Ethnicity AT Vijaywada CKT Area Primary-DB Secondary LDB: From TO Wire Size Vertical Horizontal End Drop Total Length

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

ETHNICITY

AT
VIJAYWADA

CKT Area Primary-DB Secondary FROM TO WIRE SIZE VERTICAL HORIZONTAL END DROP TOTAL LENGTH
LDB LDB 1 R6 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 10 2 16
R1 18 15 LDB 1 B6 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 22 2 28
R2 20 36 ckt 3 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 20 2 26
R3 18 35 ckt 4 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 22 2 28
R4 20 33 ckt 2 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 12 2 18
R5 18 34 SB SB 2R x 2.5sq.mm + 1.5s.mm (E)
R6 SB SB 2R x 2.5sq.mm + 1.5s.mm (E)
R7 17 46
R8 16 65
R9 17 29
LDB
Y1 27 19
WIRE SIZE LENGTH 30% ROUND
Y2 26 15
Y3 36 23 2R x 2.5sq.mm + 1.5s.mm (E) 116 150.8 180
Y4 28 15
Y5 26 25
Y6 25 32
Y7 27 19
Y8 22 31
Y9 22 26
LDB
B1 22 29
B2 22 17
B3 25 33
B4 36 31
B5 25 15
B6
B7 27 29
B8 25 24
B9 29 45
INVDB
CKT 1 18 38
CKT 2
CKT 3 22 37
CKT 4
CKT 5
CKT 6
CKT 7
TOTAL 634 796

824.2 1034.8
1214.8
1358.5 2109.2
ETHNICITY
AT
VIJAYWADA

CKT Area Primary-DB Secondary FROM TO WIRE SIZE VERTICAL HORIZONTAL END DROP TOTAL LENGTH
LDB LDB 2 R1 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 42 2 48
R1 LDB 2 R2 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 34 2 40
R2 LDB 2 Y1 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 41 2 47
R3 16 31 ckt 5 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 22 2 28
R4 15 25 ckt 7 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 47 2 53
R5 14 24 ckt 8 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 24 2 30
R6 15 18 LDB 2 B4 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 10 2 16
LDB ckt 6 SB 2R x 2.5sq.mm + 1.5s.mm (E) 4 27 2 33
Y1
Y2 14 12
Y3 20 23
Y4 20 13
WIRE SIZE LENGTH 30% ROUND
Y5 23 10
Y6 20 8 2R x 2.5sq.mm + 1.5s.mm (E) 295 383.5 390
LDB
B1 16 35
B2 27 22
B3 24 10
B4 16 23
B5 17 22
B6 27 8

INVDB ( 2nd F& Terrace)


CKT 1 22 33
CKT 2
CKT 3 31 32
CKT 4
CKT 5 28 28
CKT 6
CKT 7 26 8
CKT 8 20 3
TOTAL 411 388

534.3 504.4
894.4
ETHNICITY
AT
VIJAYWADA

Primary Secondary Primary Secondary


CKT Area Legend Length Legend Length Conduit Conduit
RPDB
R1 16A S/S 30
Y1 16A S/S 31
B1 CONNECTOR 27 6/16A S/S,6/16A S/S 19
R2 6A S/S 17 6/16A S/S 9
Y2 6/16A S/S 27 16A S/S 14
B2 CONNECTOR 26 CONNECTOR,CONNECTOR 14
R3 6/16A S/S 18 6A S/S,6/16A S/S,6/16A S/S 26
Y3 E3 16 16A S/S,16A S/S 12
B3 6A S/S 16 6/16A S/S,6/16A S/S 33
6/16A S/S,6/16A S/S,6/16A
R4 6/16A S/S 26 S/S,6/16A S/S 17
Y4 CONNECTOR 37 CONNECTOR 10
B4 6/16A S/S 30 6/16A S/S,6/16A S/S,6/16A S/S 13

UPSDB
CKT 9 6A S/S 37 6A S/S
CKT 1 E3 30
CKT 2 6A S/S 28 6A S/S 10
CKT 3 CONNECTOR 27
CKT 4 6/16A S/S 18 E1,E1,E1 29
CKT 5 6/16A S/S 16 10
CKT 9 6/16A S/S 45
TOTAL 502 216 0 0

502 216
652.6 280.8

933.4
977

1910.4
ETHNICITY
AT
VIJAYWADA

Primary Secondary
CKT Area Legend Length Legend Length
RPDB 2
R1 6A S/S 12 16A S/S,16A S/S, 18
Y1 16A S/S 20 16A S/S, 12
R2 16A S/S 28 CONNECTOR 11
Y2 16A S/S 30 16A S/S 32
B2 16A S/S 27 16A S/S 14
R3 6A S/S 32 16A S/S(3) 18
Y3 6A S/S 34 16A S/S 16
B3 E2 31 E2,E2 18
UPSDB
CKT 6 Back Office 6A S/S 39 6A S/S, 10
CKT 7 Back Office 16A S/S 30 16A S/S,16A S/S 14
CKT 8 Back Office 16A S/S 26 16A S/S 18

TOTAL 309 181 0 0

309 181
401.7 235.3 340
ETHNICITY
AT
VIJAYWADA

From To Circuit Breaker Cable Size Run Terminations Vertical Horizontal End Drop Sum Total Length
1941 - ETHNICITY AT VIJAYWADA

Main Panel 1st Floor LDB1 63A TPN MCB 4C x 16sq.mm AL.PVC Cable+Earth 1 2 2 8 2 12 12
Main Panel 2nd Floor LDB2 63A TPN MCB 4C x 16sq.mm AL.PVC Cable+Earth 1 2 2 20 2 24 24
Main Panel 1st Floor INV DB 32A DP MCB 3C x 6sq.mm Cu.PVC Cable 1 2 2 8 2 12 12
Main Panel 1st Floor RPDB 1 63A TPN MCB 4C x 16sq.mm AL.PVC Cable+Earth 1 2 2 8 2 12 12
Main Panel 1st Floor RPDB 2 63A TPN MCB 4C x 16sq.mm AL.PVC Cable+Earth 1 2 2 20 2 24 24
Main Panel 1st UPS DB 63A DP MCB 4C x 10sq.mm Cu.PVC Cable+Earth 1 2 2 10 2 14 14
Main Panel ODU 1 -12 HP 40A TPN MCB 4C x 10sq.mm Cu.PVC Cable+Earth 1 2 2 56 2 60 60
Main Panel ODU 1 -12 HP 40A TPN MCB 4C x 10sq.mm Cu.PVC Cable+Earth 1 2 2 56 2 60 60
Main Panel ODU 1 -12 HP 40A TPN MCB 4C x 10sq.mm Cu.PVC Cable+Earth 1 2 2 56 2 60 60
Main Panel ODU 1 - 14 HP 40A TPN MCB 4C x 10sq.mm Cu.PVC Cable+Earth 1 2 2 57 2 61 61
Main Panel ODU 1 -12 HP 40A TPN MCB 4C x 10sq.mm Cu.PVC Cable+Earth 1 2 2 50 2 54 54
Main Panel ODU 1 -18 HP 40A TPN MCB 4C x 10sq.mm Cu.PVC Cable+Earth 1 2 2 51 2 55 55

MCB UPS 4C x 10sq.mm Cu.PVC Cable+Earth 1 2 2 10 2 14 14


UPS MCB 3C x 16sq.mm cu Flexible cable 1 2 2 10 2 14 14
MCB INV 3C x 6sq.mm cu Flexible cable 1 2 2 10 2 14 14
INV MCB 3C x 6sq.mm cu Flexible cable 1 2 2 10 2 14 14

Grd floor
CABLE SIZE TER LENGTH 20% Total length
4C x 16sq.mm AL.PVC Cable+Earth 8 72 86.4 100
4C x 10sq.mm Cu.PVC Cable+Earth 16 364 436.8 440
3C x 16sq.mm cu Flexible cable 2 14 16.8 20
3C x 6sq.mm Cu.PVC Cable+Earth 6 40 48 45
4C x 6sq.mm Cu.PVC Cable+Earth
ETHNICITY
AT
VIJAYWADA

Cable Tray
Flooor 150MM 300MM
Ground Floor 36
First Floor 39
Second Floor 41
Terrace 16 28
Total 132 28
20% Extra 158.4 33.6
Round Off 200 35
power
data
ETHNICITY
AT
VIJAYWADA

Ground Floor First Floor Second Floor Terrace TOTAL GRAND TOTAL 30% DROP
25 mm HMS 15 15 15 19.5 20 25 mm MMS 25 mm MMS
20 mm HMS 30 15 12 57 57 74.1 80 29 8
25 mm MMS 200 158 90 250 698 846 1099.8 1200 116 32