712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

कायो की सूची

LIST OF WORK

भारतीय विमानपत्तन प्राविकरण

AIRPORTS AUTHORITY OF INDIA

रे वियो वनमाा ण और विकास एकक

RADIO CONSTRUCTION & DEVELOPMENT UNIT

काया पालक वनदे शक का कायाा लय (एफ आई यू )


OFFICE OF EXECUTIVE DIRECTOR (FIU)

सफदरजंग एयरपोर्ा नई वदल्ली - 110003


SAFDARJUNG AIRPORT NEW DELHI – 110003

सटेशन का नाम :
Station Name : MOPA(Goa)

इक्विपमें ट: डी.वी.ओ.आर
Equipment: DVOR

P a g e 1 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
149
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

1.0 INTRODUCTION
a) DVOR is to be, installed at the approved site at a location as approved/ communicated
to you by CHQ/NOC Directorate.
b) The detailed drawings are listed in Annexure -IV for carrying out Civil and Electrical works

c) The listed below are for carrying out Civil and Electrical works.

d) This List of Works issued by RCDU is Generic in nature and is issued for detailed
estimates site preparation/readiness against identified Civil, Electrical, CNS related works.
This is for implementing works at site after requisite financial concurrence.

e) Any additional works identified with relation to project at station may, also be
estimated, assimilated, included, carried out, as per recommendation/approval of Airport
/ CNS -In-Charge/RCDU/RHQ/CHQ.

2.0 CIVIL WORKS:


a) Site filling/cutting as approved in NOC may be, completed initially.

b) The site up to a radius of 100 Meter shall be, generally cleared of vegetation such as
trees, plants, and bushes.
c) The DVOR/DME site shall be leveled up to a minimum radius of 65 Mtr, within 1-
5°gradient falling below/above the horizon to meet the minimum siting criteria of DVOR,
from the center of the building.

d) Normally counterpoise level is about 4.5 meter above vicinity ground level, however
wherever site does not meet the referred gradient clearances then counterpoise plinth
level height adjustments needs to be, explored. Such changes in plinth level shall be,
brought to notice of RCDU/NOC accorded by CHQ, before start of plinth works.

e) The site shall have 300 mm hard paved area below the DVOR counterpoise up to a
radius of 18Mtr.
f) The hard pavement/standings works shall be done in coordination with CNS-In-
Charge/RCDU after the 11 no’s cable trenches for laying minimum 120-150 mm OD
Concrete Hume/HDPE pipes, is complete.
g) All these 11 trenches concrete /HDPE pipes shall extend radially out towards the
Openings shown for cable entry exit in shelter drawing.
h) These laid Hume/HDPE pipes along with guy wires shall terminate in a covered manhole.
i) All the Concrete Hume/HDPE pipes shall be, laid in around shelter, below the hard
standing/paved area, along with 3-6mm guide wires, & shall extend radially out, towards
the Openings shown for cable entry exit; tentative lay out drawing is enclosed.
j) 02 cable trenches with Concrete Hume/HDPE along with 3-6mm guide wires shall be
exclusively constructed for laying monitor RF / Power associated Cables on either side of
P a g e 2 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
150
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

& along the monitor path of width about 3ft, constructed from Hard standing to monitor
plinth.
k) This trench shall have regular openings/ covered manhole at every 30 meter.

l) Hard paved area shall be, constructed after laying of HDPE/HUME pipes of 120-150mm
as per drawing for laying of requisite communication armored/non armored cables,
monitor RF cable, Electrical cables, electrical Earth & CNS Equipment, and counterpoise
Earth interconnect etc. For this purpose, about 600m of 150mm HDPE/Concrete Hume
pipe shall be required.
m) The casting of the counterpoise (CP) plinths shall be, completed before starting the DVOR
building works using the referred drawings & Supplied template by CP manufacturer.

n) All measurements for determining location of CP plinths shall be from the center of the
CP structure only and shall not be disturbed until plinths measurements are complete.

o) It shall be noted that distributed load of the CP structure is about 25 tons.

p) The maximum permissible error for CP Centre and Plinths, as per OEM, shall be ± 1cm.

q) The orientation of the CP plinths shall be correct and shall be as per enclosed drawings,
so that the horizontal trusses of CP shall exactly fall in place for CP structure
erection and the load of CP Structure shall evenly fall on the CP plinths.

r) The erected surface/base level of all the CP plinths shall be exactly at the same elevation
level (at water level )so that CP columns gets erected properly.

s) All measurements between the CP plinths shall be, taken from the center of the
cross section each of the anchor bolts.

t) During casting of anchor bolts in each CP plinth, separate template shall be, used
and shall be left over in the CP plinths until final curing of the casting of counterpoise
plinths is complete. This shall ensure anchor bolts to be in right/correct position
until curing is complete.
u) Provision of a cement concrete plinth of size as in 2019/05 (depth) for fixing of ladder
within the periphery of counterpoise is to be made. This plinth shall be above the vicinity
ground level. The location can be, decided in consultation with RCDU at the time of
installation.

v) Monitor Antenna plinth shall be in a direction where minimum 100-110 meter clear
from all obstructions from center of CP is available preferably in any of the most usable
radial (in the west side).

w) Monitor Antenna plinth shall be, constructed in the direction away from the
approach road / main road direction, its template is normally supplied, if not supplied
then it shall not be very different from a single CP plinth.
P a g e 3 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
151
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

x) Monitor Plinth constructed shall support the supplied monitor antenna structure so
that monitor antenna is azimuthally 6 feet (2 meter) above CP level. However, this may
be subject to NOC accorded in consultation with CNS-In-Charge/RCDU. HDPE/Concrete
Hume pipe shall be, laid on either side of Monitor path/road with openings as suggested
above.

y) Generally, the size of the Monitor Antenna mast plinth height is about 30cm above CP
plinth level of DVOR and shall be, provided with bolts to fix the base plate for DVOR
monitor antenna mast using supplied items by OEM. The work of erection of Monitor
Mast shall be, carried out by RCDU installation team.

z) The location of the L1, L2, L3 (for Conventional Vertical Air terminal Lightening
Arrestors) shall be 120 degree apart evenly spread around the CP after minimum 3 feet
hard pavement area.

aa) The Vertical Air terminal lightening arrestors shall be made of 1 inch 90% or more pure
copper rod of 5 feet positioned above 30 feet 2 inch GI pipe.

bb) The LA concrete plinth of these arrestors shall be about 2ft x 2ft x 2.5ft (LBH) and can
be, constructed at the time of erection of DVOR CP.

cc) All the CP works shall be, carried out at site in consultation with CNS-In- Charge/RCDU
Recommendations.

3.0 BUILDING/SHELTER WORKS:

a) The b u i l d i n g /shelter shall be, c o n s t r u c t e d a s p e r Drawing no. 2017/02. This


shall, h o u s e p r o p o s e d DVOR/DME equipment. Orientation of the building shall be
such that its entrance shall face North & the main approach road to building and the
route shall be, finalized in consultation with CNS-In-Charge/RCDU.

b) Constructed building/shelter (DVOR/DME equipment room), as per Drawing


2017/02, walls and roof shall be fitted with fire retardant and self-extinguishing
Wall paneling & false ceiling.

PROVIDING AND FIXING OF WALL PANELING general Specifications: -


1. Provisioned with Fire retardant & self-extinguishing Wall paneling material.

2. Fixing of internal framework with vertical and intermediate G.T. section 80 mm x 26


mm x 0.5mm (similar to MF5 section marketed by Gyp-board).

3. Vertical section shall be, fixed to wall at 1000 mm center-to-center and intermediate at
400 mm c/c.

4. Fixing 10 mm thick EGSB grade Medium Density Fiber (M.D.F.) Board confirming to IS
P a g e 4 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
152
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

12406-1988 such as NUWUD or equivalent to be, fixed on top of above framing with
drywall screws 25 mm long at 300 mm c/c nominal.

5. The boards shall be jointed and finished to have a flush look.

6. Finally fixing on the vertical faces 1.5 mm thick laminate of approved make and shade
shall be, fixed using approved adhesive leaving 1.5 mm wide grooves as desired. (color
shall be RAL 9003 or as approved by CNS-In-Charge)

c) FALSE CEILING
1. 12.5 mm thick, Gyp-board false ceiling with seamless finish is to be, provided in
equipment room. (color shall be RAL 9003 or as approved by CNS-In-Charge)
d) TILE FLOORING
1. Tile flooring is to be, provided in the shelter.

2. Granite vitrified tile flooring of Light Gray (RAL 7004), smooth-antiskid finish, laid on
minimum 20 mm thick base of cement mortar of 1:4 (1 cement: 4 coarse sand), after
applying cement slurry to the back of the tiles and jointed with white cement mixed
with pigment to match the shade of tiles.

3. The color of the tiles shall be light gray (RAL7004 or as approved by CNS-In-Charge).

4. Wall paneling, false ceiling & Tile flooring works is to be carried out after making
provision for Construction of holding joints for Equipment racks, Provision of pipes
in the hole/Openings in the wall, other electrical and duct etc.. works shown in drawing
(2017/02).

e) The day & night marking on the shelter shall be, provided as per ICAO criteria. Provision for
other works as per the requirements projected by local CNS station in charge, in consultation
with RCDU and NOC accorded by CHQ.

f) APPROACH ROAD: A suitable approach/ motor-able road up to DVOR shelter/building


shall be constructed to bear the loaded capacity of a fire truck shall be made from the main
road up to DVOR building.

g) WATER PROVISIONING: Site shelter & Toilet shall be, provisioned with regular potable
water supply using a 1000-Liter overhead water tank.

h) 1” water CPVC pipe with 09 taps opening over earth pits shall be, laid around hard standing.

i) DME Antenna shall be, installed over the CP and its location shall be, indicated to station
by RCDU.

P a g e 5 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
153
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

j) Earth of Lightening Arrestors shall be, interconnected at any point to Earth of


counterpoise, CNS Equipment and electrical main power supply. Two earth pits shall be
minimum 10Mtr longitudinally/radially away each other.

k) The n e w c o n s t r u c t e d shelter shall h o u s e p r o p o s e d new DVOR and DME


equipment along with N+1 UPS, IP based Access Control, IP based Fire Sensing & Control
System, and IP based CCTV. In addition, Electrical Earth shall be interconnected to
counterpoise, CNS Equipment earth.

NOTE:
a. Foundation Bolts and foundation plates are, supplied along with the CP material.
b. Foundation bolts shall be embedded, within in the CP plinths casting during casting.
c. The height of bolt outside the finished top surface of CP plinth shall be 04 inches.
d. One plinth-pair foundations of P-1 & P-2 of CP Plinth shall be aligned to the North.

4.0 ELECTRICAL WORKS

a) Provision of fixing of four 1.5 Ton Split type, single phase, air conditioners with
individual circuit breakers and voltage stabilizers as per drawing (2017/02)

Or

b) fixing of 01 no’s 1.5 ton split type 1 phase air-conditioner and 01 no’s Dual 3 phase 1.5
ton precision air-conditioner, configured in main stand/by mode to cool 03 no’s of
top/bottom/side fed 42U 19” racks of DVOR/DME equipment as per design and
location approved by CNS-In-charge/RCDU.

Note:

 Single phase air conditioner type, shall not be connected in the phase
connected to single phase UPS/supplying power to the equipment.

 The load on each source supply shall be, evenly distributed properly to avoid
phase imbalance & runaway.

c) Dual Redundant SPD Protected RAW/Conditioned Mains power supply shall be


provided to the DVOR building/shelter from the Main Power House through 4 wire
underground cable routed through appropriate Hume pipes arrangement using class
B & C or Type II III surge protectors.

d) The load requirement including the load of air conditioners is approximately 25


KW.

e) The power at the location is to be laid, in underground Hume pipe and terminated in
the main switchboard in the electrical room.

f) The mains switch board to be provided in the electrical room shall have the
P a g e 6 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
154
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

following provisions:

a. 03-Input to 03 output in various tap power source selection mechanism


with bypass mechanism & appropriate indication shall be, made for latching
to incoming source.
b. Mains/Generator auto source, selection mechanism with bypass
mechanism & appropriate indications.
c. Each source shall be, routed through a Power conditioner.
d. These shall be along with appropriate bypass mechanism & indications.
e. Class B SPD shall be, installed in input & Class C SPD shall be, installed to
output of each Power Conditioner.
f. Each source route shall have Two/Three 63 Amp 4-pole Isolator for routing
power source coming from Source 1, Source 2, RAW.
g. After d), each source route shall have Two 32 Amp 4-pole Isolator for
the equipment powering. Output of this Isolator shall be, connected to each
UPS.
h. Each source shall have Two 16 Amp MCB followed by switch/ socket with
05/15 Amp for mast light.
i. The voltage between neutral and electrical earth shall never exceed 2.5 Volt.
j. Appropriate in number of Isolators/MCBS of suitable ratings for air
conditioners, light and fans may be installed in phases, which are not feeding
equipment.
k. All cables shall be of Low Smoke Flame Retardant type.
l. ISO/IEC Standard cable colors shall be used preferably Red for Line, Blue for
Neutral and Green for earths.
m. These shall be connected to the 08 no’s 5/15Amp sockets in each source
evenly distributed in the room shall be in standard sequence. Switch shall
always come in the line & disconnect it.
n. Appropriate Bus Bar arrangement for drawing/distribution of Power
Supply to equipment’s (Nav-Aids) through UPS.
o. A Digital voltmeter selectable to read the input & output voltage along
with frequency on each phase separately.
p. The 5/15 Amp sockets in standard output sequence shall always remain
same under all power source condition, via mains, Generator, Source1/UPS1
or Source2/UPS2.
g) Minimum one 5KVA capacity modular N+1 type online UPS with minimum 60
Minutes full load battery backup facility along with independent battery monitoring
system of international standard/reputed brand/ make shall be installed along with
provision for source selection. Estimate for this UPS shall be included in consolidated
AA&ES.

h) The minimum Specifications are given below –

a. Input : Auto ranging 1phase 160V to 260V, 50 ± 3Hz.


P a g e 7 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
155
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

b. Output : 1 phase 230V + 1%, 50±1 Hz


c. single phase Neutral to ground Voltage: Shall be less than 1 Volt
d. Output Voltage Harmonic Distortion:
e. <2% THD maximum for a 100% linear load.
f. <6% THD maximum for a 100% non-linear load
g. Power conversion Efficiency 80% or better at 50-100% varying load.
h. Output Overload Rating :
i. Normal Operation: 125% for 60 sec before transfer to By-pass
j. Bypass operation:
k. 120% continuous
l. 1000% for >10 milliseconds
i) UPS shall have I/O, O/P, Bypass static switches and shall operate automatically.

j) UPS shall have provision of control mechanism with appropriate indications to control
UPS operation in I/O ON/OFF, O/P ON/OFF, Bypass ON/OFF modes, Emergency
shut down and normal shutdown from local and remote locations.

k) UPS shall preferably indicate i/p, o/p voltage, frequency, power factor, on load, on
battery, battery backup time left may also be available.

l) 3 core 16 sq mm copper wires/cables Fire retardant, low smoke 1100VAC breakdown


voltage shall be installed from UPS to distribution sockets for earth, neutral and phase
at the respective wire pins/clips and shall be appropriately color coded.

m) The UPS shall be, installed in the equipment shelter at a convenient place. UPS shall
be, fed through appropriate MCB/Isolators. The output of the UPS shall be connected
to the input of the type III or class C surge protected 16Amp MCBs having 5/15 Amp
industrial sockets (Qty.06) for feeding equipment’s (DVOR/DME) installed in the
equipment room.

n) The UPS battery shall be of Advanced Glass Mat Valve Regulated Sealed Lead Acid
Battery Construction (AGM or VRSLAB) in ABS Flame retardant (UL94V-O) grade (UL
2436) spill containment casing to meet UL 62368-1 / IEC 62133 or equivalent
standards type.

o) LIGHTS: Four C F L /LED l i g h t s ( 200W c a n d l e s -cent b u l b l i g h t


e q u i v a l e n t ) in watertight enclosures, preferably in IP 65/66 enclosures,
connected via 5/15 Amp individual switch-sockets fed via MCB, for installation at the
four corners of the building to illuminate outside area of the building.

p) SIX (4+2) CFL/LED lights (100W candles-cent bulb light equivalent) preferably in
IP54/55 enclosures with 5/15 Amp individual switch-sockets fed via MCB shall be
installed within the equipment shelter.

q) One wall mountable EMERGENCY LIGHT OF CFL/LED TYPE (60W candles-cent

P a g e 8 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
156
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

bulb light equivalent) shall be, provided in each room.

r) One portable hand held type EMERGENCY LIGHT (Rechargeable) shall be, provided.

s) Preferably generator power supply may be extended from airport operational


essential supply to DVOR shelter, however if essential supply cannot be extended
then provision shall be made to install Low noise 25 KVA DG set with AMF panel and
Auto start Facility, for meeting exigencies of main supply. In such case, DG sets shall,
preferably be of trolley type so that it can be moved easily during transportation for
sets maintenance/ reuse.

t) DG sets shall be, installed at a separate location, in a low noise enclosure at any
suitable place around counterpoise in consultation with CNS-In-Charge/RCDU. DG
set shall not require separate DG room with the exhaust outlet. Exhaust outlet shall
be below the level of CP.

u) Earth of Lightening Arrestors shall be interconnected at any point to Earth of


counterpoise, CNS Equipment and electrical main power supply and shall be installed
minimum 10Mtr longitudinally/radially away from such earth pits. ALL CNS earths &
Electrical Earth shall be, interconnected to counterpoise, & Equipment earth &
Foundation Bolts and foundation plates.

v) PROVISION OF EARTHING PIT: Provision for 11 no. earth pits digging (02 for DVOR
& HP-DME Equipments + 04 for CP + 03 for LA + 02 for field monitor & LA) shall be,
provisioned along with civil or electrical works.

w) Exhaust fan shall be, provisioned at a location as shown in Drawing No.2017/02.

x) ANTI-STATIC MATS shall be, laid completely in DVOR/DME Equipment Room.

y) 6 NO’S ABC/CO2 FIRE EXTINGUISHERS of about 05 KG shall be, provisioned in


DVOR/DME shelter.

z) IP BASED ADDRESSABLE FIRE SENSOR, smoke detection & alarm system shall be,
provisioned in DVOR/DME shelter with status indication at ATS Complex
Equipment/Nav-aid Room.

aa) IP BASED CCTV with 04 no’s day/night IP PTZ cameras with 30 days data storage
shall be, provisioned in DVOR/DME shelter with status indication at ATS Complex
Equipment/Nav-aid Room.

GENERAL IP CCTV CAMERA with equivalent or better specifications

INTEGRATED DAY/NIGHT OUTDOOR HIGH SPEED COLOUR VIDEO DOME


CAMERA WITH PTZ

i. 1/4" or 1/3“ Progressive scan/Interlace Scan CCD or better format

P a g e 9 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
157
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

CCD/CMOS sensor
ii. Number of Pixels 720 X 576
iii. Scanning System: PAL
iv. Resolution: 540 TV Lines or better Scalable resolution from CIF-4CIF
(PAL) in all FPS
v. F=3.4mm to 119mm(approx.)
vi. 35X optical zoom plus 12x digital zoom
vii. Wide dynamic range, Day/Night with Electronic Image Stabilization
viii. Illumination (For Outdoor camera)0.1 (Night) Lux (Color), 0.05 Lux (B/W) or
better
ix. Housing (Outdoor) IP 66
x. Pan Travel 360º Continuous
xi. Tilt Travel 0 - 90º
xii. Unicast /Multicast support,
xiii. Dual H.264 & MPEG/MJPEG video stream for independent viewing and
recording
xiv. Electronic Shutter: 1/2 to 1/30,000 sec
xv. Auto Focus, Auto Iris, BLC/white balance/electronic shutter: On/Off/Auto

xvi. Pan range 360° continuous, Tilt: -5° - +/- 90° (with auto-flip)
xvii. Manual Pan / Tilt speed 240°/sec, Preset Pan/Tilt speed 120°/sec
xviii. 64 Pre-sets per tour
xix. 2 alarm inputs, 2 relay outputs
xx. 32 Privacy masking zones
xxi. External Power supply, if required: As per OEM's design, however generally
AC 230 V @ 50Hz/12V or 24 V AC Rectifier and SMPS if DC supply
xxii. Frame Rate : 1-25FPS for PAL
xxiii. Resolution: Adjustable
xxiv. Bandwidth: 64Kbps to 6Mbps
xxv. Remote access for configuration, viewing and control via standard web
browser.
xxvi. Supported Protocols: As per system design for real time live monitoring and
recording using IPv4, HTTP, TCP, RTSP, RTP, ICMP, UDP, IGMP, RTCP, FTN,
DNS, DHCP, Bonjour, AR etc.
xxvii. Ethernet 10/100 Base-T Auto sensing, Half /Full Duplex (RJ45)
xxviii. Outdoor enclosure with IP66 rated, Vandal proof, Built in Heater and Blower
and shall be of same make as of camera.
xxix. Mount: pipe/corner/ parapet/ pendant with wall mount bracket and as
required
xxx. FCC, CE certified & UL listed for Safety

P a g e 10 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
158
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

5.0 CNS WORKS

The following, m aterials shall be, made available to RCDU at site by the Airport/ CNS In-charge.

5.1 SITE FURNITURE/FIXTURE:


The following items as site furniture shall be, provisioned for shelter. These items can be
included along with AA & ES of C&E works. CNS-Incharge may use this AA&ES to
procure the site furniture or Civil Engg- Incharge may procure and
provide this furniture to site:
a. 3.5ft x 2.5ft computer table-Qty-1no.
b. 4ft x 3ft office table -Qty-1no.
c. Godrej revolving chairs with arms & back rest-Qty -2 no.
d. Godrej office chairs with arms rest-Qty-3 no.
e. Wooden side table cum stool 2ft x 2ft x 3.5ft (height) -Qty-2no
f. 42U Steel Almirah- Qty-1no.
g. Hot and cold Water Dispenser 10 litres-Qty-1no.
h. 360° rotatable about 2 x 2 x 2 feet wheel trolley for test Eqpt.

5.2 INSTALLATION AND EARTHING MATERIAL

Sl. No ITEM SIZE QUANTITY PURITY OF


MATERIAL
1) COPPER PLATE AT LEAST 600MM X600MM 11 NO’S NOT LESS THAN
90%
X3.15MM (THICKNESS) -

2) COPPER STRIP AT LEAST 25MM X 3 MM 200 METER NOT LESS THAN


(THICKNESS) 90%

3) COPPER WIRE AT LEAST 4 MM DIAMETER 250 METER NOT LESS THAN


(NON STRANDED) 90%

4) COPPER ROD 1 INCH DIA X 5 FEET 04 NO’S NOT LESS THAN


90%
5) INSULATED PVC INSULATED COPPER 90 METER NOT LESS THAN
90%
COPPER WIRE CABLE OF 50MM SQUARE
CROSS SECTION
6) GI PIPE 2 INCH X 30 FEET 04 NO’S NOT LESS THAN
3 MM

7) PVC PIPE 2 INCH X 20 FEET 20 NO’S UV RESISTANT


8) PVC PIPE 40 MM X 10 FEET 11 NO’S NOT LESS THAN
3 MM HEAVY
9) HEAVY DUTY PVC 4 INCH DIA 20 METER DUTY
PIPE PLASTIC
CORRUGATED
HOSE

P a g e 11 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
159
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

10) SALT GRANULAR 1320 KG ABOUT 1-3 CM


GRANULES
11) CHARCOAL GRANULAR 1320 KG ABOUT 1-3 CM
GRANULES

12) CABLE TRAY AT LEAST 6” X 10 FEET X 03 NO’S NOT LESS THAN


18 GAUGE 12
SWG
13) EXTENSION 4 X 5/15 AMP WITH 02 NO’S
BOARD
INDIVIDUAL SWITCH WITH
25 METER USING 3 X 1.5
SQ MM COPPER
CONDUCTOR ARMOURED
PVC SHEATHED
14) BAMBOO MINIMUM 20 FEET (200 03 NO’S
DISPOSABLE KG CAPACITY)
LADDER

15) SELF SUPPORTING 2 CROSS LEG MINIMUM 15 01 NO’S


HEAVY DUTY FEET
FOLDING
ALUMINIUM
LADDER

16) BATTERY STAND TO HOUSE 4 X 120 AH 01 NO’S

17) HEAVY DUTY PVC 1 INCH DIA 90 MTRS


PIPE PLASTIC
CORRUGATED
HOSE

18) MOXA N PORT MOXA N-PORT 5250A 12 NO’S


SWITCHES CONVERTERS

19) MODULAR 08/12 PORT & 4 OR MORE 03 NO’S CISCO/


MANAGED IP SFP PLUS JUNIPER/
SWITCHES WITH MODEULES/PORTS EXTREME/
DUAL POWER BROCADE
SUPPLY EACH
20) WITH 04 SFP PLUS
OFC 12 SMF AS PER
POPULATED DISTANCE &
PORTS ROUTE
BETWEEN
SITE AND ATS

P a g e 12 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
160
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

ANNEXURE - I

LIST OF ANCILLARY WORKS FOR DVOR/DME TO BE ARRANGED BY STATION

Station is to provision mandatorily following for assistance of RCDU team and confirm its
availability along with site readiness.

a. Approval of SCARS by CHQ/RHQ


b. Dedicated SUV type transport/Conveyance for 06-07 no’s RCDU team size shall be,
made available at site in view of safety for use of RCDU team during tour period.
c. Labor 08-10 no's per day for the RCDU tour period of 04 to 06 weeks.
d. Materials listed in Para 5.1 and 5.2
e. Crane /Hydra of 15-17 ton with boom not less than 50 feet for minimum 15 days.
f. Total Station for 03-05 days.
g. GAS & ARC Welding machine with welder for minimum 10 days.
h. Availability of Mains Power, Air conditioning and sufficient lighting around
Counterpoise hard standing.
i. Readiness of CNS, Civil and Electrical Works.
j. Airport shall ensure availability of emergency First Aid Medical kit consisting
of minimum antibiotic/antiseptic ointment 02 no’s, cotton with bandage 05 no’s,
Band Aid -30 no’s, Pain Relief Spray/cream 02 no’s, Pain killer tablets 01 strip,
Dettol/Savlon 01 mid-size bottle, Crepe bandage -02 no’s, glucose-200gms, Antacid-
100ml etc..
k. Airport shall ensure RO drinking water availability at site preferably in a water
dispenser type. This water shall be utilized by RCDU & other manpower available.
l. Station may also arrange shifting of CP/Equipment material to site and also confirm
approval for NOTAM likely to utilized in 4th week of RCDU tour for
alignment/tuning.

Payment towards all the above is to be borne by station.

Estimates for provisioning may be made in AA & ES or from station revenue expenditure.

P a g e 13 | 20

Internal document of AAI, RCDU, New Delhi-03 for use by its officers
161
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

Annexure-II

ARMOURED RC LINES & ARMOURED 12F SMF OFC

a. For Extending Indications & Controls to ATS building m i n i m u m 12SMF armored


cable shall be laid preferably through minimum 01 no’s 06” HDPE pipes along with suitable
installation accessories & in minimum 01 no’s 06” dia. about 03mm thickness GI pipe along
with suitable installation accessories in NALLAH areas. These HDPE/GI pipe shall be, laid in
03 feet soft soil below the vicinity ground level & shall be installed in such a way that it
prevents water seepage, i.e. preferably one side in higher/upward inclination maintaining
about 5°. GI & HDPE laid route shall have marker flags at every 30m distance and shall have
03 mm continuous guide wire without joints laid within/inside GI & HDPE pipes for
laying/pulling cables. A minimum 60 cm X 60 cm X 75 cm manhole with a cast iron cover of
appropriate size shall be at every 100m in the route of these pipes.
b. Armored SMF OFC cable is to be laid in ring pattern so as to interconnect DVOR/DME
building & NAV-AIDS Equipment Room at ATS building. This ring can also interconnect other
not integrated NAV-AIDS shelter/equipment to above referred ring of OFC network, for
integration of control/status indicators at ATS positions. Each pair of the cable shall be,
identified and tagged at both ends and good quality splicers/LIU shall be, installed. OFC
cable binders shall be preferred at OFC cable joint locations, which will essentially extend all
fibers without any other active device.
c. If ring pattern of OFC is not feasible then Radio/Wi-Max having minimum 20 Mbps
throughput may be, utilized for completion ring.
d. One 0.6-1mm 10-pair armored jelly filled RC cable and one CAT 6 cable is to be, installed from
NAV-AIDS Equipment room to TWR for DVOR & DME status indications.
e. Construction of manhole of size 2 feet X 2 feet X 3 feet at the location of cable joints. The
manhole will be, filled with sand layer of 3 inch thick.
f. 16 SWG GI sheet Route Markers shall be erected in the shape of a flag of size 10 inch x 6 inch
marked ‘OFC-NAVAIDS’. The flag will be on a 3 feet iron rod out of which 1.5 feet will be,
embedded in the ground. Such markers will be, laid throughout the cable route at an interval
of about 30 m and at any turning in path of cable.
g. Equipment uses Modem Telephony Standards for connecting to RCSU at NAV-AIDS
Equipment Room. However to use OFC these needs to be tapped from another location
within equipment or from Synchronous RS232 port which needs to be converted into Ethernet
standards using MOXA make converters model N-port 5250A (and then to OFC standards
using UTP to fiber optic full duplex media converters with appropriate connectors) or using
TCF 142-S/M or equivalent convertors in pair or may use a pair of VERSITRON V.35 Point-to-
Point Series/ M62xxD /M82xxD Micro Modems with Fiber ports for directly converting modem
tones in fiber media. Each equipment needs a pair for each link/site connection, so a
minimum of 12 no’s MOXA N-port 5250A Converters shall be required for this purpose.
Accordingly minimum 12 fiber link connectivity may be planned which can include status
of UPS, Voice, Surveillance & Fire Alarm Systems etc. Extension up to NAV-AIDS Equipment

P a g e 14 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
162
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

Room.
h. Minimum 08 port Modular Managed Switches Qty-02 no’s each with 04 SFP plus populated
ports shall be provisioned with Dual Power Supply & SFP plus port shall be utilized for
connecting various infrastructures at a shelter to equipment room. Latest Specifications of
available products in market may be enquired from vendors like CISCO/ JUNIPER/ ALLIED
TELESSIS/ BROCADE etc by station to meet the requirements detailed in this LOW.

P a g e 15 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
163
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

Annexure III

POWER SUPPLY SURGE PROTECTION SYSTEM:


SPD’s may be, provisioned at input & output of systems, as assed by CNS & Electrical In-charge, at
below recommended Specifications.

PRIMARY PROTECTION (CLASS B / Type 2): A SURGE PROTECTION DEVICE (SPD) having
100KA 10/350 micro seconds neutral to earth, 50 KA 10/350 micro sec line to neutral, with
limiting voltage less than 1.5 KV shall be provided on the mains power entry point at the incomers
before UPS & shall be of modular type.
1. The enclosure shall be of high quality workmanship and materials suitable for a wall
mounting installation and shall be IP – 42 or higher rated without fan cooling.
2. The offered, Three phase SPD/Single Phase system (as per site requirement) and shall have:
i. Lines protected Line-Neutral and Neutral to Earth + Line to Line + Line to Ground (4 modes).
ii. Nominal Operating Voltage: 220/240 V AC
iii. Input Power Frequency: 47-60 Hz
iv. Protection: Transverse and common mode.
v. Response Time:< 100 ns
vi. Surge rating:10/350 µs pulse response
vii. Voltage Protection Level:< 1.5 KV
viii. The SPDs may also have LED indication per phase, if feasible, to notify the working
status of the SPD.
ix. Approvals and Testing: Listed with UL-1449-3/IEC – 61643 - 62305.
x. Enclosure: IP 42 or higher
All accessories required for installing the Surge Protection System shall be, installed.

SECOND STAGE PROTECTION (CLASS C/Type 3):


1. This protection to be, provided at UPS output/Isolation Transformer output in each phase and
neutral. The protection devices shall be a combination of Multi stage modular MOV devices to
attenuate the surges and noise.
2. All in-circuit SPD shall have associated thermal fuse to isolate the circuit in the event of failure of
SPD Modules.
3. The SPD shall have LED indication to identify/notify the working status of the SPD.
4. LC filter shall attenuate surge voltage to limit peak surge to less than 900 V.
5. The filter shall attenuate noise and power system harmonics by minimum 30 dB.
6. The offered SPD and Series Power Filter shall have:
a) Lines protected : Line-Neutral, Line-Earth and Neutral to Earth.
b) Operating Voltage : 240 V AC (Phase to Neutral)
c) Voltage Drop : < 3 V at full load
d) Efficiency : 99%
e) Response Time : < 5ns
f) Protection Modes : Transverse and Common mode

P a g e 16 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
164
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

g) Protection Stages : MOV, LPF SPD


h) The SPDs shall have LED indication per phase to notify the working status of the SPD.
i) Filter Configuration: LC, transverse and common modes
j) Surge Rating: 40 KA, 8/20 µs
k) Voltage Protection Level : < 0-9 KV
l) Approvals and Testing : UL-1449-3/ IEC 61643 /62305, as applicable.
m) Enclosure : IP-42 or higher.
All accessories required for installing the Surge Protection System shall be, installed.

EARTHING SYSTEMS: Conventional earthing using copper plates as per IS 3043:-


1 Earth Pit of the Size of 1 meter diameter and 3 meter depth shall be excavated, after depth
of 3 meter the size of excavation shall be 900 X 300 X 900mm depth.
2 Plate Electrodes shall be in vertical position.
3 PVC pipe for Watering shall be used of 40mm Diameter, length of 3m (contain hole of
12mm Diameter in Zigzag manner starting from 15 cm away from bottom to 2 meter height).
4 At bottom 150mm layer of salt and charcoal power shall be installed, then Plate shall be
installed.
5 Min 120 Kg each of charcoal powder and salt shall be used for each earthing pit.
6 The plate/pipe electrode, as far as practicable, shall he buried below Permanent moisture level
but in no case less than 2.5 meter below finished ground level.
7 600 mm x 600 mm x 3.15 mm copper plate buried at a depth of 8 ft in vertical position with the
pit filled with alternate layers of charcoal and salt up to 4ft from bottom.
8 The copper plates shall be connected to earth strip by riveting and brazing at no less than two
points and the joints shall be protected by heavy coat of bitumen.
9 Schematic diagram for copper plate earthing is shown in Figure below.

GENERAL REQUIREMENT: Earthing Systems shall comprise of Conventional copper plate


earthing system.
a) Each earth pit shall be 1m diameter and 3 meter depth. Each earth pit shall have 1 No’s
copper plates of 2 ft x 2 ft x 3.15mm size or better shall be connected by Copper Strip of 25
mm wide x 3 mm thick via riveted and brazed to copper plate at minimum 2 points and shall
be extended out of the pit as earth. A PVC pipe 40 mm diameters and 3 meter with holes of
12mm diameter within 15 cm from bottom to 2m height. The pit shall be filled with altering
layers of charcoal, salt & clear soil, as required. Approximately 1 ft of hollow pipe shall be
above the ground level. Proper protection, painting, marking / serial no shall be given to it
and shall be shown in the lay out drawings. This copper plate grounding device shall lead to
the earth distribution plate/bonding unit. Effective Earth resistance from all earth pit shall be
less than or equal to 1-3 Ω.
b) There shall be a Earth Distribution Plate (300 mm x 50 mm x 5 mm), if required, for

P a g e 17 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
165
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

multiple Earth connections to site. The Earth Distribution Plate shall have at least 5 holes
with stainless steel nut and bolt of M8 size. The distribution shall be, mounted on insulator
with C Clamp.
c) The earth distribution plate shall be connected from earth pit by 90% pure Copper Strip of 25
mm wide x 3mm.
d) Connection to the Equipment/system shall be made using 99% pure PVC insulated copper
cable of 50mm square cross section or 99% pure Copper Strip of 25 mm wide x 3mm from
Earth Distribution Plate, as per siting requirements, with stainless steel nut and bolt of M8
size.
e) Earth pit shall be apart from building by about 10m and depending on site conditions.
f) All jointing shall be, brazed with copper.
g) All masonry work (concrete) shall be, made on earth pits protecting, easy identification,
maintenance etc.
h) An earth pit chamber made of lockable plastic material shall be used as inspection
chamber.
i) Earth system shall have minimum useful life of at least 06 years.
j) A detailed drawing for Copper Plate Earthing System is attached to this section.

P a g e 18 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
166
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

Schematic diagram for copper plate earthing

P a g e 19 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
167
712312/2021/O/o GM(RCDU&FIU)

आर आरसीडीयू/ कायो की सूची-06/आम/डी.वी.ओ.आर/2019/ वर्जन 4.3

RCDU/LOW-06/GEN/DVOR/2019/VER 4.3

Annexure IV

Refer the following drawings for list of works:

S.No. Title of Drawing Drawing no.


1 FND PLAN DRAWING COUNTERPOISE CP TSPL/15-16/CP/TEMP-001
2 GA DRG COUNTERPOISE CP 1010 SBC-5T RDA/TSPL/CP/C-01
3 TEMPLATE DRAWING FOR COUNTERPOISE INNER TSPL/15-16/CP/TEMP-001
LADDER_CP 1010
4 TEMP_DRAWING COUNTERPOISE CP-1010 TSPL/15-16/CP/TEMP-001
5 6 Mtr Pole Assembly TSPL/15-16/POLE/6M/2006
6 Antenna Mount Assembly TSPL/18-19/CP/C23
7 C 24 & 25 ASSEMBLY TSPL/15-16/CP/C-24 & C-24A
8 CAT WALK ASSEMBLY TSPL/17-18/CP/C34-40
9 DRG TSPL DME ANTENNA MOUNT TSPL/147-18/CP/DME/PWA-01
10 LADDER ASSEMBLY WITH SAFETY RING TSPL/17-18/CP/RA001
11 LIGHTENING ARRESTOR WITH MOUNTING BRACKET TSPL/17-18/CP-1010/CW-01
12 PROPOSED RAIL FITMENT ASSEMBLY TSPL/18-19/CP-1010/CW-01
13 RAIL FITTMENT ASSEMBLY TSPL/17-18/CP/RA001
14 DRAWING CP COL-12 INNER LADDER TSPL/15-16/CP/GA/STR/CP-121
15 DVOR BUILDING PLAN 2017/02
16 MANHOLE 91/16 A
17 CP INDICATIVE ELEVATION DETAILS 2018/1
18 DVOR EARTHING LAYOUT 2019/1

P a g e 20 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
168
712
1 2 3 4 5 6 7 8 169
712

2100

A 550
A

2100

550
P1
F1
2100 2100

550 550

2100

2100

550
550
P1 P1
F1 F1

2800

B 1950
B

2200

600
P2
F2

2200 2200

2100 600 600 2100


F2 F2

3836

3836
550 550
26000

2100

2100
1950

1950
550

550
2800

2800
C F1
P1
P2 P2 F1
P1 C

2800
2100 1950
2800

1950
550
2200

600

P2

2100

550

2200

600
F2

D D
2100 2100

550 550
2100

2100
550

550
P1 P1
F1 F1
2100

550
2100

550

P1
F1

E E

F Model:

Drawn by
REF: P/N
Checked by Approved by - date File name
SERVICE
Date Scale
F
JITENDER VARUN DKU 13-06-2017 NTS
TITAL:

TRIDENT STRUCTURES (P) LTD.


E-105, SITE-B, SURAJPUR IND,AREA
GREATER NOIDA, G.B.NAGAR (U.P.) DRG. NO. Revision Sheet
RDA/TSPL/CP/C-01
0 1/1

1 2 3 6 7 8
170
712
171
1 2 3 4 5 6 7 8 712
RevNo Revision note Date Signature Checked
Anchor Bolt Holes
P1
3000 4000 6000 6000 4000 3000
P7 P6 156
330 330 106

A T3 T2
A
M12x45
Hex Bolt A
2670

2670

3000
T5 T14
T1
T4 1044
0 0
P2 1044 50
25 56
330 330 50
T7 T7 206

6670
7000

7000
25
P2

T6
T6
60 330 60 DETAIL A

4000
105 15
M12x45
T1 Hex Bolt
6000 6000
T4

B P4
T10 P3
P4
330
50
25 60 3xM20
Hex Nut B
2xM20

125
Plain washer
T9 Ø150
T10
9670

9670
1044
0

450

450
300

330
1044

T8 Ø20

450

450
M20x450

0
T6 Anchor Bolt

3856
2176
T2
T12 T3 50 25 60
6000

6000
85
311

84
T8X PL-100x8x100

84
T9

85
311 21 T13 60 Ø22

T7
135
135 T7 Anchor Bolt
P4
P4 165 270 Qty:82+16 =98 Nos.
290 150
P5 P1 15

1689
T11
C P1
T5 P3 9659 2146
P3 567 T5 Ø22
C
DETAIL C

27
T6
25670

12000

11670
81
330 330 330

8
T6X
567 450
T10 T10

8
T10 150

81
393 60 330 60 M12x45

27
M16

P4
T10
C 193 150
33
567
25 400 25
567
Hex Bolt

50
150 193 Anchor Bolt Hole
33

60
P4 100 Ø150 25 100
T7 T7
84
85

T9
6000

6000
T8

85

260

330
195

195

195

195
60

60
6670 11670 6670

84
Ø22
330 330
T2
T3 Ø22 32 100 32
100 Ø22

60
T6
1044

0
343 507 400 507 343

1044
9670

9670
D D
0

T10
T8 2150
T9 330

P4
T10 P3
P4
DETAIL D
T4
D T1
BOQ Mark. No. Section Length Qty.

4000
T6 P1 PL-450 x 6 450 4
T7 Mark. No. Section Length Qty.
T7 P2 PL-450 x 6 450 4
T6 T1 ISA45X45X5 5086 4
P3 PL-450 x 6 450 4
7000

7000

6670

T2 ISA45X45X5 5086 4
P4 PL-260x6 393 8
330 330 T3 ISA45X45X5 5086 4
P5 PL-180x8 371 1
T4 ISA45X45X5 5086 4
P6 PL-40x6 156 12
0
1044
T5 ISA45X45X5 4050 4
P2 1044 P2 P7 PL-40x6 206 12
0
E T6 ISA45X45X5 4050 7
E
2670

2670

3000
T1 T4 T6X ISA45X45X5 4050 1
T5 T7 ISA45X45X5 6424 8
S. No. HARDWARE QTY
T8 ISA45X45X5 3453 3
T2 T3 1 M12x45 With 1nut, 1pw, 1sw 200
T8X ISA45X45X5 3453 1
M20x450 with 3nut, 2pw
T9 ISA45X45X5 2 (anchor bolt) 82
3453 4
330
P1 T10 ISA45X45X5 2150 8 M20x450 with 3nut, 2pw
2670 9670 9670 2670 3 (anchor bolt) for 4m & 6m 16
T11 ISA45X45X5 1461 1 Pole
330 330 330 330
T12 ISA45X45X5 1150 1
T13 ISA45X45X5 361 1
T14 ISA45X45X5 206 12

330
Model: TSPL-CP-12 P/N SERVICE
Drawn by Checked by Approved by - date File name Date Scale
F S.M.NAYEEM S.K. AMAN PANKAJ CHHATWAL CP-12_COL 19-05-2017 NTS F
TITAL:
TRIDENT STRUCTURES (P) LTD. GA DRAWING TEMPLATE CP-12N
E-105, SITE-B, SURAJPUR IND,AREA DRG. NO. Revision Sheet
GREATER NOIDA, G.B.NAGAR (U.P.) TSPL/15-16/CP/TEMP-001 01 1/25

1 2 3 6 7 8
172

4
712312/2021/O/o GM(RCDU&FIU)

Ø225x6Th
Cap Plate, 1Nos

Ø225x12Th
FLANG, 1Nos

SPECIFICATIONS:
1. HEIGHT OF POLE :6Mtr
2. WIND LOAD :120KMPH.
A

A
3. HEAD LOAD :20Kgs.

PIPE
Ø114.3mmX4.5W.T
B

B
Ø225x12Th
FLANG, 2Nos

GI Ø6mm ROPE
3 Nos, 120°

RIBS
4Nos
C

C
Ø6 THIMBLE
D

D
Ø12 D SHACKLE

Ø12 TURN BUCKLE

PIPE
Ø114.3mmX4.5W.T

PL600X12, - 600 Lg
1Nos
Ø16X700
GUY ROPE ANCHOR ROD
RIB
100X100X6
E

Ø20X450
ANCHOR BOLT

PL100X100X6

SIDE ELEVATION

TRIDENT STRUCTURES (P) LTD.


F

TRIDENT STRUCTURES (P) LTD.


1 2 3 4 5 6 7 8
173

A A
B B
PIPE 101.6X5.6 OD
500 PIPE 89.0 OD
4xM12x150
141 40x5 162 Bolt with Nut & 2 PW
C C
Ø14
8 8
1220
SECTION C-C
3 500 PIPE 89.0 OD
D 8° 8° D
200
Ø130
A C B 25 150 25
12
Ø103 Ø14

50
200

100
E E

50
4Slot 12x30 121 40x6 142
712312/2021/O/o GM(RCDU&FIU)

136
Ø180
A C B
18 14 14 18
1220
PIPE 101.6X5.6 OD
SECTION B-B
SECTION A-A
Drawn by Checked by APPROVED BY File name Date Scale
F S.M NAYEEM MADAN LAL P.CHHATWAL 22-02-2019 NTS F
TITAL:
DRG. NO. Revision Sheet
**STAR MARK DIMS ARE CRITICAL** Machining Symbol (Before Hot Dip Galavanised) TSPL/18-19/CP/C23 03 1 of 5
1 2 3 Plot Date : 22-02-2019 6 7 8
174
1 2 3 4 5 6 7 8
712
BOQ-C24-25 ASSLY 25b
Mark. No. Section Length Qty. 16 ASSLY.
A C25a ISMC75X40 2804 1 16
25a A
C25b PL-139.5X4 838 6 96

C25c FL-40x4 410 2 32 24c 24b


C24a ISMC75x40 2509 1 16

C24b ISA35x35x5 710 2 32

C24c PL-45X6 75 4 64

**TOTAL NO. OF ASSLY. IN COUNTER POISE ARE 12 NOS.** 24a


B B
2744
74 787 149 773 145 748 68
24
789 150

788
5 2804 150
92 25c
14 2788 788

546
7.5° 24c
C C

251
790

710

838

710

7.5° 74
92

1276

1276
5 7.5°

2509

788
24

727
686

730
D 74
150 D
686
486

2493 150

686

31
74
684 149 673 145 649 68
116
2442
E E

41

116
75
2744

Drawn by Checked by APPROVED BY File name Date Scale


F S.M NAYEEM S.K.AMAN . S.K AMAN TSPL- CP25 05/08/15 NTS F
TITAL:
TRIDENT STRUCTURES (P) LTD.
DRG. NO. Revision Sheet
TSPL/15-16/CP/C24&24A 03 1 of 7

1 2 3 6 7 8
175
1 2 3 4 5 6 7 8 712

C34 C40
HARDWARE
Mark.
C35 ITEM Qty.
C38 No.
A B-1
A-1 B-1 A
A-1 A-1
A HEX BOLT M8x35 With 1Nut 1PW 48
A-1 B-1
B-2 B-1
C36 B-1 A-1 Sq. U BOLT 70X90 With 2Nut 2PW
A-1 C37 B 76
A-1 A-1
B-2 C J HOOK (125) With 1Nut 1PW 32
B-2 B-2 A-1
A-1 C39
B-1 B-1 D HEX BOLT M12X50 With 1Nut 1PW 12
B-2 B-2
A-1 A-1
C36
C37 A-1 B-2 B-2 A-1
B-1 B-1 B-2 B-1 B-1
C41
B B-1
B
B-2 B-2
A-1 A-1
A-1 B-1 A-1
B-1
C38 B-1 C35
B-1 B-2 B-2 B-2 B-2

B-1
B-1

A-1 A-1
A-1 A-1
C40 C31
C B-1
B-1
C

C-1
C-1
C-1
C-1
C-1
C-1
C-1
C-1
C-1
B-1 B-2 B-2 B-2 B-2 B-1 C34
C-1 C-1 B-1
D-1 D-1 C-1
C-1
D-1 D-1
C-1 C-1
A-1 D-1 D-1
A-1 C-1 C-1 A-1 A-1
C30 D-1 D-1
C-1 C-1
C34 D-1 D-1
C-1
D-1 D-1
C-1 C30a
C-1 C-1
B-1 B-2 B-2 C-1 B-2 B-2 B-1
C40

C-1
C-1
C-1
C-1
C-1
C-1
C-1
C-1
D A-1 A-1 A-1
A-1 D
C35
B-2 B-2 B-2 B-2 B-1

B-1 C38
A-1 A-1
A-1
A-1

B-2 B-2
B-2
E C36
B-1
A-1 B-1
B-2
A-1 B-1
C37 E
B-1
A-1 A-1
B-2 B-2

B-1 B-1
A-1 B-2 A-1
B-2
C37 B-2 B-2 C36
A-1 A-1 A-1
B-1 B-2 A-1
A-1 B-1
B-1
C35
C38 A-1 A-1
B-1 B-1
A-1 Drawn by Checked by APPROVED BY File name Date Scale
F C40
S.M NAYEEM S.K.AMAN . S.K AMAN TSPL- CP12 05/08/15 NTS F
C34 TITAL:
TRIDENT STRUCTURES (P) LTD.
DRG. NO. Revision Sheet
**STAR MARK DIMS ARE CRITICAL** TSPL/17-18/CP/C34-40 03 1 of

1 2 3 6 7 8
176
712

TRIDENT STRUCTURES (P) LTD.


177
712

PL
TS
FL-40X4
ISA 65X65X6

25@300

ISA 65X65X6

MADAN LAL 22-02-2019


1 2 3 4 5 6 7 8
178

A A
LA ASSLY.
INSULATOR
300 20 75
B B
22
14
200

200

200

LA MOUNTING BKT.
22
75
20 855 200 875
C Ø20
C
BASE SUPPORT
2500

ISMC75
D D
E Ø60.3x3.6 E
2000
712312/2021/O/o GM(RCDU&FIU)

6
75 75
2100 200
Drawn by Checked by APPROVED BY File name Date Scale
F S.M NAYEEM MADAN LAL P.CHHATWAL 22-02-2019 NTS F
TITAL:
DRG. NO. Revision Sheet
**STAR MARK DIMS ARE CRITICAL** TSPL/17-18/CP-1010/CW-01 02 01
1 2 3 Plot Date : 22.02.2019 6 7 8
1 2 3 4 5 6 7 8
179

A 820 A
C17
C17a
C17e

C17b
C17d

C17c
C17c

B C17d

B
C17b
820
C17e

C17a
C C
900

C17
C17

820
C17a

888 887 WALK WAY


900
C17e
D D
885 885
2855
820
PCD 13567
C17b

888 887 WALK WAY


14350
885 885 C17d
2855
PCD 13567
14350
C17c

C17c
E E
C17d

C17b
712312/2021/O/o GM(RCDU&FIU)

C17e
C17a
C17
30500
PLAN PORPOSED RAIL FITMENT ASSLY
& WALK WAY
Drawn by Checked by APPROVED BY File name Date Scale
F S.M NAYEEM MADAN LAL 21-02-2019 NTS F
TITAL:
DRG. NO. Revision Sheet
TSPL/18-19/CP-1010/CW-01 03 01
1 2 3 Plot Date : 21.02.2019 6 7 8
180
712
181
712
182
712

FALSE CEILING
WATER
TANK

SUN SHADE

FLOOR LEVEL

HARD STANDING HARD STANDING HARD STANDING HARD STANDING

FRONT VIEW SIDE VIEW

EARTH PIT
MAINHOLE
5M
COL

EARTH PIT
MAINHOLE
5M

ALUMINIUM FRAME WITH GLASS


AND BOARD PARTITION
EARTH PIT
MAINHOLE

5M
EARTH PIT
MAINHOLE

5M

EF EF EF
D4

LEGENDS:-

D3
HARD STANDING
PREFERABLY CEMENT
LED LED 1. ROOF HEIGHT OF KITCHEN AND PANTRY
INTERLOCK BRICK

TOILET PANTRY
SHOULD BE LOWER AS SHOWN
2. EF 15" DIA. EXHAUST FAN
3. LED TUBE LIGHT
BATT. ROOM ELECTRICAL ROOM 4. WEATHER PROOF LIGHT
2.175M x 3M 2.675M x 3M
LED LED 6" HOLE FOR
5. D 1.5 M WIDE WOODEN DOOR
CABLE TRENCH
6. D1 1.5 M WIDE ALUMINUM DOOR WITH
W

D3
GLASS & BOARD
D3 D3
7. D2 0.9 M WIDE ALUMINUM DOOR WITH
5M

COL
UPS COMM DME
COL
RACK GLASS & BOARD
LED
8. D3 0.75 M WIDE WOODEN DOOR

OD UNIT
EARTH PIT MAINHOLE

A/C
LED

4" HOLE FOR RF CABLE 9. D4 1.2 M WIDE WOODEN DOOR


OD UNIT

10. W 1.2M x 1.2M WINDOW


A/C

LED
11. A/C 1.5 TON AIRCONDITIONER

VOR
12. CEILING FAN
W

EQUIPMENT ROOM
5M x 4.1M
WORK AREA ROOM
3.5M x 4M
2 NOS. CABLEENTRY HOLES 1FT
SEPARATE AT 2.75 M HT.
13. 5 AMP. POWER PLUG
14. 15 AMP. POWER PLUG
LED LED
2" DIA HOLE FOR RC
CABLE
15. MON = MONITOR PLINTH UP TO 110M
D3 AND MAIN HOLE AT EVERY 30M.
A/C A/C A/C

D2
16. LA = LIGHTNING ARRESTOR PLINTH
D1
W W
OD UNIT OD UNIT OD UNIT
LA PLINTH
D 5M
2M EARTH PIT
MAINHOLE
SUN SHADE

LED LIGHT

COL

5M LA PLINTH
AIRPORTS AUTHORITY OF INDIA
2M
LA PLINTH
EARTH PIT
EARTH PIT
MAINHOLE RADIO CONS. AND DEV. UNIT
MAINHOLE
DATED
RCDU DRG NO. 2017/02 29-07-19
PREPARED BY : APPROVED BY :

EARTH PIT MAINHOLE

CHECKED BY :
DETAIL OF DVOR BUILDING FOR TRIDENT STRUCTURES COUNTER POISE
RADIO CONS. & D. UNIT
NEW DELHI
183
712312/2021/O/o GM(RCDU&FIU)
184
712
1 2 3 4 5 6 7 8
185
712312/2021/O/o GM(RCDU&FIU) DVOR EARTHING BASIC LAYOUT DIAGRAM
A EA6
NORTH A
P5 REFERENCES
LEGEND DESCRIPTION
MH5 MON MONITOR PLINTH
LA3
P6
MH(1-20) MAN HOLE
MH12 LA EARTHPIT WITH
P12
MAN HOLE FOR
B MH4 MH6
LIGHTINING B
ARRESTOR
EA EARTH PIT WITH
MAN HOLE
120-150MM HDPE
P1
MH20 MH19 1 INCH CPVC
MH14 MH13 WATER PIPE
EA1
WATER TAP
MH15
C MON
WT WATER TANK C
EA2 110M EA5
MH16 MH11 DVOR Building
MH1 MH3
P11 P4 11mX8m P2
MH7
P7
EA3
WT

MH18
D MH17 D
P3

MH2
MH10
MH8

P8
P10 LA3
E LA1 MH9 E

P9
EA4

F
AIRPORTS AUTHORITY OF INDIA F
TOTAL NO OF MAN HOLE =24
WATER TAP SHOULD BE 2 FEET ABOVE EARHPIT RADIO CONS. AND DEV UNIT
CONNECTED TO 1" C PVC PIPE
RCDU DRG NO 2019\01 DATED 14/12/2019

1 2 3 6 7 8
186
712312/2021/O/o GM(RCDU&FIU)

4 3 3 4

4 3 3 4
4 3 3 4
3 4
4 3

3 4
4 3 2

3 4
4 3

3 4
4 3
3 4
4 3 5 6 7 8
3 4
4 3
3 4
4 3 1
3 4

13 12 11 10

STEEL REINFORCEMENT DETAIL