Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

Design of RCC Bedding, Joint

Boxing, and Manhole


of a Sewer Line from
Rajpur Khadar to Shyamkuti

Reference Letter No.: 812/ Contract/19


Dated: 16.7.2022
Contract No.1/GM-DSU/2022-23

For
Drainage & Sewerage Unit
U.P. Jal Nigam (Urban)
Water Works Compound
Krishnanagar, Mathura

Design Submitted by

M/s Project India


69, Dayal Bagh,
Sarla Bagh, Agra
Design of RCC Bedding of Ductile Iron Pipes

DESIGN OF BEDDING FOR DUCTILE IRON SEWER LINE OF DN500K9

Data Supplied by the Client


Invert Levels 5 to 8 m

Data as per Soil Investigation Report


3
Unit weight of soil above water table 15.4 kN/m
3
Saturated Unit weight of soil 20 kN/m

DN500 k9 Properties supplied by the Manufacturer


Internal Diameter (Di) 500 mm
Outer Diameter (Do) 532 mm
Thickness (t) 9 mm
Allowable Ovalization (∆) 3.25 %
Diameteral Stiffness 52 kN/m2
Weight per m 100 kg/m

1. Computation of the Load

Considering NEGATIVE PROJECTING CONDUIT

(a) Using Marston's Formula 𝑊𝑊𝑐𝑐 = 𝐶𝐶𝑛𝑛 𝑤𝑤𝐵𝐵𝑑𝑑2

W c Load on the conduit in kg/m


B d Width of trench in m
3
w Unit weight of soil in kg/m 1540
Load coefficient, which is a function of the ratio
(H/Bd) of the height of fill and the width of trench
equal to the projection ratio p (Vertical distance from
Cn
the firm ground surface down to the top of the
conduit/width of the trench) and the settlement ratio
rsd given by the expression
p= 2
r sd = -0.3 (As per CPHEEO manual)

Bd (i) (1.25*Do) 665 mm


(ii) Do+200 732 mm
Adopting max and rounding 740 mm

For Excavation Refer Attached Drawing No. PROJ./UPJN/RCCB/03


Design of RCC Bedding of Ductile Iron Pipes

H (m) 6 7.5
H' (m) 5.468 6.968
H'/B d 7.39 9.42
C n (As per CPHEEO manual: Fig. 3.36) 3.2 5
Load on the conduit 26.99 42.17 kN/m
𝑊𝑊𝑐𝑐 = 𝐶𝐶𝑛𝑛 𝑤𝑤𝐵𝐵𝑑𝑑2 = 3.2(𝑜𝑜𝑜𝑜 5) × 15.4 × 0.842

Load due to fluid in the pipe 1.47 1.47 kN/m


𝜋𝜋 2 3 𝜋𝜋 3
𝑊𝑊𝑤𝑤 = 𝐷𝐷 𝛾𝛾 = × 0.52 × × 10
4 𝑖𝑖 4 𝑤𝑤 4 4

Load due to self-weight of the pipe as per manufacturer 1.00 1.00 kN/m

Total Design Load (W c +W w +W p ) 29.46 44.64 kN/m

2. Bedding Type

Ovalization of DI pipes according to EN 545 2010(E) (Annex F)


100𝐾𝐾(𝑃𝑃𝑒𝑒 + 𝑃𝑃𝑡𝑡 )
∆=
8𝑆𝑆 + 𝑓𝑓𝑓𝑓𝑓

∆ pipe ovalization (%)


K bedding factor 0.09
pressure from earth loading, in kilonewtons per square
Pe 109.36 139.36
metre = γ sat ×H'
pressure from traffic loading, in kilonewtons per square
Pt 0
metre (No traffic in this case)
S pipe diametral stiffness, in kilonewtons per square metre 52
factor of lateral pressure (f = 0.061, according to the
f 0.061
IOWA-Spangler model)

E' modulus of soil reaction, in kilonewtons per square metre 5000

100 × 0.09(139.36 + 0)
∆= 1.739584 < 3.25 SAFE
8 × 52 + 0.061 × 5000

Getting three-edge bearing strength from ovalization


8𝑆𝑆 + 𝑓𝑓𝐸𝐸 ′ ∆𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎
𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡 − 𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒 𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 = × 𝐷𝐷𝑜𝑜 = 138.512 kN/m
100𝐾𝐾

As the equivalent three-edge bearing strength of the pipe is very high as compared to the
design loads, and as per the site condition observed in the soil report, a uniform bedding with
minimum reinforcement i.e. 0.4% shall be considered to be most appropriate for such sites.

Hence Providing Reinforced Concrete Cradle (RCCB) Bedding with 0.4% reinforcement
Design of RCC Bedding of Ductile Iron Pipes

3. Bedding Size and Material

Width 740 mm
Thickness below invert level of Pipe 125 mm
Thickness above invert level of Pipe 125 mm
Concrete M20
2
Main Reinforcing Steel of Fe500 0.40% 500 mm /m
2
Providing 12mm φ @ 200mm c/c 565 mm /m
Secondary Reinforcement: Providing 4# 10mm φ

Refer Attached Drawing No. PROJ./UPJN/RCCB/01


Design of RCC Bedding of Ductile Iron Pipes

DESIGN OF BEDDING FOR DUCTILE IRON SEWER LINE OF DN600K9

Data Supplied by the Client


Invert Levels 6 to 7.5 m

Data as per Soil Investigation Report


3
Unit weight of soil above water table 15.4 kN/m
3
Saturated Unit weight of soil 20 kN/m

DN600 k9 Properties supplied by the Manufacturer


Internal Diameter (Di) 600 mm
Outer Diameter (Do) 635 mm
Thickness (t) 9.9 mm
Allowable Ovalization (∆) 3.55 %
Diameteral Stiffness 41 kN/m2
Weight per m 140 kg/m

1. Computation of the Load

Considering NEGATIVE PROJECTING CONDUIT

(a) Using Marston's Formula 𝑊𝑊𝑐𝑐 = 𝐶𝐶𝑛𝑛 𝑤𝑤𝐵𝐵𝑑𝑑2

W c Load on the conduit in kg/m


B d Width of trench in m
3
w Unit weight of soil in kg/m 1540
Load coefficient, which is a function of the ratio
(H/Bd) of the height of fill and the width of trench
equal to the projection ratio p (Vertical distance from
Cn
the firm ground surface down to the top of the
conduit/width of the trench) and the settlement ratio
rsd given by the expression
p= 2
r sd = -0.3 (As per CPHEEO manual)

Bd (i) (1.25*Do) 793.75 mm


(ii) Do+200 835 mm
Adopting max and rounding 840 mm

For Excavation Refer Attached Drawing No. PROJ./UPJN/RCCB/03


Design of RCC Bedding of Ductile Iron Pipes

H (m) 6 7.5
H' (m) 5.365 6.865
H'/B d 6.39 8.17
C n (As per CPHEEO manual: Fig. 3.36) 3.4 4.2
Load on the conduit 36.95 45.64 kN/m
𝑊𝑊𝑐𝑐 = 𝐶𝐶𝑛𝑛 𝑤𝑤𝐵𝐵𝑑𝑑2 = 3.4(𝑜𝑜𝑜𝑜 4.2) × 15.4 × 0.842

Load due to fluid in the pipe 2.12 2.12 kN/m


𝜋𝜋 2 3 𝜋𝜋 3
𝑊𝑊𝑤𝑤 = 𝐷𝐷 𝛾𝛾 = × 0.62 × × 10
4 𝑖𝑖 4 𝑤𝑤 4 4

Load due to self-weight of the pipe as per manufacturer 1.40 1.40 kN/m

Total Design Load (W c +W w +W p ) 40.47 49.16 kN/m

2. Bedding Type

Ovalization of DI pipes according to EN 545 2010(E) (Annex F)


100𝐾𝐾(𝑃𝑃𝑒𝑒 + 𝑃𝑃𝑡𝑡 )
∆=
8𝑆𝑆 + 𝑓𝑓𝑓𝑓𝑓

∆ pipe ovalization (%)


K bedding factor 0.09
pressure from earth loading, in kilonewtons per square
Pe 107.3 137.3
metre = γ sat ×H'
pressure from traffic loading, in kilonewtons per square
Pt 0
metre (No traffic in this case)
S pipe diametral stiffness, in kilonewtons per square metre 41
factor of lateral pressure (f = 0.061, according to the
f 0.061
IOWA-Spangler model)

E' modulus of soil reaction, in kilonewtons per square metre 5000

100 × 0.09(137.3 + 0)
∆= 1.952133 < 3.55 SAFE
8 × 41 + 0.061 × 5000

Getting three-edge bearing strength from ovalization


8𝑆𝑆 + 𝑓𝑓𝐸𝐸 ′ ∆𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎
𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡 − 𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒 𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 = × 𝐷𝐷𝑜𝑜 = 158.549 kN/m
100𝐾𝐾

As the equivalent three-edge bearing strength of the pipe is very high as compared to the
design loads, and as per the site condition observed in the soil report, a uniform bedding with
minimum reinforcement i.e. 0.4% shall be considered to be most appropriate for such sites.

Hence Providing Reinforced Concrete Cradle (RCCB) Bedding with 0.4% reinforcement
Design of RCC Bedding of Ductile Iron Pipes

3. Bedding Size and Material

Width 840 mm
Thickness below invert level of Pipe 150 mm
Thickness above invert level of Pipe 150 mm
Concrete M20
2
Main Reinforcing Steel of Fe500 0.40% 600 mm /m
2
Providing 16mm φ @ 300mm c/c 670 mm /m
Secondary Reinforcement: Providing 5# 10mm φ

Refer Attached Drawing No. PROJ./UPJN/RCCB/02


Design of Manhole

DESIGN OF 8m DEEP MANHOLE OF 1500MM DIAMETER

Data Provided/ Assumed


Saturated unit weight of Soil, γsat 20 kN/m3
Angle of Internal Friction, φ 23 Degree
Maximum Depth, h 8000 mm 8m
Thickness, t 200 mm 0.2 m
Internal Diameter, Di 1500 mm 1.5 m
Outer Diameter, Do 1900 mm 1.9 m
D/d ratio 7.5 Hence THICK CYLINDER
Unit weight of RCC, γconc 25 kN/m3
Grade of Concrete, fck 30 MPa
Grade of Steel, fy 500 MPa
Unit width, b 1000 mm 1m
Modular Ratio,m 9.33

WALL DESIGN

Condition 1: Manhole is empty and outside soil is saturated

Calculation of Lateral Pressure (No Traffic Load)


Pressure at Rest,
𝑘𝑘𝑂𝑂 = 1 − sin 𝜑𝜑 = 0.61

Earth Pressure at 8m
2
𝑝𝑝𝑂𝑂 = 𝑘𝑘𝑜𝑜 𝛾𝛾 ′ ℎ + 𝛾𝛾𝑤𝑤 ℎ = 86.09 kN/m
0.09 MPa

Maximum Hoop/Compressive Stress at outer face


𝐷𝐷𝑜𝑜2 + 𝐷𝐷𝑖𝑖2
𝜎𝜎ℎ = 𝑝𝑝𝑜𝑜 = 0.371 MPa Hence safe
𝐷𝐷𝑜𝑜2 − 𝐷𝐷𝑖𝑖2

Hence Minimum Area of Hoop Reinforcement can be provided

0.12 0.12 2
𝐴𝐴𝑠𝑠𝑠𝑠(𝑚𝑚𝑚𝑚𝑚𝑚) = 𝑏𝑏𝑏𝑏 = × 1000 × 200 = 240 mm on each face
100 100
2
Hence Providing Hoop steel 12T@200c/c 565 mm on each face

Check for Longitudinal Compressive Stress


𝐷𝐷𝑜𝑜2 1.92
𝜎𝜎𝑧𝑧 = 𝑝𝑝𝑜𝑜 = 0.09 × = 0.229 MPa < 8.0 MPa
𝐷𝐷𝑜𝑜2 − 𝐷𝐷𝑖𝑖2 1.92 − 1.52

Check due to Pressure of Wall on base slab

2
𝜎𝜎 = 𝛾𝛾𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 × 𝐻𝐻 = 25 × 8 = 200 kN/m
0.200 MPa < 8.0 MPa
Design of Manhole

Condition 2: Manhole is full of water and outside No soil

Max. Hoop Tension as per IS-3370 part 4 2013 (Table 9)


𝐷𝐷𝑖𝑖 1.5
𝑇𝑇 = 𝑘𝑘1 𝛾𝛾𝑤𝑤 𝐻𝐻 = 1 × 10 × 8 × = 60 kN/m
2 2

(Max value of k 1 is considered)

Area of Reinforcement
𝑇𝑇 60 × 103 2 2
𝐴𝐴𝑠𝑠𝑠𝑠 = = = 218.18 mm < 565 mm
𝜎𝜎𝑠𝑠𝑠𝑠 275
Hence Provided Reinforcement is sufficient

Check for Tensile Stress in Concrete


𝑇𝑇
𝜎𝜎𝑐𝑐𝑐𝑐 =
𝐴𝐴𝑔𝑔 + 𝑚𝑚 − 1 𝐴𝐴𝑠𝑠𝑠𝑠

60 × 103
= = 0.287 MPa < 1.5MPa
1000 × 200 + 8.33 × 2 × 565

Max. Moment as per IS-3370 part 4 2013 (Table 10)

𝑀𝑀 = 𝑘𝑘2 × 𝛾𝛾𝑤𝑤 ℎ3 = 0.01 × 10 × 83 = 40.960 kNm/m

Check for Thickness of Wall


𝑀𝑀𝑢𝑢 (= 1.5𝑀𝑀)
t= = 124.091 mm
0.133 × 𝑓𝑓𝑐𝑐𝑐𝑐 × 1000
160 mm Adopted

Providing total thickness = 160 + 40 cover = 200 mm

Area of Reinforcement in the walls

𝐴𝐴𝑠𝑠𝑠𝑠 𝑓𝑓𝑦𝑦
𝑀𝑀𝑢𝑢 = 0.87𝑓𝑓𝑦𝑦 𝐴𝐴𝑠𝑠𝑠𝑠 𝑡𝑡 1 −
𝑏𝑏𝑏𝑏𝑓𝑓𝑐𝑐𝑐𝑐
Trial for Ast
2
Ast (mm ) LHS RHS
500 61440000 32987500
800 61440000 51040000
1000 61440000 62350000

Vetical Reinforcement:
2
Providing 12T@150c/c on both faces 1506.667 >1000 mm
Design of Manhole

Check for Shear Force at junction of wall and bed


as per IS-3370 part 4 2013 (Table 11)

V = 𝑘𝑘3 × 𝛾𝛾𝑤𝑤 𝐻𝐻 2 = 0.1 × 10 × 82 = 64 kN/m

Shear Stress
𝑉𝑉𝑢𝑢 1.5 × 64
𝜏𝜏𝑣𝑣 = = = 0.48 MPa < 3.5MPa
𝑏𝑏𝑏𝑏 1000 × 200

Refer Attached Drawing No. PROJ./UPJN/MH/01

BASE SLAB PROVIDED WITH NOMINAL REINFORCEMENT AT TOP

Top Reinforcement of Base Slab: 12T @ 200c/c bothways


Design of Manhole

DESIGN OF 5-7m DEEP MANHOLE OF 1500MM DIAMETER

Data Provided/ Assumed


Saturated unit weight of Soil, γsat 20 kN/m3
Angle of Internal Friction, φ 23 Degree
Maximum Depth, h 7000 mm 7m
Thickness, t 200 mm 0.2 m
Internal Diameter, Di 1500 mm 1.5 m
Outer Diameter, Do 1900 mm 1.9 m
D/d ratio 7.5 Hence THICK CYLINDER
Unit weight of RCC, γconc 25 kN/m3
Grade of Concrete, fck 30 MPa
Grade of Steel, fy 500 MPa
Unit width, b 1000 mm 1m
Modular Ratio,m 9.33

WALL DESIGN

Condition 1: Manhole is empty and outside soil is saturated

Calculation of Lateral Pressure (No Traffic Load)


Pressure at Rest,
𝑘𝑘𝑂𝑂 = 1 − sin 𝜑𝜑 = 0.61

Earth Pressure at 8m
2
𝑝𝑝𝑂𝑂 = 𝑘𝑘𝑜𝑜 𝛾𝛾 ′ ℎ + 𝛾𝛾𝑤𝑤 ℎ = 76.09 kN/m
0.08 MPa

Maximum Hoop/Compressive Stress at outer face


𝐷𝐷𝑜𝑜2 + 𝐷𝐷𝑖𝑖2
𝜎𝜎ℎ = 𝑝𝑝𝑜𝑜 = 0.328 MPa Hence safe
𝐷𝐷𝑜𝑜2 − 𝐷𝐷𝑖𝑖2

Hence Minimum Area of Hoop Reinforcement can be provided

0.12 0.12 2
𝐴𝐴𝑠𝑠𝑠𝑠(𝑚𝑚𝑚𝑚𝑚𝑚) = 𝑏𝑏𝑏𝑏 = × 1000 × 200 = 240 mm on each face
100 100
2
Hence Providing Hoop Steel 12T@200c/c 565 mm on each face

Check for Longitudinal Compressive Stress


𝐷𝐷𝑜𝑜2 1.92
𝜎𝜎𝑧𝑧 = 𝑝𝑝𝑜𝑜 = 0.08 × = 0.202 MPa < 8.0 MPa
𝐷𝐷𝑜𝑜2 − 𝐷𝐷𝑖𝑖2 1.92 − 1.52

Check due to Pressure of Wall on base slab

2
𝜎𝜎 = 𝛾𝛾𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 × 𝐻𝐻 = 25 × 7 = 175 kN/m
0.175 MPa < 8.0 MPa
Design of Manhole

Condition 2: Manhole is full of water and outside No soil

Max. Hoop Tension as per IS-3370 part 4 2013 (Table 9)


𝐷𝐷𝑖𝑖 1.5
𝑇𝑇 = 𝑘𝑘1 𝛾𝛾𝑤𝑤 𝐻𝐻 = 1 × 10 × 7 × = 52.5 kN/m
2 2

(Max value of k 1 is considered)

Area of Reinforcement
𝑇𝑇 52.5 × 103 2 2
𝐴𝐴𝑠𝑠𝑠𝑠 = = = 190.91 mm < 565 mm
𝜎𝜎𝑠𝑠𝑠𝑠 275
Hence Provided Reinforcement is sufficient

Check for Tensile Stress in Concrete


𝑇𝑇
𝜎𝜎𝑐𝑐𝑐𝑐 =
𝐴𝐴𝑔𝑔 + 𝑚𝑚 − 1 𝐴𝐴𝑠𝑠𝑠𝑠

52.5 × 103
= = 0.251 MPa < 1.5MPa
1000 × 200 + 8.33 × 2 × 565

Max. Moment as per IS-3370 part 4 2013 (Table 10)

𝑀𝑀 = 𝑘𝑘2 × 𝛾𝛾𝑤𝑤 ℎ3 = 0.01 × 10 × 73 = 27.440 kNm/m

Check for Thickness of Wall


𝑀𝑀𝑢𝑢 (= 1.5𝑀𝑀)
t= = 99.710 mm
0.133 × 𝑓𝑓𝑐𝑐𝑐𝑐 × 1000
160 mm Adopted uniform

Providing total thickness = 160 + 40 cover = 200 mm

Area of Reinforcement in the walls

𝐴𝐴𝑠𝑠𝑠𝑠 𝑓𝑓𝑦𝑦
𝑀𝑀𝑢𝑢 = 0.87𝑓𝑓𝑦𝑦 𝐴𝐴𝑠𝑠𝑠𝑠 𝑡𝑡 1 −
𝑏𝑏𝑏𝑏𝑓𝑓𝑐𝑐𝑐𝑐
Trial for Ast
2
Ast (mm ) LHS RHS
800 41160000 51040000
700 41160000 45167500
650 41160000 42176875

Vertical Reinforcement:
2
Providing 12T@200c/c on both faces 1130 >650 mm
Design of Manhole

Check for Shear Force at junction of wall and bed


as per IS-3370 part 4 2013 (Table 11)

V = 𝑘𝑘3 × 𝛾𝛾𝑤𝑤 𝐻𝐻 2 = 0.1 × 10 × 72 = 49 kN/m

Shear Stress
𝑉𝑉𝑢𝑢 1.5 × 64
𝜏𝜏𝑣𝑣 = = = 0.3675 MPa < 3.5MPa
𝑏𝑏𝑏𝑏 1000 × 200

Refer Attached Drawing No. PROJ./UPJN/MH/02

BASE SLAB PROVIDED WITH NOMINAL REINFORCEMENT AT TOP

Top Reinforcement of Base Slab: 12T @ 200c/c bothways


Joint Boxing and Design of Manhole

JOINT BOXING

AS PER MANUFACTURER (JAI BALAJI INDUSTRIES), THERE IS NO NEED TO PROVIDE JOINT BOXING IN DUCTILE
IRON PIPES IF THE PIPES ARE PROPERLY SEALED AND HAVE 180 DEGREE LINE, HOWEVER, DEPENDING UPON
THE SITE CONDITION AND AT ANY BEND ETC, BOX JOINTING MAY BE PROVIDED (Drawing No.
PROJ./UPJN/RCCB/03).

DESIGN OF PRECAST MANHOLE OF 1500MM DIAMETER

3
Saturated unit weight of Soil, γsat 20 kN/m
Angle of Internal Friction, φ 23 Degree
Maximum Depth, h 8m

Calculation of Lateral Pressure (No Traffic Load)

Rankine's Active Earth Pressure Coefficient,


1 − sin 𝜑𝜑
𝑘𝑘𝑎𝑎 = = 0.44
1 + sin 𝜑𝜑
Active Earth Pressure at 8m
2
𝑝𝑝𝑎𝑎 = 𝑘𝑘𝑎𝑎 𝛾𝛾 ′ ℎ + 𝛾𝛾𝑤𝑤 ℎ = 84.38 kN/m
0.08 MPa

Checking for Hoop Strength of Precast Annular Panel:

Thickness 15 mm
Internal Diameter, Di 1500 mm
Outer Diameter, Do 1530 mm
Length 1000 mm
D/d ratio 100 Hence THIN CYLINDERICAL SHELL

Maximum Hoop/Compressive Stress in Concrete of M30


𝑝𝑝𝑎𝑎 𝐷𝐷𝑜𝑜
𝜎𝜎ℎ = = 4.30 MPa Hence verymuch safe
2𝑡𝑡

1530mm
3.7MPa

4.2MPa

Pressure variation around most bottom Precast Rim to be used in Manholes


Joint Boxing and Design of Manhole

Reinforcement Detail of Precast Base Slab

Bottom Reinforcement of Precast Base Slab: 12T @ 200c/c bothways

Top Reinforcement of Precast Base Slab: Radial- 24# 12T 300mm long; Circular- 2# 8T

Refer Attached Drawing No. PROJ./UPJN/MH/03

Note: The Base Slab reinforcement is as per CPHEEO drawings.


CLIENT:-
U.P JAL NIGAM, MATHURA

CONTRACTOR:-
M/s PROJECT INDIA
69 Dayal Bagh
Sarla Bagh, Agra

DRAWING TITLE:

SCALE: NOT TO SCALE


DWG.NO. :-
PROJ./UPJN/RCCB/01
CLIENT:-
U.P JAL NIGAM, MATHURA

CONTRACTOR:-
M/s PROJECT INDIA
69 Dayal Bagh
Sarla Bagh, Agra

DRAWING TITLE:

SCALE: NOT TO SCALE


DWG.NO. :-
PROJ./UPJN/RCCB/02
CLIENT:-
U.P JAL NIGAM, MATHURA

CONTRACTOR:-
M/s PROJECT INDIA
69 Dayal Bagh
Sarla Bagh, Agra

DRAWING TITLE:

SCALE: NOT TO SCALE


DWG.NO. :-
PROJ./UPJN/RCCB/03
CLIENT:-
U.P JAL NIGAM, MATHURA

CONTRACTOR:-
M/s PROJECT INDIA
69 Dayal Bagh
Sarla Bagh, Agra

DRAWING TITLE:

SCALE: NOT TO SCALE


DWG.NO. :-
PROJ./UPJN/RCCB/04
CLIENT:-
U.P JAL NIGAM, MATHURA

CONTRACTOR:-
M/s PROJECT INDIA
69 Dayal Bagh
Sarla Bagh, Agra
DRAWING TITLE:
1500 mm DIA.RCC MANHOLE
8.0M DEPTH

SCALE: NOT TO SCALE


DWG.NO. :-
PROJ./UPJN/MH/01
CLIENT:-
U.P JAL NIGAM, MATHURA

CONTRACTOR:-
M/s PROJECT INDIA
69 Dayal Bagh
Sarla Bagh, Agra
DRAWING TITLE:
1500 mm DIA.RCC MANHOLE
5M TO 7M DEPTH

SCALE: NOT TO SCALE


DWG.NO. :-
PROJ./UPJN/MH/02
CLIENT:-
U.P JAL NIGAM, MATHURA

CONTRACTOR:-
M/s PROJECT INDIA
69 Dayal Bagh
Sarla Bagh, Agra
DRAWING TITLE:

1500 mm DIA.RCC MANHOLE

SCALE: NOT TO SCALE


DWG.NO. :-
PROJ./UPJN/MH/03