EI

Appendix 1 A specimen of Application Form

S
Application No.:

Application Form for

C
Manufacture Licensing of Special Equipment of

the People’s Republic of China

Manufacturer:
Equipment Category:
Type of application:
Application Date:

s e
.c
General Administration of Quality Supervision
w w
Inspection and Quarantine of the People' Republic
of China
w
(A Q S I Q)
EI TSZS009-2003

S
Basic Conditions of Application Manufacturer
Full Name of Manufacturer

Address of Manufacturer

C
Corporate
Country / Region
Representative
Liaison Phone Number

Facsimile Number E-mail Address

Post Code Website Homepage

Date of Establishment Total Employees

Position of
Management Representative Management
Representative
Items under
Registration Certification
Date of issue Date of Expiration
or Organization
Certification
Registration
or
Certification
Achieved

s e
Application Agent

. c
Full Name

w w
w
Address 、Postcode
Corporate
Organization Code
Representative

Representative
Phone Number
on Manufacturer’s Behalf

E-mail Address Facsimile Number

1
EI
Category of Licensing Applied

S
( Mark “O” in the column of “Licensing Held” for licensing holder, and mark “√” in the column of “New Applicant” for new application, license renewal or
application for scope extension)
Licensing New
Category Classification Level Manufacture Range Typical Products Type Testing Organization
Held Applicant

C Declaration and Signature of Applicant


I hereby declare that my party is willing to apply for the Manufacturer Licensing by following the provisions on the “Supervision Administration Regulation
for Manufacture of Boilers and Pressure Vessels”. My party will accept the review, survey and assessment, product (sample) inspection & testing, and engage
our full guarantee for product quality by following relevant regulations, and accept subsequent surveillance & product supervisory inspection, and provide the
necessary working conditions, and pay the relevant fees and expenses as stipulated.

Corporate Representative of Applicant:


(Signature)

2
Position: Date:

ww w .
EI Sales in Recent Four Years within China’s Mainland

S
Year Category Quantity Installation Location

C
s e
. c
w w
w
3
EI Manufacturer’s Resources

S
Area of Manufacturer (㎡) Area of Workshop(㎡)

Area of Radiography Testing


Design Capacity (Category)
Exposure Room(㎡)

C
Technician ( Number) Designer (Number)

Quality Responsible
Professional Personnel (Number) Engineer
(Number)

Welding Technician(Number) Inspector ( Number)

Welder and Welding


NDT Examiner (Number)
Operator (Number)

Composition of Each Department


Department Person in Charge Staff Quantity

s e
. c
w w
w
4
EI
Certification of the NDT Examiner, Welder and Welding Operator

S
Certified Operation
Of NDT Examiner
Name
or Welder Level/Welding
Method /Type Date of Expiration
Process(es)

C
s e
. c
w w
w
5
EI
S
List of Quality Responsible Engineer

Name Education Major Responsibility

C
s e
.c
w w
w
6
EI Main Manufacture Equipment(s)

S
No. Name of Equipment Capacity Quantity

C
s e
. c
ww
w
7
EI
Main Inspection and Testing Instrument and Equipment

S
Name of Instrument and
No. Capacity Quantity
Equipment

C
s e
c
Capability of Self-Calibration of Instrument and Equipment
No
.
Name of Instrument and Equipment Calibration Scope

w .
w w

8
EI Sub-contract

S
No. Sub-contracted Item Name of Sub-contractor

C
No.
Submitted Documents
Document Title Number of Sheet or Page

s e
. c
w w
w
9
EI
S
Acceptance views and result of General Administration of Quality Supervision,

Inspection and Quarantine of the P. R. of China:

CSignature of Person in Charge:

Date:

Acceptance number:

Remarks

s e
.c
ww
w
10
EI Filling Out Description of the Application Form
1 Applicable Scope

S
This application form is applicable for boilers, pressure vessels and their safety
appurtenances, and limited to overseas manufacturers.
2 Cover
2.1 Manufacturer

C
Fill out the full name of the manufacturer who completes this form.
2.2 Equipment Category
State the categories of special equipment applying for Manufacture Licensing, including
Boiler, Pressure Vessel, or Safety Appurtenance; In case of applying more than one
category, each category shall be filled out in one form respectively.
2.3 Type of application
Fill out “New” for new application; “The First Renewal” or “ The Second Renewal” for
license renewal application
2.4 Application Date
Fill out the date of completing this form by the applicant.
3 Page 1
3.1 Basic Conditions of Application Manufacturer
Provide the basic conditions of the manufacturer applying for the Manufacture Licensing.
3.1.1 Full Name
State full name of the application manufacturer that must be in strict compliance with
what appears on the cover.
3.1.2 Address
Fill out the manufacture address(es) of the application manufacturer; In case that the

e
applicant has more than one production site, all of them shall be listed.
In the case of production facilities are not located in the same city, which will be treated

c s
.
as the separated application.

w
3.1.3 Country/Region

3.1.4 Corporate Representative


w w
Give the name of the country or region where the application manufacturer is located.

The corporate representative of the application manufacturer who has registered at the
local government
3.1.5 Liaison
Give the name of the person in charge of the application for the manufacture license.

11
EI
3.1.6 Phone Number
Fill out the Phone Number of the Liaison.

S
3.1.7 Facsimile Number
Fill out the Facsimile number of the Liaison.
3.1.8 E-mail Address
Fill out the E-mail address of the Liaison.

C
3.1.9 Post Code
Fill out the postcode in accordance with the address of application manufacturer.
3.1.10 Website Homepage
Give the Internet website homepage of the application manufacturer, leaving blank in
case of no.
3.1.11 Date of Establishment
State the date the application manufacturer acquired its registration legally at local
government.
3.1.12 Total Employees
Give the total number of employees of all manufacture site(s) or enterprise(s) of the
applicant related to the Manufacture Licensing.
3.1.13 Management Representative
Give the name of the person nominated by the corporate representative in charge of the
management of the manufacturer; this blank shall also be filled in case of the Corporate
Representative him/herself runs the role.
3.1.14 Position of Management Representative
Fill out the position of the management representative.
3.1.15 Registration or Certification Achieved

e
List the registration or certification other than the Manufacture Licensing of Special
Equipment of the People’s Republic of China approved or accredited by other

c s
.
organizations or communities, e.g. ISO etc..

w
3.1.15.1 Items under Registration or Certification
List the items under the registration or certification, e.g. ISO9001.
3.1.15.2 Certification Organization
Fill out the name of organization that accredited the named certification. w w
3.1.15.3 Date of Issue
Give the date of acquirement of the accreditation of the named certification.
3.1.15.4 Date of Expiration

12
EI
Fill out the expiration date of each named certification.
3.2Application Agent

S
Inform the name of agent that is entrusted by the applicant and responsible for handling
with the related issues of the Manufacture Licensing, say an agent.
3.2.1 Full Name
Fill out the full name of the entrusted agent.

C
3.2.2 Address and postcode
Give the address and postcode of the entrusted agent.
3.2.3 Organization Code
Fill out the organization code of entrusted agent issued by organization code
administration.
3.2.4 Corporate Representative
Give the name of Corporate representative of the entrusted agent. The name shall be in
strict compliance with that on its Business License.
3.2.5 Representative on Manufacturer’s Behalf
Give the name of specific person in charge of the application affairs of the agent.
3.2.6 Phone Number
Address the phone number of the person in charge of the application affairs.
3.2.7 E-mail Address
Give the e-mail address of the person in charge off the application affairs.
3.2.8 Facsimile Number
Give the facsimile number of the person in charge of the application affairs.
4 Page 2
4.1Category of Licensing Applied

e
4.1.1 Category
State the Boiler, Pressure Vessel or Safety Appurtenance.

c s
.
4.1.2 Classification

w
Please refer to the requirement of Annex 1 to this document.
4.1.3 Level

w w
“ A, B, C or D” for Boiler and Pressure Vessel products applying for the licensing; Leave
blank for Boiler and Pressure Vessel components, Organic Fluid Heater and Safety
Appurtenance. Please refer to the Annex 1 to this document and Annex 1 to “Supervision
Administration Regulation for Manufacture of Boiler and Pressure Vessel” for correct
fill-in.

13
EI
4.1.4 Manufacture Scope
According to Annex 1 to this document, mainly refer to the range of the pressure, etc.

S
4.1.5 Typical Products
According to Annex 1 to this document
4.1.6 Licensing Held
Mark “O” for applicant who needs to renew its original Manufacture License of Special

C
Equipment of the People’s Republic of China and describe the original licensing status;
Leave it blank for new applicant or for applying to extend its original licensing scope.
4.1.7 New Application
Mark “√” for all applicant including of new application, renewal application and of
extending licensing scope
4.1.8 Type Testing Organization
In case of a type testing is required, it must be conducted by the type testing organization
authorized by General Administration of Quality Supervision Inspection and Quarantine
of the People’s Republic of China (hereinafter called AQSIQ). In case of type testing
been done, fill in the name of the organization who has done the type testing; Fill in “Not
Required” in case of no type testing is required; Fill in “ Undone” in case of the required
type testing has not yet fulfilled. Manufacturers who want to conduct type testing may
contact with the China Special Equipment Inspection & Research Institute, General
Administration of Quality Supervision Inspection and Quarantine of the People’s
Republic of China (hereinafter referred to as CSEI), or a type testing organization directly
or through its agent(s).
4.2 Declarations and Signature of Applicant
Indicate that the Applicant promises to certify his commitment.

e
4.2.1 Representative of Applicant
Signature of corporate representative of application manufacturer, the same corporate

c s
.
Representative as 3.1.4

w
4.2.2 Position

Board, Factory Director etc..


5 Page 3 w w
State specific position of the corporate representative undertaking, say Chairman of the

5.1 Sales in Recent Four Years within China’s Mainland


Fill in the record of product(s) exported to China’s mainland in the past recent four years,
leaving blank for new applications; Additional paper can be attached if necessary.

14
E
5.2 Year

I
Fill in the year of the corresponding sale, for example 1999, 2000 etc..

S
5.3 Category
Fill in according to the requirements on Annex 1 and shall be in accordance with 4.1.1 of
this document, as manufacture history attestation during licensing review or audit;
Additional paper can be attached if necessary.

C
5.4 Quantity
The quantify of the corresponding sale in China, in set, piece or unit
5.5 Installation Location
The address of the location where corresponding product installed.
6 Page 4
6.1 Manufacturer’s Resource
6.1.1 Area of Manufacturer
Area for manufacture, administration etc. of the applicant related to the manufacture
licensing.
6.1.2 Area of Workshop
Constructional area of workshop building(s) of the applicant related to the manufacture
licensing.
6.1.3 Area of Radiography Testing Exposure Room
Area of the room used as radiography NDT that meets the requirements of environmental
protection
6.1.4 Design Capacity
Fill in the number of design of equipment category(ies) that the applicant is competent
and qualified to undertake.

e
6.1.5 Technician
Total number of the personnel accredited with bachelor’s degree or higher, with good

c s
.
command of manufacture technology on relevant special equipment or enterprise

w
administrative competency
6.1.6 Designer

w w
Quantity of the designer(s) having design capability in the design section of the
manufacturer with design capability
6.1.7 Professional Personnel
Total number of the technical personnel accredited with bachelor’s degree or higher, with
good command of manufacture technology on Boiler or Pressure Vessel

15
6.1.8

EIQuality Responsible Engineer


Quality Responsible Engineer is the person who grants green light of the quality of

S
products at different stage in the manufacturing of Boiler, Pressure Vessel and Safety
Appurtenance.
6.1.9 Welding Technician
Total number of the personnel accredited with bachelor’s degree or higher, with good

C
command of welding technique
6.1.10 Inspector
The number of personnel engaged in special role of inspection at each working procedure
6.1.11 NDT Examiner
Fill out the number of qualified NDT examiner.
6.1.12 Welder and Welding Operator
Fill out the number of qualified welder and welding operator.
6.2 Composition of Each Department
Staff composition of each department and workshop; Additional paper can be attached if
necessary
6.2.1 Department
Fill out the name of departments and workshop(s)
6.2.2 Person in Charge
Fill out the name of departmental director, for example the name of departmental
manager or workshop director.
6.2.3 Staff Quantity
Fill out the staff quantity of each department or workshop.
7 Page 5

e
7.1 Certification of the NDT Examiner, Welder and Welding Operator
Fill out the certification-hold status of NDT examiner(s), welder(s) and welding

c s
.
operator(s); Additional paper can be attached if necessary.

w
7.1.1 Of NDT Examiner or Welder
Fill out NDT or welding.
7.1.2 Name
w w
List the name(s) of the qualified NDT examiner(s), welder(s) or welding operator(s) and
NDT person for sub-contract is exclusive.
7.1.3 Certified Operation
State the certification status of NDT examiner(s), welder(s) and welding operator(s) of

16
EI
the manufacturer.
7.1.3.1 Method/Type

S
Describe the method or type of certification holders by using symbols, for example use
RT for radiographic testing, or welding process symbols.
7.1.3.2 Level/Welding Process
Fill out the level or welding process of certified operators, by using symbols, for example

C
use III for top-level radiographic testing examiners, or item symbols for welders and
welding operators.
7.1.3.3 Date of Expiration
Fill out the expiration date of the certified items.
8 Page 6
8.1 List of Quality Responsible Engineer
Specific information of the quality responsible engineer; Additional paper can be attached
if necessary.
8.1.1 Name
Fill in the name of the quality responsible engineer.
8.1.2 Education
The highest schooling record achieved
8.1.3 Major
The major in the achieved highest schooling record
8.1.4 Responsibility
The responsible scope shall include design, technology, material, cold-work, hot-work,
machining, shaping, welding, NDT, heat treatment, pressure testing, product inspection,
standardization, metrology, quality control etc. for quality responsible engineer; And

e
design, technology, material, welding, physical and chemical testing, heat treatment, NDT,
pressure testing, final inspection etc. for quality control system responsible personnel.

c s
.
9 Page 7

w
9.1 Main Manufacture Equipment

w w
On basis of relevant requirements of the Manufacture Licensing, applicant shall have
related main production equipment, including manufacture equipment and heat treatment
furnace whose capacity is suitable for production of the products applying for
manufacture license. The quantity and capacity of them filled in this form shall meet the
Requirements for Boiler and Pressure Vessel Manufacture Licensing. Additional paper
can be attached if necessary. (Please refer to the Annex 2)

17
9.1.1

EICapacity
Fill in the capacity range of the same kind of equipment that meets the specified

S
requirements, for example, equipment name: bending machine, maximum bending
capacity: 70mm.
9.1.2 Quantity
The quantity of the equipment with same name and same function

C
10 Page 8
10.1Main Inspection and Testing Instrument and Equipment
According to the relevant stipulations of Manufacture Licensing, applicant should have
corresponding main inspection and testing instrument including physical-chemical testing
devices. The capacity and quantity of them filled in this form shall meet the
Requirements for Boiler and Pressure Vessel Manufacture Licensing. Additional paper
can be attached if necessary. Please refer to Annex 3.
10.1.1 Capacity
In same way as 9.1.1
10.1.2 Quantity
In same way as 9.1.2
10.2Capacity of Self-Calibration of Instrument and Equipment
List the items and calibration scope of self-calibration for measuring instrument and
equipment both mandatory and non-mandatory. Additional paper can be attached if
necessary.
11 Page 9
11.1Sub-contract
Status of manufacture process, parts which are permitted to be sub-contracted, for

e
example NDT, heat treatment, manufacture of heads of pressure vessels etc.. State the
comparable steady sub-contract situations. The attachment products for the special

c s
.
equipment, such as safety valve, pressure gauge, shall not be included in the

w
sub-contracted range.
11.1.1 No.
Sequence numbers of the sub-contracted items
11.1.2 Sub-contracted Item w w
By classifications of NDT, heat treatment, heads
11.1.3 Name of Sub-contractor
State the specific sub-contractor(s).

18
EI
11.2Submitted Documents
As per the requirements of the Procedures for Boiler and Pressure Vessel Manufacture

S
Licensing, the following documentation shall be submitted during licensing
application:(The working language for Manufacture Licensing is Chinese or English)
(1) Application Form for Special Equipment Manufacture Licensing original in quadruple
(2) Introduction of Manufacture

C
(3) Copy of legal business license or document approved or registered at local
government
(4) Copies of qualified licenses or certificates that manufacturer has obtained (in case of
license renewal, including Special Equipment Manufacture Licensing of the People’s
Republic of China)
(5) Brochure of typical products with relevant technical parameters and specifications
(6) Drawings of products and design documents (applicable for gas cylinder, safety valve,
rupture discs, valves etc.)
(7) Quality Manual of manufacturer
(8) Other supplementary documents if deemed necessary.
11.2.1 No.
State the sequence number of corresponding document.
11.2.2 Document Title
State the title of corresponding document.
11.2.3 Number of Sheet or Page
Number of sheets or pages of the documents, for example sheets for drawings and pages
for text documents
12 Page 10

e
12.1
Acceptance views and result of General Administration of Quality Supervision,

c s
.
Inspection and Quarantine of the P. R. of China (AQSIQ).

w
This column shall be completed by AQSIQ. The acceptance comments are expressed as:
“Accepted ” ( indicating full acceptance for all application items);
“ Rejected ”(indicating rejection of all application items);
w w
“Accepted for the following category(-ies), level(s), variety(-ies)”(indicating partial
acceptance for application items).
In the cases of full rejection or partial acceptance of the application items, a formal
rejection notice shall be issued to indicate the reasons of rejection and rejection notice

19
EI
number shall be filled out in this column.
12.1.1 Signature of Person in Charge

S
The person responsible for manufacture licensing of AQSIQ
12.1.2 Acceptance number
Acceptance number generated by the acceptance organ
12.2Remarks

C
Other issues the application manufacturer wants to state
13 Others
13.1Means for submitting the application documents
The applicant shall submit the Application Form for Special Equipment Manufacture
Licensing in quadruple accompanying other documents required to the Special
Equipment Licensing Office (hereinafter called SELO) of AQSIQ. After acceptance by
the AQSIQ, the acceptance organ, application manufacturer, the survey and assessment
organ shall keep the application form respectively. In addition to submit application form,
the applicant is asked to submit an electric copy of file (by e-mail, flip disk or compact
disc).
13.2 Means of acquirement of licensing application documents
Applicant may download the application form and other relevant documents for licensing
application as follows:
http://www.cnisn.com.cn/IRC/EIRC/special1_1.html
http://www.aqsiq.gov.cn
The application form shall be printed in form of A4 size paper with over 70g weight.
13.3 How to handle with the questions arising from the Form filling-out
In events of problems with downloading Form or questions to the contents of the Form,
please contact SELO.
13.4 The survey and assessment organ
China Special Equipment Inspection and Research Institute (Briefed as the CSEI) is

e
responsible for conducting the manufacturer survey and assessment of all overseas
application of special equipment manufacture licensing
13.5 Contact to SELO

c s
Address: Room B202, Building 2, Xiyuan, Hepingjie, Chaoyang District, Beijing 100013

w .
w
P.R.China

w
Tel: 0086-10-59068665
Fax: 0086-10-59068666
E-mail: selo@csei.org.cn
13.6 Contact to CSEI
Address: Room B212, Building 2, Xiyuan, Hepingjie, Chaoyang District, Beijing 100013
P.R.China
Tel: 0086-10-59068360

20
EI
Fax: 0086-10-59068383
E-mail:international@csei.org.cn

S
13.7 Consulting service
Applicant who needs consulting service before manufacturer audit(s) may contact at :
+86-10-59068341.

Annex 1: Requirements for Classification of Applying Licensing Products

C
Annex2: Sample of Main Manufacture Equipment(s)
Annex3: Sample of Main Inspection and Testing Instrument and Equipment

s e
. c
w w
w
21
Annex 1

EI Requirements for Classification of Applying Licensing Products

S
Category Classification Level Manufacture Range Typical Products
Pressure-resistant Steam Boiler A; B; C; (Main technical
D parameter)

C
Pressure-resistant Hot Water A; B; C; Ditto
May leave it blank
Boiler D
Organic Fluid Heaters Leaving Ditto
Boilers out
Boiler Component A Ditto Heads, drum, header,
superheater,
re-heater,
economizer, water
cooled wall
Pressure Vessel A1; A2; Range of pressure
A4 and other main
technical parameter Filling out per Annex
Railway Tanker C1 Ditto 1 of “ Supervision
Tank Truck or Tubular Trailer C2 Ditto Administration
Tubular Container C3 Ditto Regulation for
Seamless Gas Cylinder B1 Ditto Manufacture of
Pressure Welded Gas Cylinder B2 Ditto Boiler and Pressure
Vessels Special Gas Cylinder B3 Ditto Vessel”

e
Oxygen Cabin for Medical A5 Ditto
Utility

c s
.
Pressure Vessel A3 Diameter of head Head of pressure
vessel or

w w
w
Petal of spherical
tank
Safety Safety Appurtenances Leaving Main technical Safety Valve,
Appurte out parameter Rupture Disc,
nances Cylinder Valve

22
Annex 2:

EI Pattern

Main Manufacture Equipment(s)

S
No. Name of Equipment Capacity Quantity
Max. Bending thickness of Steel Plate:
1 Bending Machine
mm

C
2 Press Max. pressure: t

3 Lifting Appliance Max. lifting capacity: t

4 Pipe bender Max. bending capacity: Ø × mm

5 Driller Max. drilling capacity: mm

6 Vertical Lathe Max. capacity: Ø mm

7 Bevel Planer Max. capacity:

8 Welding machine SMAW

9 Welding machine SAW

10 Welding machine GTAW

11 Welding machine GMAW


Max. dimensions of chamber: × ×
12 Heat treatment furnace
mm
13 Cutting machine

s e
. c
w w
w
23
EI
Annex 3 Pattern

Main Inspection and Testing Instrument and Equipment

S
Name of Instrument and
No. Capacity Quantity
Equipment
Mechanical Property
1 Max. capacity: N
Testing Machine

C
2 Impact testing machine

3 Hardness tester □Hb □Hv □Hi

4 Ultrasonic thickness gauge

5 Chemical Composition Analyzer □C □S □P □Mn

□Si □Cr □Ni □Ti

□Mo □ □ □
Radiographic examination
6 Max. capacity: Kv
machine
7 Ultrasonic flaw detector

8 Magnetic testing equipment

9 Hydrostatic testing equipment Max. pressure: MPa

10 Air-tight testing equipment Max. pressure: MPa

e
Capability of Self-Calibration of Instrument and Equipment

No. Name of Instrument and Equipment Calibration Scope

c s
1 Pressure gauge

w .
2

3
Thermal coupling

Amperometer for electric welding machine w w


4 Voltmeter for electric welding machine

24
EI
Appendix 2 A specimen of Overseas Standard Adoption Application Form

Application No. :

S
Application form for the use of boiler code/standard
Name of Applicant
Address of Applicant

C
Manufacture License
No.(or Safety Quality Applicable Code/Standard
License No.) and Level
Contact Person Tel. No
Email Fax. No.

Products description and main Technical parameters


□ Steam Boiler
Type of Boiler □ Hot water Boiler Capacity (t /h or MW)
□ Organic Fluid Boiler
Design Temp.(℃) Design Pressure (MPa.)

We plan to export the boilers to China, but we are difficult to completely carry out the Chinese boiler code/standard.
Therefore, we would like to adopt the above mentioned applicable code/standard to design and fabricate the
boilers .In addition, we confirm we will comply with Article 45 to 50 of “Requirement for Boiler and Pressure
Vessel Manufacture Licensing” (down load at http://www.cbpvi.org/selo/selo/download.asp)

Authorized signature of applicant:


(Signature)

Title: Date:

(Filled by Special

e
Equipment Licensing Person in Charge: Date
Office)

c s
w .
(Acceptance view and
result filled by SESA of
AQSIQ)
Person in Charge: Date
w w

25
EI Application No.:

S
Application form for the use of pressure vessel code / standard

Name of Applicant

Address of Applicant

C
Manufacture License(or Safety
Applicable Code / Standard
Quality License) No. and Level
Contact Person Tel. No
Email Fax. No.
Order information(One application for each contract)

Contract No. Name of Chinese user

Products description and main Technical parameters


(Please attach the “List of Products” indicating the contents below if the contract contains more products)
Name of Product Design Pressure (MPa.)
Design Temp.(℃) Applicable Medium
Geometric Dimension (mm) Material Designation of
diam×length×wall thickness Main Shell
Material of Main Shell * □Carbon steels□Alloy steel□Cast irons□Cast Steels □Others:

Safety Factor* (Tensile strength) Safety Factor*(Yield limit)


We plan to export the pressure vessels to China, but we are difficult to completely carry out the Chinese pressure vessel
code/standard. Therefore, we would like to adopt the above mentioned applicable code/standard to design and fabricate
the pressure vessels .In addition, we confirm we will comply with Article 52 to 57 of “Requirement for Boiler and
Pressure Vessel Manufacture Licensing”(down load at http://www.cbpvi.org/selo/selo/download.asp)
Authorized signature of applicant:
(Signature)

e
Title: Date:
(Filled by Special
Equipment Licensing

c s
Office) Person in Charge: Date

w .
(Acceptance view and result
filled by SESA of AQSIQ)
Person in Charge: Date
w w

26
EI Guide to fill out the “Application form for the use of pressure vessels
code/standard”

S
1.“Material of Main Shell”: Please select by “√” .
2.“Safety Factor”: Please fill out the “Tensile strength” and “Yield limit” which specified as
following:

C
Conditions Tensile strength Yield limit at Average Average creep limit at
at room temps. design temp. endurance design temp. (with
strength at design creep rate of 0.01%
σb σ 0t .2
temp. (rupture
per 1000 hours) σ n
t
Material strength at 105

hours) σ dt
Carbon steels, low alloy nb≥3.0 ns≥1.6 nd≥1.5 nn≥1.0
steels
High alloy steels nb≥3.0 ns≥1.5 nd≥1.5 nn≥1.0
Al, Plate, Ti nb≥3.0 ns≥1.5 nd≥1.5 nn≥1.0
Cu, Ti, forging, Ni nb≥3.0 ns≥1.5 nd≥1.5 nn≥1.0
Ni and Pipe & Al nb≥4.0 ns≥1.5
their bar Cu nb≥4.0 ns≥1.5
alloys
Cast Grey cast iron nb≥10.0
irons Nodular or nb≥8.0
malleable
cast iron
Note:
1. When the yield strength (or conditional yield strength) at design temperature cannot be determined
and the allowable stress is based on the tensile strength of material, the value nb shall be raised
appropriately.
2. The casting factors of nonferrous metals shall be determined by the corresponding values for plate,

e
forging, pipe or bar divided by 0.8.

s
3. The casting factor of cast steel shall not exceed 0.9.

. c
w
Conditions Yield limit at Average Average creep limit at
Lower limit of

w
design temp. endurance
tensile design temp. σ nt

w
Material strength at design
strength(σb)
σ t
0.2
temp. σ dt

Design Temp. nb ≥4.0/ / / /


≤300℃
casting factor

27
Cast
steels

EI Design Temp.

>300℃
nb ≥4.0/

casting factor
ns ≥1.5/

casting factor
/ /

S
Note:
1. Allowable stress (design safety factors )for cast steels pressure vessels shall be the less one between

C
nb and ns.

s e
. c
w w
w
28
EI
Appendix 3 Resource Requirements for Boiler Manufacture Licensing

1 General Provision

S
1.1 The Requirements for Boiler Manufacture Licensing are specially formulated in
accordance with relevant requirements in the Supervision Administration Regulation for
Manufacture of Boiler and Pressure Vessel (hereinafter referred to as the "Administration
Regulation").

C
1.2 The Requirements apply to all boiler product manufacturers, which specifies in
“Administration Regulation” (hereinafter referred to as manufacturer).

1.3 The Requirements are comprised of the resources requirements for boiler
manufacture licensing, quality management system requirements and boiler safety quality
requirements. The resource requirements include basic requirements and specific
requirements. The basic requirements are the general requirements for producing all
kinds of boiler products and the specific requirements are the specific requirements for
producing relevant level of boilers , all of which should be met by the manufacturers
simultaneously.

1.4 Manufacturer shall establish, and continuously and effectively implement a sound
quality management system suitable for its boiler products. In order to verify the control
capability of its quality management system for boiler products, the manufacturer shall
have enough practice in continuous producing boiler products.

1.5 The non-destructive examination (NDE), heat treatment, and physical and chemical
property examination can be performed either by manufacturer itself or by subcontractors
with relevant qualification or competence, when the manufacturer signing consignment
agreement with them. The consignment agreement has to put forward to the license-issue
department on file. The consignee shall issue the related report of the consigned work to
the manufacturer and the manufacturer shall be responsible for the quality control of the
consigned work, which should be included in the quality management system for boiler

e
of the manufacturer. The requirements of the specific requirements for resource shall not

s
be consigned.

1.6 Manufacturer shall have a capability of producing main body (shell and/or head) of

. c
products to the subcontractors.

w w
boiler products independently. It is unacceptable to consign all pressure parts of boiler

2 Basic Resources Requirements for Boiler Manufacture Licensing


w
2.1 The applicants for boiler manufacture licensing must have independent legal status or
have registered in local governmental departments where the manufacturer is located.

2.2 The boiler manufacturer must have suitable technical ability for boiler production and

29
EI
management.
2.2.1 The manufacturers should have enough technical staff for various technical
processes including boiler manufacture, machining, NDE, welding, material examination

S
and quality management. The technical staff of the manufacturer with license of level A
and level B have to be no less than 10 per cent of all its employees, and those of level C
and level D have to be no less than 5 per cent and not less than 5 persons. Enough
professional welding and boiler manufacture technical staff must be employed by boiler

C
manufacture.
2.2.2 The manufacturer shall have relevant personnel responsible for the stages in boiler
manufacture including design, technology, material, cold working, hot working,
machining, forming, welding, NDE, heat treatment, pressure test, product inspection and
testing, standardization, metrology and quality management, etc.
2.2.3 Qualified NDE personnel and NDE items, qualified welders and welding operators,
and welding items shall meet the requirements of the production of the products produced

2.3 The requirements for workplace and technical facilities:


2.3.1 The area and height of workshop should meet the requirements for manufacture of
boilers with the applied licensing level. The manufacturing process should be rationally
arranged. The welding of pressure parts of boilers shall be performed in workshop.
2.3.2 Pipes and semi-finished products should be kept at the place under certain
protection.
2.3.3 Warehouse for keeping welding consumables that require control of temperature
and humidity during storage must be equipped with equipment to ensure the required
temperature and humidity. Drying and temperature-maintaining oven to make these
welding consumables ready for use is also required.
2.3.4 There should be radiographic testing site that can meet both product requirements
and protection requirements. There should be basic conditions to ensure quality of
developed negative film and the storage of the radiographs.
2.3.5 NDE facilities that fit for the manufacture of the products are required except NDE
is performed by subcontractors.
2.3.6 Fixtures are required to meet demand of boiler product manufacture.

e
2.3.7 The Lifting capacity at main workshops should meet the manufacturing demand of

s
boiler products.

c
2.3.8The drilling and pipe-bending machines should meet the manufacturing demand of

.
boiler products.
2.3.9 Welding machines that fit for boiler product manufacture are required.

w w
2.3.10 Examination Platform and tools, and hydrostatic pressure testing facilities suitable
for production are also required.

w
2.3.11 Mechanical property testing facilities, physical and chemical property examination
devices or a consignment relationship of the above mentioned testing and examination
with competent subcontractors are required.
2.3.12 The applicants should have the machining tools, including cutting machines,
presses and bevel machines for both plates and pipes to meet the demand for the
manufacture of boilers of applied licensing level. Compact boiler manufacturer must have

30
EI
the ability to turn out final products.

2.4. The resources requirements for the manufacture licensing of organic fluid heater and

S
the resources requirements for level A boiler parts may consult the relevant resource
requirements for the manufacture licensing of level C and level A boilers respectively.
Furthermore, the manufacturing equipment required should match the manufacturing
products.

C
3.1 Specific requirements for manufacture licensing of level A boiler
3.1.1 Requirements for technical resource:
(1). There should be chemical and physical property testing lab and metallographic
examination lab suitable for the manufacturing products
(2). There should be welding labs suitable for manufacturing products
(3). There should be R&D capacity for design new products and the capacity for
production of the new products.
(4). There should be enough staff for standardization, metrology and enough full-time
inspectors
(5). There should be NDE examiners that hold RT III and UT III certificates in addition
the examiners with level II certificates in RT, UT, MT, PT. Provided the NDE are
consigned outside, the above requirements for examiners holding RT II and UT II
certificates may be exempted.
(6). The number and granted item of qualified welder and welding operator should be
satisfying the requirements of production, it should be not less than 50 person-items in
general.
3.1.2 Requirements for manufacture equipment and fixture:
(1). The capacity of semi-automatic or automatic cutting machines should meet the
cutting thickness demand for manufacturing level A boilers.
(2). Welding equipment including automatic arc welding machine, gas shield arc welding
machine and manual arc welding machine, etc. should meet the demand of the
manufacturing products.
(3). Level-A manufacturers must have two of the following three significant facilities:

e
If only one of the three is existent, the manufacturer can only apply for level A license of

s
boiler parts manufacture.

c
A. Boiler drum manufacture equipment:

.
a. Hydraulic or oil presses with capacity of not less than 1000 tons.
b. Plat bending machine with bending capacity not less than 46mm thickness of steel
plate in general.

w w
c. Heat treatment furnace for boiler drum.

w
B. Water wall production equipment (including welding, flattening and panel blending
machines)
C. Spiral pipe production equipment and heat treatment furnace for headers of
superheater and of reheater.
3.1.3 Examination and Testing Equipment
(1) Metallographic examination apparatus suitable for manufacture of level A boiler

31
EI
products.
(2) Standard metrological instruments for length, thermal, force, electric measurement or
a fixed tracing system to for their magnitude.

S
(3) Mechanical property testing machine, machining tools and instruments for prepare
impact test specimen or having consignment agreement with competent subcontractor.
(4) NDE equipment in good condition including thickness gauge, radiographic detector,
ultrasonic flaw detector, magnetic particle and dye penetration testing devices are

C
required provided NDE is performed by the manufacturer itself.

3.2 Specific requirements for manufacture licensing of level B boiler


3.2.1 Requirements for technical resource:
(1) There should be enough capacity for changing the requirements in drawing to actual
manufacturing technology.
(2) There should be enough full-time inspectors.
(3) The qualified RT II and UT II examiners should not less than 2 persons respectively.
The figures can be decreased to 1 person respectively provided the NDE are consigned
outside.
(4) The number and granted item of qualified welder and welding operator should be
satisfying the requirements of production and not less than 30 person-items in general.
3.2.2 Manufacture and inspection and testing equipment
(1). Press or the ability to coordinate quality warranty subcontractor is required to meet
the demand of products
(2) Plate bending machine is required to meet product demand (with bending capacity of
20-30mm thickness of steel plate in general)
(3) The maximum lifting capability in main workshop should satisfy the product demand
and normally be not less than 20 tons.
(4) Enough welding equipment including automatic submerged arc welding machine, gas
shield arc welding machine and manual arc welding machine, etc. are required to meet
the demand of products.
(5) Mechanical property testing machine and machine tools and instruments for preparing
impact testing specimen or the ability to coordinating all the quality warranty tests are

e
required.

s
(6) Platform for lofting and examining bending pipe in accordance with requirements is

c
needed.

.
(7) Radiographic detectors (at least including one circumferential exposing radiographic

provided the NDT is performed by the manufacturer itself.

w w
machine) and one ultrasonic flaw detector are required to meet requirement of products

3.3 Specific requirements for manufacture licensing of level-C boiler


3.3.1 Requirements for technical resource:
(1) There should be enough full-time inspectors.
w
(2) The qualified RT II examiners should not less than 2 persons. The figures can be
decreased to 1 person provided the NDE are consigned outside.
(3) The number and granted item of qualified welder and welding operator should be

32
EI
satisfying the requirements of production and not less than 20 person-items in general.
3.3.2 Manufacture and Inspection and Testing Equipment
(1) Press or the ability to coordinate a quality-warranty subcontractor is required to meet

S
the demand of the manufacturing products.
(2) Plate bending machine is required to meet the demand of manufacturing product
(bending capability: 12--20mm thickness steel plate in general).
(3) The maximum lifting capability in main workshop should satisfy the demand of

C
manufacturing product and normally be not less than 10 tons.
(4) Enough welding equipment including automatic submerged arc welding machine and
manual arc welding machine, etc. is required and should meet the demand of the
manufacturing products.
(5) At least a radiographic detector in good condition is required to meet the demand of
the manufacturing products provided the manufacturer itself performs the NDT.

3.4 Specific requirements for manufacture licensing of level-D boiler


3.4.1 Requirements for technical resource:
(1) At least one qualified RT II NDT examiner is required..
(2) The number and granted item of qualified welder and welding operator should be
satisfying the requirements of production and not less than 10 person-items in general.
3.4.2 Manufacture and Inspection and Testing Equipment
(1) Equipment for cutting, welding, drilling, pipe bending, plate bending and machining
is needed to meet the product's demand.
(2) Forming and machining equipment are required to meet the demand of manufacturing
products.
(3) The maximum lifting capability in main workshop should satisfy the demand of
manufacturing product and normally be not less than 5 tons.
At least one radiographic detector in good condition is required to meet the demand of
the manufacturing products provided the manufacturer itself performs the
NDT.

4. Resource Requirements for Manufacture Licensing of level A Boiler Parts

e
The term “Parts of boiler A level” refer to the following pressure parts used on steam

s
boiler (including waste heat boiler) with the rated output steam pressure greater than

c
2.5Mpa,such as the boiler drum, membrane water-cooled wall, economizer, superheater,

.
reheter and header, etc. The manufacturer fabricating the aforementioned pressure parts
shall obtain corresponding manufacture license of “part of boiler A level”.

w w
The manufacturing resource requirements for parts of boiler A level please refer to
corresponding condition of boiler A level.
4.1 Basic Requirements
w
The basic requirement for level A boiler parts shall satisfy the stipulations of 2 in this
appendix.
4.2 Specific requirements
4.2.1 Technical resource
Technical resource shall comply with Article 11 of “Requirement for Boiler and

33
EI
Pressure Vessels Manufacture Licensing”. For the boiler parts manufacturer who doesn’t
fabricate the boiler drum, RT and UT level Ⅲ examiner required by NDE allow to be
exempted.

S
4.2.2 Requirement for the tool and equipment
Manufacturer of boiler drum shall meet the requirement of Article 11 of
“Requirement for Boiler and Pressure Vessels Manufacture Licensing”. Among these
equipment, the subcontract of hydraulic (oil) pressure and heat treatment equipment is

C
permitted if the products quality is ensured under subcontracting. Membrane
water-cooled wall manufacturer shall have the especial equipment such as auto-welding
machine with multi head, flattening and panel bending machine, finishing equipment for
flat steel. For the boiler manufacturer fabricating economizer, superheater and reheater,
the equipment and tool which suitable for tube butting welding are required, such as
automatic hot wire TIG or TIG plus MIG welding machine etc. Simultaneity, the argon
arc welding machine, tube end forming machine, chamfer machines, groove preparation,
tube bender, cutting and rack for tube, etc. are also required. For the manufacturer of
boiler pressure piping and header of boiler, the necessary equipment, such as cutting,
bending, gas-shield welding, Arc welding, submerged arc welding of girth seam
(applicable only for the header fabrication), preheating and heat treatment equipment
(allow to subcontract),etc. shall be available.
4.2.3 Inspection and test equipment
Inspection and test equipment shall meet the requirements of Article 11 in
“Requirement for Boiler and Pressure Vessels Manufacture Licensing”, and the
manufacturer of alloy steel products shall have the equipment for the spectral inspection
4.3 Cast iron economizer
No manufacture license required to the foundry which produce the casting pieces
only, and which doesn’t fabricate and assemble the parts to the economizer.
4.4 Other boiler parts
The boiler parts, such as the internal furnace (including expansion joints of the
internal furnace), food ring, tube sheet, etc. may produced by the manufacture license
holder of pressure vessel head.

s e
. c
w w
w
34
EI
Appendix 4 Resource Requirements for Pressure Vessel Manufacture Licensing

1. General Provision

S
1.1 The Requirements for Pressure Vessel Manufacture Licensing are specially
formulated in accordance with relevant requirements in the Supervision Administration
Regulation for Manufacture of Boiler and Pressure Vessel (hereinafter referred to as the
"Administration Regulation").

C
1.2 The Requirements apply to all pressure vessel product manufacturers, which specifies
in “Administration Regulation” (hereinafter referred to as manufacturer).

1.3 The Requirements are comprised of the resources requirements for pressure vessel
manufacture licensing, quality management system requirements and pressure vessel
safety quality requirements. The resource requirements include basic requirements and
specific requirements. The basic requirements are the general requirements for producing
all kinds of pressure vessel products and the specific requirements are the specific
requirements for producing relevant level of pressure vessels, all of which should be met
by the manufacturers simultaneously.

1.4 Manufacturer shall establish, and continuously and effectively implement a sound
quality management system suitable for its pressure vessel products. In order to verify the
control capability of its quality management system for pressure vessel products, the
manufacturer shall have enough practice in continuous producing pressure vessel
products.

1.5 The non-destructive examination (NDE), heat treatment, and physical and chemical
property examination can be performed either by manufacturer itself or by subcontractors
with relevant qualification or competence, when the manufacturer signing consignment
agreement with them. The consignment agreement has to put forward to the license-issue
department on file. The consignee shall issue the related report of the consigned work to
the manufacturer and the manufacturer shall be responsible for the quality control of the

e
consigned work, which should be included in the quality management system for

s
pressure vessel of the manufacturer. The requirements of the specific requirements for

c
resource shall not be consigned.

1.6 Manufacturer shall have a capability of producing main body (shell and/or head) of

w .
w
pressure vessel products independently. It is unacceptable to consign all pressure parts of

w
pressure vessel products to the subcontractors. (This stipulation has been modified, please
refer to Article 5 of Appendix 15 Revised Regulation for Boiler and Pressure Vessel
Manufacture Licensing (hereinafter referred as the “Revised Regulation” for detailed
information)

2 Basic Resource Requirements for Pressure Vessel Manufacture Licensing

35
EI
2.1 The applicants for pressure vessel manufacture licensing must have business license
or have registered in relevant local governmental departments where the manufacturer is
located.

S
2.2 The manufacturers of pressure vessel, that have been granted level A1, level A2 or
level C manufacture license, will be granted level D License automatically. No
manufacture license is required for those manufacturers who produce pressure vessel

C
products with design pressure less than 10 MPa, the same time the maximum inner
diameter less than 150mm and the water volume less than 25L.(This stipulation has been
modified, please refer to Article 6 of Appendix 15 Revised Regulation for detailed
information)Similarly, manufacture licensing is also unapplied to those products, such as,
shells of dependent pressure parts attached to machine, sleeved-tube type heat exchanger
without shell, corrugate plate heat exchanger, air-cooler and cooling panel. The
manufacturer who produces pressure-containing shell with irregular shape should report
Safety Supervision Administration of AQSIQ in order to determine if the application for
manufacture licensing is required.(This stipulation has been modified, please refer to
Article 7 (3)onwards of Appendix 15 Revised Regulation for detailed information)

2.3 Quality assurance system staff for pressure vessel


Pressure vessel manufacturer should provide the following quality control system with
responsible persons having relevant professional knowledge, experience and suitable for
the manufacturing products.
(1). Responsible persons for design and technological process control system
(2). Responsible persons for material quality control system
(3). Responsible persons for welding quality control system
(4). Responsible persons for chemical and physical testing quality control system
(5). Responsible persons for heat treatment quality control system
(6). Responsible persons for NDT quality control system
(7). Responsible persons for pressure testing quality control system
(8). Responsible persons for final inspection and testing quality control system

e
2.4 Technical staff

s
The pressure vessel manufacturer should have all the professional technical staff that

c
meets the demand of pressure vessel manufacture and management. Technical staff for

.
various manufacture licensing levels of pressure vessel should meet the following
requirements:

w w
(1) Technical staff in the manufacturers of licensing level A1 and level A2, level C

w
and level B1 have to be no less than 10 % of all employee and there should be
professional technical persons with relevant knowledge suitable for the requirements of
manufacturing product.
(2) Technical staffs in manufacturer of level A3, level A4, level A5, level B2 and
level B3 have to be no less of 5 % of all employee and not less than 5 persons and there
should be technical persons with relevant knowledge suitable for the requirements of
manufacturing pressure vessel products.(This stipulation has been modified, please refer

36
EI
to Article 7(5) of Appendix 15 Revised Regulation for detailed information)

2.5 Professional operator

S
2.5.1. Among all levels of pressure vessel manufacturers, the manufacturer of welded
pressure vessels should have qualified welders and welding operators to meet the demand
of products.
(1). Level A2 and level A3 and Level C licensing manufacturer should have at least 10

C
qualified welders and welding operators who have at least 4 granted items together.
(2). Level A1, level A5, level B2 and level B3 licensing manufacturer should have at
least 8 qualified welders and welding operators who have at least 3 together granted items
(except for non-welded vessels manufacturers).
(3). Level D licensing manufacturer should have at least 6 qualified welders and welding
operators who have at least 2 granted items together.
A. All levels of manufacture licensing pressure vessel manufacturers should have the
assemblers who can meet the requirements of pressure vessel production.
B. Among all levels of pressure vessel manufacturers, those who consign the NDE to
other enterprises should have high- and middle-level of responsible qualified NDE
examiners in accordance with the manufacture level. If the manufacturers themselves
perform the NDE, the qualified NDE examiners should meet the following requirements:
a. Level A1 licensing manufacturer should have at least one qualified high-level RT
(or UT, MT, PT) examiner who is responsible for NDE.(This stipulation has been
modified, please refer to Article 1 of Appendix 15 Revised Regulation for detailed
information)
b. Level C licensing manufacturer should have at least one qualified high-level RT
(or UT) examiner and two qualified middle-level RT and UT examiners
respectively.(This stipulation has been modified, please refer to Article 1 of Appendix 15
Revised Regulation for detailed information)
c. Level A2 and level A3 licensing manufacturer should have at least three qualified
RT and UT middle-level examiners respectively, and the responsible person for NDE
should hold middle-level certificate or higher.
d. Level A5, level B2 and Level D licensing manufactures should have at least two

e
qualified RT and UT examiners respectively and the responsible persons for NDE should

s
hold middle-level certificate or higher.

c
e. Level B1 licensing manufacturer should have at least two UT and MT examiner

.
respectively and the responsible persons for NDE should hold middle-level certificate or
higher.

w
f. Level B3 licensing manufacturer should meet the requirements of level B1 or level
w
w
B2 for the number and level of NDE examiners provided it needs to perform NDE

2.6 Pressure vessel manufacturers licensing on all levels should have suitable workshop,
machining tools, forming equipment, cutting and welding machines, lifting appliances,
and necessary fixtures and should meet the following requirements(This stipulation has
been modified, please refer to Article 7(2)(4) of Appendix 15 Revised Regulation for
detailed information):

37
EI
2.6.1. Enough warehouse or specific areas with effective protection measures for storing
pressure vessel materials; distinctive marks should be put between areas for the
acceptable materials and unacceptable materials.

S
2.6.2. Specific warehouse with drying and temperature maintain ovens, suitable for
welding materials storage.
2.6.3. The manufacturer should have enough working site for radiographic testing and
welding lab suitable for the requirements of product production.

C
3 Specific requirements
All levels of pressure vessel manufacturers should meet the following specific
requirements.
3.1 Specific requirements for level A pressure vessel manufacture licensing
3.1.1 Super-high pressure vessel manufacturer in level A1 licensing manufacturer should
have machining tools and inspection and testing devices suitable for producing
super-high pressure vessel and have at least 2 middle-grade or high-grade machinists.
The high-pressure vessel manufacturer should have heat treatment furnaces suitable for
production.(This stipulation has been modified, please refer to Article2 (1) of Appendix
15 Revised Regulation for detailed information)
3.1.2 Level A2 licensing manufacturer should have plate bending machine with rating
capacity no less than 30mm in plate thickness(This stipulation has been modified, please
refer to Article 2 (2) of Appendix 15 Revised Regulation for detailed information)and
lifting appurtenance with lifting capacity of no less than 20 ton(This stipulation has been
modified, please refer to Article 3 of Appendix 15 Revised Regulation for detailed
information). The cryogenic (isolated) vessel manufacturer should have equipment for
packing filling, drying, vacuuming and leak detector.
3.1.3 Spherical tank petal manufacturer among level A3 licensing manufacturer should
equip with press with capacity not less than 1200 tons and have experienced professional
operator in producing the petal.
3.1.4 Fiber wrapping vessel manufacturer among level A4 licensing manufacturer should
have automatic wrapping machine.

e
3.1.5 Level A5 licensing manufacturer should at least have 2 qualified electrician with

s
middle-grade or above and electric inspection and testing equipment.

3.2 Specific requirements for level B pressure vessel manufacture licensing

. c
3.2.1 Level B licensing manufacturer should have specific site and automatic recording
devices for burst testing of gas cylinder.

w w
w
3.2.2 Level B1 licensing manufacturer should have continuous gas cylinder production
line. The manufacturers, that produces gas cylinders requiring quenching and tempering
heat treatment, should have UT or MT detectors, heat treatment furnace for quenching
and tempering treatment and the hydrostatic pressure testing device with measurable
water jacket volumetric expansion.
3.2.3 Level B2 licensing manufacturer should have gas cylinder production line.
Among them, the acetylene gas cylinder production line should equip with equipment for

38
EI
compounding material, mixing, vibrating and drying and autoclaves etc., The LPG gas
cylinder manufacturer should have continuous production line and heat treatment furnace
with automatic recorder.

S
3.2.4 Level B3 licensing manufacturer should have specific manufacture facilities and
production lines; those who produce wrapping gas cylinders should have wrapping
machines and solidifying device.
3.2.5 Other specific equipment for manufacturing specific products.

C
3.3 Specific requirements for level C pressure vessel manufacture licensing
3.3.1. Level C1 licensing manufacturer should have specific railway line.
3.3.2. Level C2 and level C3 licensing manufacturers should have relevant assembly
capability and testing facilities.(This stipulation has been modified, please refer to
Article 7 (2)(4) of Appendix 15 Revised Regulation for detailed information)

3.4 Stainless or non-ferrous metallic vessel manufacturer should have specific workshop,
processing equipment, forming equipment, cutting equipment, welding machines, lifting
appliances, and necessary fixtures. The above specific equipment should not be used for
carbon steel

3.5 The manufacturers with several licensing levels should meet the relevant specific
requirements respectively.

s e
. c
w w
w
39
EI
Appendix 5 Quality System Requirements and Assessment Checklist

S
Section 1 Management responsibility
The boiler and pressure vessel manufacturer shall define and document its policy and
objective for quality. The manufacturer should make necessary measures to ensure this
policy is understood and implemented at all of its staff and should meet the following
requirements:

C
1. The quality related activities, responsibility, authority and the relationship among them
should be clearly defined. There should be the control and coordinate measures for the
interrelation among the different activities.
2. The responsibility, authority and the interrelation of personnel who manage, perform
and verify work affecting quality, especially those who are authorized to conduct work
independently, shall be defined and documented (including the responsibility of the
personnel who is in charge of material, welding, and NDE). The manufacturer’s
management with executive responsibility shall appoint a member of the
manufacturer’s own management as quality assurance engineer and defining his/her
duty and authority for assuring the establishment, implementation, maintenance and
improvement of its quality system

Section 2 Quality system


The boiler and pressure vessel manufacturer should establish a quality system
documentation suitable for design and manufacturing of boiler and pressure vessel, which
should include the fundamental elements of quality management.
1. Quality Manual should be established as a means for assuring that the product
conforms to the specified requirements. The quality manual should include or make
reference to the quality system procedures and outline the structure of the
documentation used in the quality system.
2. The manufacturer should prepare documented procedures consistent with the
requirements and manufacturer’s stated quality policy, and effectively implement the
quality system and its documented procedures.
3. The forms required by quality manual should be documented with standard format.

e
The contents in the current quality record forms should meet the requirements for

s
quality control of boiler and pressure vessel product with relevant levels.

c
4. The implementing quality plan should assure the quality of product. The quality

.
control points for product in the quality plan (including checkpoint, witness point and
hold point) should be reasonably arranged.

w w
Section 3 Document and data control

w
The manufacturer should establish documented procedures to control all documents
and data. They should include:
1. Establishment of document management procedure
(1). The manufacturer should clearly identify the documents to be controlled.
(2). The manufacturer should establish the procedures for draft, joint review, distribution,
change, recovery and maintenance of documents.

40
EI
2. The manufacturer should establish the provisions for assuring that only the latest
version of the documents can be used in the relevant departments.
3. The manufacturer should establish the procedure for management of external

S
documents such as, standards and customer-provided drawings.

Section 4 Design control


1. The manufacturer should clearly identify the responsibility of personnel at all level in

C
design department.
2. The manufacturer should keep the relevant codes, regulations and standards concerned
to the boiler and pressure vessel manufacture.
3. The design documents should specify that the boiler and pressure vessel produced
should meet the relevant safety quality requirements (see Chapter 5 onwards).
4. The manufacturer should establish the provisions of collecting and implementing new
standards.
5. The manufacturer should establish the procedure for design control (including the links
of design input, output, review, change and verification).

Section 5. Purchasing and material control


1. Purchasing
1). The procedure for effective quality control of supplier should be formulated.
2). The disposal measures for unacceptable goods provided by supplier should be
formulated.
3). The pressure parts should be provided by the suppliers that have recognized by
Chinese government or its authorized department. The manufacturer should effectively
control of the quality of products subcontracted.(This stipulation has been modified,
please refer to Article 7 (2)(4) of Appendix 15 Revised Regulation for detailed
information)
4). The control procedure for purchasing documents should be formulated.
5). The rules for checking, accepting and controlling of the purchasing materials and
products i.e. plate, tube for pressure parts should be formulated.
2. Storage and distribution of material

e
1). The manufacturer should establish the rules for storage of the raw materials, and

s
purchasing products including stockpile, identification, sorting etc.

c
2). The manufacturer should clearly prescribe the measures for storage the material in

.
warehouse.
3). The manufacturer should establish the rules for material distribution including
material release and substitution.

w w
w
4). The manufacturer should establish the rules for transplantation of material
identification including the transplantation during processing and the handling of surplus
material.

Section 6 Technology control (Process Control)


1. The manufacturer should establish the procedures for the management of technological
documents, including draft, release, change, review and approval of them.

41
EI
2. The manufacturer should establish the technological flow diagram or
product-processing card or product technology card (or work instruction) suitable for
the boiler and pressure vessel products.

S
3. The manufacturer should establish the technological flow diagram or technological
document for instructing the operator (work instruction) for main pressure parts.

Section 7 Welding control

C
1. Management of welding consumables
The manufacturer should keep and effectively implement a management rule for
welding consumables including order, receive, inspection, storage, drying, release,
use and restore of them.
2. Welding management
1). The manufacturer should establish the stipulations for training, qualification and the
file management of welders and welding operators.
2). The manufacturer should establish the stipulations for welding procedure qualification
(PQR), welding specification (WPS) or welding process card suitable for its boiler and
pressure vessel products and the requirements of the relevant technical codes. The
management stipulations for verifying the PQR and the distribution, use, amend of WPS
are both required.
3). The manufacturer should take necessary measures for assuring that welding of
pressure parts must be performed by qualified welders. The procedures for welder
qualification, the management of the record of the welder performance qualification
(WPQ) and the method and implementation for identifying the welder symbol on welds
should both be required.
4). The manufacturer should stipulate the procedures for the approval formalities for
welding repair, the requirement of re-examination of repaired weld and the process of
welding repair of flaws in base metal.
5). The manufacturer should establish the stipulation for keeping welding record of main
pressure parts.

Section 8 Heat treatment control

e
1. The manufacturer should establish the procedures for management of technological

s
documents for heat treatment including draft, review and approval, use, distribution,

c
recording and maintenance of them.

.
2. The manufacturer should establish the rules for the management of heat treatment
quality control.

w w
3. The manufacturer should establish procedure for the management of the subcontractor,

w
which should include, at least, the evaluation of the subcontractor and the quality
control items for subcontracted products, if the heat treatment is consigned to
subcontractors.

Section 9. NDE control


1. The manufacturer should formulate a procedure for quality control of NDE including
determining the NDE methods, selection of standards and codes, draft and approval of

42
EI
NDE technological documents, control of operation, sign and issue of NDE report and
the management of radiograph films.
2. The manufacturer should formulate the technological process card and record forms

S
suitable for the manufacturing products.
3. The manufacturer should formulate the rules for the management of qualification of
NDE personnel.
4. The manufacturer should establish procedure for the management of the subcontractor,

C
which should include, at least, the evaluation of the subcontractor and the quality
control for subcontracted items, if the NDE is consigned to subcontractors.

Section 10. Chemical and physical examination and testing


1. The manufacturer should formulate a management procedure for chemical and
physical examination testing.
2. The manufacturer should formulate a procedure for verification of the chemical and
physical examination and testing results and for repeating examination and testing of
them.
3. The manufacturer should establish procedure for the management of the subcontractor
which should include, at least, the evaluation of the subcontractor and the quality
control for subcontracted items, if the chemical and physical examination and testing
are consigned to subcontractors.

Section 11 Pressure testing control


1. The manufacturer should formulate technology and related procedure for pressure
testing.
2. The manufacturer should formulate a procedure on quality control for pressure testing
including the supervision and verification of pressure testing, safety protection during
pressure testing and the temperatures of test medium and of environment, etc.

Section 12. Control of other inspection and testing


1. The manufacturer should formulate a procedure for the management of inspection
and testing including the authority and responsibility of inspector, incoming

e
inspection, process inspection, final inspection, the file of inspection report and the

s
management of quality testimony, etc.

c
2. The manufacturer should formulate and implement inspection and testing plan.

.
3. The manufacturer should formulate provisions for identification of inspection and
testing status.

w w
Section 13. Control of metrology and equipment

w
1. The manufacturer should formulate the provision of metrology management to assure
the measuring meters, instruments and tools to be used are in their valid calibration
period.
2. The manufacturer should formulate the provisions for effective control, calibration
and maintenance of the measuring meters and testing instruments.
1) There should have provisions that the metrology environment should be suitable to

43
EI
the undertaking metrology testing.
2) There should have the provisions for the management of manufacturing equipment.

S
Section 14. Control of non-conformity product
1. The manufacturer should establish documented procedures to ensure that product that
does not conform to specified requirements is prevented from inadvertent use or
installation.

C
2. The manufacturer should establish provisions for identification, record, evaluation,
segregation (where practical), disposition of non-conforming products.
1). The provisions for drafting, review and approval and file of non-conformity report
should be established.
2). The relevant provisions for the links of disposal of non-conformity products (use as it
is, rework and scrap) should be established.
3). The provision that the re-inspection of reworked product should be established.

Section 15. Quality improvement


1. A flow chart for feedback, collection and analysis, and disposal of product quality
information (both inside and outside manufacturer) should be established.
2. A procedure on planning and implementing internal quality audit should be established
in order to ensure the normal implementation of quality assurance system, analyzing
and investigating the exist quality problems and putting forward the solving and
preventing measures to the problems.
3. The Provisions for internal quality audit including that the audit should be carried out
by personnel independent of those having direct responsibility for the activity being
audited should be established.
1). It should have a provision for receiving, disposal and answer to the comments of the
quality audit and the corrective or improvement measures to them.
2). It should have a provision for solving the product quality problems raised by
supervisory inspection agency (or the third party inspection agency) or customers in time.

Section 16. Training

e
The manufacturer should established a documented procedures for the training of quality

s
assurance engineers, welding engineers, inspectors, chemical and physical testing
personnel, NDE examiner, welder and welding operators and those personnel engaged in
manufacture, verification and management whose activities are greatly affecting quality.

. c
w w
w
Section 17. Implementing China’s manufacture licensing system
1. The manufacturer should establish a documented procedure for implementing China
boiler and pressure vessel manufacture licensing system. It should clearly define the
control procedure for boiler and pressure vessel products to be used in China. It should
be also specified that the auditors conducting survey and assessment for manufacture
licensing shall have free access, at the manufacturer facility, to all concerned drawings,
calculation sheets, procedures, records, the inspection and test results and other
necessary documents and data.

44
EI
2. The manufacturer should specify the use and management of boiler and pressure
vessel manufacture license.
3. The manufacturer should specify that it should provide with the product certificate of

S
compliance and other delivery documents to the Chinese customer.

C
s e
. c
w w
w
45
EI
Appendix 6 Quality Requirements for Boiler Safety

1 General requirements

S
The boilers produced by boiler manufacturer should meet the requirements of the
following safety technical codes and regulations.
1) Technical Supervision Regulation for Safety of Steam Boilers
2) Technical Safety Supervision Regulation for Hot Water Boilers

C
3) Technical Safety Supervision Regulation for Organic Fluid Heaters
4) Technical Safety Supervision Regulation for Small and Atmospheric Hot Water
Boilers
Manufacturers outside China, who have difficulties to completely carry out the
above-mentioned regulations, are allowed to adopt the technical codes and standards,
which is conventional and complete in system and are used by most countries after
having approved by Boiler and Pressure Vessel Safety Supervision Administration of
AQSIQ. But, in this case, they must meet the requirement as stipulated from article 2 to 7
onwards simultaneously.

2 Requirements of steel for pressure components of boiler


Steel for pressure components of the boiler (including staying components) must be
killed-steels. The designations of the steel should be those listed in foreign boiler steel
standards, or of conventional boiler steels.

3 Requirements for boiler structure


The structure of boiler should be in complete accordance with above-mentioned
Chinese safety technical regulations for boilers.

4 Requirements product inspection


The results of visual inspection of boiler, mechanical property testing of welded joint,
metallograpy and fractography, hydrostatic pressure test, and the NDE items and
detective rate must satisfy the requirements of above-mentioned Chinese boiler codes and
regulations.

5 The requirements for safety appurtenances and metering devices

s e
c
1) The spring-loaded safety valves for steam boilers should be of the full lift type.

.
2) The spring-loaded safety valve with threaded connection should be connected with a
stub and the latter should be welded to the drum or the header.
3) Pressure gauge and thermometer should be of SI unit.

w w
w
4) Two independent water-level gauges should be mounted on the drum of every steam
boiler. Only one gauge may be mounted if one of the following conditions is met:
A. For boilers with a rated capacity not greater than 0.5 tons/hr.
B. For boilers with a rated capacity not greater than 2 tons/hr, and equipped with a set of
reliable water level controlling device.
C. For boilers provided with two sets of independent remote water level display devices.
D. For electric heating boilers

46
EI
5) For boilers with a rated capacity not less than 2 tons/hr, the low/high water level
alarms and low water level interlock-protection device should be provided. For boilers
with rated capacity not less than 6 tons/hr, the over-pressure alarm and the over-pressure

S
interlock device should be provided.
6) For coal-fired, oil-fired, or gas-fired boilers, the ignition sequence controller and
extinguish protection devices should be provided.
7) For hot water boilers with rated temperature of outlet water not less than 120 or with

C
rated heating capacity not less than 4.2 MW, the over-temperature alarm should be
provided.

6 Requirements for delivery documents


The following safety-related technical documents are required when the boilers are to be
delivered.
1) Boiler drawing (including general drawing, installation drawing and drawings of main
pressure parts).
2) Strength Calculation sheets for pressure components and the calculation sheets for
relieving capacity of safety valves (or selected from operational manual of the safety
valves) or a summary of above mentioned calculation results.
3) Product quality testifying documents (including product certificate of compliance,
material mill sheets for main pressure parts, NDE reports, post-welding heat treatment
reports and hydrostatic pressure test report).
4) Installation and operational manual for the boiler.
5) Boiler with rated pressure equal to or greater than 3.8MPa should also attach to the
following documents:
A. Calculation sheets for thermodynamic, wall temperature of super-heater, and for fuel
gas resistance or a summary of the above calculation results.
B. System thermal expansion diagram.
6) For boilers with rated pressure not less than 9.8 MPa, the following additional
documents should be provided:
A. The calculation sheets for the wall temperature of re-heater and for boiler water
circulation or a summery of the calculation results.

e
B. Diagram of the steam-water system of the boiler.

7 Requirements for nameplate

c s
.
A metallic nameplate should be put on the conspicuous place on the boiler. The contents

using SI units):

w w
on the nameplate should include at least the following items (in Chinese or English and

1) Name and address of manufacturer,


2) Level and serial number of manufacture license,
3) Rated steam capacity (thermal power),
4) Rated steam pressure (outlet pressure),
w
5) Rated steam temperature (outlet temperature),
6) Steam temperature at inlet and outlet of the re-heater (not applicable for the boilers
without re-heaters),

47
EI
7) Manufacturing number of the boiler,
8) Manufacturing date.

CS
s e
.c
ww
w
48
EI
Appendix7 Quality Requirements for Pressure Vessel Safety

1 General requirements

S
Pressure vessels produced by pressure vessel manufacturers should meet the
requirements of the following Chinese pressure vessels' safety technical codes and
regulations:
1) Safety Technical Supervision Regulations for Pressure Vessel,

C
2) Safety Supervision Regulations for Super-high Pressure Vessels,
3) Simple Pressure Vessels Safety and Technical Regulations
Manufacturers outside China, who have difficulties to completely carry out the
above-mentioned regulations, are allowed to adopt the technical codes and standards,
which is conventional and complete in system and are used by most countries after
having approved by safety supervision administration under AQSIQ. But, in this case,
they must meet the requirement as stipulated from article 52 to 58 onwards
simultaneously.

2 Requirements for safety quality documents of pressure vessel products


Pressure vessel products should at least have the following technical documents
concerned with the safety of them during delivery:
1) As-built drawing of pressure vessel (including general drawing and drawings for main
pressure components).
2) Strength calculation sheets for main pressure parts of level A1, level A2 and level C
licensing pressure vessels or a summary of the calculation results.
3) Calculation sheets for the required safe relieving capacity of pressure vessel, relieving
capacity of safety valves and/or the discharge area of bursting or a summary of above
calculation results.
4) Testifying papers of product quality including certificate of compliance of the product,
mill reports for main pressure parts, NDE reports, heat treatment reports, pressure test
reports and leak test reports, etc.,

3 Requirements for product nameplate

e
The manufacturer shall set a metallic nameplate on a conspicuous place of the pressure

s
vessel. The following items, as a minimum, shall be included (written in Chinese or

c
English both with SI unit) in the contents of the nameplate:

.
1) Name of product,
2) Name and address of manufacturer,
3) Level and serial number of manufacture license,

w w
4) Working medium,
5) Design temperature,
6) Design pressure,
7) Pressure test pressure,
w
8) Manufacturing number of product,
9) Manufacturing date,
10) Class of vessel,

49
EI
11) Volume of vessel.

4 Design requirements

S
4.1 The safety factor for allowable stress of materials (design safety factor) should be
determined in accordance with the following requirements:
In general, the safety factor for steel pressure vessel shall not be less than 3 if the
design is based on the tensile strength at room temperature. The factors should normally

C
not less than 1.6 for carbon steel and low alloy steel and not less than 1.5 for high alloy
steel if the design is based on the yield strength at ambient temperature. Otherwise, it
should subject to prior approval by the safety supervision administration of AQSIQ.
The safety factor for stress analyzing design should normally not be less than 2.6 if
the design is based on the tensile strength at ambient temperature and should normally
not be less than 1.5 if the design is based on the yield strength both at ambient and design
temperatures. Otherwise, it should subject to prior approval by the safety supervision
administration of AQSIQ.
The design safety factors for steel and nonferrous metal pressure vessel should be
selected from Table 1.

Table 1. Design Safety Factor for Steels, Al, Cu, Ti, Ni and Their Alloys

Conditions
Average creep limit at
Average endurance strength at
Tensile strength Yield limit at design design temp. (with creep
t design temp. (rupture strength at
at room temps.σb temp.σ 2.0 t rate of 0.01% per 1000
105 hours)σ d
hours) σtd
Material
Carbon steels, low
alloy
nb≥3.0 ns≥1.6 nd≥1.5 nn≥1.0
steels

High alloy steels


nb≥3.0 ns≥1.5 nd≥1.5 nn≥1.0

Al, Ti nb≥3.0 ns≥1.5 nd≥1.5 nn≥1.0

s e
c
Plate,
Cu, Ti,

.
forging,
Ni nb≥3.0 ns≥1.5 nd≥1.5 nn≥1.0

w
Ni and Al nb≥4.0 ns≥1.5
Pipe &

w
their
bar

w
alloys Cu nbn≥4.0 ns≥1.5

Grey cast
nb≥10.0
iron
Cast Nodular or
irons malleable
nb≥8.0
cast iron

50
Cast
Design temp.
≤300℃

EI nb≥4.0/casting
factor

S
steel Design Temp. nb≥4.0/casting
ns≥1.5/casting
>300℃ factor
factor
(Note a)
Carbon steel ns≥2.7(H.R)

C
ns≥2.5(N)
Low alloy
steel
ns≥3.5(Q&T)
High alloy
ns≥2.7(Q&T)
steel
nb≥5.0 nd≥1.5

Bolt Martensite
steel
ns≥3.0(Q&T)
Austenitic
ns≥1.6(S)
steel

nonferrous
metals nb≥5.0 ns≥4.0

Note:
a. The safety factor for allowable stress of cast steels pressure vessels, which design Temp. higher
than 300℃ shall use lower calculation between n and n
b s

b. When the yield strength (or conditional yield strength) at design temperature cannot be determined
and the allowable stress is based on the tensile strength of material, the value nb shall be raised
appropriately.
c. The casting factors of nonferrous metals shall be determined by the corresponding values for plate,
forging, pipe or bar divided by 0.8.
d. The casting factor of cast steel shall not exceed 0.9.

s e
c
e. H.R—Hot Rolled, N—Normalized, Q&T—Quenched and Tempered, S—Solution heat- treated.

4.2 If the pressure vessel is designed by stress analysis, the manufacturer should register

w .
w
at the safety supervision administration of AQSIQ.

w
4.3If the pressure vessel is designed by the strength calculation method other than those
in the relevant standards or designed by proof testing, the manufacturer should register at
the safety supervision administration of AQSIQ.
4.4 The design for transportable pressure vessel should be submitted to the safety
supervision administration of AQSIQ for review and register.
4.5 All welded joint of category A and B (see figure below) should be non-destructive
examined (RT or UT) in accordance with the relevant standards and design drawing.

51
EI
CS Scheme of Category A and Category B Welded Joints
The joint efficiency shall be determined according to the type of welded joint of the
welded pressure parts and the percentage of NDE. Table 2 gives the stipulations for the
joint efficiency.

Table 2 Joint Efficiency of Welded Pressure Vessel

Butt joint as attained by double welding or by


other means having the same quality as full
penetrating double welding
Steel

1.0
Full NDE

Nonferrous metal

Al

0.85 0.85
0.90 0.95
Cu Ni

0.85
0.95
Ti

0.90
Steel

0.85
Al
Spot NDE
Nonferrous metal

Cu

0.80 0.80 0.80


0.85 0.85 0.85
Ni Ti

0.85

Single-welded butt joint with backing strip 0.80 0.80 0.80 0.70 0.70 0.70
0.90 0.85 0.80 0.80
0.85 0.85 0.85 0.80 0.80 0.85
Single-welded butt joint without backing strip 0.65 0.65

e
/ / / / / / / /
0.70 0.70

c s
.
Note:

w
a. NDE in the Table means RT or UT for steel pressure vessels and RT for non-ferrous

w
metal pressure vessels in principle. Full NDE means 100% RT or UT; and spot NDE

w
means 20% or 50% (for ferrite steel low temperature pressure vessel) RT or UT.
b. The upper limit of joint efficiencies for nonferrous metal pressure vessel is for welded
joint fabricated by metal inert gas welding, the lower limit is for welded joint fabricated
by gas tungsten arc welding.
c. The words “by other means having the same quality as full penetrating double welding
“ in the Table means the welded joint welding by one side which can assure good weld
appearance at both side. In this case, it should be qualified with the same measures as for
welding by both sides (including the qualification of welding testing plate). The welds by

52
EI
using argon shielded arc welding in backing welding or using ceramic or copper backing
pads are the examples.
4.6The design pressure of liquefied petroleum gas (LPG) vessels operated at ambient

S
temperature should base on the actual saturated vapor pressure of the mixed compositions
of LPG at a temperature not lower than 50. The limitation of LPG compositions and the
corresponding working pressure shall be noted on the design drawing.
4.7 Neither lap joint nor cruciform joint is permissible for connecting shell to shell, shell

C
to head and for connecting welds in welded heads.
4.8 One hand hole or two hand holes (for those vessels impossible to fit man-hole) should
be provided for the pressure vessels with inner diameter not less than 500mm (except for
those vessels, such as, jacket vessel, heat exchangers where the opening on the vessel are
not allowed).
4.9 The safety interlocking devices shall be provided for pressure vessels with
quick-actuating doors (closures).

5 Requirements for pressure vessel steels


5.1 The materials for pressure components of pressure vessel shall be used within the
applicable range of relevant standards.
5.2 The phosphor and sulfur contents of the carbon steel and low-alloy steel used for
main pressure components of welded pressure vessel shall not be greater than 0.030%
and 0.020% respectively.
5.3 The carbon contents in carbon steel and low-alloy steel used for main pressure
components of welded pressure vessel shall not be greater than 0.25%, and the carbon
equivalent Ceq should not be more than 0.45%. If the carbon and low-alloy steel, which
carbon contents are greater than 0.25%, are necessarily needed, the manufacturer shall
meet all the following requirements:
5.3.1 Obtaining agreement and acknowledge of the customer in advance,
5.3.2 Carbon equivalent Ceq of the material should not be greater than 0.45%,
5.3.3 Weldability test report and welding procedure qualification report of the material
should be provided, and report safety supervision administration of AQSIQ for review
and approval.

e
5.4 For those quenched and tempered low-alloy pressure vessel steel, if the specified

s
minimum tensile strength in the relevant standard is equal to or greater than 540MPa, the

c
phosphor and sulfur contents shall not be greater than 0.020% and 0.015% respectively.

.
The welding cracking sensitivity coefficient Pcm shall not be greater than 0.25%, and the

provided to safety supervision administration of AQSIQ for review and approval.

w w
weldability test report and welding procedure qualification report of the material shall be

The welding cracking sensitivity coefficient Pcm shall meet the following
requirement:
540Mpa≤σ (Note c)≤570 Mpa, Pcm≤0.25%;
b
w
570Mpa<σ ≤610 Mpa, Pcm≤0.28%;
b

σ >610Mpa, Pcm≤0.30%。
b

53
Note:

EI
a. Ceq=C+Si/24+Mn/6+Ni/40+Cr/5+Mo/4+V/14

S
b. Pcm=C+Si/30+(Mn+Cu+Cr)/20+Ni/60+Mo/15+V/10+5B
c: σb is the lower limit of tensile strength at the ordinary temperature specified in steel

standard.

C
5.5 Impact toughness of the low alloy steel plate for the proper of transportable pressure
vessel shall be conducted(This stipulation has been modified, please refer to Article 4 of
Appendix 15 Revised Regulation for detailed information).The sampling quantity of the
impact test is two steel plate per batch and the test temperature should be -20 or per
instruction on the drawing. The requirements and acceptable value of the impact test
should conform to the applicable provisions in Table 3.

Table 3 Requirements for Impact Test and Acceptable Impact Toughness


Value
Average impact energy value of three test
Minimum standard tensile strength of steel
specimens Akv,J
σьMPa
Specimen size:10mm × 10mm × 55mm
≤450 18
>450 ~ 515 20
>515 ~ 650 27
Note: The average impact energy of the three test specimens at test temperature must not
less than the requirements as specified in this table. Among them, the impact energy
value of one specimen may be less than the average value but in no case it should be less
than 70% of the average impact energy value.

5.6 The rimmed steels are not permitted in manufacturing the pressure components of
pressure vessel.
5.7 The use of cast irons for pressure components in pressure vessel should accord to the
requirements as specified in Table 4. Furthermore, they must not be used for pressure

s e
c
components in the following pressure vessels:

.
5.7.1 The pressure components of pressure vessels used to contain lethal, high-poisonous

w
or middle-poisonous substances.

w
5.7.2 The pressure vessel for containing flammable media with design pressure equal to

w
or more than 0.15 MPa.
5.7.3 Waste heat boilers with shell and tube type.
5.7.4 Transportable pressure vessels.
Table 4
Type of cast iron Design pressure, MPa Design temperature,℃
Grey cast iro 0.8 0~250
Nodular or malleable cast iron 1.6 -10~350

54
EI
6 Requirements for manufacture
6.1 Cold-formed carbon steel and low-alloy steel convex concave heads should conduct

S
stress-relieving heat treatment after cold forming.
6.2 The following pressure vessels should conduct block post-welding heat treatment for
relieving residual stress:
6.2.1 The pressure vessels used to contain lethal, high-poisonous substances.

C
6.2.2 The pressure vessel with wall thickness more than 16mm and design temperature
lower than -20 .
6.2.3 The carbon steel pressure vessel with wall thickness more than 32mm (or more than
38mm, if the welding preheat temperature is more than 100).
6.2.4 The low alloy steel pressure vessel with wall thickness more than 30mm (or more
than 34mm, if the welding preheat temperature is more than 100).
6.2.5 All Cr-Mo low alloy steel pressure vessels.
6.3 For pressure vessels used for storage of mixed LPG at ambient temperature or for
other working media, which may induce stress corrosion, each steel plate should be
examined by UT and the post welding heat treatment should be made for stress relieving.
6.4 For those pressure vessels, which is designed by fatigue analysis, the reinforcement of
welds in category A, and category B butt-joints shall be removed; all welded joints shall
have smooth transition.
6.5 All corrugate plate-and-shell type heat exchanger shall have dismountable and
cleanable structure.

7 Requirements for inspection


7.1 Each of the following pressure vessels should produce a longitudinal product welding
test plate:
7.1.1 The pressure vessels made of Cr-Mo low alloy steel or material with minimum
specified tensile strength more than 540 MPa in the relevant standard.
7.1.2 The pressure vessels with design temperature of less than -20 and requiring low
temperature impact test.
7.1.3 The pressure vessels requiring heat treatment to assure the mechanical properties of

e
its steel plate.

s
7.1.4 The pressure vessels used to contain lethal or high-poisonous substances,

c
7.1.5 The pressure vessels with design pressure more than 10Mpa,

.
7.1.6 The non-ferrous metal pressure vessels with design pressure more than 1.6Mpa,
7.1.7 The welded pressure vessels made by dissimilar metals,
7.1.8 Spherical tanks,

w w
7.1.9 Transportable pressure vessels.

w
7.2 NDE on welded joints of pressure vessel should accord to the requirements as
specified in the drawing. The Category A and category B welded joint of the following
pressure vessels shall perform 100% RT or UT but the RT should be adopted if the wall
thickness of the vessel is equal to or less than 38mm.
7.2.1 The class III pressure vessel.
7.2.2 The reactors and storage pressure vessels among class II used to contain

55
EI
inflammable media.
7.2.3 The pressure vessels with design pressure more than 5.0Mpa.
7.2.4 The tube and shell waste heat boilers with design pressure more than 0.6Mpa.

S
7.2.5 The pressure vessels with joint efficiency of 1.0 (except for the pressure vessels
which use seamless tube as shell and the close circumferential weld, but the later should
use the suitable welding method and parameter to assure the welding quality).
7.2.6 The pressure vessels that can not perform inner examination or pressure-test after

C
put in use.
7.2.7 The carbon steel pressure vessels with wall thickness more than 30mm and low
alloy steel or stainless steel pressure vessels with wall thickness more than 25mm.
7.2.8 The pressure vessels made by Cr-Mo low alloy steel or steels with specified
minimum tensile strength more than 540 MPa in the relevant standard.
7.2.9 The vessels used to contain lethal or high-poisonous substances.
7.2.10 The pressure vessels using pneumatic pressure test other than hydrostatic-test.
7.2.11 The pressure vessel designed and constructed per stress analysis standard.
7.2.12 Butt joints in inner cylinder of multi-layered pressure vessel and in each cylinder
of hot-shrink-fitted pressure vessels.
7.2.13 The pressure vessels which should be examined with 100% RT or UT in
accordance with design drawing.

7.3 Except for the requirements as specified in 2. Of this Article, it is permissible to apply
spot NDE for category A and B welded joints. The percentage for spot NDE shall not be
less than 20% of the length of each weld and not less than 250mm. But all of the
following welded joint should be non-destructive examined and the acceptable criterion
should be in accordance with the requirements of the pressure vessel.
7.3.1 All of the T-joints.
7.3.2 All welded joints within opening area (the area within the circle with diameter of
1.5 times of the opening diameter and having the same center of the circle as the opening).
7.3.3 The welded joint to be covered by reinforcement rings, saddles or pads.
7.3.4 Butt joint in welded head or welded tube plate.
7.3.5 All butt joints in nozzles with a nominal diameter greater than 250mm. The

e
percentage and acceptable criteria shall be the same as that of the welded joint in the

s
vessel proper.

7.4 It is not allowed to exempt NDE of the welded joint by decreasing its joint efficiency.

. c
w
7.5 The test pressure, test medium, temperature of test medium, pressure holding time
w
w
and test results shall be included in the pressure test and leak test report. The pressure test
and leak test report shall be provided to the customer together with the vessel.

56
EI
Appendix 8 Quality Requirements for Gas Cylinder Safety

1. The gas cylinders produced by gas cylinder manufacturer should meet the

S
requirements of the following safety technical codes and regulations.
1) Safety Supervision Regulation on Baric Oxygen Chamber for Medical Treatment
2) Safety Supervision Regulation for Gas Cylinders
3) Safety Supervision Regulation for Dissolved Acetylene Cylinder

C
4) Safety Supervision Regulation on Liquefied Gas Containers for Tankers

2. All gas cylinders must be designed and manufactured in accordance with the Chinese
national standards. In addition, the design documents of them shall be appraised before
type testing. In the case of lack of Chinese standards, the manufacturer should report the
applied standard and related technical document to the safety supervision administration
of AQSIQ for review and approval. Among them, the key items related to the safety
quality of gas cylinder, such as, design temperature, design pressure, bursting testing,
NDE, mechanical properties, must not lower than the requirements as specified in the
corresponding Chinese national standard.

3. The color marking of the imported cylinders shall be in accordance with the provisions
in Chinese mandatory national standard GB 7144.

s e
. c
w w
w
57
EI
Appendix 9 A Specimen of Manufacture License of Boilers and Pressure Vessels

S
Sample of Manufacture License for Boiler and Pressure Vessel

MANUFACTURE LICENSE

FOR BOILER & PRESSURE VESSEL

C
THE PEOPLE’S REPUBLIC OF CHINA

LICENSE NO.:

(NAME OF MANUFACTURER)
(LOCATION OF MANUFACTURER)

IS QUALIFIED THE MANUFACTURE LICENSING OFR FOLLOWING PRODUCTS

SIGNATURE ISSUE ORGAN

e
(AUTHORIZED PERSON)

s
DATE OF ISSUE

.c
w w
ADMINISTRATION ORGAN OF THE LICENSE (FULL NAME OF SAFETY
SUPERVISION ORGAN OF THE LICENSE-ISSUE ORGAN)
w
58
EI
Appendix 10 A Specimen of Notice of Boiler and Pressure Vessel Products to be
Exported to China

S
Data Notice of Boiler Products to be Exported into China
Name of Country/Area
Manufacturer
Manufacture License Manufacture Licensing
Number Scope or Level

C
Buyer
End User
Installation address
Delivery Date
Order Number or
Product Identification
Product Quantity
Name
Type of Boiler Design Parameter
Rated Rated Steam Rated Steam Steam Temperature at inlet
Steam Pressure Temperature and outlet of the re-heater
Steam Boiler Capacity (MPa) (℃) (℃)
(Ton/h)

Rated Heating Rated Outlet Water Rated Outlet Water


Hot Water Capacity (MW) Pressure (MPa) Temperature (℃)
Boiler

Rated Working Maximum Working Total


Organic Heating Pressure Temperature Substance Weight
Fluid Boiler Capacity (MPa) (℃) (Ton)
(MW)

e
Design and Fabrication Standard

s
Has AQSIQ ever approved the adopted code or standard Yes□ No□

c
to the license holder?
Estimate Design Completion Date

w .
w
Estimate Fabrication Time

Title of the
Reporter
Telephone
Name of the
Reporter
Fax
w
E-mail
Address
Signature: Date:

59
EI Data Notice of Pressure Vessel Products to be Exported into China

S
Name of Country/Area
Manufacturer
Manufacture License Manufacture Licensing
Number Scope or Level
Buyer

C
End User
Installation Address
Delivery Date
Order Number or
Product Identification
Type of Pressure □Stationary Pressure Vessel □Transportable Pressure Vessel
Vessel □ Medical Oxygen Cabin □Other
Design Parameter
Design Pressure Shell(side) Tube Side Jacket
(MPa)

Design Temperature Shell(side) Tube Side Jacket


(℃)

Medium

Volume (L)

Geometric Dimension (mm)

Wall Thickness (mm)

Main Material

Installation □ Horizontal □Vertical □Spherical


Design and Fabrication Standard

e
Has AQSIQ ever approved the adopted code or standard Yes□ No□

s
to the license holder?

c
Estimate Design Completion Date

Estimate Fabrication Time

w .
Title of the
Reporter
Telephone
Name of the
Reporter
Fax w w
E-mail
Address
Signature: Date:

60
EI Data Notice of Gas Cylinder Products to be Exported into China

S
Name of Country/Area
Manufacturer
Manufacture Manufacture Licensing
License Number Scope or Level
Buyer

C
End User
Installation
Address
Delivery Date
Order Number or
Product Identification
Product Quantity
Name

□Seamless Gas Cylinder □Welded Gas Cylinder □Liquefied


Type of Gas Petroleum gas cylinder □Dissolved acetylene gas cylinder □Gas
Cylinder Cylinder for Motor-driven Vehicles □Thermal Insulation Cryogenic
Gas Cylinder □Wrapped, non-rechargeable Gas Cylinder □ Special
Gas Cylinder

Design Parameter
Nominal Working
Pressure (MPa)
Nominal Volume (L) Shell

Dimension (mm)
Inner diameter × length × wall thickness
Design and Fabrication Standard

e
Has AQSIQ ever approved the adopted code or standard Yes□ No□

s
to the license holder?

c
Estimate Design Completion Date

Estimate Fabrication Time

w .
w
Title of the Name of the
Reporter
Telephone

E-mail
Reporter
Fax
w
Address
Signature: Date:

61
EI
Name of
Data Notice of Safety Component Products to be Exported into China
Country/Area

S
Manufacturer
Manufacture License Manufacture Licensing
Number Scope or Level
Buyer
End User

C
Installation Address
Delivery Date
Order Number or
Product Identification
Product Quantity
Name
Product Product Parameter
Product Serial Type and Set Pressure Maximum Working Coefficient of Quantity
Number Specificati (MPa) Temperature (℃) Discharge or Flow

Safety Valve ons Capacity

Product Serial Type and Marked Burst Applicable Medium Material Quantity
Number Specificati Pressure and Temperature (℃)
ons (MPa)

Rupture
Discs
Product Serial Type Nominal Size Nominal Working Maximum Working Quantity
Number Pressure (MPa) Temperature (℃)

Gas
Cylinder
Valve
Design and Fabrication Standard

Has AQSIQ ever approved the adopted code or standard Yes□ No□

s e
c
to the license holder?

.
Estimate Design Completion Date

w
Estimate Fabrication Time

w
Title of the Name of the

w
Reporter Reporter
Telephone Fax
E-mail
Address
Signature: Date:

62
EI
Appendix 11 An Outline for Safety Performance Supervisory Inspection of Boiler
and Pressure Vessel Products

S
Outline for Safety Performance Supervisory Inspection
of Boiler and Pressure Vessel Products

A. BOILER

C
I. Applicable scope
This outline is the general requirements for supervisory inspection of the safety
performance of stationary pressure-containing boilers with water medium and organic
fluid Heaters and their parts. The supervisory agency may adjust the items and contents
based on the actual situation.

II. Contents of supervisory inspection


1. Supervisory inspecting the items related to the safety performance of the product
during boiler manufacturing.
2. Supervisory examining the implementation of the quality system of the supervised
manufacturer

III. Items and methods of supervisory inspection


1. Drawing and data review
(1) Review the design data of the boiler products,
(2) Examine the standards and technology for boiler manufacture and inspection;
(3) Review the standards and technology for non-destructive examination (NDE);
(4) Review the approval formalities of design change (including material substitution).

2. Manufacture quality of drum (shell), furnace, tube-plate, reverse combustion chamber,


vertical flue and lower support ring
(1) Check material certificate and material re-test report
(2) Check the selection and formalities of substitute materials

e
(3) Check the transplantation of material identification

s
(4) Appearance examination (including base metals and welds)

c
(5) Examine weld position and stagger between the abutting welds

.
(6) Check the identification steel stamp of welders and welding operators
(7) Spot-check geometric dimension (including difference between the maximum and the

w w
minimum inner diameters of cylinder, angularity, straightness, misalignment and location
of opening)

w
(8) Measure wall thickness of cylinders and heads (tube plate) (if necessary)
(9) Examine the number and manufacturing method of welding test plate
(10) Check property test reports of welding product test plate and verify the test results
(11) Check NDE report and spot-check the x-ray films. The number of the x-ray films
being checked should not be less than 30 per cent of the total number of films (films at
cross joint, T-joint and at doubtful position and welding repair should be included.

63
EI
(12) Check heat treatment records and report
(13) Check hydrostatic (pressure) test (including testing pressure, temperatures of test
medium and of environment, pressure raising rate, pressure dwelling time and validation

S
of pressure gauge calibration)
(14) Check the dimensions and appearance of openings for tube, the rectification of tube
joints and machining quality.

C
3. Supervisory inspection of manufacturing quality for header
(1) Check material certificate and material re-testing report
(2) Check the selection of substitute materials and material substitution formalities
(3) Examine the transfer of material identification
(4) Examine surface quality (including weld)
(5) Wall-thickness measurement (if necessary)
(6) Check the identification steel stamp of welders
(7) Check spectrum analysis report of alloy steel tube, weld and of components and parts
(8) Verifying the number and manufacturing method of welding test plate
(9) Check the mechanical property test report of the product welding test plate and verify
the test result
(10) Check NDE report and spot check x-ray films. The number of the x-ray films being
checked should not be less than 30 per cent of the total number of films
(11) Check heat treatment technology and report
(12) Check hydrostatic (pressure) test (including testing pressure, temperatures of testing
medium and of environment, pressure-raising rate, dwelling time and the validation of
calibration for pressure gauges)
(13) Examine the opening dimension and surface quality of tube hole, rectification of
tube-joints and machining quality

4. Supervisory inspection of manufacturing quality for tubes


(1) Check material certificate and material re-testing report
(2) Check the selection of substitute materials and material substitution formalities
(3) Check the transfer of material identification

e
(4) Appearance examination (including weld)

s
(5) Spot-check geometry (including bending quality of tubes and difference between the

c
maximum and the minimum inner diameters)

.
(6) Review the spectrum analysis report for alloy steel tube, welds, components and parts
(7) Verifying the number and manufacturing method tube test samples made by either
cutting from tubes or attaching with tubes

w w
the test result
w
(8) Check the mechanical property test report of the product welding test plate and verify

(9) Check NDE report and spot check x-ray films. The number of the x-ray films being
checked should not be less than 30 per cent of the total number of films
(10) Conduct sounding of tube by balls
(11) Check hydrostatic (pressure) test (including testing pressure, temperatures of test
medium and of environment, pressure raising rate, dwelling time and validation of

64
EI
calibration for pressure gauges)

5. Safety appurtenance

S
The number, specifications, types and certificates of compliance of safety appurtenance
should meet the relevant requirements.

6. Thermal adjusting test for safety performance of compact oil-fired or gas-fired boilers

C
in manufacturer
(1) Check if the types and specifications of safety valves, pressure gauges and water level
indicators meet the requirements.
(2) Check if the water level control devices are sensitive
(3) Check if the over-pressure protection devices are sensitive
(4) Check if the ignition program controllers and fire extinguish protection devices are
sensitive
(5) Check if the burner matches the boiler

7. Examination of delivery technical document of boilers


(1) Check the delivery technical documents
(2) Check the contents on nameplate and stamp the supervisory inspection symbol on it

8. Supervisory inspection data


Once the product has passed the supervisory inspection, the supervisory inspector should
summarize the data and verifying papers in time according to the Supervisory Inspection
Items for Safety Performance of Boiler Products and issue the Supervisory Inspection
Certificate.

9. The supervisory inspector should check the following documents of the supervised
companies
(1) Quality manual
(2) The list of appointment and dismissal of quality system personnel
(3) The list of qualified welders and welding operators engaged in boiler welding

e
(including qualified items, term of validity in their certificates and identification steel

s
stamp)

c
(4) The list of personnel engaged in NDE (including qualified items, level and term of

.
validity in their certificates)
(5) The list of inspectors engaged in boiler quality inspection

w
(6) Boiler design data, technological document and inspection and testing report and
w
record and a summarized table of welding procedure qualification
(7) Supervised manufacturer production plan for boilers
(8) Sub-contracts for boiler production
w
B. Pressure Vessel

I. Applicable scope

65
EI
This outline is applied to the supervisory inspection on safety performance of pressure
vessel except for gas cylinders.

S
II. Contents of supervisory inspection
1. Supervisory inspecting the items related to the safety performance of the product
during pressure vessel manufacturing.
2. Supervisory examining the implementation of the quality system of the supervised

C
manufacturer

III. Items and methods of supervisory inspection


1. Drawing and data
(1) Examine the certification of pressure vessel designer, conform the effectiveness of its
qualification
(2) Review the effectiveness of standards on manufacture and inspection for pressure
vessel
(3) Review the approval formalities for design change (including material substitution).

2. Materials
(1) Check material certificate and material re-test report
(2) Check the transplantation of material identification
(3) Check the selection and formalities of substitute materials for main pressure parts

3. Welding
(1) Check the welding procedure qualification and their records, verify that the welding
technology used in product production is in accordance with the relevant standards and
codes.
(2) Confirm the number and manufacturing method of the welding test plate.
(3) Check the property test report of the product welding test plates and confirm the test
results.
(4) Check identification steel stamps of welders and welding operators.
(5) Check formalities and procedures for welding repair.

4. Visual and dimensional examination

s e
c
(1) Examine the appearance of welded joints.

.
(2) Check the mechanical damage on the surface of base metal
(3) Check the difference between maximum and minimum diameters of shell. Check the

w
straightness of the cylinder of vertical vessel with height more than 30 meters, Check the
w
w
arrangement of welds and the deviation of figure in head and record their actual
dimensions. Check the main dimensions of the forming petal for spherical vessels.
5. Non-destructive examination
(1) Check x-ray film arrangement map and NDE report. Verify the proportion and
position of NDE. For the spot-NDE pressure vessel, check the extension RT for the
repaired welds. As for the UT or surface flaw detection, the supervisory inspector should
conduct random on-site supervisory inspection in addition checking the report.

66
EI
(2) Check the x-ray films. The number of the x-ray films being checked should not be
less than 30 per cent of the whole and should not less than 10 films (including the x-ray
films at T-joint, doubtful area and at the repaired area).

S
6. Heat treatment
Check and confirm the correspondence between heat treatment curve and actual heat
treatment parameter and procedure.

C
7. Pressure test
Before pressure test, confirm that all required items have passed the supervisory
inspection and the supervised manufacturer has kept the testimony of the
whole-completed work. During pressure test, the supervisory inspector shall check the
test equipment, instruments, and preparation work for testing and verify the test results on
the site.

8. Safety appurtenance
The number, specifications, types and certificates of compliance of safety appurtenances
should meet the requirements.

9. Leak test
Check the leak test result to assure that it meets to the requirement of concerned code,
standards, and design drawing.

10. Delivery technical data


(1) Check the technical data to be delivered
(2) Check the nameplate if the contents on it are in accordance with the relevant
requirements and the supervisory inspection stamp has imposed.

11. Supervisory inspection data


Once the product has passed the supervisory inspection, the supervisory inspector should
summarize and verify the testifying paper in time according to the Supervisory Inspection

e
Items for Safety Performance of Pressure Vessel Products and issue the Supervisory

s
Inspection Certificate.

C. Gas cylinder

. c
I. Applicable Scope

w
This outline is applicable to the supervisory inspection for safety performance of gas
w
cylinders.
II. Supervisory inspection content
w
1. Supervisory inspecting the items related to the safety performance of the product
during gas cylinder manufacturing.
2. Supervisory examining the implementation of the quality system of the supervised
manufacturer.

67
EI
III. Items and methods of supervisory inspection
1. Check if the enterprise standard (i.e. the standards formulated by manufacture itself)
has established and being approved by safety supervision department of AQSIQ.

S
Confirm that the design documents of gas cylinders have been checked and approved
by inspection agency in accordance with the relevant requirements. The general
drawings of gas cylinders should bear the symbol of being checked and approved.
Check the type approval testing results of the gas cylinders.

C
2. Check and confirm the material certificates of the proper of gas cylinders. Confirm that
all kinds of data meet the requirements of corresponding codes and standards and
design documents.
3. Check the materials of the gas cylinder proper; verify the chemical composition per
heat and the re-testing results. The supervisory inspection agency may conduct the
re-testing if necessary. Confirming the re-test results for macrostructure of material if
the gas cylinders are made of billet. Verifying the situation and results of NDE per each
tube if the gas cylinders are made of seamless steel tubes.
4. Check the identification of the acceptable material before and the transportation
identification of the after cutting.
5. Check the welding procedure qualification and its record, Confirm the welding
procedures used in gas cylinder production are conforming to the relevant standards
and codes. Check the proof test reports for heat treatment parameter and procedure of
seamless gas cylinders.
6. On-site witness the hydrostatic pressure tests of each gas cylinder and confirm the test
pressure, dwelling time, test results and the cylinder’s serial numbers stamped on each
gas cylinders whether have been recorded.
7. The supervisory inspector shall select and mark the sampling gas cylinders with small
or medium volume and record the serial numbers of them. The inspection results of the
appearance and other items, that require to be inspected one by one according to the
product standards, should accord with the requirements as specified in the relevant
codes and standards.
8. Check if the material of product welding test plate for big gas cylinders (>150 liters)
are in conformity with the material of the gas cylinder proper. Before product welding

e
test plate is cut off from longitudinal weld, the supervisory inspector should stamp the

s
Supervisory Inspection Symbol on it for verification and confirm whether the

c
manufacturing number and identification number of the welder is in existence.

.
9. The supervisory inspector should choose and mark one sample cylinder per batch of
acetylene gas cylinders, and records its manufacturing number. When the sample

w w
cylinder is sectioned, the inspector should check the gap between packing and wall of

w
the cylinder, packing appearance, surface holes and the preparation of packing sample
on the spot. During the test of compressive strength, bulk density and porosity etc. of
the sample packing, the supervisory inspector should conduct on-site spot check and
verify the test records.
10. On-site check if the process and test results of mechanical property testing conform
to the relevant requirements.
11. The supervisory inspector shall sample the gas cylinders for performing flattening

68
EI
test according to the rules, check the preparation work before the test and witness the
test on the site. Check the span between plungers, flattened value and whether there is
crack in the flattened place under loading.

S
12. Check the section, preparation of cold bending test specimens for seamless gas
cylinders and the cold bending test method and test results of them.
13. Check the metallographic report. Check metallographic photo if necessary. As for gas
cylinders under heat re-treatment, check the test specimen and metallographic photo of

C
the sample cylinder. Check the section and preparation of the dissection specimen from
the bottom of gas cylinder, examine its macroscopic analysis result and measuring the
shape and size of the bottom structure of gas cylinder.
14. The supervisor should sample one test cylinder from every batch of products,
witness the hydraulic burst test on the site. Check test equipment, instruments and safe
protection measures before the test. Validate the test records and results.
15. Check the appearance, stamp mark, color and mark of the gas cylinder. The color
should be in conformity with standard color card.
16. Check the batch inspection report of delivery gas cylinders. Each gas cylinder should
attach with certificate of compliance with the stamp of supervisory inspector. The
supervisory inspector should put supervisory inspection stamp on each gas cylinder.
17. The supervisory inspector should review the following documents of the supervised
(1) Quality manual
(2) The list of appointment and dismissal of quality system personnel
(3) The list of personnel engaged in NDE (including items in certificate, level and term of
validity, etc.)
(4) The list of personnel engaged in gas cylinder quality inspection
(5) Manufacturing technological documents and inspection data as well as the list of
welding procedure qualification.
(6) Enterprise standards, design documents and fatigue test verification report for gas
cylinder.

IV. Quantity of gas cylinders to be supervisory inspected


1. Each beach gas cylinders must complete all supervisory inspection items listed in

e
Supervisory Inspection Items Form.

s
2. If the unacceptable items found during supervisory inspection, the items should be

c
re-inspected and re-tested with additional quantity, which should be in accordance with

.
the requirement of relevant standards or decided by supervisory inspection agency
when the requiring quantity for re-inspection and re-testing is unavailable in the
standards. The supervisory inspection agency can add additional supervisory

w w
inspection items to the Supervisory Inspection Item Form when necessary.

D. Non-metallic pressure vessels


I. Applicable scope
w
This outline is applied to the supervisory inspection of the safety performance of
glass-fiber-reinforced plastic vessels and graphite vessels.

69
EI
II. Supervisory inspection content
1. Supervisory inspection of the items related to the safety performance of non-metallic
vessels during their manufacture.

S
3. Supervise and examine the implementation of quality system of the supervised
manufacturer.

III. Items and methods of supervisory inspection

C
1. Drawing and Data
(1) Check the certified stamp of pressure vessel design to confirm the validity of its
qualification.
(2) Check the validity of applied manufacturing and inspection standards.
(3) Check the formalities of design change.

2. Materials
(1) Check material certificate of main body.
(2) Check the transplantation of material identification.
(3) Check the material substitution formalities.

3. Technology qualification
(1) Check the technology qualification of glass-fiber reinforced plastic vessel product
(2) Check the assessment for graphic vessel products per certified material standard
(CMS) and certified cohesive standard (CCS).
Assessment: For dipped non-penetrating graphite product, check the infusing
procedure qualification and cohesive procedure qualification.
(3) Check the property test reports of product test plate and confirm the test result.
(4) Check the certification of qualification of workers engaged in on-site manual paste
operation of glass reinforced plastic and graphite cohesion

4. Appearance and geometry


(1) Check the surface appearance of the joint especially the appearance of fillet joints.
(2) Check the products' appearance.

e
(3) Check the data of total weight, Babbit hardness, content of resin, moisture

s
absorptivity of laminate materials etc.

c
(4) Spot-check the grain composition test, bending strength, tensile strength, tensile

.
strength of adhesive.

5. Pressure test

w w
w
Before pressure test, confirm that all related items have passed the supervisory inspection
and the supervised manufacturer has kept the evidence of the whole-completed work.
During pressure test, the supervisory inspector shall check the test equipment,
instruments, and preparation work for testing and verify the test results.

6. Safety appurtenance
Check if the specifications and number of safety appurtenance accord with the relevant

70
EI
stipulations

7. Delivery technical data

S
Check if the contents of product’s certificate of compliance and product quality
certificate are correct and complete and if the final issuing and signing (stamping)
formalities are complete and correct. Check if the as-built drawing can reflect the factual
manufacture situation of the product.

C
8. Name-plate
Check the nameplate if the contents on it are in accordance with the relevant stipulation

E. Baric oxygen chamber for medical treatment


I. Applicable scope
This outline is applied for all kinds of baric oxygen chamber for medical treatment with
working pressure equal to or less than 0.3 MPa.

II. Supervisory inspection contents


1. Supervisory inspection the items concerning products' safety performance during the
process of manufacturing and installing baric oxygen chamber for medical treatment, i.e.,
including supervisory inspection during manufacturing and supervisory inspection during
installation.
2. Supervisory examining the implementation of the quality system of the baric oxygen
chamber manufacturer.

III. Items of supervision inspection


1. Design drawing and related data
(1). Check if the design drawings of the chamber and of the main system of the product
have reviewed and approved in accordance with the relevant stipulation and if the
drawings has borne a design approval stamp so as to confirm the validity of their
qualification.
(2). Confirm the effectiveness of the standards for manufacture, installation and for

e
inspection on design drawing.

s
(3). Check the certificates of compliance, quality certificates, as-built drawing and

c
supervisory inspection certificate of the auxiliary pressure vessel for the baric oxygen

.
chamber.

w w
(4) Check if the contents of on-site commission report are complete and correct and if all
the functions of the baric oxygen chamber meet the requirements of related standards and
codes.

w
(5) Check the on-site supervisory inspection record for installation, including system leak
test record, purge records of supply and exhaust piping for both oxygen and gas, degrease
record of supply and exhaust piping for oxygen, and welding and NDE record.
(6) Check the qualification of the personnel engaged in manufacture (installation) and
inspection of the baric oxygen chamber, including welders and welding operators,
non-destructive examiners and electricians.

71
EI
(7) Verify whether the volume of the chamber per person meets the requirements in
relevant standards.

S
2. Materials
(1) Check the material certificate of the chamber proper and main pressure parts
(including plate, pipe for supply gas and for supply and exhaust oxygen).
(2) Check material certificate of observation windows, illumination window and the

C
organic glass for illumination windows. The material must free of obvious scuffing and
mechanical damage or aging silvery vestiges.
(3) Check if the decoration materials in the chamber meet the related requirements of
GB12130 or related standards for the baric oxygen chamber.
(4) Check the certificates of compliance of valves, sealing components and cables.
(5) Check the material substitution formalities for main pressure parts and components
and for organic glass.

3. Manufacture, inspection and testing


(1) Check the applied welding procedure qualification of the baric oxygen chamber.
(2) Spot-check the identification steel stamp and the qualification of the welder and
welding operator performing the welding of the chamber.
(3) Check the surface quality of welded joint, especially attention to the appearance of
fillet joint between observation window and chamber, supply passage and chamber,
and the chamber door and head.
(4) Check the x-ray film map and the flaw detection report. Verify the NDE detection rate,
x-ray position and assessment result of flaw detection.

4. Equipment in the chamber


(1) Check if the supply passage, chamber door in the chamber, which has quick-actuating
door structures opening outwards, has installed with safety interlock devices.
(2) Check if the manual operational device in quick-actuating door structures opening
outwards, which has equipped with the electric or pneumatic gearing device, can open
the door within the specified time.

e
(3) Check the connections of electrical cables and if they are easy to examine and repair

s
when the electrical appliances are fitted in the chamber.

c
(4) Check if the oxygen-collecting opening for oxygen gauge is placed in the middle of

.
the chamber and its outlet is out of the ornamental plate.
(5) Check the mark, reliability and sensitivity of emergency exhaust device.

w
(6) Check if there is a ground wire for eliminating electricity in the baric chamber.
w
5. Electric appliances and communications
w
(1) Confirm that the chamber adopts both cold light source and external illumination, and
is equipped with emergency illumination system, which can work automatically as
soon as the power source of chamber was broken.
(2) The intercom device between control desk of oxygen chamber and the chamber
room should be sensitive and with clear voices.

72
EI
(3) Check the resistance and connections of grounding device of the chamber proper and
the cases of other device.
(4) Check if the electric motor and controller for air-conditioning device are fixed

S
outside of the chamber.
(5) Check the leakage electric current to the earth.
(6) Check the certificates of compliance or quality documents of attached electric
appliances

C
7. Supply and exhaust systems for gas and oxygen
(1) Check the function of sound alarm and light warning device of the oxygen gauge.
Check if the oxygen electrode is valid when the oxygen gauge is based on the
principle of galvano-chemistry.
(2) Check the material for the oxygen exhaust piping in the chamber and the link
between oxygen exhaust piping and the chamber.
(3) Check the leakage rate of the chamber during the leak test.
(4) Check the control valves at the high-pressure side of the oxygen manifold, check the
anti-malfunction device and warning sign at the connection between manifold and
oxygen gas cylinder.
(5) Check the outfits of gas storage tanks, air purifier and oil and water separators.
(6) Check the certificates of compliance or quality documents of flow meters;
thermometers pressure gages and other instruments.

7. Heat treatment
Check the area or parts of the baric oxygen chamber, which require heat treatment.
Confirm the heat treatment parameter and procedure and its actual report.

8. Safety appurtenances
(1) Check the quantity, accuracy and scale of the pressure gauges in the oxygen chamber.
(2) Check the type, quantities and set pressure of the safety valves on the chamber proper
and on the auxiliary pressure vessels.

e
9. Check if the fire-fighting equipment in the chamber meets the requirements of

s
GB12130.

10. Name-plate

. c
and its auxiliary pressure vessels meet the relevant requirements.

w w
Check if the contents and specifications on the nameplates of the baric oxygen chamber

IV. Methods of supervisory inspection


w
1. Both manufacture and installation supervisory inspection for baric oxygen chamber for
medical treatment should use the Supervisory Inspection Item Form. The items should
be done during manufacture at the place where the oxygen chamber manufacturer
located as far as possible.
2. Except the items listed in this outline to be supervised and inspected during both

73
EI
manufacture and installment, all the other items that have passed the supervisory
inspection during manufacture should not undergo repeated supervisory inspection
during installation.

S
3. The agency, which undertakes the manufacture supervisory inspection, should sign on
the items that pass the supervisory inspection for confirmation and issue the
Manufacture Supervisory Inspection Certificate. The agency, which undertakes the
installation supervisory inspection of oxygen chamber, should sign on the items that

C
have passed the supervisory inspection for confirmation and issue the Supervisory
Inspection Certificate and stamp the Supervisory Inspection Mark on the nameplate of
the oxygen chamber.
4. The supervisory inspector shall put “acceptable” on the “Supervisory Inspection
Result” column for those items which are conform with relevant codes and standards
and put the name and serial number of their testifying paper with his/her signature on
the “Working Testimony” column. The supervisory inspector should put the measuring
data or existing problems on the “ Supervisory Inspection Result” column and
describing the actual situation of non-conform with the relevant codes and standards in
detail in addition to the handled measures of supervised manufacture on the “Note”
column, if the items are not conform to the relevant codes and standards.

s e
. c
w w
w
74
EI
Appendix 12 A Specimen of Supervisory Inspection Certificate for Safety
Performance of Boiler and Pressure Vessel Products

S
Supervisory Inspection Certificate for
Safety Performance of Boiler and Pressure Vessel Products

Serial No.:

C
Manufacturer: License Level and No.:

Product Name: Product Type:

Product No.: Completion Date:

This is to certify that as per the requirements of Regulations on Safety


Supervision of Special Equipment,the product/products has/have undergo
the supervisory inspection conducted by our institution. The safety
performance of the product/products is/are in compliance with ( (the
relevant supervisory regulations are filled here) .
The following steel seal shall be applied on the product nameplate or on
the shield of gas cylinder:

s e
. c
Supervisory Inspector:
Reviewed by: Supervisory Inspection Institution(seal):

w w
Approved by
Date:
w
The certificate shall be issued in triplicates. The original copy shall be forwarded to the end-users
together with other delivery documents; the other two copies shall be kept by the supervisory
inspection institution and the inspected manufacturer respectively.

75
EI
Appendix 13 A Specimen of Application Form for the Change of Special Equipment
License

S
Application form for the change of special equipment manufacture license

Application No.:

C
Original name of
manufacturer
Manufacture License No.
Date of Expiration
(or. SQL license No.)
Item of Change □ Company Name □ Ownership □ Re-location

From:
Content of Change
To:

Reason of Change

Submitted Documents

1. The new copy of the corporate business license registered by your local government.

2. The copy of related update certificate, such as ASME, ISO, etc.

The formal application letter declaring that there has only an name change and the address of
3. the factory, quality systems, resource of manufacturing, manufacturing scope of products, etc
are unchanged (For change of name or ownership only).
4. Others.
Authorized signature of applicant:
(Signature)
Title: Date:

Acceptance views and result of General Administration of Quality Supervision, Inspection and Quarantine of
the P. R. of China (AQSIQ)

s e
c
Signature of Person in Charge:

.
(Sealed by SESA of AQSIQ)

w
Date:

Note:
1. “Item of Change” : Please confirm “Company Name”, “Ownership” or“ re-location”
with “√” . w w
2. “Content of Change”: Please describe the complete update name or location so that
the license may be revised correctly. “From” refer to the old one, “To” refer to the new
one required.

76
EI
Appendix 14 List of Type Test Organs

S
No. Testing Item Organ Name Address Contact

National
Engineering No.1 Nan Da Hong Men
Mrs.Wu Yuzhen
Research Road,
E-mail: office@nercspv.com
Center For FengTai

C
1 Safety Valves Fax:+86 10 88530942;68382214
Special Pump District,Beijing,China
Tel:+86 10 68382215
& 100076
Valve(Briefed P.O.Box:9200-11,Beijing
as the“P &V”)

Hefei General
No.888,West Changjiang Mr.Li Jiang;Mr.Fan Gaoding
Machinery
Road, E-mail:gmpc@mail.hf.ah.cn
2 Safety Valves Products
Hefei,Anhui,P.R.China Fax:+86-551-5325105
Inspection
230031 Tel:+86-551-5316828
Institute

Dalian Boiler
and Pressure
Mr.Hu Jun
Vessel 20, Xinhe Street, Xigang
Gas E-mail:dbpvi01@126.com
3 Inspection District,Dalian, P.R.China
Cylinders,Accumulator Fax:+86-411-82485212
Institute 116013
Tel:+86-411-82492742
(Briefed as
the“ DBPVI”)

National Centre
Of Oilfield & Ms.Nie Mengqiu
Petrochemical 349, Dunhuang Road, Qilihe E-mail:jczx@lpmri.com ;
Accumulator
4 Equipment district, Lanzhou City, China niemenqiu@sohu.com
Seamless Gas Cylinder
Quality 730050 Fax: +86-931-2349984
Supervision Tel: +86-931-2349984

e
Inspection

s
Ningbo Special Mr.Wang Jian

c
Equipment No.140 Xicao Road,Jiangbei E-mail:nbwqj@126.com

.
5 Accumulator
Inspectin District,Ningbo,China Tel:+86 574 87356603
Center Fax:+86 574 87664697

w w
w
Shenyang
lnstitute of Mr.Song Yongli
Nine,Chongshan West
Special E-mail:SBPVI@SBPVI.cn
6 Rupture Disc Road,Huanggu
Equipment Fax: +86-24-86723501
District,Shenyang,China
Inspection and Tel: +86-24-86748732
Research

77
EI Shanghai
Institute of

S
Rupture Disc(Only for Special Mr.Yang Jingfu
915 # Jinshajiang
7 gas cylinder) Equipment E-mail:neiltwo@126.com
Road,Shanghai,China.200062
Valves for gas cylinder Inspection and Tel&Fax: +86-21 56873369
Technical
Research

C
Cryogenic
Research and
Testing Mr.Wang Rongshun
1954 Hua Shan Road,
8 Cryogenic Cylinders Department of E-mail:rswang@sjtu.edu.cn
Shanghai, 200030, P.R.China
Shanghai Tel & Fax:+86 21 62932602
Jiaotong
University

ZheJiang
Province
Mr.Ding Shoubao;Mr.Shi Ping
Special
Non - Refillable Gas 211#,Kaixuan rd., Hangzhou, E-mail:zjtjcg@126.com;sptime@zj.com
9 Equipment
Cylinders) Zhejiang, P.R.China Fax:+86-571-86023014
Inspection &
Tel:+86-571-86024093
Supervision
Center

China Quality
Supervising Mr.Wang Qi
No.16 Guiyuan Road,
Valves of Cylinders for And Testing E-mail: wangqi@chinagas.com.cn
10 Huayuan Industrial District,
LPG Center For Gas Fax: +86-22-83717080
Tianjin PR China 300384
Appliances Tel: +86-22-83711026
(CGAC)

National
Quality
Mr.Li Jianping
Valves of Compressed Supervision and No.101

e
E-mail:catc@ccari.com

s
11 Natural Gas Cylinders Inspection Chaotiancun,Shiqiaopu,
Fax:+86-23-68966987

c
for Vehicle Center of Chongqing,P.R.China 400039
Tel:+86-23-68821302

.
Heavy Duty

w
Vehicle

Appendix 15 Revised Regulation for Boiler and Pressure Vessel Manufacture


Licensing
w w
Since the“ Supervision Administration Regulation for Manufacture of Boiler and
Pressure Vessel” and “Requirement for Boiler and Pressure Vessels Manufacture
Licensing” came into effect on Jan.1st, 2004, AQSIQ has made revisions and

78
EI
interpretations to same of the provisions, which are summarized as following.

1. NDE person requirement (Article 11 and 19 of “Requirement for Boiler and Pressure

S
Vessels Manufacture Licensing”)
“RT Ⅲ and UT Ⅲ” person required by the manufacturer of boiler A level , pressure
vessels A1 and C level was adjusted from “Level Ⅲ” to “ holding the certificate of RT
and UTⅡ(or above level) not less than four years”

C
2. Requirement of heat treatment and rolling machine (Article 22 of “Requirement for
Boiler and Pressure Vessels Manufacture Licensing”)
2.1 Heat treatment equipment required by high-pressure vessels manufacturer of A1 level
in “Requirement for Boiler and Pressure Vessels Manufacture Licensing” has been
changed to below:
For the high-pressure vessels manufacturer of A1 level, heat treatment performed by
outsourcing through corresponding qualified sub-contractor is acceptable.
2.2 Rolling machine required in “Requirement for Boiler and Pressure Vessels
Manufacture Licensing” has been changed to follow:
Manufacturer of pressure vessels shall have the bending ability suitable for its main
products. Sub-contacting of steel plate bending is permitted if the machine can’t roll
some individual products. However, the final weld for longitudinal seam shall be
completed by the manufacturer of pressure vessel.
On the situation of above mentioned, the corresponding quality control procedure or
document for sub-contracting shall be submitted together with the application
documentation while manufacturer begin to apply for the manufacture license.

3. Lifting ability
Lifting activity may be sub-contracted if the crane can’t meet the requirement for
lifting.

4. Item 5 of Article 55 in “Requirement for Boiler and Pressure Vessels Manufacture


Licensing”

e
“For the steel plate used for the tank of transportable pressure vessels, the sampling

s
quantity of the impact test is two steel plate per batch and the test temperature should be

c
-20℃ or per instruction on the drawing. The requirements for impact test and acceptable

.
impact toughness value should conform to Table 3.

5. Shell of the pressure vessels

w w
w
The shell is the main pressure part of pressure vessel, the manufacturer shall have the
capability of producing the shell of pressure vessel and normally the sub-contracting is
not permitted. However, for the forged or foundry pressure vessels without longitudinal
seam, shell fabricating performed by the subcontractor who has the adequate production
conditions is also acceptable. Under the outsourcing, the subcontractor’s production
conditions, quality assurance measures, etc. shall be evaluated in accordance with the
pressure vessel manufacturer’ own quality guaranty systems. The subcontractor shall be

79
EI
responsible for the shell quality of the pressure vessel, such as geometric dimension,
chemical composition, mechanical properties, the results of impact test (if require) and
NDE, etc.

S
Accumulator assemblers who do not have accumulator shell production ability
cannot be granted the pressure vessel Manufacture License, however, they are allowed to
purchase and assemble accumulator shell produced by manufacturers who have obtained
the corresponding Manufacture License, and on the body of the accumulator the

C
accumulator shell manufacturer and its license number shall be clearly indicated.

6. Qualification and classification for small size pressure vessel


The term” small size pressure vessel” refer to the pressure vessel which diameter less
than 150 mm or the content less than 25 liters. The pressure vessels aforementioned is
subjected to “Regulations of Safety Supervision of Special Equipment”, but are not
applicable to the“ Supervision Regulation on Safety Technology for Pressure Vessel”, so
these vessels may be designed and fabricate by any manufacturer holding the license of
A1, A2, A3, D1, or D2 level. Simultaneity, small size pressure vessels are not classified
in accordance to “Supervision Regulation on Safety Technology for Pressure Vessel”.

7. Gas cylinder container


Manufacturer of gas cylinder container with whole assembling volume no less than
one cubic meter shall obtain manufacture license of C3 level (assembling for gas cylinder
container only).
The basic requirement for pressure vessel C3 (assembling for gas cylinder container
only) shall be as follow:
(1) In order to guaranty the efficient performance of quality systems, the quality
management systems shall be established; the quality control documents and regulation
shall be completed too.
(2) The workshop is required to meet the production of assembling the gas cylinder
container.
(3) The gas cylinder container shall pass the corresponding inspection by China

e
Classification Society (Briefed as the CCS).

s
(4) The facility for pressure test and gas tightness test is required to assemble the gas

c
cylinder container.

.
(5) The professional technician and operator is needed and not less than 3 person
Manufacture license of C3 (assembling for gas cylinder container only) is not

w
required for the license holder of B1 (Seamless gas cylinder). However, above-mentioned
w
w
containers of gas cylinder shall pass the corresponding inspection by CCS, and the
inspection report shall be submitted to the license-issue organ for registration.

8. Addition the boiler and pressure vessel production site.


8.1 The manufacturer of boiler and pressure vessel, who desire to add another production
site beyond the approved address under the same company name due to the increase of
production ability, shall deliver the application to the license-issue organ. Upon the

80
EI
application accepted and approved, the applicant is required to invite the audit organ to
conduct the manufacturer survey to the additional production site. After the assessment
passed, the name, address, manufacturing level, products variety approved at the

S
additional production site will be merged into the license scope of general factory (head
office), and no independent license issued only to the additional production site.
8.2 The subsidiary company who has business license or possesses the legal person status
can apply for boiler and pressure vessel Manufacture License independently according to

C
its qualifications, the Supervision Administration Regulation for Manufacture of Boiler
and Pressure Vessel, the Requirements for Boiler and Pressure Vessel Manufacture
Licensing, and the Procedures for Manufacture Licensing of Boiler and Pressure Vessel.
If the subsidiary company does not apply for Manufacture License by itself, its mother
company can apply as indicated by 8.1.

9. Change of manufacture address


With the reference to the Article 20 of “Supervision Administration Regulation for
Manufacture of Boiler and Pressure Vessel”, refer to the change of production site, the
form of “Application form for the change of special equipment manufacture license”
shall be filled out and delivered to the license-issue organ. After the application accepted
and approved, the manufacturer shall invite the audit organ to perform the manufacturer
survey for this change confirmation and the revised license will be issued after the
assessment passed finally. Production activities of boiler and pressure vessels shall be
suspended while site moving. Any production at the same time of removal is not
permitted in principle.

10. Scope extension of license


The license holder of pressure vessel including D level, or pressure vessel
manufacture holding level B, A3, A4 or A5, shall deliver the application to the AQSIQ
for the adding of D level. Upon the application accepted and approved, audit organ who
has the assessment qualification applicable for manufacture licensing of D level shall be
invited to perform the manufacturer survey and the corresponding audit report shall be
submitted to AQSIQ for approval.

11. Expiry date of boiler and pressure vessel manufacture license

s e
c
The manufacture license of boiler and pressure vessel is valid for a period of 4 years

.
since the date of issue. If license upgraded from level D to level A, B, or C, the license
expiration shall be re-calculated from the date of upgrading approved. Within the

w w
license’s approved scope, if add the level or products variety, the license’s expiration date
remain unchanged.

12. Regulation of sample products for trial-manufacture


The sample/demo products for trial-manufacture describing in Article 10 of
w
“Supervision Administration Regulation for Manufacture of Boiler and Pressure
Vessel ”refer to the typical products or major components corresponding to the applied
level.

81
EI
S
SELO (Special Equipment Licensing Office) of AQSIQ
Feb.8, 2007

C
s e