This document contains performance evaluations for assembling washing machines. It evaluates whether resources were prepared and tested, components were properly inserted, final inspections and testing were conducted, proper tools were used, housekeeping was performed, and the activity was finished within the timeframe. All criteria were fully met for all evaluations, with perfect scores of 20 out of 20.
This document contains performance evaluations for assembling washing machines. It evaluates whether resources were prepared and tested, components were properly inserted, final inspections and testing were conducted, proper tools were used, housekeeping was performed, and the activity was finished within the timeframe. All criteria were fully met for all evaluations, with perfect scores of 20 out of 20.
This document contains performance evaluations for assembling washing machines. It evaluates whether resources were prepared and tested, components were properly inserted, final inspections and testing were conducted, proper tools were used, housekeeping was performed, and the activity was finished within the timeframe. All criteria were fully met for all evaluations, with perfect scores of 20 out of 20.
Prepared and test all the resources needed 2 0 Inserted the components on the training board properly 2 0 Conduct final inspection and testing 2 0 Observed proper used of tools and performed line to line test 2 0 Performed housekeeping 2 0 Product works normally & finished the activity within the 10 0 timeframe (10 minutes) NAME: ________________________ Date: ________________ Score: ________________
Inserted the components on the training board properly 2 0
Conduct final inspection and testing 2 0
Observed proper used of tools and performed line to line test 2 0
Performed housekeeping 2 0
Product works normally & finished the activity within the 10 0
timeframe
PERFORMANCE 2: Washing Machine Assembly
EVIDENT NOT EVIDENT
Prepared and test all the resources needed 2 0 Inserted the components on the training board properly 2 0 Conduct final inspection and testing 2 0 Observed proper used of tools and performed line to line test 2 0 Performed housekeeping 2 0 Product works normally & finished the activity within the 10 0 timeframe NAME: ________________________ Date: ________________ Score: ________________