Professional Documents
Culture Documents
Detailed Design Submission: JULY 2021
Detailed Design Submission: JULY 2021
MEKKAH
MEKKAH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NOTES:
68600 1. FOR GENERAL NOTES & DETAILS REFER TO DRAWING Nos. ST002 &
ST003.
2. UNLESS OTHERWISE INDICATED, ALL DIMENSIONS ARE IN
3600 3100 6050 4800 6400 5500 5500 5500 5500 5500 5500 5500 6030 120 MILLIMETERS AND ALL LEVELS ARE IN METERS.
3. UNLESS OTHERWISE INDICATED, ALL LEVELS SHOWN ON THE PLAN
OR SECTION INDICATES THE TOP OF STRUCTURAL CONCRETE LEVEL.
4. FOR EXACT LOCATION OF OPENINGS AND SLEEVES REFER TO
ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS. ANY
DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE ENGINEER
FOR CLARIFICATION.
5. ALL SLEEVES MUST BE FIXED IN SLABS BEFORE CASTING
CONCRETE.
6. CONCRETE SLAB LIMIT TO BE VERIFIED FROM ARCHITECTURAL
DRAWINGS PRIOR TO CONSTRUCTION.
C 7. ALL COUPLING BEAM DEPTHS TO BE VERIFIED WITH
ARCHITECTURAL/ELECTRICAL DRAWINGS AND/OR ELEVATOR
2200
1700
1200
15. ALL COUPLING BEAM DEPTHS TO BE VERIFIED WITH
3000
2350
10T12@200 ARCHITECTURAL/ELECTRICAL DRAWINGS. AND/OR ELEVATOR
30T32@200
15T25@200 L= 2500 MANUFACTURE PRIOR TO CONSTRUCTION.
3000
L= 4000
15T16@200
L= 6500 16. STEEL BARS WITH LENGTH MORE THAN 12M ARE SHOWN ON
PLAN AS A ONE SINGLE STRAIGHT LINE FOR CLARITY PURPOSE ONLY.
L= 3000
THE CONTRACTOR SHALL PROVIDE FULL TENSION DEVELOPED
6350
15T12@200
T12@200
CASE OF THE NECESSITY TO ONLY HAVING MECHANICAL COUPLERS
L= 6500
TO AVOID STEEL BARS CONGESTION, SO THIS SHALL BE TOTALLY ON
T12@200 CONTRACTOR EXPENSIVE AS HE SHOULD BID ACCORDINGLY
L= 6500
15T12@200 WITHOUT ANY FURTHER CLAIM TO THE CLIENT OR ANY OTHER
5500 L= 2500 PARTIES.
17. IN CASE OF INVERTED BEAMS AT LAST FLOOR,THE TOP LEVEL OF
G THE COLUMNS SHOULD MATCH THE TOP LEVEL OF THE BEAM.
20T20@200
L= 2500 35T25@200
35T20@200 LEGENDS:
L= 4000
3500 L= 5500
6400
4200
T20@200
T25@200
L= 7000
L= 7000
20T25@200
L= 2500
9750
H
DD1
3300
PS - 1
20T25@200
15T12@200
L= 6000
L= 2500
J 25T20@200
L= 4000
1600
2550 1550
+3.925
T12@200
4600
S.C.L.
L= 5500
T16@200
L= 3000 MESH REINF.
2900
T16@200 T&B
BOTH DIRECTIONS
T16@200
L= 2000 PS - 2
K
40T32@200
T12@200
55000
L= 6000
35T25@200
L= 6000
1900
PS - 1
L= 4000
25T20@200 40T25@200
L= 4000
5800
15T16@200
T12@200
L= 4500
L= 8000
L= 2500
L
30T25@200
L= 5000
2400
T12@200 T12@200
L= 4000 5000 L= 4000
4600
DD1
T25@200
L= 3000
20T16@200
2300
L= 6000
10T16@200
L= 4000
PS - 3
M
DD2
+3.925
S.C.L.
5400
MESH REINF.
T16@200 T&B
BOTH DIRECTIONS
T12@200
L= 4500
5800
DETAILED DESIGN
120 mm
EXPANSION JOINT SUBMISSION
JULY 2021
P
CLIENT
R
2400
S
CONSULTANT
PROJECT TITLE
NE1919 00 BA DD ST116a 01