Professional Documents
Culture Documents
Act-2 Progress-Report GRP6
Act-2 Progress-Report GRP6
Act-2 Progress-Report GRP6
AE 309
AERONLAB
ACTIVITY NO. 2
TITLE: WIND TUNNEL PROGRESS REPORT
NAME: BAUTISTA R., MANABAT, Y., MANTIBE, L., SUBMISSION DATE: SEPT. 24, 2022
SALVADOR, B., VINOYA, A. (GROUP 6)
Progress Report # 2
Day 1
On the same day we cut our airfoil by using a sticker paper print out airfoil as our
guidelines for tracing the model on the wood. Then glue them together in pieces.
ACTIVITY NO. 2 TITLE: WIND TUNNEL PROGRESS REPORT
On September 23, 2022 we cut our airfoil by using a sticker paper print out airfoil as
our guidelines for tracing the model on the wood. Then glue them together in pieces.
ACTIVITY NO. 2 TITLE: WIND TUNNEL PROGRESS REPORT