CERBO GX name name
BMS-Can
BMS-Can
MPPT-1 Case ground
VE.Can
VE.Bus
Battery-1 Battery-2 ETHERNET
VRM
WORLD
VE.Can VE.Can
BMS-CAN Freedom Lite-2 VEConfigure default settings for Freedom Lite 15/12 Distributed Voltage and Current Control DVCC
BMS-CAN Freedom Lite-1
It is important to set default values for the Freedom Lite From GX device software version 2.60, DVCC will be
15/12 batteries with VEConfigure software in case enforced ON for Freedom won batteries with battery
2 x Freedom Lite 15/12 batteries communication with the batteries is interrupted.
All LiFePo4 settings for this are available in the Victron
detection ON, as well as enforcing good settings for it:
DVCC-ON and SVS-OFF and STS-OFF. The Cerbo
3 pole 160 Amp breaker build inside each battery Freedom won Freedom Lite user manual.
Confirm the float Voltage after completing the installation
receives the Charge Voltage Limit, Charge Current Limit,
Discharge Current Limit as well as the Battery Low
PV BREAKERS/ISOLATORS-2
of any Victron assistant and if necessary reset the float Voltage from the batteries towards the connected MAIN INCOMING
Voltage back to 55.8 Volt. inverter/chargers and solar chargers. These then disable MPPT-2 SOLAR ARRAY-2 AC BREAKERS
Low Shut-down: 47.00V Absorption voltage: 55.80V their internal charge algorithms and simply do what TOWARDS
Low Restart: 52.50V Float voltage: 55.80V they're told by the battery.
QUATTRO'S
Low Pre-alarm: 51.50V Absorption time: 1 Hr
48 70 A
QUATTRO'S QUATTRO'S
INPUT-1 INPUT-2
BATTERY-1 name name
L1 L2 L3 L1 L2 L3
0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF
GX TOUCH 50
Error 100%
on
SACE Tmax
IEC60047-2
WARNING
NEMA AB1 Do not reset
ON OFF Reduced
Power
50% ABB SACE
Italy trip breaker
before contacting
Latest information from the manufacturers
authorised installer
2263W
54.8V 44.2A Conn-J+O AC IN-2 L1 Conn-J+O AC IN-2 L1
victron energy
Conn-A+P AC IN-1 L1 Conn-A+P AC IN-1 L1
Conn-J+O AC IN-2 L2 Conn-J+O AC IN-2 L2
Conn-A+P AC IN-1 L2 Conn-A+P AC IN-1 L2
ALL MAIN SWITCHES SHOULD BE 48V MINIMUM ! Conn-J+O AC IN-2 L3
Conn-A+P AC IN-1 L3
MAIN SWITCH-1
OFF
QUATTRO 5KW/48V/230V AC QUATTRO 5KW/48V/230V AC QUATTRO 5KW/48V/230V AC
MAIN FUSES
INVERTER/CHARGER MASTER L1 INVERTER/CHARGER FOLLOWER L2 INVERTER/CHARGER FOLLOWER L3
Li-DISTRIBUTION WARNING
MEGA
ON 200A Quattro-L1 Batt + FOR A PROPER FUNCTION OF THE 3 PHASE QUATTRO
POSITIVE
BUSBAR CONFIGURATION, THE PHASE ROTATION FOR GRID/
SHORE POWER AND GENERATOR POWER HAS TO BE
5x20mm fuse
CONNECTED CORRECTLY FOLLOWING L1-L2-L3
KEEP ALL POSITIVE
100 AMPERE
CERBO 1A
285100F
A
B
T
AT THE SAME LENGTH ! MAIN SWITCH-2 www.victronenergy.com www.victronenergy.com www.victronenergy.com
D
A
L
OFF ET MPPT 1+ victron energy victron energy victron energy
RES
BLUE POWER BLUE POWER BLUE POWER
15/12
charger inverter charger inverter charger inverter
mains on inverter on mains on inverter on mains on inverter on
AC in 1 AC out 1
I on AC in 1 AC out 1
I on AC in 1 AC out 1
I on
bulk overload bulk overload bulk overload
AC in 2 AC out 2 O off AC in 2 AC out 2 O off AC in 2 AC out 2 O off
absorption low battery absorption low battery absorption low battery
charger only charger only charger only
float temperature float temperature float temperature
MEGA
ON 200A Quattro-L2 Batt + .battery charger .sinewave inverter .transfer switch .battery charger .sinewave inverter .transfer switch .battery charger .sinewave inverter .transfer switch
Quattro Battery
.powerassist .parallel
connectable
.three phase
connectable Quattro Battery
.powerassist .parallel
connectable
.three phase
connectable Quattro Battery
.powerassist .parallel
connectable
.three phase
connectable
LiFePO4 BATTERY
VOLT
VOLT
VOLT
48 |5000 |70
AMP
48 |5000 |70
AMP
48 |5000 |70
AMP
AC transfer capacity: 2x100A | Inverter 230V AC transfer capacity: 2x100A | Inverter 230V AC transfer capacity: 2x100A | Inverter 230V
VA
VA
VA
CE CE CE
IN IN OUT OUT OUT BATTERY IN IN IN IN OUT OUT OUT BATTERY IN IN IN IN OUT OUT OUT BATTERY IN IN
100 AMPERE
1 1 1 1-2 2 2 2 1 1 1 1-2 2 2 2 1 1 1 1-2 2 2 2
285100F
_ _ _ _ _ _
A
B
T
L N L N L L N L N L N L L N L N L N L L N
OFF
D
A
BATTERY BATTERY BATTERY
L
+ + + + + +
NEUTRAL
NEUTRAL
NEUTRAL
NEUTRAL
NEUTRAL
NEUTRAL
MPPT 2+
LINE
LINE
LINE
LINE
LINE
LINE
LINE
LINE
LINE
LINE
LINE
LINE
BATTERY BATTERY BATTERY
NEUTRAL
NEUTRAL
NEUTRAL
ET V-SENSE T-SENSE AUX1 AUX2
GND
RELAY
TRICKLE
CHARGE K1 K2 V-SENSE T-SENSE AUX1 AUX2
GND
RELAY
TRICKLE
CHARGE K1 K2 V-SENSE T-SENSE AUX1 AUX2
GND
RELAY
TRICKLE
CHARGE K1 K2
RES
+ - + - + - + - + - S1 S2 + NC NO COM NC NO COM + - + - + - + - + - S1 S2 + NC NO COM NC NO COM + - + - + - + - + - S1 S2 + NC NO COM NC NO COM
GROUND AC IN-1 AC OUT-1 AC OUT-2 AC IN-2 GROUND GROUND AC IN-1 AC OUT-1 AC OUT-2 AC IN-2 GROUND GROUND AC IN-1 AC OUT-1 AC OUT-2 AC IN-2 GROUND
ON ON ON
W O N ON
MEGA
200A Quattro-L3 Batt +
BATTERY-2 VE.Bus to CERBO VE.Bus link Quattro's VE.Bus link Quattro's Conn-D+P AC OUT-2 L3
Conn-C+P AC OUT-1 L3
Conn-D+P AC OUT-2 L2 Conn-D+P AC OUT-2 L2
IMPORTANT INFORMATION ! Conn-C+P AC OUT-1 L2 Conn-C+P AC OUT-1 L2
Use Case Ground connection only when Conn-D+P AC OUT-2 L1 Conn-D+P AC OUT-2 L1
recommended by the manufacturer ! Conn-C+P AC OUT-1 L1 Conn-C+P AC OUT-1 L1
SACE Tmax
Error 100%
on I XT1N 160
WARNING
ON OFF Reduced
Power
50%
IEC60047-2
NEMA AB1
ABB SACE
Italy
Do not reset
trip breaker
CENTRAL NEGATIVE BUSBAR MAIN OUTGOING
before contacting
authorised installer
BREAKERS
KEEP ALL POSITIVE QUATTRO
0%
W O N
off In= 160A O TEST
TOWARDS AC
Battery-1 Case Ground QL1 Conn-G Batt+ CABLES AT THE SAME LENGTH ! DISTRIBUTION
Battery-2 Case Ground
QL2 Conn-G Batt+
MPPT-1 Case Ground
MPPT-2 Case Ground QL3 Conn-G Batt+
L1 L2 L3 L1 L2 L3
QL1 Conn-L Case ground QL1 Conn-L Case ground 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF
AC No Break Distribution
15/12 Drawing BJE-283A Rev-B IMPORTANT INFORMATION ! IMPORTANT INFORMATION ! IMPORTANT INFORMATION ! IMPORTANT INFORMATION ! IMPORTANT INFORMATION ! IMPORTANT INFORMATION !
LiFePO4 BATTERY When operating in inverter mode, the Neutral
output of a inverter/charger must be
Quattro 3 phase setup programming Recommended AC Out-1 cable/breaker size Quattro's Recommended AC Out-2 cable/breaker size Quattro's Recommended DC cable/fuse size 48V Quattro's Recommended AC IN-1 & AC IN-2
cable/breaker size Quattro's
WARNING
The 3 phase setup programming has to be With Power assist each Quattro can add AC Out-2 only is available when power is 0-5 m cable length: 2 x 70SQmm 5-10 m cable length: 230/400 VOLT IS EXTREMELY HAZARDOUS
connected to ground to guarantee proper completed with Victron's VE.Bus Quick 5KW to the output load per phase when present on AC IN-1 or AC IN-2. During 4 x 70SQmm. When used in closed conduits, cable size AC IN-1 & AC IN-2 both must be protected DO NOT TOUCH ANY LIVE WIRED
Plug into The Current Future functioning of a GFCI or RCD device.
In case of a split phase supply the Neutral
Configure before the ESS assistant is
loaded into each Quattro !
needed. Together with the adjustable 100A
input this all adds up to the max sum of
battery operation it will be disconnected.
AC Out-2 supports up to 50A per phase.
should double. DC cable length stands for the distance
between the battery connections and the Quattro
by a circuit breaker rated at 100A max per
phase or less. This depends heavily on the
PARTS OF THE INSTALLATION !!!
WHEN IN DOUBT, ALWAYS CONSULT
also must be grounded. input and output current of 100+21=121A An Earth leakage device with breaker or a connections !!! size of the connected power source.The YOUR VICTRON DEALER !!!
Quattro programming with VEConfigure input currents must be adjusted to fit the
per phase. An Earth leakage device with combination MCB/RCD must be installed Recommendations are without other loads in the
The primary Case ground connection from a The ESS assistant has to be added to each breaker or a combination MCB/RCD must on the output. Cable size must be adjusted system and these also should be taken into account for size of the connected power sources. The
inverter charger like a Multi or a Quattro, Quattro with Victron's VEConfigure after be installed on the output. Cable size must accordingly. proper main battery, main fuse & main switch cables !!! breaker and cable size for both AC IN-1 &
must be connected to the Central Negative completion of the 3 phase setup. be adjusted accordingly. Fuse size should be 200A per Quattro. AC IN-2 should be adjusted accordingly.