1.4.1 Crosshead pin & bearing No.1 16/Nov/19 15 73,858 60 90,000 Nov/2024
1.4.2 Crosshead pin & bearing No.2 16/Aug/20 6 73,858 60 90,000 Aug/2025
1.4.3 Crosshead pin & bearing No.3 16/Nov/19 15 73,858 60 90,000 Nov/2024
1.4.4 Crosshead pin & bearing No.4 16/Aug/20 6 73,459 60 90,000 Aug/2025
1.4.5 Crosshead pin & bearing No.5 16/Aug/20 6 73,459 60 90,000 Aug/2025
1.4.6 Crosshead pin & bearing No.6
Page 1 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1.8.1 Inlet Valve Actuator (4-stroke engine) No. 1
1.8.2 Inlet Valve Actuator (4-stroke engine) No. 2
1.8.3 Inlet Valve Actuator (4-stroke engine) No. 3
1.8.4 Inlet Valve Actuator (4-stroke engine) No. 4
1.8.5 Inlet Valve Actuator (4-stroke engine) No. 5
1.8.6 Inlet Valve Actuator (4-stroke engine) No. 6
1.8.7 Inlet Valve Actuator (4-stroke engine) No. 7
1.8.8 Inlet Valve Actuator (4-stroke engine) No. 8
Page 2 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Turbocharger No. 1 major overhauling
1.16.1 21/Nov/19 3,309 8,000
(concurrent with docking)
Turbocharger No. 2 major overhauling
1.16.2 NA
(concurrent with docking)
1.16.3 Turbocharger No. 1 Air Filter 17/Feb/21 0 1 Mar/2021 C C S
1.16.4 Turbocharger No. 2 Air Filter NA
3 AUXILLARY ENGINE
3.1 Auxiliary Engine No. 1
4 BOILER
4.1 Boiler No. 1
4.1.1 Internal & External Survey 19-Nov-19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
4.1.2 Burner Unit overhaul 27-Nov-20 3 3 Feb/2021 S DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
4.1.3 Forced Draft Fan 19-Nov-19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
4.1.4 F.O. Heater No. 1 31-Aug-16 54 60 Aug/2021
4.1.5 F.O. Heater No. 2 31-Aug-16 54 60 Aug/2021
4.1.6 F.O. Filter 21-Jan-21 - 1 - C S
4.1.7 Furnance Inspection 27-Nov-20 3 3 Feb/2021 S DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
4.1.8 Burner windbox check 27-Nov-20 3 3 Feb/2021 S DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
4.1.9 Boiler Water treatment 22-Jan-21 - 3 Days - C S
4.1.10 System Device Test 20-Sep-20 5 6 Mar/2021
Page 4 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
4.3 Exhaust Gas Economizer
4.3.1 Smoke side cleaning 6/Nov/20 3 3 Feb/2021 S DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
4.3.2 Internal & External Survey 15/Nov/19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
4.3.3 Soot blower NA - - -
4.3.4 Safety Valve Lifting (Manual) 16/Jan/21 1 1 Feb/2021 C S
5 AIR COMPRESSOR
5.1 Main Air Compressor No. 1
C Air Compressor 2/Oct/20 4 60 Oct/2025
5.1.2 Piston Overhaul 2/Oct/20 4 60 Oct/2025
5.1.3 Suction and Delivery Valves Overhaul 27/Jul/20 7 12 Jul/2021
5.1.4 L.O Renewal / Crankcase Inspection 2/Feb/21 0 3 May/2021 C
5.1.5 Intercooler / Aftercooler Cleaning 18/Nov/20 3 12 Nov/2021 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
5.1.6 Relief Valve Overhaul 27/Jul/20 7 12 Jul/2021
5.1.7 Air Receiver Internal & Safety Valve Check 27/Jul/20 7 60 Jul/2025 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
Unloader solenoid valve and Unloader
5.1.8 2/Feb/21 0 6 Aug/2021 C
Overhaul
6 PURIFIER
6.1 F.O. Purifier No. 1
6.1.1 Bowl and Disc Cleaning 8/Nov/20 3 2 Jan/2021 S S
6.1.2 F.O.Purifier Preheater 5/Sep/20 5 12 Sep/2021
6.1.3 F.O.Purifier External leakages 10/Dec/20 - Daily - C
6.1.4 Friction pad and Drum / belt Checking 10/Dec/20 2 3 Mar/2021
6.1.5 Major Servicing 7/Jan/20 13 12 Jan/2021 S S
6.1.6 Lub oil renew & Crankcase Inspection 10/Dec/20 2 3 Mar/2021
6.1.7 FO Feed / Attach Pumps 17/Jul/20 7 6 Jan/2021 S S
6.1.8 Solenoid Valve for opening & closing water 31/Jan/21 1 1 Mar/2021 C
6.1.9 Overflow Alarm 31/Jan/21 1 1 Mar/2021 C
Page 5 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
6.2 F.O. Purifier No. 2
6.2.1 Bowl and Disc Cleaning 18/Dec/20 2 2 Feb/2021
6.2.2 F.O.Purifier Preheater 6/Jan/20 13 12 Jan/2021 S S
6.2.3 F.O.Purifier External leakages 18/Dec/20 - Daily -
6.2.4 Friction pad and Drum / belt Checking 5/Oct/20 4 3 Jan/2021 S S
6.2.5 Major Servicing 11/Aug/20 6 12 Aug/2021
6.2.6 Lub oil renew & Crankcase Inspection 18/Dec/20 2 3 Mar/2021
6.2.7 FO Feed / Attach Pumps 18/Dec/20 2 6 Jun/2021
6.2.8 Solenoid Valve for opening & closing water 31/Jan/21 1 1 Mar/2021 C S
6.2.9 Overflow Alarm 31/Jan/21 1 1 Mar/2021 C S
6.3 D.O.Purifier
6.3.1 Bowl and Disc Cleaning 3/Jan/21 1 2 Mar/2021 C
6.3.2 D.O.Purifier External leakages 3/Jan/21 - Daily C S
6.3.3 Friction pad and Drum / belt Checking 4/Dec/20 2 3 Mar/2021
6.3.4 Major Servicing 4/Sep/20 5 12 Sep/2021
6.3.5 Lub oil renew & Crankcase Inspection 4/Dec/20 2 3 Mar/2021
6.3.6 DO Feed / Attach Pumps 5/Oct/20 4 6 Apr/2021
6.3.7 Solenoid Valve for opening & closing water 31/Jan/21 1 1 Mar/2021 C S
6.3.8 Overflow Alarm 31/Jan/21 1 1 Mar/2021 C S
8 FILTERS
8.1 Sea chest strainer (high and low) 15/Jan/21 1 1 Feb/2021 C S
8.2 M/E F.O Backwash filter / Secondary Filter 31/Jan/21 1 1 Mar/2021 C S
Page 6 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
8.3 M/E F.O.Booster pump filter 31/Jan/21 1 1 Mar/2021 C S
8.4 F.O. transfer pump suction filter 30/Jan/21 1 1 Mar/2021 C S
8.5 D.O. transfer pump suction filter 30/Jan/21 1 1 Mar/2021 C S
8.6 L.O. transfer pump suction filter 30/Jan/21 1 1 Mar/2021 C S
8.7 L.O. backwash filter 21/Jan/21 1 1 Feb/2021 C S
8.8 L.O. pump suction / discharge filter 29/Jan/21 1 1 Mar/2021 C S
8.9 Blige well suction filters 16/Jan/21 1 1 Feb/2021 C S
8.10 Purifier Suction filter 16/Jan/21 1 1 Feb/2021 C S
8.11 Sluge Pump filter 17/Jan/21 1 1 Feb/2021 C S
8.12 Emergency Fire pump suction filter 23/Jan/21 1 1 Feb/2021 C S
8.13 Pump Room ballast Pump suction filter 17/Jan/21 1 1 Feb/2021 C S
9 HEAT EXCHANGERS
9.1 F.W Central Cooler system. 21/Nov/20 2 6 May/2021
9.2 Main Engine L.O. Cooler No. 1 21/Nov/20 3 6 May/2021
9.3 Main Engine L.O. Cooler No. 2 NA #VALUE! #VALUE!
9.4 Main Engine Camshaft L.O. Cooler 7/Jan/21 1 3 Apr/2021 C
9.5 Main Engine Air Cooler 24/Nov/20 3 6 May/2021 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
9.6 Stern Tube L.O. Cooler NA #VALUE! 6 #VALUE!
9.7 Aux Eng F.W. Cooler No.1 NA #VALUE! 3 #VALUE!
9.8 Aux Eng F.W. Cooler No.2 NA #VALUE! 3 #VALUE!
9.9 Aux Eng F.W. Cooler No.3 NA #VALUE! 3 #VALUE!
9.10 Aux Eng L.O. Cooler No.1 27/Jan/21 1 3 Apr/2021 C
9.11 Aux Eng L.O. Cooler No.2 12/Nov/20 3 3 Feb/2021
9.12 Aux Eng L.O. Cooler No.3 27/Jan/21 1 3 Apr/2021 C
9.13 Aux Eng Air Cooler No.1 12/Nov/20 3 3 Feb/2021 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
9.14 Aux Eng Air Cooler No.2 12/Nov/20 3 3 Feb/2021 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
9.15 Aux Eng Air Cooler No.3 12/Nov/20 3 3 Feb/2021 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
9.16 Turbo Generator L.O. Cooler NA #VALUE! #VALUE!
9.17 Shaft Generator L.O. Cooler NA #VALUE! #VALUE!
9.18 Atmos Steam Condenser 6/Aug/20 6 6 Feb/2021 S
9.19 Vaccum Condenser NA #VALUE! #VALUE!
9.20 Drain Cooler NA 6
9.21 Main Air Compressor F.W Cooler NA #VALUE! #VALUE!
9.22 E.C.R A/C Condenser 18/Dec/20 2 3 Mar/2021
9.23 C.O.P Vacuum Condenser NA #VALUE! #VALUE!
9.24 C.O.P.T No. 1 L.O. Cooler NA #VALUE! #VALUE!
9.25 C.O.P.T No. 2 L.O. Cooler NA #VALUE! #VALUE!
9.26 C.O.P.T No. 3 L.O. Cooler NA #VALUE! #VALUE!
9.27 C.O.P.T No. 4 L.O. Cooler NA #VALUE! #VALUE!
9.28 C.O.P.T No. 5 L.O. Cooler NA #VALUE! #VALUE!
9.29 C.O.P.T No. 6 L.O. Cooler NA #VALUE! #VALUE!
9.30 Ballast Pump Turbine L.O. Cooler NA #VALUE! #VALUE!
9.31 Hydraulic system Oil Cooler 18/Mar/20 11 12 Mar/2021
9.32 Tank Cleaning Heater 15/Nov/20 3 12 Nov/2021
10 AIR CONDITIONER
10.1 Compressor No. 1 (Major Overhaul) 6/Feb/20 12 24 Feb/2022 S
10.2 Compressor No. 2 (Major Overhaul) 9/Feb/20 12 24 Feb/2022 S
10.3 Blower unit & Evaporator 18/Sep/20 5 6 Mar/2021
10.4 Dryer silicagel Renewal 10/Jan/21 1 6 Jul/2021 C
10.5 L.O renewal and Crankcase Inspection 20/Sep/20 5 6 Mar/2021
10.6 Condenser 27/Dec/20 2 3 Mar/2021
10.7 Air suction filter 10/Jan/21 1 1 Feb/2021 C S
10.8 L.O low pressure trip 10/Jan/21 1 1 Feb/2021 C S
10.9 Gas high pressure trip 10/Jan/21 1 1 Feb/2021 C S
11 REFRIGERATION
11.1 Compressor No.1 11/Feb/20 12 24 Feb/2022
11.2 Compressor No.2 13/Feb/20 12 24 Feb/2022
11.3 Condenser No. 1 5/Jan/21 1 6 Jul/2021 C
11.4 Condenser No. 2 5/Jan/21 1 6 Jul/2021 C
11.5 Dryer silicagel Renewal 21/Sep/20 5 6 Mar/2021
11.6 L.O renewal and Crankcase Inspection 27/Nov/20 3 6 May/2021
11.7 L.O low pressure trip 5/Jan/21 1 1 Feb/2021 C S
11.8 Gas high pressure trip 5/Jan/21 1 1 Feb/2021 C S
12 PUMPS
12.1 Main Eng S.W. Cooling Pump No. 1 15/Sep/20 5 60 Sep/2025
12.2 Main Eng S.W. Cooling Pump No. 2 22/Aug/20 6 60 Aug/2025
12.3 Main Eng S.W. Cooling Pump No. 3 25/Jan/21 1 60 Jan/2026 C
12.4 Main Eng F.W. Cooling Pump No. 1 3/Oct/17 40 60 Oct/2022
12.5 Main Eng F.W. Cooling Pump No. 2 23/Jun/20 8 60 Jun/2025
12.6 Main Eng F.W. Cooling Pump No. 3 NA 30
12.7 Main Eng/AE F.O.Feed Pump No.1 12/Sep/20 5 60 Sep/2025
12.8 Main Eng /AE F.O.Feed Pump No.2 29/Jun/20 8 60 Jun/2025
12.9 Main Eng F.O Booster Pump No.1 7/May/20 9 60 May/2025
12.10 Main Eng F.O Booster Pump No.2 8/May/20 9 60 May/2025
12.11 Main Eng /A E F.O. Supply Pump No.1 NA 60
12.12 Main Eng/AE F.O. Supply Pump No.2 NA 60
12.13 Main Eng L.O Circ. Pump No. 1 11/Jun/19 20 60 Jun/2024
12.14 Main Eng L.O.Circ Pump No. 2 13/May/19 21 60 May/2024
12.15 Main Eng camshaft L.O. Pump No.1 5/Jun/20 8 60 Jun/2025
12.16 Main Eng camshaft L.O. Pump No.2 5/Jun/20 8 60 Jun/2025
Page 7 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
12.17 Main Eng Nozzle Cooling Pump NA #VALUE! #VALUE!
12.18 Main Eng Air Cooler Chemical Cleaning Pump NA #VALUE! #VALUE!
Page 8 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
12.76 Stripping Pump No. 4 NA #VALUE! 30 #VALUE!
12.77 Stripping Pump No. 5 NA #VALUE! 30 #VALUE!
12.78 Stripping Pump No. 6 NA #VALUE! 30 #VALUE!
12.79 Cargo Oil Turbine No. 1 NA #VALUE! 60 #VALUE!
12.80 Cargo Oil Turbine No. 2 NA #VALUE! 60 #VALUE!
12.81 Cargo Oil Turbine No. 3 NA #VALUE! 60 #VALUE!
12.82 Cargo Oil Turbine No. 4 NA #VALUE! 60 #VALUE!
12.83 Cargo Oil Turbine No. 5 NA #VALUE! 60 #VALUE!
12.84 Cargo Oil Turbine No. 6 NA #VALUE! 60 #VALUE!
12.85 Liquid Cargo Pump Hydraulic Power Unit No. 1 NA #VALUE! 60 #VALUE!
12.86 Liquid Cargo Pump Hydraulic Power Unit No. 2 NA #VALUE! 60 #VALUE!
12.87 Liquid Cargo Pump Hydraulic Power Unit No. 3 NA #VALUE! 60 #VALUE!
12.88 Liquid Cargo Pump Hydraulic Power Unit No. 4 NA #VALUE! 60 #VALUE!
12.89 Liquid Cargo Pump Hydraulic Power Unit No. 5 NA #VALUE! 60 #VALUE!
12.90 Liquid Cargo Pump Hydraulic Power Unit No. 6 NA #VALUE! 60 #VALUE!
12.91 Cargo Oil Pump No. 1 (P) NA #VALUE! 60 #VALUE!
12.92 Cargo Oil Pump No. 1 (S) NA #VALUE! 60 #VALUE!
12.93 Cargo Oil Pump No. 2 (P) NA #VALUE! 60 #VALUE!
12.94 Cargo Oil Pump No. 2 (S) NA #VALUE! 60 #VALUE!
12.95 Cargo Oil Pump No. 3 (P) NA #VALUE! 60 #VALUE!
12.96 Cargo Oil Pump No. 3 (S) NA #VALUE! 60 #VALUE!
Page 9 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
12.122.22 Cargo Pump (Chemical) No. 20 NA #VALUE! #VALUE!
13 WINCHES
13.1 Forward Hydraulic Pump No. 1 NA #VALUE! 1 #VALUE!
13.2 Forward Hydraulic Pump No. 2 NA #VALUE! 1 #VALUE!
13.3 Aft Hydraulic Pump No. 1 NA #VALUE! 1 #VALUE!
13.4 Aft Hydraulic Pump No. 2 NA #VALUE! 1 #VALUE!
Hydraulic Power Pack (Centralised incl.cargo
13.5 10/Jan/21 1 1 Feb/2021 C S
pump)
15 ELECTRICAL
15.1 Alternator No.1
15.1.1 Alternator 1 6/Sep/20 5 6 Mar/2021
15.1.2 Clean Air Filter (N/A) NA #VALUE! 1 #VALUE!
15.1.3 Main Switchboard Safety Devices 18/Nov/19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
16 FAN
16.1 Engine Room Vent. Fan No. 1 20/Nov/19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
16.2 Engine Room Vent. Fan No. 2 20/Nov/19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
16.3 Engine Room Vent. Fan No. 3 20/Nov/19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
16.4 Engine Room Vent. Fan No. 4 20/Nov/19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
16.5 IGG Room Supply Fan 30/Aug/16 54 60 Aug/2021
16.6 Purifier Space Exhaust Fan 31/Aug/16 54 60 Aug/2021
16.7 Paint Store Exhaust Fan 31/Aug/16 54 60 Aug/2021
16.8 Galley Exhaust Fan 31/Aug/16 54 60 Aug/2021
16.9 Galley Supply Fan 31/Aug/16 54 60 Aug/2021
16.10 Steering Gear Exhaust Fan 31/Aug/16 54 60 Aug/2021
16.11 CO2 Room Exhaust Fan 20/Nov/19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
16.12 Ballast Pump Rm Exhaust Fan 20/Nov/19 15 60 Nov/2024 DRY DOCK MARCOPOLO 07 - 22 NOVEMBER 2019
16.13 Deck Store Exhaust Fan 31/Aug/16 54 60 Aug/2021
16.14 Bow Thruster Rm Exhaust Fan 30/Aug/16 54 60 Aug/2021
16.15 Welding Plat Exhaust Fan 24/Jul/16 55 60 Jul/2021
Page 10 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
16.16 Bonded Store Exhaust Fan 31/Aug/16 54 60 Aug/2021
16.17 Hospital Exhaust Fan 31/Aug/16 54 60 Aug/2021
19 BOW THRUSTER
19.1 Bow Thruster 30/Jan/21 1 1 Mar/2021 C S
19.2 Strainer 30/Jan/21 1 1 Mar/2021 C S
19.3 Oil level 30/Jan/21 1 1 Mar/2021 C S
19.4 Electric Insulation 30/Jan/21 1 1 Mar/2021 C S
20 LIFEBOAT
20.1 F.O. Filter 26/Jan/21 1 3 Apr/2021 C
20.2 L.O Renew 10/Oct/20 4 6 Apr/2021
20.3 L.O. Filter 26/Jan/21 1 3 Apr/2021 C
20.4 Air filter 26/Jan/21 1 3 Apr/2021 C
20.5 Batteries 26/Jan/21 1 3 Apr/2021 C
SW Sprinkler Pump (For Enclosed Lifeboat
20.6 26/Jan/21 1 3 Apr/2021 C
Only)
The under noted items are categorized as CRITICAL Machinery List . Please note that ANY SHUT DOWN of the equipments for Maintenace or Repair (scheduled or unscheduled) OFFICE MUST be informed . The agreed period of repair must be advised to the OFFICE and agreed. Onboard Risk Assement MUST be carried out and submit to office before shut down.
21 CRITICAL EQUIPMENT
21.1 Pollution Prevention Equipment
21.1.1 Oily Water Separator 27/Jan/21 1 1 Feb/2021 C S
21.1.2 Oil Discharge Monitor 27/Jan/21 1 1 Feb/2021 C S
21.1.3 Bilge High Level Alarm 27/Jan/21 1 1 Feb/2021 C S
21.1.4 Emergency Bilge Suction Valve 27/Jan/21 1 1 Feb/2021 C S
21.1.5 Incinerator 27/Jan/21 1 1 Feb/2021 C S
21.2 Machinery
21.2.1 Main Engine
21.2.1.1 Engine Side Local Control 27/Jan/21 1 1 Feb/2021 C S
21.2.1.2 M/E Emergency Stop Switch (ECR and Bridge) 27/Jan/21 1 1 Feb/2021 C S
21.2.1.3 F.O. Leakage Alarm 27/Jan/21 1 1 Feb/2021 C S
21.2.1.4 L.O. Low Pressure Trip 27/Jan/21 1 1 Feb/2021 C S
21.2.1.5 Oil Mist Detector 27/Jan/21 1 1 Feb/2021 C S
21.2.1.6 Scavenge Air High Temperature Alarm 27/Jan/21 1 1 Feb/2021 C S
Page 11 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021 Symbol S : Scheduled Maintenance
C : Completed Maintenance
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Current Data since last Maint Interval Next Due
PMS No. Unit / System Last Maint. Date Est. Next Due CMS Due REMARKS
Months Run Hours Months Hours Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
21.2.3.2 Engine L.O. Low Pressure Trip 27/Jan/21 1 1 Feb/2021 C S
21.2.3.3 Jacket Cooling Water High Temp. Slow Down 27/Jan/21 1 1 Feb/2021 C S
21.2.3.4 On Load Test 27/Jan/21 1 1 Feb/2021 C S
Year to Date Completed Task Percentile 93.8% 51.7% 35.8% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Page 12 of 24
FORM E-05
PT GEMILANG BINA LINTAS TIRTA REVISION 00_14 May 2009
SHIP MANAGEMENT
PLANNED MAINTENANCE REPORT
ENGINE DEPARTMENT
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
1 MAIN ENGINE
1.1.1 Cylinder Head No. 1 15/Jul/18
1.1.2 Cylinder Head No. 2 17/Nov/20
1.1.3 Cylinder Head No. 3 16/Nov/19
1.1.4 Cylinder Head No. 4 11/Jun/20
Check seating surfaces for cracks & chemically cleaned cooling passages
1.1.5 Cylinder Head No. 5 16/Aug/20
1.1.6 Cylinder Head No. 6 NA
30/Dec/99
30/Dec/99
Page 13 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
Turbocharger No. 1 major overhauling (concurrent Clean and inspect blower & turbine. Check balancing of rotor. Renew all
1.16.1 21/Nov/19
with docking) bearings & seals
Turbocharger No. 2 major overhauling (concurrent Clean and inspect blower & turbine. Check balancing of rotor. Renew all
1.16.2 NA
with docking) bearings & seals
1.16.3 Turbocharger No. 1 Air Filter 17/Feb/21 Renew air filter
1.16.4 Turbocharger No. 2 Air Filter NA Renew air filter
1.17 Main Engine Aux.Blower No. 1 (major overhauling) 31/Aug/16 Clean and inspect blower. Replacement of bearings
1.18 Main Engine Aux.Blower No. 2 (major overhauling) 31/Aug/16 Clean and inspect blower. Replacement of bearings
1.19 Aircooler (Air Side) 24/Nov/20 Inspect & chemically clean air side
1.20 Aircooler (FW Side) 24/Nov/20 Inspect & clean SW side and renew zinc anodes
1.21 Scavenging Space 17/Feb/21 Clean scavenge trunk, under piston space and clear drain pipes
1.22 Scavenging Ports inspection for piston ring condition 17/Feb/21 Clean and inspect scavenge ports
1.23 Jacket cooling water treatment 6/Feb/21 Test cooling water and dosed chemical as required
1.24 Governor (concurrent with docking) 22/Nov/19 To be serviced by technician
1.25 Governor Use Electric motor (not use LO) 30/Dec/99 To be renewed at regular interval
1.26 Viscorator / Viscotherm 17/Feb/21 Inspection and cleaning
1.27 Engine fuel control linkage 17/Feb/21 Inspect and grease all links
1.28 Cylinder Lubricators 30/Dec/99 Visual inspection of cylinder lubricators performance.
1.29 Camshaft driving gear 22/Jan/21 Inspect gear teeth/ chain condition and backlash clearance
Measure the crankweb deflection at regular interval. Submit Crankshaft
1.30 Crankshaft Deflection 16/Oct/20
Deflection Record form (E-27) to office
1.31 Bedplate & Column Holding Down Bolts 24/Nov/20 Check and adjust tension of bolts accordingly
1.32 Thrust shaft & Bearing 23/Aug/20 Inspect thrust collar & bearing condition and check oil clearance
1.33 Intermediate Shaft 20/Nov/19 Inspect shaft, bearing condition and end seals
1.34 Intermediate Shaft Bearing No. 1 20/Nov/19 Inspect shaft, bearing condition and end seals
1.35 Intermediate Shaft Bearing No. 2 20/Nov/19 Inspect shaft, bearing condition and end seals
1.36 Propeller Shaft & Bearing 20/Nov/19 Inspect wear-down of stern tube bearing & seals
1.37 Propeller 12/Nov/19 Inspect blades and check wear-down of shaft
Inspect rudder air tightness and wear-down of pintle & rudder stock neckbush
1.38 Rudder 12/Nov/19
clearance
1.39 Engine Performance 23/Feb/21 Indicator cards to be taken and balance all units accordingly.
To clean piston valves and the liners in the distributor housings to remove dirt,
1.40 Inspection of Starting Air Distributor 21/Nov/19
rust and foreign particles.
3 AUXILLARY ENGINE
3.1 Auxiliary Engine No. 1
Clean and check ring grooves. Measure cyl liner bore. Renew piston rings &
3.1.1 Piston Overhaul 15/Apr/18
liner 'O'rings.
Inspect and renew v/v guide bush and rocker arm bush. Lapping suc/exh
3.1.2 Top Overhaul 15/Apr/18
valves. Submit form (E-18) to the office.
Inspect crank pin, main bearing bolts tightness, crankshaft counter-weight and
3.1.3 Crankcase Inspection 28/Dec/20
lub oil-flow
3.1.4 Crank Journal & Pin 15/Apr/18 Open up for inspection of crank journal & pin surfaces and oil clearance
3.1.5 Connecting Rod Bolt 15/Apr/18 Renew at maker recommended hour
Inspect crankweb deflection. Submit Crankshaft Deflection Record form (E-27)
3.1.6 Crankshaft Deflection 28/Dec/20
to office
3.1.7 Cam Shaft 29/Dec/20 Inspection of external cam profile surface, tappet-roller, lub oil-flow
3.1.8 F.O. Filter 15/Feb/21 Clean F.O.filters at regular intervals
Shore calibration if common rail type. Renew delivery v/v,plunger & barrels if
3.1.9 Fuel Inject. Pump 4/Mar/18
bosch type
Page 14 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
3.1.10 Fuel Inject.Valves 13/Jul/20 Change with new/reconditioned spares
3.1.11 L.O Renew 24/Sep/20 Renew L.O. based on laboratory test analysis report
3.1.12 L.O. Filter / Cardridge 15/Feb/21 Clean L.O.filters at regular intervals
3.1.13 Governor 20/Nov/19 Renew Lub oil at every 500 hours
3.1.14 Turbocharger Bearing 20/Nov/19 Maintenance / bearing renewal, balancing etc
3.1.15 Turbocharger L.O. Renewal 24/Sep/20 Renew Lub oil at regular interval
3.1.16 Intercooler 15/Feb/21 Clean air & SW sides. Renew zinc anodes
3.1.17 Air filter 13/Feb/21 Renew air filters at regular intervals
3.1.18 Tappet Clearance 15/Feb/21 Check and adjust tappet clearance. Check rocker-arm lub oil flow
3.1.19 Engine Performance Data 10/Jan/21 Peak pressure cards to be taken and balance all units accordingly.
4 BOILER
4.1 Boiler No. 1
Clean water and fire side, boiler mountings, safety valves and operation safety
4.1.1 Internal & External Survey 19/Nov/19 test. Water level transmitter and controller to be calibrated and checked.
Pressure- gauge calibration
4.1.2 Burner Unit overhaul 27/Nov/20 Inspect & clean burner unit including wind-box, swirl-plate as necessary.
4.1.3 Forced Draft Fan 19/Nov/19 Inspection of fan blower, outlet trunking
Page 15 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
4.2.10 System Device Test NA Perform functional test & alarm
5 AIR COMPRESSOR
5.1 Main Air Compressor No. 1
C Air Compressor 2/Oct/20 Inspect LO level inside crankcase daily. Clean,overhaul HP & LP valves
5.1.2 Piston Overhaul 2/Oct/20 Clean,inspect ring grooves and renew piston rings
5.1.3 Suction and Delivery Valves Overhaul 27/Jul/20 Open up for inspection of journal & bearing surfaces and oil clearance
5.1.4 L.O Renewal / Crankcase Inspection 2/Feb/21 Renew L.O. as per running hrs/laboratory test report
5.1.5 Intercooler / Aftercooler Cleaning 18/Nov/20 Clean water side of intercooler and renew 'O' rings as required
Open up & clean. Inspect for corrossion ,pitting and apply apexior paint. Drain
5.1.6 Relief Valve Overhaul 27/Jul/20
condensate atleast once per watch
5.1.7 Air Receiver Internal & Safety Valve Check 27/Jul/20 Clean & inspect internal surfaces, safety valve overhaul and testing
5.1.8 Unloader solenoid valve and Unloader Overhaul 2/Feb/21 Dismantle and clean unloader valve and check solenoid coil
6 PURIFIER
6.1 F.O. Purifier No. 1
6.1.1 Bowl and Disc Cleaning 8/Nov/20 Clean cone discs and bowl assembly at regular interval
6.1.2 F.O.Purifier Preheater 5/Sep/20 Clean oil side of preheater
6.1.3 F.O.Purifier External leakages 10/Dec/20 Clean and be cleared from all leakages
6.1.4 Friction pad and Drum / belt Checking 10/Dec/20 Inspect friction pad and drum/belt internal surface for any deformation
6.1.5 Major Servicing 7/Jan/20 Inspect bearings of vertical & horizontal shafts and water operating chambers
6.1.6 Lub oil renew & Crankcase Inspection 10/Dec/20 Inspect worm gear / wheel
6.1.7 FO Feed / Attach Pumps 17/Jul/20 Inspect gears, bushes, seals and safety joints.
6.1.8 Solenoid Valve for opening & closing water 31/Jan/21 Inspect and check valve operations and clean suction filter
6.1.9 Overflow Alarm 31/Jan/21 Test alarm
6.3 D.O.Purifier
6.3.1 Bowl and Disc Cleaning 3/Jan/21 Clean cone discs and bowl assembly at regular interval
6.3.2 D.O.Purifier External leakages 3/Jan/21 Clean and be cleared from all leakages
6.3.3 Friction pad and Drum / belt Checking 4/Dec/20 Inspect friction pad and drum/belt internal surface for any deformation
6.3.4 Major Servicing 3/Jan/21 Inspect bearings of vertical & horizontal shafts and water operating chambers
6.3.5 Lub oil renew & Crankcase Inspection 4/Dec/20 Inspect worm gear / wheel
6.3.6 DO Feed / Attach Pumps 4/Sep/20 Inspect gears, bushes, seals and safety joints.
6.3.7 Solenoid Valve for opening & closing water 4/Dec/20 Inspect and check valve operations and clean suction filter
6.3.8 Overflow Alarm 5/Oct/20 Test alarm
Page 16 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
6.4.8 Solenoid Valve for opening & closing water 10/Jan/21 Inspect and check valve operations and clean suction filter
6.4.9 Overflow Alarm 10/Jan/21 Test alarm
8 FILTERS
8.1 Sea chest strainer (high and low) 15/Jan/21 Cleaning at regular interval
8.2 M/E F.O Backwash filter / Secondary Filter 31/Jan/21 Cleaning at regular interval
8.3 M/E F.O.Booster pump filter 31/Jan/21 Cleaning at regular interval
8.4 F.O. transfer pump suction filter 30/Jan/21 Cleaning at regular interval
8.5 D.O. transfer pump suction filter 30/Jan/21 Cleaning at regular interval
8.6 L.O. transfer pump suction filter 30/Jan/21 Cleaning at regular interval
8.7 L.O. backwash filter 21/Jan/21 Cleaning at regular interval
8.8 L.O. pump suction / discharge filter 29/Jan/21 Cleaning at regular interval
8.9 Blige well suction filters 16/Jan/21 Cleaning at regular interval
8.10 Purifier Suction filter 16/Jan/21 Cleaning at regular interval
8.11 Sluge Pump filter 17/Jan/21 Cleaning at regular interval
8.12 Emergency Fire pump suction filter 23/Jan/21 Cleaning at regular interval
8.13 Pump Room ballast Pump suction filter 17/Jan/21 Cleaning at regular interval
9 HEAT EXCHANGERS
9.1 F.W Central Cooler system. 21/Nov/20 Clean SW side and renew zinc anodes.Pressure test to FW side
Clean SW side and renew zinc anodes.Clean oil side chemically and perform
9.2 Main Engine L.O. Cooler No. 1 21/Nov/20
pressure test
Clean SW side and renew zinc anodes.Clean oil side chemically and perform
9.3 Main Engine L.O. Cooler No. 2 NA
pressure test
Clean SW side and renew zinc anodes.Clean oil side chemically and perform
9.4 Main Engine Camshaft L.O. Cooler 7/Jan/21
pressure test
9.5 Main Engine Air Cooler 24/Nov/20 Clean SW side and renew zinc anodes.Pressure test to Air side
Clean SW side and renew zinc anodes.Clean oil side chemically and perform
9.6 Stern Tube L.O. Cooler NA
pressure test
9.7 Aux Eng F.W. Cooler No.1 NA Clean SW side and renew zinc anodes.Pressure test to FW side
9.8 Aux Eng F.W. Cooler No.2 NA Clean SW side and renew zinc anodes.Pressure test to FW side
9.9 Aux Eng F.W. Cooler No.3 NA Clean SW side and renew zinc anodes.Pressure test to FW side
Clean SW side and renew zinc anodes.Clean oil side chemically and perform
9.10 Aux Eng L.O. Cooler No.1 27/Jan/21
pressure test
Clean SW side and renew zinc anodes.Clean oil side chemically and perform
9.11 Aux Eng L.O. Cooler No.2 12/Nov/20
pressure test
Clean SW side and renew zinc anodes.Clean oil side chemically and perform
9.12 Aux Eng L.O. Cooler No.3 27/Jan/21
pressure test
9.14 Aux Eng Air Cooler No.2 12/Nov/20 Clean SW side and renew zinc anodes.Clean air side and perform pressure test
10 AIR CONDITIONER
10.1 Compressor No. 1 (Major Overhaul) 6/Feb/20 Overhaul / valve replacement / crankcase oil change
10.2 Compressor No. 2 (Major Overhaul) 9/Feb/20 Overhaul / valve replacement / crankcase oil change
10.3 Blower unit & Evaporator 18/Sep/20 Clean blower and evaporator fins at regular interval
10.4 Dryer silicagel Renewal 10/Jan/21 Dryer silicagel to be renewed as required
10.5 L.O renewal and Crankcase Inspection 20/Sep/20 Inspect all parts in crankcase and renew lub oil
10.6 Condenser 27/Dec/20 Clean SW side and renew zinc anodes.
10.7 Air suction filter 10/Jan/21 Renew air suction filter
10.8 L.O low pressure trip 10/Jan/21 Functional test
10.9 Gas high pressure trip 10/Jan/21 Functional test
Page 17 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
11 REFRIGERATION
11.1 Compressor No.1 11/Feb/20 Overhaul / valve replacement / crankcase oil change
11.2 Compressor No.2 13/Feb/20 Overhaul / valve replacement / crankcase oil change
11.3 Condenser No. 1 5/Jan/21 Clean SW side and renew zinc anodes.
11.4 Condenser No. 2 5/Jan/21 Clean SW side and renew zinc anodes.
11.5 Dryer silicagel Renewal 21/Sep/20 Dryer silicagel to be renewed as required
11.6 L.O renewal and Crankcase Inspection 27/Nov/20 Inspect all parts in crankcase and renew lub oil
11.7 L.O low pressure trip 5/Jan/21 Functional test
11.8 Gas high pressure trip 5/Jan/21 Functional test
11.9 Provision Chamber Call Alarm 5/Jan/21 Functional test
12 PUMPS
12.1 Main Eng S.W. Cooling Pump No. 1 15/Sep/20 Overhaul / renew wear rings and shaft bearings as required
12.2 Main Eng S.W. Cooling Pump No. 2 22/Aug/20 Overhaul / renew wear rings and shaft bearings as required
12.3 Main Eng S.W. Cooling Pump No. 3 25/Jan/21 Overhaul / renew wear rings and shaft bearings as required
12.4 Main Eng F.W. Cooling Pump No. 1 3/Oct/17 Overhaul / renew wear rings and shaft bearings as required
12.5 Main Eng F.W. Cooling Pump No. 2 23/Jun/20 Overhaul / renew wear rings and shaft bearings as required
12.6 Main Eng F.W. Cooling Pump No. 3 NA Overhaul / renew wear rings and shaft bearings as required
12.7 Main Eng/AE F.O.Feed Pump No.1 12/Sep/20 Overhaul / inspect gears, sleeves and bush bearings. Renew as required
12.8 Main Eng /AE F.O.Feed Pump No.2 29/Jun/20 Overhaul / inspect gears, sleeves and bush bearings. Renew as required
12.9 Main Eng F.O Booster Pump No.1 7/May/20 Overhaul / inspect gears, sleeves and bush bearings. Renew as required
12.10 Main Eng F.O Booster Pump No.2 8/May/20 Overhaul / inspect gears, sleeves and bush bearings. Renew as required
12.11 Main Eng /A E F.O. Supply Pump No.1 NA Overhaul / inspect gears, sleeves and bush bearings. Renew as required
12.12 Main Eng/AE F.O. Supply Pump No.2 NA Overhaul / inspect gears, sleeves and bush bearings. Renew as required
12.13 Main Eng L.O Circ. Pump No. 1 11/Jun/19 Overhaul / inspect screws, sleeves and bush bearings. Renew as required
12.14 Main Eng L.O.Circ Pump No. 2 13/May/19 Overhaul / inspect screws, sleeves and bush bearings. Renew as required
12.15 Main Eng camshaft L.O. Pump No.1 5/Jun/20 Overhaul / inspect screws, sleeves and bush bearings. Renew as required
12.16 Main Eng camshaft L.O. Pump No.2 5/Jun/20 Overhaul / inspect screws, sleeves and bush bearings. Renew as required
12.17 Main Eng Nozzle Cooling Pump NA Overhaul / inspect gears, sleeves and bush bearings. Renew as required
12.18 Main Eng Air Cooler Chemical Cleaning Pump NA Overhaul / inspect gears, sleeves and bush bearings. Renew as required
12.19 Aux Eng No. 1 S.W Cooling Pump NA Overhaul / renew wear rings and shaft bearings as required
12.20 Aux Eng No. 2 S.W Cooling Pump NA Overhaul / renew wear rings and shaft bearings as required
12.21 Aux Eng No. 3 S.W Cooling Pump NA Overhaul / renew wear rings and shaft bearings as required
12.22 Aux Eng No. 1 F.W Cooling Pump NA Overhaul / renew wear rings and shaft bearings as required
12.23 Aux Eng No. 2 F.W Cooling Pump NA Overhaul / renew wear rings and shaft bearings as required
12.24 Aux Eng No. 3 F.W Cooling Pump NA Overhaul / renew wear rings and shaft bearings as required
12.25 F.O Transfer Pump No.1 19/Jun/18 Overhaul / inspect gears and renew bush bearings as required
12.26 F.O Transfer Pump No.2 NA Overhaul / inspect gears and renew bush bearings as required
12.27 D.O Transfer Pump 26/Feb/18 Overhaul / inspect gears and renew bush bearings as required
12.28 L.O Transfer Pump 25/Aug/20 Overhaul / inspect gears and renew bush bearings as required
12.29 Boiler Feed Water Pump No. 1 26/Sep/17 Overhaul / renew multistage impellers and wear rings as required
12.30 Boiler Feed Water Pump No. 2 5/Jun/18 Overhaul / renew multistage impellers and wear rings as required
12.31 Boiler Feed Water Make Up Pump No. 1 NA Overhaul / renew multistage impellers and wear rings as required
12.32 Boiler Feed Water Make Up Pump No. 2 NA Overhaul / renew multistage impellers and wear rings as required
12.33 Aux Boiler Feed Water Pump No. 1 NA Overhaul / renew multistage impellers as required
12.34 Aux Boiler Feed Water Pump No. 2 NA Overhaul / renew multistage impellers as required
12.35 Economiser Feed Water Pump No. 1 9/Jul/19 Overhaul / renew multistage impellers as required
12.36 Economiser Feed Water Pump No. 2 10/Jul/20 Overhaul / renew multistage impellers as required
12.37 Boiler Water Chemical Dosage Pump NA Overhaul / renew wear rings and shaft bearings as required
12.38 Vaccum Condensate Pump No.1 NA Overhaul / renew wear rings and shaft bearings as required
12.39 Vaccum Condensate Pump No.2 NA Overhaul / renew wear rings and shaft bearings as required
12.40 Boiler Pilot Burner Pump 28/Oct/20 Overhaul / inspect gears and renew bush bearings as required
12.41 Boiler Main Burner Pump No. 1 30/Mar/20 Overhaul / inspect gears and renew bush bearings as required
12.42 Boiler Main Burner Pump No. 2 31/Jan/20 Overhaul / inspect gears and renew bush bearings as required
12.43 F.W Domestic Pump No. 1 14/Aug/20 Overhaul / inspect gears and renew bush bearings as required
12.44 F.W Domestic Pump No. 2 19/Aug/20 Overhaul / inspect gears and renew bush bearings as required
12.45 Domestic Hot Water Circ. Pump 25/Oct/20 Overhaul / renew multistage impellers as required
12.46 FWG ejector Pump 25/Aug/18 Overhaul / renew multistage impellers as required
12.47 FWG distillate Pump 6/Apr/20 Overhaul / renew multistage impellers as required
12.48 Gas Detecting Vacuum Pump NA Inspect and make operational at all times
12.49 S.W Service Pump No. 1 NA Overhaul / renew wear rings and shaft bearings as required
12.50 S.W Service Pump No. 2 NA Overhaul / renew wear rings and shaft bearings as required
12.51 Fire & G.S.pump No. 1 6/Aug/20 Overhaul / renew wear rings and shaft bearings as required
12.52 Fire & G.S.pump No. 2 10/Apr/19 Overhaul / renew wear rings and shaft bearings as required
12.53 Water Mist (Fog system) Pump NA Overhaul / renew wear rings and shaft bearings as required
12.54 Foam Dispensing Pump 6/Apr/20 Overhaul / renew wear rings and shaft bearings as required
12.55 Ballast Pump No. 1 6/Aug/20 Overhaul / renew wear rings and shaft bearings as required
12.56 Ballast Pump No. 2 6/Jun/18 Overhaul / renew wear rings and shaft bearings as required
12.57 Bilge pump 27/Aug/18 Overhaul / Inspect bucket rings, suction & delivery valves. Renew as required
12.58 Oily Water Seperator Pump 26/May/17 Overhaul suction & delivery valves and renew bucket rings as required
12.59 Sludge pump 6/Dec/20 Overhaul / renew stator, rotor and bearings as required
12.60 Air Con Cooling S.W. Pump NA Overhaul / renew wear rings and shaft bearings as required
12.61 Sanitary & Sewage Service Pump 1/Aug/18 Overhaul / renew wear rings and shaft bearings as required
12.62 Refrigeration Cooling S.W. Pump NA Overhaul / renew wear rings and shaft bearings as required
12.63 Inert Gas System Pump 26/May/20 Overhaul / renew wear rings and shaft bearings as required
12.64 Portable Tank Cleaning Machine NA Overhaul / renew wear rings and shaft bearings as required
12.65 Ballast Pump (Pump Rm) NA Overhaul / renew wear rings and shaft bearings as required
12.66 Tank Cleaning Pump (Pump Rm) NA Overhaul / renew wear rings and shaft bearings as required
12.67 Tank Cleaning Pump No. 1 NA Overhaul / renew wear rings and shaft bearings as required
12.68 Tank Cleaning Pump No. 2 NA Overhaul / renew wear rings and shaft bearings as required
12.69 Tank Cleaning Pump No. 3 NA Overhaul / renew wear rings and shaft bearings as required
12.70 Tank Cleaning Pump No. 4 NA Overhaul / renew wear rings and shaft bearings as required
12.71 Tank Cleaning Pump No. 5 NA Overhaul / renew wear rings and shaft bearings as required
12.72 Tank Cleaning Pump No. 6 NA Overhaul / renew wear rings and shaft bearings as required
12.73 Stripping Pump No. 1 NA Overhaul / inspect screws and renew bush bearings as required
12.74 Stripping Pump No. 2 NA Overhaul / inspect screws and renew bush bearings as required
12.75 Stripping Pump No. 3 NA Overhaul / inspect screws and renew bush bearings as required
12.76 Stripping Pump No. 4 NA Overhaul / inspect screws and renew bush bearings as required
12.77 Stripping Pump No. 5 NA Overhaul / inspect screws and renew bush bearings as required
12.78 Stripping Pump No. 6 NA Overhaul / inspect screws and renew bush bearings as required
12.79 Cargo Oil Turbine No. 1 NA Inspection / clean turbine blades and renew bearings as required
12.80 Cargo Oil Turbine No. 2 NA Inspection / clean turbine blades and renew bearings as required
12.81 Cargo Oil Turbine No. 3 NA Inspection / clean turbine blades and renew bearings as required
12.82 Cargo Oil Turbine No. 4 NA Inspection / clean turbine blades and renew bearings as required
12.83 Cargo Oil Turbine No. 5 NA Inspection / clean turbine blades and renew bearings as required
12.84 Cargo Oil Turbine No. 6 NA Inspection / clean turbine blades and renew bearings as required
12.85 Liquid Cargo Pump Hydraulic Power Unit No. 1 NA Keep clean from all leakages and clean all line filters at regular interval
12.86 Liquid Cargo Pump Hydraulic Power Unit No. 2 NA Keep clean from all leakages and clean all line filters at regular interval
12.87 Liquid Cargo Pump Hydraulic Power Unit No. 3 NA Keep clean from all leakages and clean all line filters at regular interval
Page 18 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
12.88 Liquid Cargo Pump Hydraulic Power Unit No. 4 NA Keep clean from all leakages and clean all line filters at regular interval
12.89 Liquid Cargo Pump Hydraulic Power Unit No. 5 NA Keep clean from all leakages and clean all line filters at regular interval
12.90 Liquid Cargo Pump Hydraulic Power Unit No. 6 NA Keep clean from all leakages and clean all line filters at regular interval
12.91 Cargo Oil Pump No. 1 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.92 Cargo Oil Pump No. 1 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.93 Cargo Oil Pump No. 2 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.94 Cargo Oil Pump No. 2 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.95 Cargo Oil Pump No. 3 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.96 Cargo Oil Pump No. 3 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.97 Cargo Oil Pump No. 4 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.98 Cargo Oil Pump No. 4 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.99 Cargo Oil Pump No. 5 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.100 Cargo Oil Pump No. 5 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.101 Cargo Oil Pump No. 6 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.102 Cargo Oil Pump No. 6 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.103 Cargo Oil Pump No. 7 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.104 Cargo Oil Pump No. 7 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.105 Cargo Oil Pump No. 8 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.106 Cargo Oil Pump No. 8 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.107 Cargo Oil Pump No. 9 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.108 Cargo Oil Pump No. 9 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.109 Cargo Oil Pump No. 10 (P) NA Overhaul / inspect screws and renew bush bearings as required
12.110 Cargo Oil Pump No. 10 (S) NA Overhaul / inspect screws and renew bush bearings as required
12.111 Cargo Pump No. 1 L.O. Priming Pump NA Overhaul / inspect screws and renew bush bearings as required
12.112 Cargo Pump No. 2 L.O. Priming Pump NA Overhaul / inspect screws and renew bush bearings as required
12.113 Cargo Pump No. 3 L.O. Priming Pump NA Overhaul / inspect screws and renew bush bearings as required
12.114 Cargo Pump No. 4 L.O. Priming Pump NA Overhaul / inspect screws and renew bush bearings as required
12.115 Cargo Pump No. 5 L.O. Priming Pump NA Overhaul / inspect screws and renew bush bearings as required
12.116 Cargo Pump No. 6 L.O. Priming Pump NA Overhaul / inspect screws and renew bush bearings as required
Overhaul / inspect multi-stage impellers, bush bearings, seals and shaft as
12.117 Deep well Cargo Pump (for Gas carrier) No.1 NA
required
Overhaul / inspect multi-stage impellers, bush bearings, seals and shaft as
12.118 Deep well Cargo Pump (for Gas carrier) No.2 NA
required
12.119 Water spray pump (for Gas carriers) NA Overhaul / inspect and make operational
12.123 Emergency Portable Cargo Pump 25/Aug/16 Inspect and make operational
12.124 Stern Tube L.O Pump 6/May/19 Overhaul / inspect gears, bearings
12.125 Steering Gear Hydraulic Pump No. 1 21/Jun/18 Keep clean from all leakages and clean all line filters at regular interval
12.126 Steering Gear Hydraulic Pump No. 2 21/Jun/18 Keep clean from all leakages and clean all line filters at regular interval
13 WINCHES
13.1 Forward Hydraulic Pump No. 1 NA Keep clean from all leakages and clean all line filters at regular interval
13.2 Forward Hydraulic Pump No. 2 NA Keep clean from all leakages and clean all line filters at regular interval
13.3 Aft Hydraulic Pump No. 1 NA Keep clean from all leakages and clean all line filters at regular interval
13.4 Aft Hydraulic Pump No. 2 NA Keep clean from all leakages and clean all line filters at regular interval
13.5 Hydraulic Power Pack (Centralised incl.cargo pump) 10/Jan/21 Keep clean from all leakages and clean all line filters at regular interval
15 ELECTRICAL
15.1 Alternator No.1
15.1.1 Alternator 1 6/Sep/20 Inspect, clean and measure insulation resistance at regular intervals
15.1.2 Clean Air Filter (N/A) NA Clean / renew air filters at regular interval
15.1.3 Main Switchboard Safety Devices 18/Nov/19 Functional test of all breakers and relays simulation at regular intervals
Page 19 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
15.3.3 Main Switchboard Safety Devices 18/Nov/19 Functional test of all breakers and relays simulation at regular intervals
Page 20 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
15.4 Alternator (Turbo Generator)
15.4.1 Alternator NA Inspect, clean and measure insulation resistance at regular intervals
15.4.2 Clean Air Filter NA Clean / renew air filters at regular interval
15.4.3 Main Switchboard Safety Devices NA Functional test of all breakers and relays simulation at regular intervals
16 FAN
16.1 Engine Room Vent. Fan No. 1 20/Nov/19 Dismantle for overhaul during docking / grease 3 monthly
16.2 Engine Room Vent. Fan No. 2 20/Nov/19 Dismantle for overhaul during docking / grease 3 monthly
16.5 IGG Room Supply Fan 30/Aug/16 Dismantle for overhaul during docking / grease 3 monthly
16.6 Purifier Space Exhaust Fan 31/Aug/16 Inspect electric motor and grease bearings at regular intervals
16.7 Paint Store Exhaust Fan 31/Aug/16 Inspect electric motor and grease bearings at regular intervals
16.8 Galley Exhaust Fan 31/Aug/16 Inspect electric motor and grease bearings at regular intervals
16.10 Steering Gear Exhaust Fan 31/Aug/16 Inspect electric motor and grease bearings at regular intervals
16.11 CO2 Room Exhaust Fan 20/Nov/19 Inspect electric motor and grease bearings at regular intervals
16.12 Ballast Pump Rm Exhaust Fan 20/Nov/19 Inspect electric motor and grease bearings at regular intervals
16.13 Deck Store Exhaust Fan 31/Aug/16 Inspect electric motor and grease bearings at regular intervals
16.14 Bow Thruster Rm Exhaust Fan 30/Aug/16 Inspect electric motor and grease bearings at regular intervals
16.15 Welding Plat Exhaust Fan 24/Jul/16 Inspect electric motor and grease bearings at regular intervals
16.16 Bonded Store Exhaust Fan 31/Aug/16 Inspect electric motor and grease bearings at regular intervals
16.17 Hospital Exhaust Fan 31/Aug/16 Inspect electric motor and grease bearings at regular intervals
19 BOW THRUSTER
19.1 Bow Thruster 30/Jan/21 Perform Operation Test.
19.2 Strainer 30/Jan/21 Cleaning
19.3 Oil level 30/Jan/21 Check oil level
19.4 Electric Insulation 30/Jan/21 Check insulation resistance
20 LIFEBOAT
20.1 F.O. Filter 26/Jan/21 Clean F.O.filters at regular intervals
20.2 L.O Renew 10/Oct/20 Renew L.O. based on laboratory test analysis report
20.3 L.O. Filter 26/Jan/21 Cleaning at regular interval
20.4 Air filter 26/Jan/21 Renew air filters at regular intervals
20.5 Batteries 26/Jan/21 Carry out operation test and ensure all batteries fully-charged
20.6 SW Sprinkler Pump (For Enclosed Lifeboat Only) 26/Jan/21 Carry out operational test of SW Sprinkler Pump
21 CRITICAL EQUIPMENT
21.1 Pollution Prevention Equipment
21.1.1 Oily Water Separator 27/Jan/21 Clean filters, level probes and check alarm system at regular intervals
21.1.2 Oil Discharge Monitor 27/Jan/21 Manually check for funtional test at regular intervals
21.1.3 Bilge High Level Alarm 27/Jan/21 Manually check for funtional test at regular intervals
21.1.4 Emergency Bilge Suction Valve 27/Jan/21 Check and clean eductor orifice at regular interval
21.1.5 Incinerator 27/Jan/21 To maintain operational at all times
21.2 Machinery
21.2.1 Main Engine
21.2.1.1 Engine Side Local Control 27/Jan/21 To maintain operational at all times
21.2.1.2 M/E Emergency Stop Switch (ECR and Bridge) 27/Jan/21 Functional test at regular intervals
21.2.1.3 F.O. Leakage Alarm 27/Jan/21 Inspection/Maintenance/Functional test
21.2.1.4 L.O. Low Pressure Trip 27/Jan/21 Inspection/Maintenance/Functional test of pressure switches
21.2.1.5 Oil Mist Detector 27/Jan/21 Functional test at regular intervals
21.2.1.6 Scavenge Air High Temperature Alarm 27/Jan/21 Inspection/Maintenance/Functional test
Page 21 of 24
Vessel Name : MT. OLYMPUS I
Period : February 2021
Note: Please kindly furbish with detailed maintenance/repair report (Form E-09) to substantiate for all the maintainence/repair completed .
Last Maint.
PMS No. Unit / System Description of Work to be done Remarks / Follow-Ups
Date
21.2.4 Steering Gear
21.2.4.1 Emergency Steering 27/Jan/21 Functional Test at regular intervals
21.2.4.2 Hydraulic Oil Tank Low Level Alarm 27/Jan/21 Inspection/Maintenance/Functional test
21.2.4.3 Rudder Angle Limit 27/Jan/21 Inspection/Maintenance/Functional test
Page 22 of 24
Compatibility Report for E-04 & E-05 OLYMPUS ENG PMS OCTOBER
2020.xls
Run on 02/11/2020 16:48
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.
Engine PMS'!D207
Engine PMS'!H102
Engine PMS'!D203:D204
Some cells or styles in this workbook contain formatting that is not supported 3
by the selected file format. These formats will be converted to the closest
format available.
Version
Excel 97-2003
Excel 97-2003