1. Routine Maintenance
2. Troubleshooting
3. Replacing Components
1. Routine Maintenance
1.1 CCS Routine Maintenance
Do not maintain devices on raining days; otherwise, water may enter and
damage devices.
Before maintenance, get familiar with the site and prepare maintenance
tools.
Before maintaining the PowerCube 1000, maintenance engineers need to get familiar with the
installation procedure.
To ensure the optimal operating status of ESMs, check and maintain ESMs regularly. When maintaining
ESMs, record related information for checking ESM management parameters in the future.
Install ESMs in a dry and, clean, and ventilated environment that is far away from sources of ignition.
Keep ESMs away from strong infrared radiation, organic solvents, and corrosive gases.
Measure and record the busbar voltage and the positive and negative voltages of ESMs when
charging is about to complete. Ensure that the voltages are the same. If the voltages are
different, check for cable faults and rectify them.
Semi-annual Voltage
In the first year, collect real-time data when discharging is about to complete at least once
every six months. If a network management system is configured, collect data remotely.
From the second year, check the capacity quarterly.
1. Routine Maintenance
2. Troubleshooting
3. Replacing Components
2. Troubleshooting
2.1 General Troubleshooting Process
Key Points:
• Record every key procedure on implement the solution in order to
provide references for problem-solving.
The SPD indication window turns red. The SPD is damaged. Replace the AC SPD.
The green The PSU has no AC input. Check that the AC input voltage is normal.
is steady on. The PSU powers off due to overtemperature. Ensure that the ventilation vent is unblocked.
The PSU generates no output due to internal faults. Replace the PSU.
The power cable is not Check that the power cable properly connects to the
The indicators are off and
connected. BCU-1203A and turn on the power switch.
the BCU-1203A has no
A short circuit exists inside the If the power cable is properly connected, replace the
output. BCU-1203A. BCU-1203A.
DC input overvoltage or Adjust the DC input voltage to the normal range. Then the
The ALM indicator is on and
undervoltage occurs. BCU-1203A protection is automatically canceled.
the BCU-1203A has no
Overtemperature protection is Improve the ventilation condition. Then the BCU-1203A
output.
triggered. protection is automatically canceled.
The SMU02C breaks down or cannot be started. The LCD display is abnormal.
The buttons cannot be operated.
The SMU02C does not generate an alarm when a fault occurs in the system.
Communication is interrupted when the SMU02C monitors subordinate equipment. The SMU02C is Replace the
damaged. SMU02C.
The SMU02C fails to control or monitor all modules when these modules run
properly and communications cables are connected properly.
indicator blinks at 0.5 alarm The ATS main control box Replace the ATS main
is faulty. control box.
Hz).
A circuit breaker is faulty due to The circuit breaker is in a position Switch the circuit breaker to OFF
the inverter is powered on. The DC input power cable is connected tolerance of ±1 V DC.
reversely. Connect the DC input power cable
correctly.
Adjust the DC voltage to the normal
range of 47 V DC to 54 V DC with a
The DC input voltage is less than the
Undervoltage protection is tolerance of ±1 V DC.
minimum value.
triggered immediately after the Increase the cable diameter or
The busbar impedance is greater than
inverter is powered on and loads decrease the cable length to reduce
the maximum value.
the busbar impedance.
are added. The DC loop cable is loose.
Check that the cable connections are
secure.
1. Routine Maintenance
3. Replacing Components
3. Replacing Components
3.1 Replacing an SMU02C 3.11 Replacing an ATS Main Control Box
3.2 Replacing a UIM02C 3.12 Replacing an SAU
3.3 Replacing an NIM02D 3.13 Replacing a BC-1206A Surge Protection Board
Step 2 Remove the communications cable from the SMU02C panel and record the cable information.
Step 5 Take off the SD card from the side of the SMU02C. If no SD is installed, go to Step 7.
Step 7 Place the new SMU02C in the slot, push the locking latch leftwards, and pull out the handle.
Step 8 Gently push the SMU02C along guide rails until it is engaged. Close the handle, and push the locking latch rightwards.
Step 10 Reconnect the communications cable to the SMU02C panel based on the recorded cable information.
ESD gloves.
Step 2 Record the position of the signal cable connected to the UIM02C panel, and then
Step 4 Disconnect the –48 V power cable from the UIM02C board.
Step 8 Connect all the cables on the UIM02C board to the new UIM02C based
on the recorded information. Step 9 Reconnect the –48 V power cable to the
UIM02C board.
Step 11 Reconnect signal cables to the new UIM02C panel based on the
recorded information.
Step 12 Disconnect the ground cable of the ESD wrist strap, and remove the ESD wrist strap
Step 3 Loosen the screws on both sides of the NIM02D panel and pull out
the NIM02D.
Step 4 Disconnect the power cables between the NIM02D board and the
Step 5 Unscrew the NIM02D from the UIM02C board and take out the
UIM02C board.
Step 6 Push the new NIM02D board in place and secure it with holes
aligned.
Step 7 Connect power cables between the power port on the NIM02D
Step 8 Push the UIM02C into the subrack until its front panel is flush
Step 9 Connect the cables to the new NIM02D panel based on the
recorded information.
Step 10 Disconnect the ground cable of the ESD wrist strap, and
Step 2 Record the positions where signal cables connect to the NIM01C3 panel, and then disconnect the signal cables.
Step 6 Place the new NIM01C3 at the entry to the appropriate slot in the monitoring unit subrack, and push the NIM01C3 until its front panel
Step 7 Push the handle inwards until it is engaged, and then tighten the screws.
Step 8 Connect the cables to the new NIM01C3 panel based on the recorded information.
Step 2 Record the connection positions of cables on the CIM02C panel and disconnect the cables.
Step 4 Pull the handle rightwards and take out the CIM02C.
Step 5 Place the new CIM02C at the entry to the appropriate slot in the monitoring unit subrack, and push the CIM02C until its front
panel is flush with the front panel of the monitoring unit subrack.
Step 6 Push the handle inwards until it is engaged, and then tighten the screws.
Step 7 Connect the cables to the new CIM02C panel based on the recorded information.
Step 2 Record the connection positions of cables on the GIM01C panel and disconnect the cables.
Step 4 Pull the handle rightwards and take out the GIM01C.
Step 5 Place the new GIM01C at the entry to the appropriate slot in the monitoring unit subrack, and push the GIM01C until its front
panel is flush with the front panel of the monitoring unit subrack.
Step 6 Push the handle inwards until it is engaged, and then tighten the screws.
Step 7 Connect the cables to the new GIM01C panel based on the recorded information.
Step 2 Push the locking latch on the right side of the PSU panel towards the left.
Step 3 Gently pull the handle outwards, and then remove the rectifier from the subrack.
Step 4 Push the locking latch on the new PSU towards the left, and pull out the handle.
Step 6 Gently slide the PSU into the slot along the guide rails until it is engaged. Close the handle, and push the locking latch towards
Step 4 Connect the AC power supply and check that the AC SPD alarm has been cleared.
Step 5 Check whether the AC SPD is running properly by viewing the indication window color. If the
Step 2 Remove the cables or copper bars from the circuit breaker using a Phillips screwdriver, and then insulate the cables or copper
Step 3 Push the contact plate at the bottom of the circuit breaker downwards using a flat-head screwdriver and remove the circuit
breaker.
circuit breaker in the correct position. Then push the contact plate upwards.
Step 5 Use a Phillips screwdriver to connect the cables or copper bars to the new circuit breaker as they were originally installed.
Step 6 Reconnect the power input to the circuit breaker and switch the circuit breaker to ON
Step 1 Connect the ground cable of the ESD wrist strap, and wear the
Step 3 Disconnect cables from the faulty main control box. Insulate each cable and label it immediately after
disconnecting it.
Step 4 Remove the faulty main control box and install the new main control box:
1. Loosen the two captive screws on the panel of the faulty main control box using a screwdriver. Hold the ejector
lever and pull out the main control box.
2. Hold the ejector lever of the replacement main control box and insert the main control box into the ATS subrack
until its front panel aligns with that of the ATS subrack.
3. Close the ejector lever.
4. Tighten the captive screws clockwise using a screwdriver.
Step 5 Reconnect the cables to the new main control box based on the
cable labels.
Step 1 Connect the ground cable of the ESD wrist strap, and wear the ESD wrist strap and ESD gloves.
Step 2 Disconnect the SAU-03A cables, record the cable information, and label them.
1. Disconnect the SAU-03A power cables.
2. Disconnect the SAU-03A communications cables.
3. Disconnect the SAU-03A ground cable.
Step 4 Take out the new SAU-03A and install it on the rack.
Step 6 Disconnect the ground cable of the ESD wrist strap, and remove the ESD wrist strap and ESD gloves.
Step 2 Record the cable connection positions on the BC-1206A and disconnect the cables.
Step 6 Record the cable connection positions on the surge protection board and remove the screws that secure the cables.
Step 2 Record the cable connection positions on the BC-1206A and disconnect the cables.
Step 6 Record the cable connection positions on the surge protection board and remove the screws that secure the cables.
Step 8 Remove the surge protection board. Step 9 Install the new surge protection board on the tray.
Step 11 Connect the cables to the surge protection board based on the
recorded information.
information.
Step 15 Remove the ESD wrist strap or gloves and put all the tools away.
Step 2 Disconnect the temperature and humidity sensor cable from the TEM-
Step 5 Connect the temperature and humidity sensor cable to the TEM-HUM
2. Hold down the buckle on the smoke sensor and push the smoke sensor in the OPEN direction.
Step 2 Disconnect the water sensor cable from the WATER terminal on the UIM02C panel.
Step 3 Cut off the cable tie of the water sensor and remove the water sensor.
Step 4 Place and bind the new water sensor 5 mm to 10 mm away from the
cabinet bottom.
Step 5 Connect the water sensor cable to the WATER terminal on the
UIM02C panel.
Step 6 Disconnect the ground cable of the ESD wrist strap, and remove the