Name: Zahra Id: 22015

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

Name: Zahra id: 22015

Mana
We are a national at the new dam
civil engineering and reservoir
company construction in the
with offices in Punjab.
many of the most D Generator
Ove
important cities of at rall
this country. We e cap
can manage many acit
types of contracts, y
such as oil
industry 2 Turbine 150
installations, 0 hall 1
manufacturing 1
plant and 6
electricity
generating 2 Turbine 300
stations. 0 hall 2
News Update 1
Here is our good 7
news! We have 2 Turbine 450
just completed and
0 hall 3
commissioned the
first turbine hall for 1
the hydroelectric 8
generating station 2 Turbine 600

1
Name: Zahra id: 22015

0 hall 4 benefits of regular


1 water supply for
9 their irrigation. Not
only do the
Eventually there reservoirs provide
will be four 150 new water
megawatt supplies, but a
generators giving hydroelectric
a capacity for 600 station has been
megawatts of built into the site
power output. We and this will supply
are providing electricity to
details of this 50,000 homes,
project here in our many for the first
current newsletter. time.
The Project Early Development
It has taken twenty The dam was built
years to complete at the point where
this facility which two rivers meet.
provides water for The water held up
drinking and by the dam has
irrigation to the formed into two
region, bringing large lakes that will
clean, piped water be the reservoirs
to many villages. for fresh water
Farmers in the supplies to the
area will be able to towns and villages.
produce more and The lakes have
reliable crops filled the valleys of
through the the two rivers and

2
Name: Zahra id: 22015

now provide a Environmental


constant supply of Issues
water. This was not a
The infrastructure densely populated
for such a large area, but a number
construction of villages which
project was not in would be
existence before submerged in the
the site was lakes had to be
developed. We relocated. This
had to construct was done in
roads and consultation and
coimmunications agreement with
links up through the farmers and
the mountains to shepherds who
take the heavy would lose their
constructiuon homes and land.
traffic and to haul All of these people
up the heavy plant have been given
and supplies for new lands and
building the dam, villages to resettle.
support buildings Discussions with
and the power village elders were
station. We also done sensitively
had to build a and with
village for some consideration for
15,000 workers to their worries and
live in during the fears about a new
construction life. The new
phase. homes will benefit

3
Name: Zahra id: 22015

from the same Traditional water


water supplies and supplies have not
irrigation systems been cut off by the
as the rest of the building of the
region, so it is dam. Spillways are
hoped that their built into the sides
lives will be of the dam to allow
improved by the water to continue
project. It was hard down the old river
for them to give up courses so that
their ancient lands, villages
but agreement downstream do
was made on all not lose their water
sides. supplies as a
The construction result of this
village will be modernisation
developed as a project. However,
residential leisure the constant
centre and will dangers of annual
provide winter flooding will be
sports activities as minimised.
well as outdoor Benefits of the
adventure project
pursuits. This Water has now
should bring long- been flowing to the
term prosperity to new supply
the region without systems for
changing the drinking water
essential character piped to villages
of the landscape. and homes. No

4
Name: Zahra id: 22015

longer will people income


have to trek long considerably.
distances daily to Hydroelectricity
wells to draw generation
water. The old Built into massive
traditions of tunnels under the
washing clothes in dam is a power
the streams will no station which is
longer be now ready to start
necessary. Water supplying
will be safe to electricity to the
drink and grid. As the grid
childhood develops, power
diseases will be will be distributed
reduced. to some 50,000
Farming has homes. Many of
already begun to these will receive
be more mains electricity
productive with for the first time.
regular and New factories are
reliable irrigation being built and
systems. New and these will draw
modern farming their power from
projects have been the clean energy
introduced to of the hydroelectric
produce fruit and station. New
vegetables for employment
market, increasing opportunities will
local per capita grow for those who
wish to change

5
Name: Zahra id: 22015

their lives into a comfortable for the


manufacturing peoples of the
environment. regions. We have
We are delighted many other civil
to announce that engineering
this stage of the projects under way
hydroelectric across the country
station is now and will update our
complete and readers with these
commissioned in future editions of
ready to start our newsletter.
generating power.
It was officially
opened by the
Minister of State
for the
Environment at a
ceremony last
Tuesday.
Company News
This is but the
latest in our
successful projects
designed to
improve the
economy at local
and national
levels, as well as
to make life easier
and more

You might also like