PLUMBGUYS CONST.CORP.

267 Minnesota Mansion Unit 103 Ermin Garcia St. Cubao, Quezon City

March 28, 2023

S.D PLATON Construction,Inc.


Ilang-ilang St., Maligaya Park,
Novaliches, Quezon City

Attention: ENGR.RONALD RUIZ


Project Engineer

Project: C- JOY POULTRY MEATS PRODUCTION, INC.


2640 Brgy.Sta.Teresita, Sto.Tomas,Batangas

Subject : BILLING FOR ELECTRICAL WORKS (LABOR ONLY)

Dear Engr.Ruiz,

I would like to submit herewith our billing for LABOR COST Proposal for the above-mentioned
project as follows.

Item Description Quantity Unit Unit Cost Total

1.00 TREATMENT BUILDING -

1.10 Lighting Outlets

1.1.1 Electrical Room 17.00 set/s 650.00 11,050.00

1.1.2 Screen Area 52.00 set/s 650.00 33,800.00

1.1.3 Chemical Room 8.00 set/s 650.00 5,200.00

1.1.4 Flatform & Equalization Tank Sector 52.00 set/s 650.00 33,800.00

1.1.5 Area & DAF (High Head Room) 10.00 set/s 650.00 6,500.00

1.20 Emergency Lighting System -


17-2x-13 watts Emergency Light @
1.2.1 set/s 5,950.00
Equalization Playform Sector 17.00 350.00
14-2x-13 watts Emergency Light @
1.2.2 set/s 8,750.00
Equalization Playform Sector 25.00 350.00

1.30 Convenient outlet -

1.3.1 CO. Electrical room 2.00 set/s 650.00 1,300.00


1.3.2 CO. Chemical room 2.00 set/s 650.00 1,300.00

1.40 Air Conditioning system -


1.4.1 1HP, AC WAC 3.00 set/s 2,500.00 7,500.00
Tel. No. 02-438-02-20 / 346-7778 Email address:
plumbguysconst.corp16@yahoo.com Mobile No. 0998-990-3027

PLUMBGUYS CONST.CORP.
267 Minnesota Mansion Unit 103 Ermin Garcia St. Cubao, Quezon City

1.4.2 1.5HP, 230V, AC @ EE Room WAC 3.00 set/s 2,500.00 7,500.00


SUB-TOTAL 122,650.00

2.00 FLOW CONTROL CHAMBER

2.10 Emergency Lighting System -

2.1.1 4-2x13 watts Emergency Light 4.00 set/s 350.00 1,400.00

2.20 Convenient Outlet -

2.2.1 Control Room 5.00 set/s 2,650.00 13,250.00


SUB-TOTAL 14,650.00

3.00 IMDP at Control Room -

3.10 LLP- Pre Treatment Plant 1.00 ls 33,750.00 33,750.00

3.10 LLP- Flow Control Chamber 1.00 ls 43,750.00 43,750.00


SUB-TOTAL 77,500.00

4.00 Service Entrance

4.10 Conduit & Wiring Installation 1.00 ls 118,500.00 118,500.00

4.20 Transformer Wiring & Installation 1.00 ls 21,650.00 21,650.00


SUB-TOTAL 140,150.00

5.00 Miscellaneous

5.10 Testing and Commissioning 1.00 ls 15,650.00 15,650.00

5.20 Start Up 1.00 ls 8,500.00 8,500.00


SUB-TOTAL 24,150.00

TOTAL COST OF LABOR 379,100.00


LESS 10% DISC. 37,910.00

TOTAL 341,190.00
CONTRACT DISCOUNTED AMOUNT FOR ELECTRICAL WORKS 341,190.00
(LABOR ONLY)
ACCOMPLISHMENT TO DATE 100%
RECEIVABLE DISCOUNTED AMOUNT FOR ELECTRICAL WORKS 341,190.00
(LABOR ONLY)

Prepared by:

INV.EDWIN R. LIPURA
Pres./ CEO

Tel. No. 02-438-02-20 / 346-7778 Email address:


plumbguysconst.corp16@yahoo.com Mobile No. 0998-990-3027