Professional Documents
Culture Documents
VIEW 2-2 Intermediate Gate Body Plan: Bill of Material
VIEW 2-2 Intermediate Gate Body Plan: Bill of Material
dwg
INTERMEDIATE GATE BODY PLAN VIEW 2-2
SEALING PLANE FOR 0 0.25 0.5 m 0 0.25 0.5 m
REVISION GATE SEALING PLANE FOR 11
REGULATING GATE
2
3
STANDARD HOLE FOR TOTAL WEIGHT 2533.64 kgs.
50
400 400 400
50
50 107 13.5Ø HOLES @ 200 c/c = 2200 M12 CONNECTING 107 50 26 12Ø J-BAR WELDED WITH ANGLE - 300 LG. 4 1.07
(TYP.) 18 PL. 252x10 TH. 3' PL. 200x10 TH. BOLTS TYP.
14 14 14 25 ANGLE 50x50x 6 TH. - 50 LG. 4 0.90
100 -2514 LG. -1420 LG.
80
395
60
23 S.S. PL. 125x10 TH. -1900 LG. 1 18.64 S.S
230
120
100
6 6 6 6 S.S
100 8 PL. 295x10 TH. 22 S.S. PL. 80x10 TH. -1400 LG. 1 8.79
360
-1720 LG.
10
400
-1730 LG. 18' PL. 252x10 TH. -345 LG. 2 13.65
5 PL. 345x10 TH. 16' PL. 200x10 TH. -335 LG. 8 42.08
15' 16' -1720 LG.
3 5 5 5 5 12 16 PL. 100x10 TH. -335 LG. 8 21.04
1920
1500
1 PL. 1400x10 TH. -2225 LG.
400
8
1400
400
1 1 10 PL. 345x10 TH. -1720 LG. 2 93.16
13' 14 14 14 15' 16' 9 STIFF. PL. 100x10 TH. -1520 LG. 2 23.86
16 PL. 100x10 TH.
8 PL. 305x10 TH. -1500 LG. 2 71.83
2 -335 LG. (TYP.)
7 STIFF. PL. 220x10 TH. -1400 LG. 1 24.18
1a 3 PL. 200x10 TH.
10
160
8 -2210 LG. 6 STIFF. PL. 200x10 TH. -1520 LG. 8 190.91
6 6 6 6
230
5 STIFF.PL. 200x10 TH. -1400 LG. 9 197.82
20' 161
260
4 STIFF. PL. 395x10 TH. -1510 LG. 2 93.64
200
395
80
10
80 3' STIFF. PL. 200x10 TH. -1420 LG. 1 22.29
14 14 14 3 STIFF. PL. 200x10 TH. -1400 LG. 1 21.98
20' 13
100
9 10 505 400 400 400 505
50
2
-1510 LG. 395 400 400 400 395 340 PART NOS. TOTAL WT.
DESCRIPTION REMARKS
10 2350 10 NO. REQD. (KGS.)
BILL OF MATERIAL
SECTION 1-1 SECTION 3-3
0 0.25 0.5 m SEALING PLANE FOR 0 0.25 0.5 m
3
REGULATING GATE
2
SEALING PLANE FOR 800 937
REVISION GATE
252 252
26
18 18 18' 5
LEGEND:
180 14 14 14 15'
3'
10
200
120
100
22
160
14 14 1' 14 14 15' 15
21 1' REFERENCE DRAWINGS:
NOTES:
14 14 14 14 15' 15 1. ALL DIMENSIONS ARE IN mm.
2. FOR OTHER NOTES REFER DWG NO AFC.4313.CD.04.501.
1920
1500
6 6 6 6 8 11 2
400
14 14 14 14 15' 15
1400
REV.No. REVISION DESCRIPTION DRAWN CH'KED APP'D DATE
PREFEASIBILITY STUDY INCEPT. & BASIC DESIGN CONSTRUCTION DESIGN
Alle Rechte für den Fall der Patent-, Gebrauchsmuster- oder Geschmacksmustereintragung vorbehalten.
-1520 LG. We
Me
a n
t o
Re b u i l d O
ur
Co
u n
r
t
y
(ABCC, PIMTEK & SAROL JV)
ENERGY AND WATER, Asia
Bana
Construction
Co.
14 14 14 14 15' 15
AFGHANISTAN
KAMAL KHAN FLOOD CONTROL PROJECT (PHASE III)
1 10 PL. 200x10 TH.
160
110
110
200
5 5 5 5 5
3 PLAN & SECTIONS
© AF-Consult Switzerland AG 2011
310 400 400 400 310 DESIGNED: SHK SCALE: 1:10 FORMAT: A1
13' 17 14 14 14 17 15' 16' DRAWN: RAK CONTRACT NO. MEW / 1509 / ICB
1820 AF-Consult India (P) Ltd.
7 PL. 200x10 TH. CHECKED: HSS REVISED BY: ABCC, SAROL & PIMTEK JV
395 400 400 400 395 340 B-19 G.F. Tower-1, Stellar IT Park
10 10 -1420 LG. C-25 Sector-62 Noida - India APPROVED: BSS DRAWING No. REV. No.
3
2350
DATE: 17.05.18 AFC.4313.QF.04.510 0