Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Doc Id : TBR 23-0010

Date: 27-03-2023

Inspection Report

Equipment: Tank
Client: The Coca

Inspection Detail:

Comprehensive on-site gearbox housing inspection of Tank 3 (

Observation

Possible Causes

 Lip
 Teflon shaft bush failure

Action Required/Recommendation

 Complete cleaning of gearbox hosing.


 New Bearing installation. (if required)
 New Lip seals installation. (if required)
 Old grease removed.
 New bearing greasing.
 New Teflon shaft bush installation. (if required)

Supervisor Third Party Customer Inspector


Name
Date

You might also like