Download as pdf or txt
Download as pdf or txt
You are on page 1of 35

CONSTRUCTION OF CPF COMPLEX AND

DEVELOPMENT OF KANDYM GROUP OF


FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

DDS FOR EAM

8009-0092-00-IN-003-J15-10002-E

00 17.08.2016 ISSUED FOR APROVAL J.A SHIN N.S.YOON J.H.LEE

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 1 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

TABLE OF CONTENTS

1. INSTRUDUCTION .......................................................................................................... 3
1.1 PURPOSE ................................................................................................................................................... 3

1.2 SCOPE ........................................................................................................................................................ 3

1.3 PROJECT DESCRIPTION .......................................................................................................................... 3

2. ABBREVIATIONS .......................................................................................................... 4

3. REFERENCE DOCUMENTS ......................................................................................... 4

4. TECHNICAL DESIGN DATA BUILDING ....................................................................... 5


4.1 FUNCTIONAL LOCATION CODING .......................................................................................................... 5

4.1.1 SCOPE OF FUNCTIONAL LOCATION CODING ................................................................................ 5


4.1.2 FUNCTIONAL LOCATION CODING RULES ...................................................................................... 9
4.1.3 DESCRIPTION OF FUNCTIONAL LOCATION ................................................................................. 10
4.1.4 FUNCTIONAL LOCATION HIERARCHY .......................................................................................... 12
4.1.5 DETERMINING REQUIRED FIELD FOR FUNCTIONAL LOCATION ............................................. 20

4.2 PIECE OF EQUIPMENT (PE) ................................................................................................................... 22

4.2.1 SCOPE OF PIECE OF EQUIPMENT ................................................................................................ 22


4.2.2 DESCRIPTION OF PIECE OF EQUIPMENT .................................................................................... 22
4.2.3 EQUIPMENT HIERARCHY ................................................................................................................ 24
4.2.4 DETERMINING REQUIRED FIELD FOR PIECE OF EQUIPMENT ................................................. 24

4.3 EQUIPMENT CLASSIFICATION .............................................................................................................. 27


4.3.1 SCOPE OF EQUIPMENT CLASSIFICATION ................................................................................... 27

4.4 MATERIAL (SPARE PARTS) ................................................................................................................... 28

4.4.1 SCOPE OF MATERIAL DATA ........................................................................................................... 28


4.4.2 DESCRIPTION OF MATERIAL .......................................................................................................... 28
4.4.3 DETERMINING REQUIRED FIELD FOR MATERIAL ...................................................................... 29

4.5 EQUIPMENT BOM (Bill Of Material) ....................................................................................................... 33

APPENDIX #1 ................................................................................................................................................... 34

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 2 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

1. INSTRUDUCTION
1.1 PURPOSE
The purpose of this document is to describe the detail technical design of
equipment data for the “Construction of CPF Complex and Development of
KANDYM Group of Fields” Project.
Data configuration is a basic fundamental of qualified Computerized Maintenance
management system and enable users to implementation in the below.

 Improve plant integrity, reliability and confidence level of maintenance


 Maximize plant availability by efficient and accurate data construction
 Implement and input data to establish wide cost-effective Plant
Maintenance system

1.2 SCOPE
This technical design detail defines the data scope, hierarchy, description naming
rules, requirements and responsibilities to be followed for uploading SAP system,
maintenance management of Equipment, Spare parts for the PROJECT.

This technical design detail shall be confirmed by COMPANY whether it is


acceptable. Otherwise, COMPANY shall comment according to the respective
application, Functional Location, Piece of Equipment, Equipment Classification,
Materials. No comments from COMPANY would be considered as “Approval”

This technical design details is intended to define the COMPANY's requirement


to be performed by CONTRACTOR for the following activities.

• Equipment Data capturing & providing to COMPANY


• Arrangement Equipment Classification
• Materials Data capturing & providing to COMPANY

1.3 PROJECT DESCRIPTION


LUKOIL Company is developing the KANDYM Group of Fields. The site is
located on a part of Karakul region, Bukhara Province, Republic of Uzbekistan.

The development includes drilling of production wells, construction of the gas


gathering system, central gas processing facilities, export gas compression
station, associated utilities / pipelines and other supporting facilities to support
the operations and maintenance of the plant for the production of sales gas,
stabilized condensate and elemental sulfur.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 3 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

The total capacity of the KANDYM Group Filed new CPF facilities is 8.1BCM of
reservoir fluid. The plant will include all processing units, utilities, offsite and
infrastructure necessary to produce sales gas, stabilized condensate and Sulfur.

2. ABBREVIATIONS
COMPANY LUKOIL Uzbekistan Operating Company

CONTRACT Agreement between HEC and Honeywell

CONTRACTOR Hyundai Engineering Co. (HEC)

EAM Enterprise Asset Management (System)

PROJECT ICSS KANDYM

The site where EAM is installed and operated,


SITE especially LUKOIL Uzbekistan Operating
Company

VENDOR Honeywell and its sub supplier for this project

FL Functional Location

PE Piece of Equipment

3. REFERENCE DOCUMENTS
• Technical Directions for MES Development (8009-0092-HUND-00-000-IN-TR-
00009-E-01)
• Equipment Functional Location Coding Instruction (8009-9000-LUOC-0000-000-
MAI-REG-000003-EN-A4).
• The procedure for numbering objects (8009-9210-KNMP-0000-000-DCC-REG-
000010-RU-A3).
• Material Directory (ПР-02-0905 Справочник материалов)

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 4 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

4. TECHNICAL DESIGN DATA BUILDING


Data building according to Equipment and spares for SAP system in KANDYM
will be performed by CONTRACTOR.

Following lists are necessary things for uploading data in SAP system;

• Functional Locations Coding


• Piece of Equipment
• Equipment Classification
• Materials
• Equipment Bill Of Material

4.1 FUNCTIONAL LOCATION CODING


4.1.1 SCOPE OF FUNCTIONAL LOCATION CODING

Requirement to coding of equipment in accordance with <Equipment


Functional Location Coding Instruction> in chapter 3 will be necessarily
created as respective FUNCTIONAL LOCATION CODE.

FUNCTIONAL LOCATION (FL) means object of repair and maintenance


that constitutes a hierarchically organized structure representing an
individual operational unit or a spatial object.

The requirements of Functional Location code shall apply to all type of


equipment indicated in AS-BUILT P&ID document.

Following contents separated by discipline can give the specific information


where necessary data will be captured as Functional Location Code.

4.1.1.1 MECHANICAL / INSTRUMENT / FIRE-FIGHTING (MECH/INST/F.F)

1) REFERENCE : P & ID (AS-BUILT)


VENDOR PRINT (DATASHEET, GA DWG, Sectional DWG)

2) GENERAL RULE

2.1) The need for coding Equipment in mechanical, instrument and fire-
fighting is imperative to which is indicated in P&ID. Contractor extracts
list of all valid Tags in P&ID and codes as Functional Location through
the rules indicated in coding instruction (8009-9000-LUOC-0000-000-
MAI-REG-000003-EN-A4) provided by COMPANY.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 5 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

2.2) Contractor lists-up the Tags indicated in Vendor print and draws a
distinction about Tags between P&ID and Vendor print. And then the
right Tags will remain in actual functional Location database.

2.3) These remaining Tags will be defined as independent Functional


Location code.

P & ID Vendor Print


(Datasheet, GA DWG..)
All valid Tags Comparison All valid Tags
MECH, INST, F.F & MECH, INST, F.F
Define F/L Code

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 6 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

4.1.1.2 ELECTRICAL

1) REFERENCE : Single Line Diagram (SLD)


Layout Drawing for Electric Equipment
VENDOR PRINT (DATASHEET, GA DWG, Outline DWG, etc.)

2) GENERAL RULE

2.1) The need for coding Equipment in electrical is imperative to which is


indicated in Layout Drawing for electric Equipment documents and Single
Line Diagram. Furthermore, coding Equipment in electrical will be
defined only if non-bulk electrical equipment.

2.2) Contractor collects the electric equipment valid tags in Layout drawing for
electric and Single Line Diagram. The tags extracted from both document
are same or different each other. Contractor will define F L code for
electric equipment through checking process about what data is correct.

2.3) The listed-up F L codes for electric equipment which is extracted from
Layout drawings and Single Line Diagram also should go through
comparison process with Vendor print.

2.4) These remaining Tags will be defined as independent Functional


Location code.

SINGLIE LINE DIAGRAM Vendor Print


LAYOUT DRAWING (DATASHEET, DWG)
All valid Tags Comparison
& All valid Tags
ELECTRIC Define F/L Code

 The following electrical equipment will be defined as Functional


Location code and hierarchy structure and also applied to the
equipment. The F L code will be created and able to operate
independently.

 Transformer
 Switchgear
 Distribution Board
 UPS
 Power management Panel
 Bus Bar

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 7 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

4.1.1.3 HVAC (Heating, Ventilation and Air Conditioning system)

1) REFERENCE : HVAC DRAWINGS (PLAN / DIAGRAM / DETAIL)


VENDOR PRINT (DATASHEET, GA DWG, Outline DWG)

2) GENERAL RULE

2.1) The need for coding HVAC equipment is imperative to which is indicated
in HVAC drawings. Contractor will extract the equipment data required F
L Code from the documents.

2.2) Contractor gathers HVAC drawings like diagram, detail for extracting
necessary data. And the HVAC equipment data will be compared in
Vendor prints. Contractor draws a distinction about required Tags
between Drawings for HVAC and Vendor prints.

DRAWINGs Vendor Print


(Datasheet, GA DWG..)
All valid Tags Comparison All valid Tags
& HVAC
HVAC
Define F/L Code

2.3) The following HVAC equipment will be defined as Functional Location


code and hierarchy structure. The F L code will be created and able to
operate independently.

 Air Handing Unit (AHU)


 Exhaust Fan (FN)
 Precision Air Conditioner (PAC)
 Split Type Air Conditioner (SAC)
 Air Cooled Condensing Unit (ACCU)

Air Conditioning System

Air conditioning systems consist of air-handling units (AHU) with all


components like fan, air filters, air cooler, drip eliminator (if applicable),
humidifiers(if applicable), dampers, sound attenuators, electric heater(if
applicable), accessories and air ducts with thermal insulation, flexible duct
connections and air distribution devices.

Air-handling units (AHU) will be created as Functional Location code based


on valid Tags in HVAC Drawings. Not only AHU case, but also Air Cooled
Condensing Unit (ACCU), Exhaust Fan (FN), Precision Air Conditioner (PAC),
etc. shall be created as F L Code. Other above-mentioned components
would be SPARE PARTS for air handling units (AHU), NOT Functional
Location code.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 8 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

Heating System

Heating system shall consist of water radiators, valves, thermostatic globe


valves and pipelines. When electric heating is applied the system shall
consist of electric radiators with temperature control elements.

Functional Location for Unit heater shall be “propeller fan unit heaters” with
propeller fan, motor, heating element and enclosure. Heating system also will
be created F L Code if there are valid tags in HVAC drawings.

4.1.1.4 PIPELINE (Process Line / Utility Line)

1) REFERENCE : P & ID (AS-BUILT)


VENDOR PRINT (DRAWINGS)

2) GENERAL RULE

2.1) All Main process lines will be created as Functional Location code.
Contractor will collect the pipelines based on as-built P&ID.

2.2) If a pipeline does NOT bear specific meaning and has no equipment
installed on, it shall be not coded.

2.3) Utility lines also will be coded as Functional Location only if the meaningful
equipment installed on. And if the utility lines passed through the main
equipment with inlet and outlet, they would be excluded.

F L Code

NOT F L Code

< Main Process Line > < Utility Process Line >

4.1.2 FUNCTIONAL LOCATION CODING RULES

CONTRACTOR follows F L Code structure as per <8009-9000-LUOC-


0000-000-MAI-REG-000003-EN-A4>.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 9 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

F L Code consists of consecutively assigned Contract Area Code, process


facility type code, facility number, process system code, process system
identifier, functional code, and serial number of equipment.

Functional Location Structure Indicator: UITO (Universal Structure Indicator 1)

Contractor will follow the coding rules provided by COMPANY as much as


possible. However, Functional Code of Equipment (6 Level) is NOT
available /applicable to Appendix 2 or 3 in <8009-9000-LUOC-0000-000-
MAI-REG-000003-EN-A4>, Contractor will suggest the new code rules
within basically COMPANY’s bounds.

For example, F L code for pipe case, the code will be followed by 6 levels
(ex. 0092(1).20(2).0001(3).314(4).0(5).000LP(6).XXXXX(7)). In 7th Level,
Contractor will consist of [Line Designation] + [Serial Number] within 5 digits
and based on P&ID.

In the below case indicated in P&ID, the F L code will be

 0092.20.0001.221.0.000LP.WF023.

4.1.3 DESCRIPTION OF FUNCTIONAL LOCATION

Generally, Description of Functional Location are collected from the service


description indicated in P&ID. This description will be used for Process
Facility Type code (2nd Level) of Functional Location.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 10 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

By Process System code (4th Level), the description will express the
meaning of indicating last code and the description for 5th Level’s will be
same as 4th Level’s.

Furthermore, the description of 6th Level represents only what equipment is.
The abbreviation also indicates the information, for instance,
PA=CENTRIFUAL PUMP, PI=PRESSURE INDICATOR.

All full reference number of the functional location consists of seven (7)
code levels, each having a certain meaning.
Here is the description rules and example below;

0092: Contract Area Code: KANDYM LEVEL 1


20: Process Facility Type Code: Oil and gas processing facilities LEVEL 2
0001: Process Facility Type Code + Facility number
: Oil and gas processing facilities No.1 LEVEL 3
484: Process system code: Water injection system LEVEL 4
0: Defines process system identifier: Water injection system LEVEL 5
000РА: Functional code of Equipment: Centrifugal Pump LEVEL 6
Р102А: Serial number of equipment: Centrifugal Pump, P-102A LEVEL 7

Reference Doc: 8009-0092-HU01-00-000-PC-PD-00001-C ( Appendix 1.)

Description for consisting of 7th levels will represent physically what


equipment is, generic names, including valid P&ID tags.

Consists of; [ Equipment name with type] + [ Tag No in PFD/P&ID ]

Equipment for MECH/INST/ELEC/FF/HVAC is applied for this naming rule.


Here is the example for mechanical discipline below;

0092.20.0001.484.0.000PA.P102A Centrifugal pump, P-102A

Where:
0092 – Code of KANDYM area
20 – Code of Oil and gas processing facilities
0001 – Facility number
484 – Code of process system (Water injection system)
0 – Defines the identifier of the process system
000РА – Functional code (Centrifugal pump)
Р102А – Serial number of equipment (according to PFD)

For reference, the description represents generic meaning by respective


code so it can be tracked where the physical equipment located in.

In terms of pipelines, the specification for pipe represents in the description.


This information is based on indicated in as-built P&ID.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 11 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

Consists of; [ “Pipeline” ] + [ Size ] + [ Line designation ] + [ material code ] +


[ Insulation ]

0092.51.0001.313.0.000LP.WF025 Pipeline, 4”, WF, 1S0S, E

Where:
0092 : Code of KANDYM area
51 : Code of Shift camp
0001 : Facility number
313 : Code of process system (Hot water supply system)
0 : Defines the identifier of the process system
000LP : Functional code (Line Pipe)
WF025: Line designation + Serial number (according to PFD)

4.1.4 FUNCTIONAL LOCATION HIERARCHY

F L Code consists of consecutively assigned Contract Area Code (1),


process facility type code (2), facility number (3), process system code (4),
process system identifier (5), functional code (6), and serial number of
equipment (7) in 4.4.1.2 FUNCTIONAL LOCATION CODING RULES
chapter.

Functional Location code levels from 1st to 5th provide logical information
where respective equipment is installed in, NOT physically. Up to 5th level,
the information give where it is located, which type it is so it is able to track
through representing unique codes.

F L code levels from 6th to 7th provide independent information with


functional code and serial number of Equipment. Level 6 th is referred based
on Appendix 2, 3 in <8009-9000-LUOC-0000-000-MAI-REG-000003-EN-A4>.
And level 7th is as per serial number of equipment in PFD.

Contractor instructs the Functional Location Hierarchy by discipline for


efficient understanding as following.

4.1.4.1 MECHANICAL

Functional Location hierarchy for mechanical equipment consists of below


level 4th or 5th. Though the Functional Location code is composed of seven
(7) code levels, six (6) and seven (7) levels should indicate the meaning
when they are written together.

The detail information for F L hierarchy of mechanical equipment is


following;

1) Generally, mechanical equipment consists of 7 levels F L code and its


upper code, named “Parent F L”, will be level 4th or 5th.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 12 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

2) If Process System Identifier (level 5) is “0”, general case, the F L


hierarchy consists of level 1 to 4 and 6, NOT level 5. The meaning of
level 5 will remain in level 6 but it is NOT representing as Functional
Location code.

1 0092 KANDYM
2 0092.20 Oil and gas processing facilities
3 0092.20.0001 Oil and gas processing facility No.1
4 0092.20.0001.280 Water injection system
6 0092.20.0001.280.0.000KA.1001A Gas compressor unit KA-1001A

3) In case of several parallel similar process systems with identic codes, A,


B, C are to be used. Level 5 should be existed as Functional Location
code in this case.

1 0092 KANDYM
2 0092.20 Oil and gas processing facilities
3 0092.20.0001 Oil and gas processing facility No.1
4 0092.20.0001.280 Compression system
5 0092.20.0001.280.A Compression line No.1
6 0092.20.0001.280.A.000KA.1003A Gas compressor unit KA-1003A

Process Functional
Hierarchy Process Facility Facility Process Serial Number
Area System Code of
Level Type Code Number System Code of Equipment
Identifier Equipment
1 0092
2 0092 20
3 0092 20 0001
4 0092 20 0001 280
5 0092 20 0001 280 0
6 0092 20 0001 280 0 000KA 1003A

5 0092 20 0001 280 A


6 0092 20 0001 280 A 000KA 1003A

4.1.4.2 INSTRUMENTION

Instrumentation basically installed on Mechanical / HVAC / Fire-fighting


equipment or pipe lines. Functional Location hierarchy for instrumentation is
also based on where instrumentation installed on.

However, if the function of instrumentation is for main equipment


(mechanical) even though it is installed on pipeline, the parent functional

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 13 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

location will be mechanical equipment. Otherwise, others are subordinate to


pipelines.

In the first instrumentation example of below, belongs to main equipment


(270-2-VA-001: CLAUS WHB STEAM DRUM).

<INSTRUMENTATION>
PI-0018(Pressure indicator)
LIT-0004B, LIT-0006(Level Transmitter)
TI-0071(Temperature Indicator)

INST INST

INST INST INST INST

Main Equipment

<example1>

In the second example of below, PI-0048B (Pressure indicator) and TI-


0051B (Temperature Indicator) belongs to pipe (4”-221-UC-0015-3S0S-H).

<example2>

1) In case instrument equipment installed on mechanical equipment.

1 0092 KANDYM
2 0092.20 Oil and gas processing facilities
3 0092.20.0001 Oil and gas processing facility No.1

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 14 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

4 0092.20.0001.270 Sulfur recovery and processing system


6 0092.20.0001.270.0.000VA.00001 STEAM DRUM, VA-001
7 0092.20.0001.270.0.000PI.00018 Pressure Gauge, PI-0018

2) In case instrument equipment installed on pipeline.

1 0092 KANDYM
2 0092.20 Oil and gas processing facilities
3 0092.20.0001 Oil and gas processing facility No.1
4 0092.20.0001.221 Condensate stabilization system
6 0092.20.0001.221.0.000LP.UC015 Pipeline, 4”, UC, 3S0S, H
7 0092.20.0001.221.0.000PI.0048A Pressure Gauge, PI-0048A
Process Process Functional
Hierarchy Facility Process Serial Number
Area Facility Type System Code of
Level Number System Code of Equipment
Code Identifier Equipment
1 0092
2 0092 20
3 0092 20 0001
4 0092 20 0001 484
5 0092 20 0001 484 0
6 0092 20 0001 484 0 000PA P102A
7 0092 20 0001 484 0 000PI 0012A

6 0092 20 0001 484 0 000LP WF001


7 0092 20 0001 484 0 000PI 0012A

4.1.4.3 ELECTRIC

Electrical control and distribution systems are generally complex and


expensive equipment that need to be effectively maintained so they operate
at optimum performance over their serviceable life.

The electric system connects organically with many wires and it consists of
tree structure to control system for operating equipment.

As identifying electric system such as switchgear, capacity, transformer and


neutral grounding resistor indicated in layout drawings are physically
located in same zone/facilities, it is not unique composition. They are linked
to several wires with electric signal and have respective function of the
supply and demand in accordance with the power.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 15 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

35kV Switchgear
Neutral Grounding Resistor
Neutral Grounding Resistor

10kV Capacitor

Transformer Transformer Transformer


< Layout Drawing >

The hierarchy for electric system is composed as a function of supply and


demand. Following capture is partial of single line diagram.

35kV SWGR – Main substation

35kV SWGR (system code 200 )

35/10.5kV Transformer

10kV SWGR (system code 200 )

10/0.4kV Transformer
t)
According to this correlation, electric hierarchy will be composed of tree
structure.

1) In case of Switchgear

1 0092 KANDYM
2 0092.82 Electric Power Lines
3 0092.82.0001 Electric Power Lines No.1
4 0092.82.0001.800 Power Supply System
5 0092.82.0001.800.A Power Supply System line No.1
6 0092.82.0001.800.A.000ES.0101A 220kV Substation Facility.A
7 0092.82.0001.800.A.000ES.0201A 35kV Switchgear
8 0092.82.0001.200.A.000ES.0201A 35kV Switchgear
9 0092.82.0001.200.A.000ES.0301A 10kV Switchgear

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 16 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

10 0092.82.0001.200.A.000ES.0401A 0.4kV Switchgear

2) In case of UPS

1 0092 KANDYM
2 0092.82 Electric Power Lines
3 0092.82.0001 Electric Power Lines No.1
4 0092.82.0001.800 Power Supply System
5 0092.82.0001.800.B Power Supply System line No.1
6 0092.82.0001.800.B.000ES.0101A 220 kV Substation Facility
7 0092.82.0001.800.B.000ES.0201A 35kV Switchgear
8 0092.82.0001.800.B.000ES.0301A 10kV Switchgear
9 0092.82.0001.800.B.000ES.0403A 0.4kV Switchgear
10 0092.82.0001.800.B.000EN.0501A 230V AC UPS

3) In case of Transformer

1 0092 KANDYM
2 0092.82 Electric Power Lines
3 0092.82.0001 Electric Power Lines No.1
4 0092.82.0001.800 Power Supply System
5 0092.82.0001.800.A Power Supply System line No.1
6 0092.82.0001.800.A.000ES.0101A 220kV Substation Facility
7 0092.82.0001.800.A.000ES.0201A 35kV Switchgear
8 0092.82.0001.200.A.000ES.0201A 35kV Switchgear
9 0092.82.0001.200.A.000ES.0301A 10kV Switchgear
10 0092.82.0001.200.A.000ET.0301A 35/10.5kV Transformer

Following electric equipment will consist of 1), 2), 3) example.

 Transformer
 Switchgear
 Distribution Board
 UPS
 Power management Panel
 Power distribution center
 Bus Bar

4.1.4.4 HVAC

Cooling system shall operate by means of central conditioner with direct


expansion cooling or split type air conditioner.

Heating system shall consist of water radiators, valves, thermostatic globe


valves and pipelines. When electric heating is applied the system shall
consist of electric radiators with temperature control elements.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 17 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

HVAC system will be designed for continuous operation under all prevailing
climatic and ambient conditions. AHU System will be equipped with filter
unit for removal of dust.

Contractor basically creates Functional Location code for HVAC as “Unit”


and consists of F L hierarchy in order. Generally, HVAC equipment is below
process system code (4) level as independent “Unit” type such as Air
Handling Unit, Air Cooled Condensing Unit.

1) The HVAC equipment belongs to the units will be created as child F L


Code like damper, electric duct heater, electric humidifier, exhaust fan,
etc.

2) The HVAC control system is composed of control panels with alarms,


indications for transferring signal to DCS. Contractor will create F L
Code as HVAC control panel units and the non-bulk equipment that
having valid tags in P&ID.

1 0092 KANDYM
2 0092.20 Oil and gas processing facilities
3 0092.20.0001 Oil and gas processing facilities No.1
4 0092.20.0001.540 Ventilation and air conditioning systems
6 0092.20.0001.540.0.00EPP.30100 Control Panel
7 0092.20.0001.540.0.000HU.001-1 Air Handling Unit

4.1.4.5 FIRE FIGHTING EQUIPMENT

The general design and layout of plant facilities shall include all the safety
devices, controls and procedures considered necessary to adequately
address the problem of incident prevention and protection.

Contractor basically creates Functional Location code for this Fire Fighting
equipment as “System” or “Package” and it consists of F L hierarchy in
order. Generally, Fire Fighting equipment is below process system code (4)
level as independent “System” or “Package” type such as DELUGE VALVE
ACTUATION TRIM PANEL PACKAGE and LOCAL FIRE ALARM
CONTROL SYSTEM.

1) The Fire Fighting equipment, especially gas detectors shall be created F


L Code through Fire Fighting grouping action. This F L Code is below
process system code level (4).

1 0092 KANDYM
2 0092.31 Water intake
3 0092.31.0001 Water intake No.1
4 0092.31.0001.433 Fire and gas (F&G) detection system

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 18 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

6 0092.31.0001.433.F.000JF.00001 Fire and gas detection system

2) In case the Fire Fighting equipment is installed on the pipelines.

1 0092 KANDYM
2 0092.31 Water intake
3 0092.31.0001 Water intake No.1
4 0092.31.0001.340 Fire-Fighting system
6 0092.31.0001.340.0.000LP.FW100 Glass reinforced plastic pipeline
7 0092.31.0001.340.0.000SS.00LS1 Fire monitors LS-1

4.1.4.6 PIPELINE

Functional Location code for pipeline shall be created only for main process
lines and utility lines to ensure efficient management. The hierarchy for
pipeline is generally composed of below process system code level (4). But
in case utility lines installed on main equipment, this will be subordinated to
the main equipment.

1) Pipeline F L below process system code.

1 0092 KANDYM
2 0092.20 Oil and gas processing facilities
3 0092.20.0001 Oil and gas processing facilities No.1
4 0092.20.0001.540 Ventilation and air conditioning systems
6 0092.20.0001.540.0.000LP.WF001 Pipeline, 4”, WF, 1S0S, E

2) Pipeline F L installed on main equipment with inlet and outlet.

1 0092 KANDYM
2 0092.20 Oil and gas processing facilities
3 0092.20.0001 Oil and gas processing facilities No.1
4 0092.20.0001.484 Water injection system
6 0092.20.0001.484.0.000PA.P102A Centrifugal Pump, P-102A
7 0092.20.0001.484.0.000LP.WF001 Pipeline, 4”, WF, 1S0S, E

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 19 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

3) Utility pipelines that are installed on instrumentation should be coded.


These will be subordinated to process pipeline or main equipment.

1 0092 KANDYM
2 0092.20 Oil and gas processing facilities
3 0092.20.0001 Oil and gas processing facilities No.1
4 0092.20.0001.484 Water injection system
6 0092.20.0001.484.0.000PA.P102A Centrifugal Pump, P-102A
7 0092.20.0001.484.0.000LP.WF001 Pipeline, 4”, WF, 1S0S, E
8 0092.20.0001.484.0.000LP.DS019 Pipeline, 3/4”, DS, 6S22, E

4.1.5 DETERMINING REQUIRED FIELD FOR FUNCTIONAL LOCATION

Contractor settled the required thirteen (13) fields according to


FUNCTIONAL LOCATION ( F L ).
The required fields for F L are organized according to check the actual SAP
system used by COMPANY.

Following Table consists of columns title, whether columns would be


mandatory or not, values and responsibility as per F/L. In case COMPANY
has comments in terms of the table composition, Contractor shall apply to
the table agreeably to COMPANY’s instruction.

Field Name M/O Value Responsibility Remarks


StrIndicator Mandatory “UITO” Contractor Need confirmation by LUKOIL
FunctLocCat. Mandatory Value list (1) Contractor
Functional Loc. Mandatory Contractor
Description Mandatory Contractor
Object Type Option Value list (2) Contractor
MaintPlant Mandatory “0090” Contractor Need confirmation by LUKOIL
Company Code Mandatory “8009” Contractor Need confirmation by LUKOIL
Planning Plant Mandatory “0090” Contractor Need confirmation by LUKOIL
SupFunctLoc. Mandatory Contractor
Location Option COMPANY
Plant Section Option COMPANY
Cost Center Option COMPANY
Planner group Option COMPANY

Note : “Mandatory” means “MUST BE ENTERED”, “Optional” means “ENTER IF AVAILABLE, NO INPUT IS ALLOWED”,
“Value list” means “CONTRACTOR SHOULD SELECT DATA , CANNOT INPUT ANONYMOUS DATA”.

Contractor defined the Value of StrIndicator / MaintPlant / Company


Code / Planning Plant. COMPANY needs to confirm the values for four (4)

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 20 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

fields would be acceptable, which are estimated by Contractor through


reviewing SAP system.
Refer to “Need confirmation by COMPANY” in Remarks column.

• StrIndicator : “UITO”
• MaintPlant : “0090”
• Company Code : “8009”
• Planning Plant : “0090”

COMPANY should confirm whether the values to be fixed or not. If it has


any other values, Contractor is required to be given the right values.

Value list

CONTRACTOR should select DATA in Value lists which are built in SAP
database. Functional Location Category, Object Type have respective
Value list and it corresponded to CONTRACTOR.
Refer to the following 1), 2).

1) Functional Location Category

Category Description
1 Field
2 Well pad
3 Wells
4 Group tech. equipment
E Power service equipment
G Group Metering Station
H Storage facilities area (own)
M Technical system - standard
T Pipelines
V Water handling facilities

CONTRACTOR follows the Functional Location category (10) in above


MATERIAL lists. If this is inadequate, COMPANY is required to provide any
other correct Functional Location category references which will be inserted
in SAP database.

2) Object Type

Object Type Description


ACTR Actuators
BIGA Garages
CLCC Control Cabinets
CLCP Control Panels
… ….

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 21 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

Contractor will follow the object types that were extracted from 0091, 0093 sites.
The total count of object type is 62 and it is in progress to apply to SAP data
construction.
Refer to APPENDIX #1.

4.2 PIECE OF EQUIPMENT (PE)


4.2.1 SCOPE OF PIECE OF EQUIPMENT

PIECE OF EQUIPMENT (PE) means separate physical object that can be


serviced and repaired as an independent unit. A characteristic feature of pieces
of equipment is their ability to be installed on FL (mounting) and removed from
FL(dismantling).

The requirement of PIECE OF EQUIPMENT is based on functional location data.


It will be generally created by respective functional location with automatically
generated equipment numbers (1007320, 1007321).

In addition, the PE includes components of equipment like assembly types which


are deliverable itself. Contractor will create the components as child equipment,
named sub-assembly, only indicated in Vendor prints.

4.2.2 DESCRIPTION OF PIECE OF EQUIPMENT

Description of PIECE OF EQUIPMENT (PE) and Functional Location (FL) is


basically similar each other. The general description of PE provides information
which item is and its specifications.

The discrepancy of description between F L and PE is how much detail


represented. The following description for F L and PE show the difference.

Fundamentally, the description for piece of equipment represents basic


information that already indicated in functional location description. In terms of
MECHANICAL equipment, the following detail example will be helpful to
understand.

DRUM / TANK / FILTER / COLUMN / EXCHANGER / COMPRESSOR / AIR COOLER

FL = [Generic equipment name] + [Tag No]


PE = [Generic equipment name with function information]

Functional Location Piece of equipment


DRUM DRUM, VN-003 REGENERATION GAS KO DRUM
TANK TANK, TA-001 SOVENT STORAGE TANK
FILTER FILTER, CL-001 LEAN SOLVENT FILTER

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 22 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

COLUMN COLUMN, VJ-001 SOLVENT ABSORBER


EXCHANGER HEAT EXCHANGER, HA-001 REGENERATION GAS COOLER
COMPRESSOR COMPRESSOR, KA-001A REGENERATION GAS COMPRESSOR
AIR COOLER AIR COOLER, HC-001 LEAN SOLVENT COOLER

PUMP

FL = [Type] + [Generic name] + [Tag No] / Centrifugal pump, PA-001A


PE = [Generic name with function information] / LEAN SOLVENT PUMPS

This naming rule will apply to the equipment not only for Mechanical but also
Fire-fighting and HVAC. According to Instrumentation for PE, the description
basically consists of generic name and specification.

According to INSTRUMENTATION, Contractor will describe the description by


function. It means that the naming rule is different by indicating condition,
pressure, temperature, level, etc.

CATEGORY Code Functional Location (FL) Piece of Equipment (PE)


[ NAME ] + [ TAG No ] [ NAME ] + [ Pressure ] + [ Model No / Manf Part No ]
PRESSURE PI PRESSURE GAUGE, PI-201A PRESSURE GAUGE, 0~2 kg/cm2, P2574A3EDB04032
PRESSURE TRANSMITTER, PRESSURE TRANSMITTER, 0~2 kg/cm2, EJX510A-FBS7N-
PT
PT-201A 019DF/D4/KS25
[ NAME ] + [ TAG No ] [ NAME ] + [ Temperature ] + [ Model No / Manf Part No ]
TEMPERATURE GAUGE,TI-
TI TEMPERATURE GAUGE, 0~100℃, TB44
201A
TEMPERATURE TEMPERATURE TEMPERATURE TRANSMITTER, 0~500℃,
TT
TRANSMITTER, TT-201A YTA320-FA4DD/KS25/X1
TEMPERATURE ELEMENT, TE-
TE 201A
TEMPERATURE ELEMENT, S100895PD ( Name + Model No )

[ NAME ] + [ TAG No ] [ NAME ] + [ Type ] + [ Model No / Manf Part No ]


LEVEL LI LEVEL GAUGE, LI-201A LEVEL GAUGE, MAGNETIC FLOAT TYPE, SMF-50A
LEVEL TRANSMITTER, EJX118A-EMSCG-919DJ-
LT LEVEL TRANSMITTER, LT-201A
WA23C1SW00-CA25/KS2/X2/D4/M2W ( Name + Model No )

The naming rule for instrumentation in PE basically consists of Name, condition,


Model No / Manf Part No. If the condition information cannot be indicated, the
model no. will be described in the description field at least because it is the key
distinguishing identifier among similar equipment.

Regarding ELECTRIC description naming rule, the following table would be help
to understand. The PE’s description for electric mostly will be same as functional
location.

CATEGORY Naming Rule Example


SWITCHGEAR [ Name ] + [ Voltage ] Switchgear 35kV

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 23 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

TRANSFORMER [ Name ] + [ Voltage ] Transformer 35/10.5kV

UPS [ Name ] + [ Voltage ] + [ Current ] UPS 110V, AC

NER [ Name ] + [ Voltage ] Neutral Earthing 3.3/√3 kV

According to HVAC and Valve description for equipment, the naming rule is
same as mechanical equipment case.

FL = [Generic equipment name] + [Tag No]


PE = [Generic equipment name with function information]

CAT EQ Functional Location Piece of Equipment


AHU AIR HANDLING UNIT, PB1-AHU-01A DX TYPE AIR HANDLING UNIT
HVAC
FAN EXHAUST FAN, PB1-FN-02A DUCT IN LINE EXHAUST FAN
PSV PRESSURE SAFETY VALVE, PSV-101A PRESSURE SAFETY RELIEF VALVE
VALVE
FV CONTROL VALVE, FV-101A CONTROL VALVE, ETDVC610-HC

4.2.3 EQUIPMENT HIERARCHY

Equipment and Functional Location usually consists of the same level, thus
one unique (1) F L Code will connect with respective equipment one
another. However, if the sub-assemblies are installed on the main
equipment, Contractor will create sub-Assembly as child (equipment) and it
should be linked to their respective main equipment as parent.

Sub-Assemblies shall be created if the components have been installed on


main equipment and it should be represented in official Vendor print such
as part lists, cross sectional drawings with BOM list and relevant drawings.

In case of compressor, the equipment hierarchy is followings:

To wrap it up, sub-Assemblies are NOT created as Functional Location


code, only as equipment.

4.2.4 DETERMINING REQUIRED FIELD FOR PIECE OF EQUIPMENT

Contractor settled up the required thirty (30) fields relevant PIECE OF


EQUIPMENT.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 24 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

The required fields for PE are organized according to checking the actual
SAP system used by COMPANY.

Following Table consists of columns title, whether columns would be


mandatory or not, values and responsibility as per PE. In case COMPANY
has comments in terms of the table composition, Contractor shall apply to
the table agreeably according to the COMPANY’s instruction.

Field Name M/O Value Responsibility Remarks


Equipment Category Mandatory Value list (1) Contractor
Equipment Option Contractor
Description Mandatory Contractor
Class Mandatory Contractor
Object Type Mandatory Value list (2) Contractor
Weight Option Contractor
W.Unit Option Contractor
Size/dimension Option Contractor
Inventory no. Option Contractor
Start-up date Option Contractor
AcquistnValue Option Contractor
Acq.Currency Option Contractor
Acquistion date Option Contractor
Manufacturer Option Contractor
ManufCountry Option Contractor
Model number Option Contractor
ManufPartNo. Option Contractor
ManufSerialNo. Option Contractor
MaintPlant Mandatory “0090” Contractor Need confirmation by LUKOIL
Company Code Mandatory “8009” Contractor Need confirmation by LUKOIL
Planning Plant Mandatory “0090” Contractor Need confirmation by LUKOIL
Functional loc. Option Contractor
Superord.Equip. Option Contractor
ConstType Option Contractor
Constr.yr Option COMPANY
Constr.MTH Option COMPANY
Location Option COMPANY
Plant Section Option COMPANY
Cost Center Mandatory COMPANY
Planner group Option COMPANY

Note : “Mandatory” means “MUST BE ENTERED”, “Optional” means “ENTER IF AVAILABLE, NO INPUT IS ALLOWED”,
“Value list” means “CONTRACTOR SHOULD SELECT DATA , CANNOT INPUT ANONYMOUS DATA”.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 25 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

Contractor defined the Value of MaintPlant / Company Code / Planning


Plant. COMPANY needs to confirm the values for three (3) fields would be
acceptable, which are estimated by Contractor through reviewing SAP
system.
Refer to “Need confirmation by COMPANY” in Remarks column.

• MaintPlant : “0090”
• Company Code : “8009”
• Planning Plant : “0090”

COMPANY should confirm whether the values to be fixed or not. If it has


any other values, Contractor is required to be given the right values.

Value list

CONTRACTOR should select DATA in Value lists which are built in SAP
database. Equipment Category, Object Type have respective Value list and
it corresponded to CONTRACTOR.
Refer to the following 1), 2).

1) Equipment Category

Category Description
M Machines
Q Test/measurement equipment

CONTRACTOR follows the Equipment category in above table. If this is


inadequate, COMPANY is required to provide any other correct Equipment
Category references which will be inserted in SAP database.

And Contractor expects that the value of equipment category will be “M” for
all equipment data. COMPANY also is required to confirm “M” as equipment
category would be acceptable.

2) Object Type

Object Type Description


ACTR Actuators
BIGA Garages
CLCC Control Cabinets
CLCP Control Panels
… ….

Contractor is given object type for PIECE OF EQUIPMENT and it is


available to Functional Location equally. As referred in 4.4.1.5, Contractor
will follow the object type data extracted from 0091, 0093 site.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 26 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

Refer to the APPENDIX #1.

4.3 EQUIPMENT CLASSIFICATION


4.3.1 SCOPE OF EQUIPMENT CLASSIFICATION

COMPANY provided 132 Equipment Classification templates, “EO


templates”, by type of Equipment. And each EO template consists of a
number of necessarily Attributes that require Value.

CONTRACTOR reviews the Attributes by respective EO template and


analyses which data would be adequate as Value. While analyzing,
CONTRACTOR simultaneously goes on to extract data in DATASHEET,
SPECIFICATION and DRAWINGS with provision by Vendor.

In the event that the Value of Attribute is NOT indicated in the above-
mentioned Documents, CONTRACTOR will fill the blank in the Value on
account of exceeding the requirements of attributes from COMPANY.

The Equipment Classification templates and Attribute count for all


Equipment in KANDYM site consist of the following:

CLASSIFICATION DESCRIPTION ATTRIBUTE COUNT


EO010105000000 Flare tip flare 27
EO010120000000 Drives screw pumps 17
EO010130000000 Installations dewaxing 20
EO010200000000 Oilfield equipment underground 17
EO010201000000 Pumps deep 19
EO010201010000 Pumps rod deep 25
EO010201020000 Pumps screw rod 22
EO010201030000 Diaphragm Pumps 21
EO010201040100 ESP section (2) 63
EO010202000000 Steps rod string 24
EO010204000000 Borehole Seals 21
EO010205000000 Cables Wentz 43
EO010206000000 Submersible motors (SEM) 60
EO010207000000 Transformers for Wentz 20
EO010208000000 Enz Control Stations 14
EO010209000000 casings 18

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 27 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

EO010210000000 packer 25
EO010211000000 gas separator 18
EO010212000000 hydroprotection 18

ЕО050101000000 Measuring 32
Secondary instruments and
ЕО050102000000 29
apparatus
Devices and instruments
ЕО050103000000 29
governing
Devices kontrolya_ signalizatory_
ЕО050104000000 28
indicators
ЕО050105000000 Controls and drives MI 32
Means of remote control and
ЕО050200000000 15
automation systems
ЕО050201000000 ESD systems and FIRE & GAS 2
ЕО900000000000 other 16
ЕО900100000000 corrosion Coupons 54

CONTRACTOR will follow the classification id provided from the


COMPANY with respective attributes according to extracted equipment.

4.4 MATERIAL (SPARE PARTS)


4.4.1 SCOPE OF MATERIAL

Requirement of material data for SAP data building is restrict belong to the
Vendor print document relevant SPARE PARTs such as “Spare parts list for
commissioning”, “ 2-Year Spare parts List” officially submitted by the
VENDORs.

CONTRACTOR collects above-mentioned document among Vendor prints


and captures spare parts to create as material data for SAP system.

4.4.2 DESCRIPTION OF MATERIAL

Descriptions of materials are collected from the vendor print like ‘Spare
parts list’ that is described in above 3.4.4.1 SCOPE OF MATERIAL DATA.

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 28 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

Following detail information will show how to make DESCRIPTION of


material out.

Above all, the description starts with the NOUN and it should be arranged to
main category and sub category in order named.

DISCIPLINE ITEM DESCRIPTION


[ Generic Item Name ] + [ Type ] + [Bearing No] + [ Material ]
BEARING
BEARING, BALL, 6301C, STEEL CAGE
[ Generic Item Name ] + [ Type ] + [ Class ] + [ Size ] + [ Material ]
MECH GASKET GASKET, SPWD, T4.5-ASME600# 20" RF, F: GRAPHITE / H, I, O:
316LSS
[ Generic Item Name ] + [ Size ] + [ Material ]
INPROSEAL
INPROSEAL, OD96xID70xW23, BRONZE/VITON
[ Generic Item Name ] + [ Pressure ] + [ Model No / Manf Part No ]
PRESSURE
PRESSURE GAUGE, 0~2 kg/cm2, P2574A3EDB04032
[ Generic Item Name ] + [ Temperature ] + [ Model No / Manf Part No ]
INST TEMPERATURE
TEMPERATURE GAUGE, 150 (Y), T1906Y1EI1104N(950/75mm)1
[ Generic Item Name ] + [ Type ] + [ Model No / Manf Part No ]
LEVEL
LEVEL GAUGE, MAGNETIC FLOAT TYPE, SMF-50A
[ Generic Item Name ] + [ Electric power ] + [ Voltage ]
TRANSFORMER
POWER TRANSFORMER ( 40/52MVA, 33/11.5kV )
ELEC
[ Generic Item Name ] + [ Electric current ]
FUSE
FUSE, 250A
[ Generic Item Name ] + [ Type ] + [ Size ] + [ Class ] + [ Mounting
VALVE
BALL VALVE type ]
( MANUAL) VALVE, BALL, 12", #150, RF
[ Generic Item Name ] + [ Type ]
VALVE CONTROL VALVE
CONTROL VALVE, BUTTERFLY

The description information basically consists of what item, type, size and
material as indicated above example. And the count of words shall not be
over than 40 characters as following SAP database standards.

4.4.3 DETERMINING REQUIRED FIELD FOR MATERIAL

Contractor settled the required eight (8) fields relevant MATERIAL.


The required fields for MATERIAL are organized according to checking the
actual SAP system used by COMPANY.

Following Table consists of columns title, whether columns would be


mandatory or not, values and responsibility as per MATERIAL. In case
COMPANY has comments in terms of the table composition, Contractor
shall apply to the table agreeably to COMPANY’s instruction.

Field Name M/O Value Responsibility Remarks


Industry sector Mandatory “M” Contractor Need confirmation by COMPANY
Material Type Mandatory Value list (1) Contractor

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 29 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

Material Optional Contractor


Plant Mandatory “0090” Contractor Need confirmation by COMPANY
Description Mandatory Contractor
Base Unit of
Mandatory Value list(2) Contractor
Measure
Material Group Mandatory Value list(3) Contractor
MRP Type Mandatory “ND” Contractor Need confirmation by COMPANY

Note : “Mandatory” means “MUST BE ENTERED”, “Optional” means “ENTER IF AVAILABLE, NO INPUT IS ALLOWED”,
“Value list” means “CONTRACTOR SHOULD SELECT DATA , CANNOT INPUT ANONYMOUS DATA”.

Contractor defined the Value of Industry sector / Plant / MRP Type.


COMPANY needs to confirm the values for three (3) fields on account of
these values, which are estimated by Contractor through reviewing SAP
system.
Refer to “Need confirmation by COMPANY” in Remarks column.

• Industry sector : “M”


• Plant : “0090”
• MRP Type : “ND”

COMPANY should confirm whether the values to be fixed or not. If it has


any other values, Contractor is required to be given the right values.

Value list

CONTRACTOR should select DATA in Value lists which are built in SAP
database. Material Type, Base Unit of Measure, Material Group have
respective Value list and it corresponded to CONTRACTOR.
Refer to the following 1), 2), 3).

1) MATERIAL TYPE

Mat. Type Description(RU) Description(EN)


GAZ Газ Gas
INVT Инв.и хоз.принадлежности Inv.i hoz.prinadlezhnosti
OBRD Оборудование Equipment
SPCD Спецодежа overall
SRE Сырье raw materials
STRM Стройматериалы building materials
SVNR Рекламно-сувенирн мат-лы Advertising and souvenir mat-ly
TOPL Топливо Fuel
USL Услуги/Работы Services / Works

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 30 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

VSMT Вспомогательные материалы auxiliary materials


ZPAV Автозапчасти Spare parts
ZPCH Запчасти Spare parts

CONTRACTOR follows the Material Type in above MATERIAL lists. If this


is inadequate, COMPANY is required to provide any other correct Material
Type references which will be inserted in SAP database.

For reference, GAZ, ZPAV and ZPCH in bold types shall be used as
Material Type in KANDYM site.

2) BASE UNIT OF MEASURE

Mat. Unit Description(RU) Description(EN)


М3 Кубический метр Cubic meter
Т Тонна Ton
ЕР Единица работы Unit of work
ШТ Штука Thing
К-Т Комплект Set
… ….. ….

CONTRACTOR will make selection from 42 “Base Unit of Measure” values


that were built up SAP database in accordance with material’s type. If
material is provided as each, the value of unit of measure will be КЖД.

3) MATERIAL GROUP

MAT. GROUP DESCRIPTION (RU) DESCRIPTION (EN)


20 Газ Gas
30 Газовый конденсат Gas condensate
50 Топливо дизельное diesel fuel
60 Бензин Petrol
70 Масла и смазки Oils and greases
80 ЖидкостиОхлТорм ZhidkostiOhlTorm
110 ЗапЧастПоршневНасос ZapChastPorshnevNasos
120 ЗапЧастУЭЦН ZapChastUETsN
130 ЗапЧастНасосВинт ZapChastNasosVint
140 ЗапЧастАрматурУстьев ZapChastArmaturUstev
141 ЗапЧастКлапанПредохр ZapChastKlapanPredohr
150 ЗапЧастПрочТехнолог ZapChastProchTehnolog

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 31 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

… … …

There is a material group reference which indicated 71 groups provided by


COMPANY, Contractor kindly requests for another legible reference in English
version. As above listed up, it is hard to understand which one contractor will use.

 Material List (sample) for 0092 KANDYM

Industry Material Base Unit of Material MRP


Material Plant Description
sector Type Measure Group Type
M ZPAV Auto 0090 IMPELLER NUT, OD53xID9xW36, SUS403 ШТ 590 ND
M ZPAV Auto 0090 BEARING NUT, OD98xID75xW13, SS400 ШТ 590 ND
M ZPAV Auto 0090 BEARING WASHER, OD104xID75xT1.5 ШТ 590 ND
M ZPAV Auto 0090 BALL BEARING 6314, STEEL CAGE ШТ 590 ND

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 32 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

4.5 EQUIPMENT BOM (Bill Of Material)


EQUIPMENT BOM (Bill of Material) is composed of CONNECTION
information with PIECE OF EQUIPMENT and material. The code number of
Equipment and Material in BOM should be belongs to PIECE OF
EQUIPMENT and MATERIAL.

In the process of collecting spare parts data for MATERIAL, Equipment


BOM also shall be filled up at the same time. CONTRACTOR consistently
collects spare parts data for MATERIAL and arranges Equipment BOM in
parallel.

Following Equipment BOM Table shows the connection information


between Equipment and Materials as the sample data.

EQUIPMENT EQ. DESCRIPTION MATERIAL MAT.DESCRIPTION QUANTITY


CASING GASKET NUCG-41,
66020219 1
OD440xID415xT4.5
66020312 BALL BEARING 6314, STEEL CAGE 1
SEALANT, LOCTITE567, LOCTITE
10072142 Stripper Feed Pump No.1 66020805 1
567
66021014 IMPELLER, A487M CA6NM B 1
BALL BEARING 7315BDB, BRASS
66021015 1
CAGE
CASING GASKET NUCG-41,
66020219 1
OD440xID415xT4.5
66020312 BALL BEARING 6314, STEEL CAGE 1
10072143 Stripper Feed Pump No.2
SEALANT, LOCTITE567, LOCTITE
66020805 1
567
66021014 IMPELLER, A487M CA6NM B 1

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 33 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

APPENDIX #1
OBJECT TYPE
Serial No Code DESCRIPTION
1 ACTR Actuators
2 BIGA Garages
3 CLCC Control Cabinets
4 CLCP Control Panels
5 CLDC Process Control Syst
6 CLIN Instrumentation - Ge
7 COMO Corrosion Monitoring
8 COMP Compressors
9 DLPG Diesel Power Station
10 EEES Electrical Earthing
11 EGGE Electric Generators
12 ELGE Electr Eqpmt-General
13 ELSE Exterior Lighting
14 ELUP UPS
15 EMCC Motor Control Centre
16 EMLG Electr.Motor HV
17 EMSM Electr.Motor LV
18 ERLP Relay Protections
19 ESBS Busbars
20 ESCA Electr. Capacitors
21 ESCH Cubicles HV
22 ESCL Cubicles LV
23 ESLI Interior Lighting
24 ESLP Lightning Protection
25 ESMS Power Metering Syst.
26 ESSD Switching Devices
27 ESSG Switchgear
28 ESSS Surge Suppressors
29 ESST Substations
30 ESTR Transformers-General
31 ETCA Cable Power Lines
32 ETOH Overhead Power Lines
33 FAAR Fan Axial/Radial
34 FFGE Firefighting-General
35 FIGE Filters - General
36 HEGE Heat Exchangers
37 HGEL Electric Heaters
38 HGHT Trace Heating Cable
39 HVAC HVAC Equipment

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 34 of 35


CONSTRUCTION OF CPF COMPLEX AND
DEVELOPMENT OF KANDYM GROUP OF
FIELDS

LUKOIL Uzbekistan
Operating Company
DDS FOR EAM

40 LAGC LiftingEqpmt-General
41 MESK Metering Skids
42 PIFL Infield Pipelines
43 PIFR Flares
44 PIIE Trunk Pipelines
45 PIPR Process Piping
46 PREQ Process Equipment
47 PUDG Diaphragm Pumps
48 PUMP Pumps
49 SYCP Cathodic Protection
50 SYST Sewage Treatment
51 SYWM Water Treatment
52 TCOM Telecom Systems
53 TKLG Tanks > 1000 m3
54 TKSM Tanks < 1000 m3
55 VAVA Valves - Unspecified
56 VEBO Vessels - Boilers
57 VEGE Pres.Vessels-General
58 VESE Vessels - Separators
59 WCEC ESP Control Panels
60 WCXT X-Mas Tree
61 WGAS Gas Wells
62 WINS Inspection Wells

Doc. No. : 8009-0092-00-IN-003-J15-10002-E Page 35 of 35