Professional Documents
Culture Documents
Phe Technical Annexure
Phe Technical Annexure
Discharge in GPH at
22.71 M'/HR
(a) Duty Point
15 M'/HR
8 (b) + 10% D.P.
31 M'/HR
(c) -25% D.P
"" Pump set shall be factory tested and factory unitized and aligned , Both Pump and Motor shall be
supplied in unitizes condition from factory, Inspection by CEIL