 FROM BL
G 0.75" G
LPT
041-HPN-01 041-HPN-01
NPIC-041-E-0129M
HP NITROGEN HP NITROGEN DWG.No. Title
2"-HPN-041-3001-D1AA-NI 2"-HPN-041-3001-D1AA-NI
041-3602M 041-1301M REFERENCE DRAWINGS
MIN 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
TO UNIT 041 FROM BL
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0129M 0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
NPIC-041-E-0153M B - NOT ISSUED DMO RKM SMA
H MIN A - NOT ISSUED DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75"-PA-041-3044-A2AA-NI

MIN REVISIONS
MIN
2"-LPN-041-3030-A1AA-NI Operation Centre JOB Code:
NPIC-041-E-0153M Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
0.75"

MIN

MIN

MIN
0-6495-20 TPM

0.75"-PA-041-3045-A2AA-NI
MIN Prepared by Checked by Approved by
2"-PA-041-3048-A2AA-NI

T. T. HUONG T. NGUYEN T. N. SON

I I
MIN

0.75"

NPIC-041-E-0142M
NPIC-041-E-0153M
NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Limited Liability Company

0.75"-LPN-041-2003-A1AA-NI
Nghi Son, Vietnam

1"-LPN-041-0008-A1AA-NI

1"-LPN-041-0011-A1AA-NI
1"-PA-041-0004-A2AA-NI

1"-PA-041-0003-A2AA-NI

Drawing Title

J HC HC PIPING AND INSTRUMENT DIAGRAM J


PENEX UNIT
AT GRADE
AT GRADE
US-037

US-038

UNIT 041
INSTRUMENT AIR, PLANT AIR AND NITROGEN - 3

Issue Purpose Document Class

041-0101M

041-0102M

041-2206M

TO 041-P-615A/B
041-0101M

041-0102M

FOR CONSTRUCTION Z

LP NITROGEN

LP NITROGEN

LP NITROGEN
TO 041-V-612

TO 041-V-615
TO 041-V-612

TO 041-V-615

K K
PLANT AIR

PLANT AIR

Unit No. Unit Abbreviation PCWBS Size Scale


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3603M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
9
10 11 12 13 14 15 16
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 4 of 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NPIC-041-E-0129M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
NPIC-041-E-0160M
0014V AND D-000-1225-0020V TO 0026V.
NPIC-041-E-0163M
1. FOR PRESSURE TEST.

TO 041-P-213A/B
041-0025M

041-0023M
A A

LP NITROGEN

LP NITROGEN
N

NPIC-041-E-0129M
TO 041-V-212

AT GRADE
EL.121050

EL.102550
AT GRADE
EL.113900

EL.110000

EL.114000
2. DELETED.

EL. 12400
US-006
US-007

US-008

US-010

US-011

US-012

US-015
US-009
HC HC HC HC HC HC HC HC

PERMANENT LINE

0.75"-PA-041-3046-A1AA-NI 0.75"

NPIC-041-E-0160M
SUBJECT TO

0.75"-LPN-041-0019-A1AA-NI

1"-LPN-041-0005-A1AA-NI

0.75"-PA-041-3014-A2AA-NI

0.75"-PA-041-3017-A2AA-NI

0.75"-PA-041-3016-A2AA-NI

0.75"-PA-041-3015-A2AA-NI

0.75"-PA-041-3018-A2AA-NI

0.75"-PA-041-3019-A2AA-NI

0.75"-PA-041-3034-A2AA-NI
SERVICE TEST
B B
TEST POINT
0.75"

MIN

NPIC-041-E-0160M
MIN
C 0.75" C

MIN
041-IAH-006
1"

2"-PA-041-3003-A2AA-NI

041-IAH-005
1"

2"-IA-041-3003-S0RA-NI
D D

NPIC-041-E-0117M
MIN
1.5"
NPIC-041-E-0153M

MIN

MIN
PLANT AIR PLANT AIR
2"-PA-041-3001-A2AA-NI 2"-PA-041-3001-A2AA-NI
041-3601M 041-3603M

MIN
MIN
TO UNIT 041 FROM BL

E NPIC-041-E-0129M NPIC-041-E-0129M
E
A. DELETED.

041-IAH-007 041-IAH-021 1. DELETED.


NPIC-041-E-0117M NPIC-041-E-0117M
1" 1" 2. DELETED.
INSTRUMENT AIR INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 2"-IA-041-3001-S0RA-NI 3. DELETED.
041-3601M 041-3603M

TO UNIT 041 FROM BL

F F

NPIC-041-E-0146M
MIN

MIN

LP NITROGEN LP NITROGEN
2"-LPN-041-3001-A1AA-NI 2"-LPN-041-3001-A1AA-NI
041-3601M 041-3603M
MIN

MIN
NPIC-041-E-0129M
TO UNIT 041 FROM BL

FEED DWG.No.
G 041-HPN-01 041-HPN-01 G
HP NITROGEN HP NITROGEN
22"-HPN-041-3001-D1AA-NI
HPN 041 3001 D1AA NI 22"-HPN-041-3001-D1AA-NI
HPN 041 3001 D1AA NI
041-3601M 041-3603M

MIN
TO UNIT 041 FROM BL DWG.No. Title

2"-IA-041-3006-S0RA-NI
NPIC-041-E-0149M
REFERENCE DRAWINGS
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
2"
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS

NPIC-041-E-0117M
MIN

0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD


B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H A - NOT ISSUED DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
Operation Centre JOB Code:
NPIC-041-E-0129M

MIN
Operation Centre DWG.No.:
2"-LPN-041-0001-A1AA-NI

MIN Contractor JOB Code Responsible Company


2" 0-6495-20 TPM
Prepared by Checked by Approved by
MIN

T. T. HUONG T. NGUYEN T. N. SON


2"-PA-041-3004-A2AA-NI

MIN
NPIC-041-E-0160M

I I
MIN

0.75"-LPN-041-3024-A1AA-NI

0.75"-PA-041-3020-A2AA-NI
0.75"-PA-041-3022-A2AA-NI

0.75"-PA-041-3024-A2AA-NI

0.75"-PA-041-3023-A2AA-NI

0.75"-PA-041-3043-A2AA-NI
MIN
1"-LPN-041-3016-A1AA-NI

0.75" NSRP

MIN
Complex Project
Nghi Son Refinery and Petrochemical
0.75"
Nghi Son, Vietnam Limited Liability Company
1.5"-HPN-041-0001-D1AA-NI
HPN 041 0001 D1AA NI
1.5"-LPN-041-0001-A1AA-NI

1"-LPN-041-2001-A1AA-NI

1"-LPN-041-2002-A1AA-NI

1"-LPN-041-3036-A1AA-NI

Drawing Title

1"-IA-041-2001-S0RA-NI

1"-IA-041-2002-S0RA-NI
NOTE 1

J NPIC-041-E-0141M
PIPING AND INSTRUMENT DIAGRAM J
NPIC-041-E-0153M PENEX UNIT
UNIT 041
INSTRUMENT AIR, PLANT AIR AND NITROGEN - 2
1.5

HC HC HC HC HC HC
EL.110000

EL.103000

EL.105300

AT GRADE

AT GRADE

AT GRADE
US-033

US-034

US-032

US-036

US-035

US-036

LP INSTRUMENT AIR

LP INSTRUMENT AIR
Issue Purpose Document Class
041-3502M

041-0002M

041-2101M

041-2102M

041-3502M

041-0002M

041-2101M

041-2102M
TO FLG HEADER

TO FLG HEADER
TO 041-K-051A/B

TO 041-K-051A/B

FOR CONSTRUCTION Z
TO 041-K-051A

TO 041-K-051B

TO 041-K-051A

TO 041-K-051B
HP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

K Unit No. Unit Abbreviation PCWBS Size Scale K


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3602M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
9
10 11 12 13 14 15 16
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 5 of 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NPIC-041-E-0162M
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.

1. FOR PRESSURE TEST.


A N A

TO AIR RESERVOIR

TO AIR RESERVOIR

AT GRADE

AT GRADE
ATGRADE

EL.117800
EL.117800

EL.118500
ATGRADE

ATGRADE

INSTRUMENT AIR

INSTRUMENT AIR
2. FOR START-UP.

US-001

US-002

US-003

US-004

US-039

US-003

US-004

US-005
TO CCB HEADER

TO CBD HEADER

TO FLG HEADER

TO 041-R-101A/B

TO 041-P-203A/B

TO 041-P-202A/B
041-0024M

041-3401M

041-0024M

041-3701M

041-3701M

041-0012M

041-3501M

041-0015M

041-0015M

041-0016M

041-0015M

041-0016M

041-0022M

041-0023M

041-0015M

041-0015M
TO FG HEADER

TO 041-R-101A

TO 041-R-101B

TO 041-R-101A

TO 041-R-101B

(041-R-101A/B)

(041-R-101A/B)
HP NITROGEN

HP NITROGEN
TO 041-TK-211

LP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN
TO 041-P-212

TO 041-A-111
3. PLANT AIR FOR TANK MIXING.

PLANT AIR
HC HC HC HC HC HC HC HC 4. SPARE IAH NPIC-041-E-0162M

NPIC-041-E-0149M

0.75"-IA-041-0002-S0RA-NI
1"-PA-041-0001-A2AA-NI

0.75"-PA-041-3008-A2AA-NI
0.75"-LPN-041-3029-A1AA-NI

0.75''-PA-041-3009-A2AA-NI

0.75''-PA-041-3011-A2AA-NI
0.75''-PA-041-3006-A2AA-NI

0.75"-LPN-041-3008-A1AA-NI

0.75"-LPN-041-0018-A1AA-NI

0.75"-LPN-041-3012-A1AA-NI

0.75"-LPN-041-3023-A1AA-NI

0.75''-PA-041-3007-A2AA-NI

0.75"-LPN-041-0002-A1AA-NI

0.75''-LPN-041-3019-A1AA-NI

0.75"-LPN-041-0014-A1AA-NI

0.75"-LPN-041-0017-A1AA-NI
0.75"-LPN-041-3017-A1AA-NI

0.75"-IA-041-0001-S0RA-NI
1.5"-LPN-041-0003-A1AA-NI

1.5"-LPN-041-0004-A1AA-NI

1.5"-HPN-041-0002-D1AA-NI
HPN 041 0002 D1AA NI

1.5"-HPN-041-0003-D1AA-NI
HPN 041 0003 D1AA NI

0.75"-LPN-041-0016-A1AA-NI
1"-LPN-041-3010-A1AA-NI
PERMANENT LINE
SUBJECT TO
B B
NOTE 3

NOTE 2

NOTE 2

NOTE 1

NOTE 1
SERVICE TEST

TEST POINT

1.5

1.5
0.75"

MIN
MIN

2"
MIN MIN
MIN

MIN

C NPIC-041-E-0153M
MIN
MIN C

NPIC-041-E-0129M
0.75"

MIN
1"-PA-041-3005-A2AA-NI

2"-LPN-041-0016-A1AA-NI
MIN

MIN

MIN
MIN
MIN
MIN
MIN
MIN

MIN
MIN
MIN

MIN

0.75"
D D
NPIC-041-E-0153M 0.75"
NPIC-041-E-0153M
NPIC-041-E-0153M

MIN
MIN

MIN

MIN
PLANT AIR
2"-PA-041-3001-A2AA-NI
041-3602M
NPIC-041-E-0128M

MIN
NPIC-041-E-0153M FROM BL
0.75"
E NPIC-041-E-0153M
E
MIN 2"-LPN-041-3033-A1AA-NI 0.75" 0.75"
A. DELETED.
NPIC-041-E-0129M NOTE 4 LPT LPT
NPIC-041-E-0162M 041-IAH-014 041-IAH-013 041-IAH-009 041-IAH-012 041-IAH-008 1. DELETED.
1" NPIC-041-E-0117M
MIN 1" 1" 1" 1" 1" 2. DELETED.

MIN
INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 3. DELETED.
041-3602M

NPIC-041-E-0162M
NPIC-041-E-0128M

2"-LPN-041-3018-A1AA-NI
FROM BL 4. DELETED.
0.75"

F F

041-IAH-015
1"

MIN

MIN
LP NITROGEN
2"-LPN-041-3001-A1AA-NI
041-3602M
MIN

MIN

MIN
FROM BL
NPIC-041-E-0128M 0.75"

041-IAH-019
1"
FEED DWG.No.
G 041-HPN-01 G
041-HPN-01
MIN

MIN
HP NITROGEN
22"-HPN-041-3001-D1AA-NI
HPN 041 3001 D1AA NI
041-3602M
MIN AT GRADE
0.75"-LPN-041-0012-A1AA-NI FROM BL

041-IAH-020
0.75''-PA-041-3028-A2AA-NI DWG.No. Title
0.75" HC US-027 1" REFERENCE DRAWINGS
NPIC-041-E-0128M MIN LP NITROGEN
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
041-0004M
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
TO 041-DR-051A/B 0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
0.75" MIN
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 2" H

041-IAH-010
A 13/JUL/13 FOR REVIEW DMO RKM SMA
1"

2"-IA-041-3004-S0RA-NI
Rev Date Description Prep'd Chk'd App'd
LPT 0.75"-LPN-041-3020-A1AA-NI

2"-LPN-041-3006-A1AA-NI
NPIC-041-E-0117M REVISIONS
EL.108050 NPIC-041-E-0149M
MIN 0.75''-PA-041-3029-A2AA-NI EL.110000 Operation Centre JOB Code:
2"-LPN-041-3031-A1AA-NI HC US-028 2"
NPIC-041-E-0129M

HC US-033 Operation Centre DWG.No.:


Contractor JOB Code Responsible Company

MIN
2"-PA-041-3027-A2AA-NI

NPIC-041-E-0149M
MIN

MIN

MIN

041-IAH-017
0-6495-20 TPM
NPIC-041-E-0129M

0.75" 1"
0.75"-LPN-041-3021-A1AA-NI Prepared by Checked by Approved by
NPIC-041-E-0153M

EL.122500 NPIC-041-E-0160M T. T. HUONG T. NGUYEN T. N. SON


0.75''-PA-041-3030-A2AA-NI EL.103000
HC US-029 HC US-034
I I

041-IAH-011
1"

075''-PA-041-3012-A2AA-NI
0.75"-LPN-041-0026-A1AA-NI

0.75"-LPN-041-0027-A1AA-NI

0.75"-LPN-041-0015-A1AA-NI

0.75"-LPN-041-3013-A1AA-NI

0.75"-LPN-041-0013-A1AA-NI 0.75"
HPN 041 0004 D1AA NI
1.5''-HPN-041-0004-D1AA-NI

MIN
2"-PA-041-3047-A2AA-NI
2"-LPN-041-3005-A1AA-NI

1"-LPN-041-3009-A1AA-NI

0.75''-PA-041-3027-A2AA-NI EL.133950 NPIC-041-E-0129M NSRP


0.75''-LPN-041-3037-A2AA-NI

075''-LPN-041-3032-A1AA-NI
NPIC-041-E-0162M

HC US-030 Complex Project


NOTE 1

MIN 2"-LPN-041-3027-A1AA-NI Nghi Son Refinery and Petrochemical

041-IAH-018
Nghi Son, Vietnam Limited Liability Company
1"
NPIC-041-E-0160M

0.75"-LPN-041-0025-A1AA-NI
MIN Drawing Title

2"
MIN
J EL.104000 J
1.5

0.75''-PA-041-3025-A2AA-NI PIPING AND INSTRUMENT DIAGRAM


HC US-025

MIN
PENEX

041-IAH-016
1"
NPIC-041-E-0160M 0.75" UNIT 041
0.75"

MIN
MIN INSTRUMENT AIR, PLANT AIR AND NITROGEN - 1

0.75"-LPN-041-3034-A1AA-NI
AT GRADE
0.75''-PA-041-3026-A2AA-NI HC HC HC
HC US-026

ATGRADE
EL. 105100
EL.106500

US-031
NPIC-041-E-0153M
US-040

Issue Purpose Document Class


US-032
MIN
TO LPCW HEADER

TO 041-DR-001A/B

0.75" FOR CONTRUCTION Z


TO CBD HEADER

TO CBD HEADER
041-0020M

041-0020M

041-0020M

041-0019M

041-3101M

041-3701M

041-3501M

041-0011M

041-0008M

041-3701M
TO FLG HEADER
TO 041-P-201A/B

TO 041-P-001A/B
TO 041-P-201A

TO 041-P-201B

HP NITROGEN
LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN

LP NITROGEN
K K
TO 041-V-201

Unit No. Unit Abbreviation PCWBS Size Scale


NPIC-041-E-0153M
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3601M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
10 11 12 13 14 15 16
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 6 of 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

START-UP PURGE
041-K-051A/B 2"-P-041-0017-A1AP04-NI A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041-0013M 0014V AND D-000-1225-0020V TO 0026V.
MAKE - UP COMPRESSORS TO 041-EJ-611
A TO ATM
1. FOR COMPRESSOR INTERFACE DETAILS, REFER TO DWG. A
CODE API 618 D-041-1225-2101M / 2102M.
AT SAFE LOCATION
TYPE / NO. OF STAGES RECIPROCATING / 1 NOTE 2 2. TO BE LOCATED OUTSIDE OF COMPRESSOR SHELTER.
RATED CAPACITY 2960 Nm3 /hr 300#
3. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
SUCTION / DISCHARGE PRESSURE 2.45 / 3.86 MPa(g) NOTE 3
4. DELETED.
MOTOR SIZE 75 kW
TRIM SPECIFICATION B1AH04 - PG NC 5. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE

E
NPIC-041-E-0158M
1"-V-041-0001-A1AP04-NI PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING

E
NPIC-041-E-0158M SWING ELBOW TO HPN.
MAKE - UP GAS NPIC-041-E-0098M
B B

E
3"-P-041-0003-B1AH04-ET 6. FOR PRESSURE TEST.
041-0001M E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
NO POCKET 1"
7. DELETED.

E
FROM 041-V-051

E
NPIC-041-E-0153M 0.75"
0.75"

E
0.75" 0.75" 8. FOR START-UP.

E
E

MIN

E
E

MIN
NPIC-041-E-0153M NPIC-041-E-0098M

E
9. DELETED.
0.75" NC

E
10. CONNECTION FOR TEMPORARY PSV. SET PRESSURE TO BE 3.50
NC

E
0.75"

E
MPa(g).

E
1"

E
1.5"-LPN-041-0001-A1AA-NI
E E 1"
C C

E
NC

E
NPIC-041-E-0153M E E

E
0.75" NC NC PERMANENT LINE

E
SUBJECT TO

MAX
450
E
LPN
0.75"

E
SERVICE TEST

E
041-3602M NOTE 8 E E 0.75" NC
NPIC-041-E-0153M NC NC

E
E
0.75" 0.75"

MAX
450
0.75" TEST POINT

E
E
3"-P-041-0009-B1AH04-ET E E

E
E
NC NC 3"-P-041-0005-B1AH04-ET

E
E
1.5"-HPN-041-0001-D1AA-NI E E E E 041 E E E E 041
D E SP E SP D

E
E
NPIC-041-E-0098M
NPIC-041-E-0126M 041 5101 NPIC-041-E-0126M 041 5102

E
E

E
PDG PDG

E
E

E
NPIC-041-E-0155M

E
041 6500 (V) 6540
041-HPN-01 PG NPIC-041-E-0119M
E (V) NPIC-041-E-0119M
E (V) (V)

E
E E
IN VIEW 0073 NOTE 10 NPIC-041-E-0155M

E
E

E
1.5" 041 041 E E E E E E E E 041
UZ UZ UZ
HPN NOTE 5 2"-300# 2"-300#
1000 6502 1000
PUCS NPIC-041-E-0150M

E
041-3602M NOTE 6 041 NPIC-041-E-0150M
RF RF 041 041
0.75" 0.75" UZ UZ UZ
NOTE 3 NOTE 2 0005 0005 6542
PUCS
1.5"-P-041-0015-D1AH04-NI TP TP 041
E 1.5"
041
UZ
1A 1B UZ
0101
E
0101
A. DELETED.

041
HZS 041 041-K-051A 041-K-051B 041 041
UZ UZ HZS
0051B NOTE 1 NOTE 1
0001 0002 0052B

041 041
HZS HZS
0051A CRIT 0052A
CRIT
F EMERGENCY
041
HZA TP TP
041
HZA EMERGENCY F
SHUTDOWN 0051 2A 2B 0052 SHUTDOWN

CRIT
CRI T
2"-300# 2"-300# 041
041 UA
UA
RF RF 0112
0111
1.5"-P-041-0012-D1AH04-NI

FEED DWG.No.
041 041
G PG PG G
0062 0063
SIZE: 1D2 SIZE: 1D2
PSET: 4.25 MPa(g) PSET: 4.25 MPa(g) 953053-120-05-A1 MAKE-UP COMPRESSOR
3"-FLG-041-0003-A1AP-NI 3"-FLG-041-0002-A1AP-NI
DWG.No. Title
REFERENCE DRAWINGS
041 041
PSV PSV 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
FLG FREE DRAINING 0002
FLG FREE DRAINING 0003 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-3502M 041-3502M B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H H
NPIC-041-E-0116M

NPIC-041-E-0116M

A 13/JUL/13 FOR REVIEW DMO RKM SMA


Rev Date Description Prep'd Chk'd App'd
650 MAX

650 MAX
REVISIONS
MIN

MIN

Operation Centre JOB Code:


0.75" 0.75"
Operation Centre DWG.No.:
2" 2"
Contractor JOB Code Responsible Company
0-6495-20 TPM
FREE DRAINING

FREE DRAINING

Prepared by Checked by Approved by


T. T. HUONG T. NGUYEN T. N. SON

I I
MAX

MAX
450

450

3"-P-041-0128-B1AH04-PG 3"-P-041-0129-B1AH04-PG NSRP


Complex Project
Nghi Son Refinery and Petrochemical
(V) (V) Nghi Son, Vietnam Limited Liability Company

Drawing Title
NC NC
1"-P-041-0014-B1AH04-NI
J 1"-P-041-0008-B1AH04-NI PIPING AND INSTRUMENT DIAGRAM J
PENEX
MIN
MIN

MAKE-UP GAS SECTION


0.75"
0.75" MAKE-UP COMPRESSOR
0.75" 3"-P-041-0013-B1AH04-PG
HPT
NC NC
0.75" MAKE - UP GAS Issue Purpose Document Class
3"-P-041-0011-B1AH04-PG
041-0003M FOR CONSTRUCTION Z
K TO 041-E-051 Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0002M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 7 of 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
LEAD REACTOR EFFLUENT
8"-P-041-0084-B1AH04-HC 041
041-0014M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TWO PHASE FLOW PSV 041-R-101A
0151 0014V AND D-000-1225-0020V TO 0026V.
FROM 041-E-102A/B (V) 041
0.75"-IA-041-0001-S0RA-NI UZ SIZE: 3J4 1. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
STRIPPING HYDROGEN AIR RESERVOIR 041 041 PSET: 3.90 MPa(g)
REACTOR
A 4"-P-041-0048-B1AH04-HC
1000
UZ UZ
041 FREE DRAINING 8"-FLG-041-0025-A1AP-NI FLG CODE ASME VIII DIV 1
2.
3.
CATALYST WITHDRAWAL NOZZLE.
FOR PURGE AND PRESSURING.
A
041-0006M 0102 0101
NOTE 4 PSV
IA 0103 041-3501M SIZE: I.D x TT 2500 mm x 12200 mm 4. FOR SULFUR STRIPPING.
FROM 041-H-011
041 3.90 MPa(g) + FV @ 205 °C 5. BLANKETING GAS.
DESIGN PRESSURE

NPIC-041-E-0153M
041-3601M
PG

MIN
INST. PIP. 6. LOW RANGE GAUGE USED FOR REACTOR BLANKETING DURING
0113 DESIGN TEMPERATURE 260 °C
(V) 041 041 CRI T LOADING ONLY.
041 041
PI PT
UZ HZA 0.75" 0.75" INSULATION TYPE HC 7. LINE FOR DRY-OUT.

MIN
0109 0109 0103 0101 NP P-041-0288-D1AH04-HC
L 041 041 8. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
1" NC

FREE DRAINING
ULL ULH TRIM SPECIFICATION
S P-041-0331-B1AH04-HC D-041-1225-2401M.
0101 0101
2" NOTE 14
9. 6" x 650 MM PIPING PIECE SAMPLE RECEIVER WITH PIPE SUPPORT
041 041 041 NC 4"-P-041-0165-B1AH04-HC NPIC-041-E-0152M
B 041 S FOR POSSIBLE VIBRATION.
B

MIN
UA HZS UA
041 041 UZY 10. FOR PRESSURE TEST.
0101A 0101 0101B

NOTE 5
USL USH 0101A 041 041
0101 0101 UZY UZV CIRCUIT EMERGENCY CIRCUIT 11. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
0101B 0101
TROUBLE SHUTDOWN TROUBLE PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
COMBINED FEED COIL 1 COIL 2
8"-P-041-0085-B1AH04-HC 8"-P-041-0259-B1AH04-HC SWING ELBOW TO HPN. NPIC-041-E-0115M
041-0014M 12. TO BE USED DURING DRY-OUT OPERATION ONLY.
TWO PHASE FLOW 041
FROM 041-E-103 FI FC 13. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO
0055 TSO 041 REACTORS.
HIC
8"

MIN
14. ALTERNATE DESIGN CONDITIONS DURING HOT HYDROGEN STRIPPING:
NC NOTE 18 0055
1.5"-P-041-0164-B1AH04-NI - PRESSURE: 2.70 MPa(g)
C 0.75"
041
FT
041
FE
NOTE 3 041
- TEMPERATURE: 315 °C C
0055 0055 HV 15. DEPRESSURING SYSTEM SHUTDOWNS BY-PASS SWITCH WITH LIGHT
NP 0.75" 0055
HYDROGEN PURGE FREE DRAINING FOR TESTING DEPRESSURING SYSTEM WHILE BY-PASSING
2"-P-041-0079-B1AH04-NI ASSOCIATED SHUTDOWNS.
041-0013M 041
NOTE 5

VENDOR CONTRACTOR LO FL(O) 2" LO 041 UZ


FROM 041-DR-051A/B 041 NOTE 6 041 HZS 0101
PG PG 0.75" 1" 0.75"
NOTE 17 2" MIN 0108

NPIC-041-E-0158M
0102 0118
1" NC FREE DRAINING 1.5" 041 041
LPN MW UZ HZL CRIT
041-3601M 30" 0102 0108A

FREE DRAINING
MIN

1.5"-LPN-041-0003-A1AA-NI 041
D STRIPPING HYDROGEN
4"-P-041-0047-B1AH04-HC NPIC-041-E-0115M
0.75" 0.75"
UZ D

MIN
041-0006M NOTE 16 1.5" 1.5"
041-R-101A 0103
NOTE 4 0.75" 0.75"
TO 041-H-011 IN VIEW 041 NOTE 13
1.5"-HPN-041-0002-D1AA-NI PG
NOTE 19 16. FOR START-UP.
0074
17. VALVE AND BLIND FLANGE TO BE PROVIDED BY CONTRACTOR.
1.5" 041 8" 8"
NOTE 11 VAPOR
041
PI 18. ORIFICE WITH 20.32 MM HOLE.
HPN PT
0103 0103 19. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 3.9 MPa(g)
041-3601M LIQUID TRAY COMBINED FEED
NOTE 10 FREE DRAINING FREE DRAINING 8"-P-041-0167-B1AH04-HC
NOTE 1 H NPIC-041-E-0115M
0.75" 0.75" 041 041 041-0016M
TT TI
NC TWO PHASE FLOW
0105 0105 MIN TO 041-R-101B
0.75"-SVW-041-0004-A2AW-NI SVW
E 041-3301M 041 H
0.75" 0.75" E
041
TT TI A. DELETED.
NC 1.5"-P-041-0170-D1AH04-PC 0106 0106 8"-P-041-0160-B1AH04-HC
NPIC-041-E-0097M H TWO PHASE FLOW
041 041
1.5"-P-041-0306-B1AH04-PC TT TI PERMANENT LINE
0107 0107
SUBJECT TO
H
2"-WW-041-0001-A2AW-NI

041 041 SERVICE TEST


NPIC-041-E-0158M TI
0.75"-P-041-0171-B1AH04-NI TT
0104 0104
H TEST POINT
FREE DRAINING

F 0.75"-FLG-041-0024-A1AP-NI FLG 041


TT
041
TI
041
PDY
041
PDI F
NO POCKET 041-3501M 0108 0108 0105 0105 L
041 H
041
TT TI
FREE DRAINING

0.75" 0109 0109


1" NC
041 UC H
041 041 041
SP PG TI
1221 0.75"-P-041-0169-B1AH04-NI TT
0115 0110 0110

041 H 041
2" 041
TI PI FEED DWG.No.
TT
G 0111 0111 0104 G

041 H
953053-120-18-A1 REACTORS
TI 0.75"
WO 041 0112
DWG.No. Title
CL OF GLASS
041 LG TL REFERENCE DRAWINGS
TG
NO POCKET 2"-FLG-041-0026-A1AP-NI FLG
0102 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
150

0207 GL(R) 041-3501M


1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041 041 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
NOTE 9 NOTE 2
0.75" TT PG 041 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
6" 6"
H SIGNAL 0112 0116
H
2300 MIN

NPIC-041-E-0115M PT A 13/JUL/13 FOR REVIEW DMO RKM SMA


041-0008M NOTE 2 LPT 0104 Rev Date Description Prep'd Chk'd App'd
PIP. LAG REACTOR EFFLUENT
8"-P-041-0166-B1AH04-HC REVISIONS
TO 041-AY-0001 0.75" INST. INST. 041-0016M
NOTE 8 Operation Centre JOB Code:
041 NOTE 12 PIP. NC CIRCUIT Operation Centre DWG.No.:
FLG 041 NOTE 1 TROUBLE FROM 041-R-101B
SC AT 8"-P-041-0161-B1AH04-HC 0.75"
0.75" 0.75" 8" 8" CRIT Contractor JOB Code Responsible Company
041-3501M 0004 0001D 0.75" NPT 041 041 041 041
NPT MOIS UZ UZ HZA UA 0-6495-20 TPM
TYPE L2
NOTE 1 0103 0101 0110 0102 Prepared by Checked by Approved by
NPIC-041-E-0105M
0.75" 0.75" 300 # 300 # SAMPLE RETURN T. T. HUONG T. NGUYEN T. N. SON
NOTE 15
NOTE 1 NOTE 1 041 0.75"-P-041-0089-B1AH04-NI
041 041-0017M
PSV
I 3"
0.75"-IA-041-0002-S0RA-NI
0152 UZ 041
HZS
NNF
TO 041-E-201A/B
I
3"-CBD-041-0026-A2AP-NI

(V) 0102
0.75"-P-041-0087-B1AH04-PG 0.75" 041
AIR RESERVOIR UA 0110
0.75"-LPN-041-0014-A1AA-NI EMERGENCY
HYDROCARBON SAMPLE MIN
0103 041
DEPRESSURIZING NSRP
FREE DRAINING

PIP. INST. CIRCUIT UZY


0.75"-P-041-0077-B1AH04-PG 0103
041-0013M LPN TROUBLE S Complex Project
IA Nghi Son Refinery and Petrochemical
TWO PHASE FLOW NC WO 041-3601M
MIN

FROM 041-E-101 NOTE 7 041-3601M Nghi Son, Vietnam Limited Liability Company
0.75" 0.75"
0.75"-LPS-041-0022-A1AS-HS 041 041 Drawing Title
NC PG UZY
0102
0117 S
J 0.75" LPS
041
(V)
PIPING AND INSTRUMENT DIAGRAM J
NP CBD 041-3101M PT
041-3701M 0.75" 0.75" 0110
H H
PENEX
NC 0.75"-P-041-0260-B1AH04-HC 041 041 041 041
MIN

ULL ULH ULH ULL REACTOR SECTION


LEAD REACTOR EFFLUENT 0102 0102 0103 0103
8"-P-041-0082-B1AH04-HC L L
041-0014M 041 REACTORS - 1
TWO PHASE FLOW PI
TO 041-E-102A/B 0110 L 041 041 041 041 041 041
START-UP PURGE USL USH UZV UZV USH USL 3"-FLG-041-0023-A1AP-NI
2"-P-041-0083-A1AP04-NI 0102 0103 Issue Purpose Document Class
0102 0102 0103 0103
041-0013M
FOR CONSTRUCTION Z
K TO 041-EJ-611
3"-P-041-0168-B1AH04-HC FREE DRAINING FLG
Unit No. Unit Abbreviation PCWBS Size Scale K
LAG REACTOR EFFLUENT
8"-P-041-0078-B1AH04-HC TWO PHASE FLOW 041-3501M
041 PENX A900 A1 NONE
LO LO

DR01A
041-0013M FC FC Contractor DWG.No. Sheet Rev.

0.75"
TWO PHASE FLOW TSO TSO
A1

TO 041-E-101 3" 3" D-041-1225-0015M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 8 of 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

041-R-101B A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.

REACTOR 1. CATALYST WITHDRAWAL NOZZLE.


A CODE ASME VIII DIV 1 2. VALVE FOR LOW RANGE PG CONNECTION. 041-PG-0102 (DWG. A
SIZE:I.D x TT 2500 mm x 12200 mm D-041-1225-0015M) IS USED FOR BOTH REACTORS AS CATALYST
DESIGN PRESSURE 3.90 MPa(g) + FV @ 205 °C LOADING MAY NOT BE DONE AT SAME TIME ON BOTH REACTORS.
DESIGN TEMPERATURE 260 °C 3. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO
INSULATION TYPE HC REACTORS.
P-041-0289-D1AH04-HC 4. ALTERNATE DESIGN CONDITIONS DURING HOT HYDROGEN
TRIM SPECIFICATION STRIPPING:
P-041-0332-B1AH04-HC
- PRESSURE: 2.70 MPa(g)
NOTE 4 NPIC-041-E-0152M
B - TEMPERATURE: 315 °C
B
5. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
SWING ELBOW TO HPN.
NPIC-041-E-0115M
6. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
SIZE: 3J4 7. FOR PRESSURE TEST
PSET: 3.90 MPa(g)
041 FREE DRAINING 8. FOR START-UP.
8"-FLG-041-0027- A1AP-NI FLG
PSV
041-3501M 9. VALVE AND BLIND FLANGE TO BE PROVIDED BY CONTRACTOR.
0104
10. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 3.9 MPa(g).
C NPIC-041-E-0115M
C
NOTE 2
0.75" PERMANENT LINE

MIN
SUBJECT TO
4"-P-041-0172-B1AH04-HC 1.5"-LPN-041-0004-A1AA-NI LPN SERVICE TEST
2" NOTE 8 041-3601M

0.75" 0.75"

FREE DRAINING
NPIC-041-E-0115M TEST POINT

D 041 IN VIEW D
PG
NOTE 10 0075
1.5"
NOTE 5
1.5"-HPN-041-0003-D1AA-NI
1.5 HPN 041 0003 D1AA NI HPN

041 CONTRACTOR VENDOR NOTE 7 041-3601M


PG NOTE 6 0.75" 0.75"
0120 NOTE 9
2"
COMBINED FEED
8"-P-041-0167-B1AH04-HC FREE DRAINING FREE DRAINING
041-0015M 1.5"-P-041-0173-D1AH04-PC
TWO PHASE FLOW MW NPIC-041-E-0097M
E FROM 041-E-103 8" 30"
1.5"-P-041-0305-B1AH04-PC
E
A. DELETED.

041-R-101B
NOTE 3 VAPOR
041 LIQUID TRAY
041
PI PT
0106 0106
H 041 041
F TI TT F
0116 0116
H 041 041
TI TT
0117 0117
H 041 041
TI TT
0118 0118
H 041 041
TI TT FEED DWG.No.
G 041 041
0115 0115 G
PDI PDY H 041 041
TI TT
0108 L 0108
0119 0119
953053-120-18-A1 REACTORS
H 041 041 DWG.No. Title
TI TT REFERENCE DRAWINGS
0120 0120
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
H 041 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041
TI TT 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
0121 0121 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H H 041 041
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
TI Rev Date Description Prep'd Chk'd App'd
TT
041 0122 REVISIONS
PI 0122
0107 Operation Centre JOB Code:
Operation Centre DWG.No.:
H Contractor JOB Code Responsible Company
041
0.75" TI 0-6495-20 TPM
0123 Prepared by Checked by Approved by
FLG 2"-FLG-041-0028-A1AP-NI NO POCKET TL
T. T. HUONG T. NGUYEN T. N. SON
041-3501M

I 0.75" 041
PT
041
PG
041
TT
I
0107 0119 0123 6" 6"

2300 MIN
LPT NOTE 1 NOTE 1
LAG REACTOR EFFLUENT
041-0015M
8"-P-041-0166-B1AH04-HC NSRP
Complex Project
Nghi Son Refinery and Petrochemical
TO 041-E-102A/B
Nghi Son, Vietnam Limited Liability Company

Drawing Title
0.75"
J 3" PIPING AND INSTRUMENT DIAGRAM J
PENEX
REACTOR SECTION
FREE DRAINING

WO
REACTORS - 2

Issue Purpose Document Class


3"-CBD-041-0027-A2AP-NI FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
CBD 041 PENX A900 A1 NONE

DR01A
041-3701M Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0016M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 9 of 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

041-AC-201 041-E-202 041-V-201 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.
STABILIZER TRIM CONDENSER STABILIZER RECEIVER
STABILIZER CONDENSER CODE ASME VIII DIV 1 / API 660 1. FOR AIR COOLER DETAILS, REFER TO DWG. D-041-1225-2301M.
A CODE ASME VIII DIV 1 / API 661 TYPE: BEU
CODE ASME VIII DIV 1
2. DELETED.
A
SIZE: I.D x TT 1700 mm x 5100 mm
SIZE: H.T. AREA 5764 m2 (FINNED) NPIC-041-E-0158M SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 650 mm / 6100 mm / 149 m²
DESIGN PRESSURE 1.75 MPa(g) + FV @ 120 °C 3. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
DESIGN DUTY 4069 kW DESIGN DUTY 573 kW D-041-1225-2401M.
DESIGN TEMPERATURE 120 °C
DESIGN PRESSURE 1.75 MPa(g) + FV @ 120 °C SIDE SHELL TUBE
INSULATION TYPE NI 4. FOR PRESSURE TEST. TEMPORARY PRESSURE PROTECTION
DESIGN TEMPERATURE 130 °C 1.75 MPa(g) + FV @ 120°C
DESIGN PRESSURE 1.35 MPa(g) P-041-0291-B1AH04-NI (PSV) TO BE INSTALLED BEFORE CONNECTING SWING ELBOW TO
NO OF FANS 2 NOTE 5 TRIM SPECIFICATION HPN.
P-041-0308-B1AP04-NI NPIC-041-E-0098M
TRIM SPECIFICATION B1AH04-NI DESIGN TEMPERATURE 120 °C 76 °C
NOTE 5 5. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE 0.34
INSULATION TYPE NI NI
MPa(g) @ 175 °C AND FV @ 175 °C.
NOTE 5
B TRIM SPECIFICATION B1AH04 - NI A2AW - NI
6. 50% OF THE FANS SHALL BE PROVIDED WITH VARIABLE SPEED
B
SIGNAL
DRIVE.
041-0013M NPIC-041-E-0158M
H 7. DELETED.
FROM 041-FIC-0004 041
TI
041-AC-201 8. ORIFICE WITH 47.9 MM HOLE. NPIC-041-E-0098M
0204
NOTE 1, 6 9. CONNECTION FOR TEMPORARY PSV. SET PRESSURE TO BE 1.75
MPa(g).
SIGNAL
041 10. MAXIMUM ALLOWED CV : 45 WHICH IS THE GOVERNING FOR
TT 041-0021M 041-PSV-0202 SIZING CASE.
C STABILIZER OVERHEAD
0204
2"-P-041-0310-B1GH04-NI FROM 041-PIC-0205
C
FREE DRAINING 11. METAL SEATED BUTTERFLY VALVE WITH OPTION CODE "4617".
041-0017M
NPIC-041-E-0121M NPIC-041-E-0108M
FROM 041-C-201 8"-P-041-0095-B1AH04-NI

PERMANENT LINE
6"-P-041-0126-B1AH04-NI 0.75" SUBJECT TO
M M TWO PHASE FLOW
2"-FLG-041-0030-A1GP-NI FLG SERVICE TEST
NO POCKET 041-3501M
041
1000 MIN
D SIZE: 0.75D1 HIC
0201
HYDROGEN RATIO TEST POINT D
PSET: 1.35 MPa(g)

NPIC-041-E-0151M
FLG

FREE DRAINING

FREE DRAINING
041 H
TSV 041 041 041
FI 041-3502M XY XI
0205
FREE DRAINING
0201 0201 0201
1"-V-041-0015-A1AP-NI L L

NOTE 3
041 SIGNAL
NOTE 8 SC
041-0021M
041 0006
041 FT TYPE L3
0.75" FE 0201 041 FROM 041-AI-0201
PV
E E
FREE DRAINING

0201 0204
1" AT GRADE STABILIZER GAS
6"-CWR-041-0014-A2AW-NI 041 FREE DRAINING 4"-P-041-0098-B1AH04-NI A. DELETED.
TO SAFE LOCATION TG 041-0021M
0213 FC
0.75" 2" 0.75" TO 041-C-202
0.75"
CWR 6"-CWR-041-0006-A2AW-NI RS
041-3001M
NOTE 11 041
NPIC-041-E-0121M 041-E-202 PG 1.5" LC
NOTE 11 RS 0210 NOTE 10 NPIC-041-E-0108M
CWS 6"-CWS-041-0007-A2AW-NI INVIEW
F 041-3001M
041 041 H
041
041
PG
F
0.75" PDY PIC PT 0235
0206 0204 0204
6"-CWS-041-0015-A2AW-NI NOTE 9
041 1.5"
TG 1.5"-HPN-041-0004-D1AA-NI
1.5 HPN 041 0004 D1AA HPN
0217 041 NOTE 4 041-3601M
PDI
0206 0.75" 0.75"
L
1.5"-P-041-0274-D1AH04-NI
6" NPIC-041-E-0098M FEED DWG.No.
4"
G G

FREE DRAINING
6"-P-041-0097-B1AH04-NI
FREE DRAINING

NPIC-041-E-0153M
TWO PHASE FLOW

953053-120-20-A1 STABILIZER RECEIVER


DWG.No. Title
REFERENCE DRAWINGS
8"
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
2" SIGNAL
1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041-0020M 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-V-201 6" VH B 11/NOV/13 FOR APPROVAL DMO RKM SMA
TO 041-FIC-0203A
H A 13/JUL/13 FOR REVIEW DMO RKM SMA H
NPIC-041-E-0090M Rev Date Description Prep'd Chk'd App'd
NPIC-041-E-0090M
REVISIONS
Operation Centre JOB Code:
Operation Centre DWG.No.:
041 TYPE 1 TYPE 1 TYPE 1 NPIC-041-E-0090M
041 041 H Contractor JOB Code Responsible Company
LI 041 041
LT MH LT LIC LG 0-6495-20 TPM
0215 L 0215 24" 0203 0203 0204
DP L Prepared by Checked by Approved by
DP MAG
2"-P-041-0248-B1AP04-HC T. T. HUONG T. NGUYEN T. N. SON

LPS 2"-LPS-041-0014-A1AS-HS
I 041-3101M FREE DRAINING MIN. I
0.75" 0.75"
CBD
NPIC-041-E-0090M
NSRP
2" Complex Project
Nghi Son Refinery and Petrochemical
4500 MIN

2"-P-041-0179-B1AP04-NI NC Nghi Son, Vietnam Limited Liability Company

0.75" 2" Drawing Title

J PIPING AND INSTRUMENT DIAGRAM J


PENEX
FREE DRAINING

REFLUX
FOR 041-LG-0204 FREE DRAINING 8"-P-041-0101-B1AP04-NI
041-0020M STABILIZER AND SCRUBBER SECTION
WO
0.75" 0.75" TO 041-P-201A/B STABILIZER RECEIVER
MIN
FREE DRAINING 2"-CBD-041-0011-A2AP-NI
Issue Purpose Document Class
FOR CONSTRUCTION Z
2"-CBD-041-0044-A2AP-NI CBD
K 041-3701M MINI FLOW Unit No. Unit Abbreviation PCWBS Size Scale K
3"-P-041-0180-B1AP04-NI 041 PENX A900 A1 NONE
041-0020M
MINI FLOW

DR01A
Contractor DWG.No. Sheet Rev.
FROM 041-P-201A/B
A1

D-041-1225-0019M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0811M_0_0050 System No. : 041-HPN-01 Package No. : 041-HPN-01-SV-1
Page 10 of 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

SIZE: 6Q8 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-AC-301 041-V-301 PSET: 0.40 MPa(g)
0014V AND D-000-1225-0020V TO 0026V.
041
PSV
DEISOHEXANIZER CONDENSER DEISOHEXANIZER RECEIVER 1. FOR START - UP.
A 0302 FREE DRAINING 8''-FLG-041-0047-A1AP-NI FLG A
CODE ASME VIII DIV 1 / API 661 CODE ASME VIII DIV 1 NPIC-041-E-0093M 2. DELETED.
NPIC-041-E-0158M 041-3503M
SIZE: H.T. AREA 64533 m 2 (FINNED) SIZE: I.D x TT 3000 mm x 10200 mm 3. FOR AIRCOOLER DETAILS, REFER TO DWG. D-041-1225-2311M /
DESIGN DUTY 25986 kW 2312M.
DESIGN PRESSURE 0.40 MPa(g) + FV @ 120°C
0.40 MPa(g) + FV @ 120°C 4. TO BE USED FOR DEGASSING DURING START-UP AND TO VENT
DESIGN PRESSURE DESIGN TEMPERATURE 120°C NOTE 4 NON-CONDENSIBLES. ACCESS TO BE PROVIDED.
DESIGN TEMPERATURE 120°C INSULATION TYPE NI
5. EQUALIZING LINE. REFER TO DWG D-041-1225-2311M/2312M FOR

MIN
NO OF FANS 16 P-041-0303-A1AP04-NI IN VIEW
TRIM SPECIFICATION LAYOUT REQUIREMENT. NPIC-041-E-0158M
TRIM SPECIFICATION A1AP04 - PG P-041-0316-B1AP04-NI 0.75''
B NOTE 6 NOTE 6
2" 6. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
B

FREE DRAINING
7. 50% OF THE FANS SHALL BE PROVIDED WITH VARIABLE SPEED
DRIVE.

8. FOR PRESSURE TEST.


NPIC-041-E-0153M
9. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
12''-P-041-0224-A1AP04-PG CONNECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
SWING ELBOW TO HPN.
NPIC-041-E-0115M
10. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
C C
11. PLUG VALVE

12. LOW LEVEL OF 041-LI-0311 SHALL CLOSE THE VALVES 041-UV-0304


041 AND 041-UV-0309. NPIC-041-E-0115M
PDT
0305 13. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 0.4 MPa(g).
2"-P-041-0249-D1AP04-NI 2"-HPN-041-0005-D1AA-NI
0 0005 HPN
NOTE 8 041-3602M 14. NON-CONDENSIBLE VENT. NPIC-041-E-0158M
041 H
PDIC 0.75'' 0.75''
0305 NPIC-041-E-0153M NPIC-041-E-0115M
PERMANENT LINE
041
D 041 PG IN VIEW 041 SUBJECT TO D
PDV 0320 PG
0305 NOTE 13 SERVICE TEST
DIH OVERHEAD 0076
10"-P-041-0220-A1AP04-PG FREE DRAINING 12" 2"
041-0026M NOTE 9
FC 2"-LPN-041-0010-A1AA-NI LPN TEST POINT
FROM 041-C-301
0.75'' 6'' NOTE 1 041-3603M
NPIC-041-E-0158M NOTE 11
SIGNAL
041 H 1"-P-041-0221-A1AP04-NI NOTE 14 0.75'' 0.75''
041-0026M PIC
041 H NOTE 10
0302
TI
TO 041-PDY-0303
0305B
12"-P-041-0122-A1AP04-NI
E E
041
041 041
PT 041 A. DELETED.
0302 PV
TT TT MIN
0302 0305A 0305B
DIH OVERHEAD
FREE DRAINING 1. DELETED.
041-0026M NPIC-041-E-0093M
FO MINIMUM RUN OF 2. DELETED.
TOP CONNECTION

3"-P-041-0222-A1AP04-NI
FROM 041-C-301
0.75'' 24" HORIZONTAL PIPE

FREE DRAINING
30"-P-041-0106-A1AP04-PG NPIC-041-E-0091M

NOTE 5
F F

FREE DRAINING
M M

MIN
041 H
TIC
041-AC-301 0305A SIGNAL
041 H
NOTE 3, 7
3" 041-V-301 LIC

10"
041-0031M
0305 L
TO 041-FIC-0303
8" VH
FEED DWG.No.
G G
NPIC-041-E-0090M
NPIC-041-E-0158M
NPIC-041-E-0090M
953053-120-29-A1 DEISOHEXANIZER RECEIVER
TYPE 1
041 H 041 041 041 TYPE 1 DWG.No. Title
LI LT TYPE 1 MH LT LG REFERENCE DRAWINGS
NPIC-041-E-0098M NOTE 12 0311 NPIC-041-E-0098M NPIC-041-E-0090M 24" 0305 0306
L 0311 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
DP MAG
3''-LPS-041-0015-A1AS-HS DP 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H LPS A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-3103M Rev Date Description Prep'd Chk'd App'd
CBD REVISIONS
0.75'' 0.75'' NPIC-041-E-0090M
Operation Centre JOB Code:
3''-P-041-0250-A1AP04-HC FREE DRAINING
ISOMERATE
Operation Centre DWG.No.:
14"-P-041-0120-A1AP04-NI
041-0031M
7800 MIN

Contractor JOB Code Responsible Company


TO 041-P-301A/B 0-6495-20 TPM
Prepared by Checked by Approved by
CLOSED BLOWDOWN
2"-P-041-0121-A1AP04-NI T. T. HUONG T. NGUYEN T. N. SON
041-0031M

I FROM 041-P-301B
I
0.75" SIGNAL
041-0032M
3"
TO DRCS CONTROL NSRP
OF 041-UV-0304 Complex Project
Nghi Son Refinery and Petrochemical
SIGNAL Nghi Son, Vietnam Limited Liability Company
041-0032M
FREE DRAINING

WO Drawing Title
TO 041-US-0309
J PIPING AND INSTRUMENT DIAGRAM J
3"-CBD-041-0017-A2AP-NI NPIC-041-E-0098M PENEX

FOR 041-LG-0306
DEISOHEXANIZER SECTION
CBD DEISOHEXANIZER RECEIVER
041-3702M
0.75" 0.75"
CLOSED BLOWDOWN MIN Issue Purpose Document Class
2"-CBD-041-0045-A2AP-NI FREE DRAINING
041-0026M FOR CONSTRUCTION Z
K FROM 041-LG-302, 304
Unit No. Unit Abbreviation PCWBS Size Scale K
MANIFOLD NPIC-041-E-0127M 041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0030M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
PJ Name: NSRP Complex Project Attachment: S-000-1730-0811M_0_0060
Contractor JOB Code: 0-6495-20 Contractor Doc No.: S-000-1730-0811M_0

PRE-COMMISSIONING
TIGHTNESS TEST/ INERTING
LIST OF CONTROL VALVE/ ON-OFF VALVE/ MOTOR OPERATED VALVES TO BE FORCED OPEN
SYSTEM No : Services Test/Inerting Package No.:

SYSTEM Name : LOCATION :


Overridden by Reinstatement
Valve Tag no. Reference P&ID
DATE CONTRACTOR EMPLOYER DATE CONTRACTOR EMPLOYER

Remarks :

INSPECTORS Subcontactor (HOLD) Contractor (HOLD) Employer (NSRP)


NAME
SIGNATURE
DATE