Kalyan: Toll Infrastructure LTD

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

KALYAN KALYAN

TOLL INFRASTRUCTURE LTD. GROUP

Date: 18.02.2023
IND/KTILU/287/RPR/661/2022

Executive Engineer & SM (C)-1


Raipur Project Circle CPWD,
Raipur-492005

IV-112, Type V-68,


Name: Construction of 729 quarters (Type l1-180, Type lI-364, Type &
Project Guest House, Crèche/Nursery
Shops, Community Center,
Type-VI-5), works and bulk
(Including all development
Dispensary in GPRA, Naya Raipur
services (Civil & Electrical) on EPC basis).

IND/KTIL/287/RPR/617/2022,
dated: 26.12.2022
Our letter no.
Ref.:
calculation.
Sub -Submission of c.C. Road revised design
Respected sir,
calculation
enclosed revised design
With reference to the subject, please find the
above-mentioned

for GPRA Project, Sector-26, Naya Raipur.


requested.
Kindly accord your approval
as
times.
the best performance at all
Thanking and assuring

Thanking You,
Yours Faithfully
TO

Authozed Sigory
KALANNELL INFRASTRUCTURE LIMITED

Encl:- Revised design calculation.

Copy to:- Raipur (Enclosed).


Assistant Engineer (C)- Raipur Project Division, CPWD,

CIN No.: U45203MP2002PLCO15157


"VIDYA DEEP" 15/3, manorama gani, Indore - 452001 (M.P)
Ph.: 2496931- 32-33-34 I fax: 0731 4096457
www.kalyangroup.in
RAIPUR-PQCROAD CALCULATION
Design of Rigid Pavement for 4.5 meter Wide Roads
GRADE-M40 As per IRRC

Inputs SP-62-2014 KN
50
Wheel load 8.2
%
CBRValue 40 Mpa
Concrete Grade 0.23
m

Slab thickness 4500


mm

Length of slab 4500


mm
CVPD
Width of slab 150
%
Present Traffic
Growth Rate 1 Year
Construction Year 20 Years
Design Period 0.8 Mpa
Tyre Pressure 0.25
Poisson ratio 30000 Mpa
Modulus of Concrete

Calculations commercial traffic 2014011.118


CVPD
number of
|Cumulative
(According to SP:62-2014)
Low
Traffic Volume: HCV, LCV, MCV,
Type of Vehicles: Tractors etc
8.2 KN
Soaked CBR value (% 50
Design Wheel Load: the design wheel load
taken as 5.1 T, as

the absence of axle load spectrum,


In pavement
determination ofthickness of 0.098
mentioned in code,for N/MM2/MM

K-Value
SUB BASE: 300
Subbase
is increased by
Hence K-value of subgrade
20% 0.0196 N/mm 2/mm
K-value increase 0.1176 N/mm 2/mm
Effective k value =

Compressive Strength
of 40
Adopt 28 days compressive strength
Mpa 0.7 vfe = 4.427188724 Mpa
Flexural strength (28 days) f
=

5.179810807 Mpa
90 day flexural strength
Edge Load Stress 0.0225
Poisson ratio
0.15
30000 MPA
Elastic modulus
0.8 MPA
Tyre Pressure MM
Radius of load contact, a 223.0720657
a/h 0.969878547
Radius of equivalent distribution, b
Radius of relative stiffness, 264.6058423
MPA
|Load stress in edge region 1.179437888

Temperature Stress
Temperatur differential 20.3
slab thickness
oT 250

aDle 4, the temperature differential for Raipurfor a


20.3 deg cel 17.00642722
MM
LA 5.179810807
Design ratio 0.43
Coefficient, C_ 0.00001
Coefficient of thermal expansion MPA
1.30935
Temperature stress

Total Stress 2.488787888


safe
stress =Edge stress +tem. Stress
Total
CONCRETE PAVMENT
FATIQUE BEHAVIOUR OF 0.480478531
STRESS RATIO 2325319.659
FATIQUE LIFE 2014011.118
EXPECTED LOAD REPETITIONS
0.86612226
LESS THAN 1
FATIQUE DAMAGE

Profile Design 230 mm


POC slab M40 grade 300mm
GSB 150 mm
PCC
hur

Arfhiitects
PAnners &
/aluers
Eas f Kuilas