 PROTECTION SETTINGS FOR 11kV BUS TIE

Department Author Status Lang. Rev. Date

INOPC SP Issued for Review en 1


PD Range Proposed Settings
Full load
Sr. Rated Protection Protection
Feeder tag Load Description Cubile CT PT Rated kV rated current NEMA Code Pick-up Time setting range Time setting (sec) / Remark
No KVA device Make device Type Parameter Unit Step Default setting Pick-up
Amps range (sec) / TMS range TMS

1 BUS TIE 11kV BUS TIE AB02 4000 5 11 ABB REF 620 50P Three-phase non-directional overcurrent protection - Instantaneous stage PHIPTOC

5P20 Start Value 1.0…..40.00 xIn 0.01 - 1.00

15VA Start Value Multiplier 0.8…..10.0 0.1 - 1 Disabled

Operate delay time - ms 10 20….200000 20

50P Three-phase non-directional overcurrent protection - Instantaneous stage PHIPTOC

1 = on
Operation - - - 1 = on 5 = off
5 = off
1 = 1 out of 3
Disabled
Number of start phases 2 = 2 out of 3 - - - 1 = 1 out of 3 -
3 = 3 out of 3
Reset delay time - ms 1 0….60000 20 -

51P-1 Three phase non-directional overcurrent protection - Low Stage PHLPTOC

Start Value 0.05…..5.00 xIn 0.01 - 0.05 1.30

Start Value Multiplier 0.8…..10.0 0.1 - 1.0 1.0


Time Multiplier - 0.01 0.05….15.00 1.00 -
Operate delay time - ms 10 40…..200000 40 240
1 = ANSI Ext. inv.
2 = ANSI Very inv.
3 = ANSI Norm. inv.
4 = ANSI Mod.inv.
5 = ANSI Def. Time
6 = L.T.E. inv.
7 = L.T.V. inv.
8 = L.T. inv.
Curve Type 9 = IEC Norm. inv. 15 = IEC Def. Time 15 = IEC Def. Time
10 = IEC Very inv.
11 = IEC inv.
12 = IEC Ext. inv.
13 = IEC S.T. inv.
14 = IEC L.T. inv.
15 = IEC Def.Time.
17 = Programmable
18 = RI type
19
1 ==immediate
RD type.
Type of reset curve 2 = Def time reset 1 = immediate 1 = immediate
3 = Inverse reset

51P-1 Three phase non-directional overcurrent protection - Low Stage PHLPTOC


1 = on
Operation - - - 1 = on 1 = on
5 = off
1 = 1 out of 3
Number of start phases 2 = 2 out of 3 - - - 1 = 1 out of 3 1 = 1 out of 3
3 = 3 out of 3

Minimum Operate time - ms 1 20…60000 20 20

Reset delay time - ms 1 0…60000 20 20


1= RMS
Measurement mode 2= DFT 2 = DFT 2 = DFT
3 = Peak-to-Peak
 PROTECTION SETTINGS FOR 11kV BUS TIE
Department Author Status Lang. Rev. Date

INOPC SP Issued for Review en 1


PD Range Proposed Settings
Full load
Sr. Rated Protection Protection
Feeder tag Load Description Cubile CT PT Rated kV rated current NEMA Code Pick-up Time setting range Time setting (sec) / Remark
No KVA device Make device Type Parameter Unit Step Default setting Pick-up
Amps range (sec) / TMS range TMS

1 BUS TIE 11kV BUS TIE AB02 4000 5 11 ABB REF 620 51P-2 Three phase non-directional overcurrent protection - High Stage PHHPTOC

5P20 Start Value 0.1…..40.00 xIn 0.01 - 0.10 -

15VA Start Value Multiplier 0.8…..10.0 0.1 - 1.0 -

Time Multiplier - 0.01 0.05….15.00 1.00 -

Operate delay time - ms 10 40…..200000 40 -


1 = ANSI Ext. inv.
3 = ANSI Norm. inv.
5 = ANSI Def. Time Disabled
9 = IEC Norm. inv.
Curve Type 15 = IEC Def. Time -
10 = IEC Very inv.
12 = IEC Ext. inv.
15 = IEC Def.Time.
17 = Programmable
1 = immediate
Type of reset curve 2 = Def time reset 1 = immediate -
3 = Inverse reset

51P-2 Three phase non-directional overcurrent protection - High Stage PHHPTOC

1 = on
Operation - - - 1 = on 5 = off
5 = off
1 = 1 out of 3
Number of start phases 2 = 2 out of 3 - - - 1 = 1 out of 3 -
3 = 3 out of 3

Minimum Operate time - ms 1 20…60000 20 - Disabled

Reset delay time - ms 1 0…60000 20 -

1= RMS
Measurement mode 2= DFT 2 = DFT -
3 = Peak-to-Peak

50N Non-directional earth fault protection - Instantaneous stage EFIPTOC

Start Value 1.0…..40.00 xIn 0.01 - 1.00 -

Start Value Multiplier 0.8…..10.0 0.1 - 1 -

Operate delay time - ms 10 20….200000 20 -

50N Non-directional earth fault protection - Instantaneous stage EFIPTOC Disabled


1 = on
Operation - - - 1 = on 5 = off
5 = off
Reset delay time - ms 1 0….60000 20 -
1= Measured Io
Io signal selection 1= Measured Io -
2 = Calculated Io
 PROTECTION SETTINGS FOR 11kV BUS TIE
Department Author Status Lang. Rev. Date

INOPC SP Issued for Review en 1


PD Range Proposed Settings
Full load
Sr. Rated Protection Protection
Feeder tag Load Description Cubile CT PT Rated kV rated current NEMA Code Pick-up Time setting range Time setting (sec) / Remark
No KVA device Make device Type Parameter Unit Step Default setting Pick-up
Amps range (sec) / TMS range TMS

1 BUS TIE 11kV BUS TIE AB02 4000 5 11 ABB REF 620 51N-1 Non-directional earth fault protection - Low Stage EFLPTOC

5P20 Start Value 0.010…..5.000 xIn 0.005 - 0.010 -

15VA Start Value Multiplier 0.8…..10.0 0.1 - 1.0 -

Time Multiplier - 0.01 0.05….15.00 1.00 -

Operate delay time - ms 10 40…..200000 40 -


1 = ANSI Ext. inv.
2 = ANSI Very inv.
3 = ANSI Norm. inv. Disabled
4 = ANSI Mod.inv.
Curve Type 5 = ANSI Def. Time 15 = IEC Def. Time -
6 = L.T.E. inv.
7 = L.T.V. inv.
8 = L.T. inv.
9 = IEC Norm. inv.
1 = immediate
Type of reset curve 2 = Def time reset 1 = immediate -
3 = Inverse reset

51N-1 Non-directional earth fault protection - Low Stage EFLPTOC

1 = on
Operation - - - 1 = on 5 = off
5 = off

Minimum Operate time - ms 1 20…60000 20 -

Reset delay time - ms 1 0…60000 20 -


Disabled
1= RMS
Measurement mode 2= DFT 2 = DFT -
3 = Peak-to-Peak
1= Measured Io
Io signal selection 1= Measured Io -
2 = Calculated Io

51N-2 Non-directional earth fault protection - High Stage EFHPTOC

Start Value 0.10…..40.00 xIn 0.01 - 0.10 -

Start Value Multiplier 0.8…..10.0 0.1 - 1.0 -

Time Multiplier - 0.01 0.05….15.00 1.00 -

Operate delay time - ms 10 40…..200000 40 -


1 = ANSI Ext. inv.
3 = ANSI Norm. inv. Disabled
5 = ANSI Def. Time
Curve Type 9 = IEC Norm. inv. 15 = IEC Def. Time -
10 = IEC Very inv.
12 = IEC Ext. inv.
15 = IEC Def.Time.
1 = immediate
Type of reset curve 2 = Def time reset 1 = immediate -
3 = Inverse reset

51N-2 Non-directional earth fault protection - High Stage EFHPTOC


1 = on
Operation - - - 1 = on 5 = off
5 = off
1 = 1 out of 3
Number of start phases 2 = 2 out of 3 - - - 1 = 1 out of 3 -
3 = 3 out of 3
Minimum Operate time - ms 1 20…60000 20 -
Disabled
Reset delay time - ms 1 0…60000 20 -
1= RMS
Measurement mode 2= DFT 2 = DFT -
3 = Peak-to-Peak
1= Measured Io
Io signal selection 1= Measured Io -
2 = Calculated Io
 PROTECTION SETTINGS FOR 11kV BUS TIE
Department Author Status Lang. Rev. Date

INOPC SP Issued for Review en 1


PD Range Proposed Settings
Full load
Sr. Rated Protection Protection
Feeder tag Load Description Cubile CT PT Rated kV rated current NEMA Code Pick-up Time setting range Time setting (sec) / Remark
No KVA device Make device Type Parameter Unit Step Default setting Pick-up
Amps range (sec) / TMS range TMS

1 BUS TIE 11kV BUS TIE AB02 4000 5 11 ABB REF 620 74 Alarm relay

5P20 SHALL BE CONFIGURED IN CONTROL SCHEMATICS


15VA

51BF/51NBF Circuit Breaker Failure Protection CCBRBRF Non Group Setting

1 = on
Operation 1 = on 1 = on
5 = off
Current Value 0.05…….1.00 xIn 0.05 0.30 0.10

Current Value Res 0.05…….1.00 xIn 0.05 0.30 -

1= 2 out of 4
Set to failure detection based on phase
CB failure trip mode 2= 1 out of 3 1 = 2 Out of 4 2 = 1 Out of 3
current exceeding the set value
3= 1 out of 4
1= Current
CB failure mode 2= Breaker status 1 = Current 1 = Current
3= Both
1= Off
CB fail retrip mode 2= Without Check 1= Off 1= Off
3= Current check

Retrip time - ms 10 0…..60000 20 20 Not Applicable

CB failure delay - ms 10 0…..60000 150 250


Applicable if CB fault condition is
CB fault delay - ms 10 0…..60000 5000 5000
monitored by binary input to relay
2= DFT
Measurement mode 2= DFT 2= DFT
3= Peak to Peak

Trip pulse time - ms 10 0…..60000 150 150

50L Arc protection ARCSARC1 Group Setting

Phase start value 0.50...40.00 xIn 0.01 2.5 - Not applicable

Ground start value 0.05...8.00 xIn 1.01 0.2 - Not applicable


1=Light+current ARCSARC1 settings stage needs to be
Operation mode 2=Light only 1=Light+current 2=Light only configured with Lower Busbar
3=BI controlled Compartment arc sensor
50L Arc protection ARCSARC1 Non Group Setting

1 = on
Operation 1 = on 1 = on
5 = off

50L Arc protection ARCSARC2 Group Setting

Phase start value 0.50...40.00 xIn 0.01 2.5 - Not applicable

Ground start value 0.05...8.00 xIn 1.01 0.2 - Not applicable


1=Light+current ARCSARC2 settings stage needs to be
Operation mode 2=Light only 1=Light+current 2=Light only configured with Breaker Compartment arc
3=BI controlled sensor
50L Arc protection ARCSARC2 Non Group Setting

1 = on
Operation 1 = on 1 = on
5 = off
 PROTECTION SETTINGS FOR 11kV BUS TIE
Department Author Status Lang. Rev. Date

INOPC SP Issued for Review en 1


PD Range Proposed Settings
Full load
Sr. Rated Protection Protection
Feeder tag Load Description Cubile CT PT Rated kV rated current NEMA Code Pick-up Time setting range Time setting (sec) / Remark
No KVA device Make device Type Parameter Unit Step Default setting Pick-up
Amps range (sec) / TMS range TMS

50L Arc protection ARCSARC3 Group Setting

Phase start value 0.50...40.00 xIn 0.01 2.5 - Not applicable

Ground start value 0.05...8.00 xIn 1.01 0.2 - Not applicable


1=Light+current ARCSARC3 settings stage needs to be
Operation mode 2=Light only 1=Light+current 2=Light only configured with Upper Busbar
3=BI controlled Compartment arc sensor
50L Arc protection ARCSARC3 Non Group Setting

1 = on
Operation 1 = on 1 = on
5 = off

25 Synchronism and energizing check SECRSYN Non Group Setting

1 = on
Operation 1 = on 1 = on
5 = off
Synchronous mode is selected as the
1 = Off
source to be controlled are the GTGs
Synchro check mode 2 = Synchronous 2 = Synchronous 2 = Synchronous
which are near to the synchronisation
3 = Asynchronous
point.
1 = Continuous Synchronising scheme shall be verified for
Control mode 1 = Continuous 1 = Continuous
2 = Command control mode selection

Dead line value 0.1……0.8 xUn 0.1 0.2 0.1

Live line value 0.2……1.0 xUn 0.1 0.5 0.5

Dead bus value 0.1…….0.8 xUn 0.1 0.2 0.1

Live bus value 0.2…..1.0 xUn 0.1 0.5 0.5

Close pulse ms 10 200…..60000 200 200 Applicable for command control mode

Max energizing V 0.50……1.15 xUn 0.01 1.05 1.05

Correction of phase difference between


measured U_BUS and U_LINE. Please
Phase shift -180……180 deg 1 180 0 check the Line and Bus voltage
connections to the relay at site before
setting the phase shift value

This is the minimum time within which


Minimum syn time - ms 10 0……60000 0 20
conditions must be simultaneously fullfilled
before the SYNC_OK output is activated.

Maximum syn time - ms 10 100…..6000000 2000 2000 Applicable for command control mode

Energizing time - ms 10 100…..60000 100 100

Closing time of CB - ms 10 40…..250 60 60 Applicable for asynchronous mode


0 = False
Voltage source switch 0 = False 0 = False
1 = True