Product Submittal: Mastertop 1205
Product Submittal: Mastertop 1205
MasterTop® 1205
Three component solvent free high build epoxy floor coating
Index
1. Company profile
2. Commercial Licenses
4. Technical datasheet
5. Method statement
6. Job references
7. Approvals
8. Test reports
9.
1. Company profile
About MBCC Group
The MBCC Group is one of the leading suppliers of construction
chemicals and solutions worldwide and has emerged from the
carve-out of the former BASF Construction Chemicals business
from BASF Group. We offer innovative and sustainable
products and solutions for the construction industry across
different sectors, such as buildings, structures, underground
construction, new construction, as well as for renovation. Our
strong brands Master Builders Solutions®, PCI®, Thermotek®,
Wolman®, Colorbiotics® and Watson Bowman Acme® are
well established in the marketplace. With our innovations, we
address sustainability challenges in the industry. MBCC Group
consists of approximately 70 legal entities worldwide and is
home to around 7,500 construction experts in over 60 countries.
A brand of
Master Builders Solutions for the Construction Industry
MasterAir® MasterFlow® MasterRoc®
Complete Solutions for air Solutions for precision grouting Solutions for underground
entrained concrete construction
MasterGlenium®
MasterBrace® Hyperplasticizer formulated from MasterSeal®
Solutions for strengthening and state-of-the-art polymers for the Solutions for waterproofing
structural adhesives ultimate performance and sealing
MasterFlame® MasterRheobuild®
Passive fire protection system Superplasticizer for concrete
International Accreditation
Master Builders Solutions Construction Chemicals LLC is a registered GCC
manufacturer certified to the ISO 9001 Quality Management System, Environmental
Standard ISO 14001 and the Occupational Health & Safety Standard OHSAS 18001.
A brand of
2. Commercial Licenses
رخصة صناعية
Industrial License
License Details / تفاصيل الرخصة
License No. 511017 رقم الرخصة
Legal Type Limited Liability Company(LLC) ذات مسئولية محدودة الشكل القانونى
Expiry Date 21/03/2022 تاريخ النتهاء Issue Date 22/03/1999 تاريخ الصدار
D&B D-U-N-S ® 366717796 الرقم العالمي Main License No. 511017 رقم الرخصة الم
No.
Register No. 52538 رقم السجل التجارى DCCI No. 53865 عضوية الغرفة
Remarks / الملحظات
2015-9-2 تم تغيير المدير
2018/5/21 تم اضافة وانسحاب مدير بتاريخ
2018/6/11 تم حذف المدير بتاريخ
Print Date 22/03/2021 15:18 تاريخ الطباعة Receipt No. 13860776 رقم اليصال
اتصالت( للحصول/ )دو6969 أرسل رقم الرخصة إلى،يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة
.على اذن الدفع Get FREE access to
Zoho One for the first
Now you can renew your trade license by sending a text message (SMS). Send your trade year
license number to 6969 (Du/ Etisalat) to receive payment voucher. g احصل على زوهو ون مجانا
للسنة الولى
Zoho.com/ded
www.dubaided.gov.ae لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع. وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية
Approved electronic document issued without signature by the Department of Economic Development. To verify the
license kindly visit www.dubaided.gov.ae
ملحق الشركاء
Partners
License Details / تفاصيل الرخصة
49.0000000% 435716 بريطانيا/ United Kingdom ماستر بيلدرز/ Master Builders Solutions Uk Limited
سوليوشنز يوكيه ليمتد
Print Date 22/03/2021 15:18 تاريخ الطباعة Receipt No. 13860776 رقم اليصال
اتصالت( للحصول/ )دو6969 أرسل رقم الرخصة إلى،يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة
.على اذن الدفع Get FREE access to
Zoho One for the first
Now you can renew your trade license by sending a text message (SMS). Send your trade year
license number to 6969 (Du/ Etisalat) to receive payment voucher. g احصل على زوهو ون مجانا
للسنة الولى
Zoho.com/ded
www.dubaided.gov.ae لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع. وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية
Approved electronic document issued without signature by the Department of Economic Development. To verify the
license kindly visit www.dubaided.gov.ae
3. ISO Certificates - Quality,
Environment & Safety Certificates
Certificate of Approval
This is to certify that the Management System of:
This certificate is valid only in association with the certificate schedule bearing the same number on which the
locations applicable to this approval are listed.
Current issue date: 12 October 2018 Original approval(s):
Expiry date: 11 October 2021 ISO 14001 – 24 March 1999
Certificate identity number: 10140652 ISO 45001 – 12 October 2018
ISO 9001 – 28 July 1995
OHSAS 18001 – 12 October 2000
Approval number(s): ISO 14001 – 0045158 / ISO 45001 – 0045160 / ISO 9001 – 0045159
Lloyd's Register Group Limited, its affiliates and subsidiaries, including Lloyd's Register Quality Assurance Limited (LRQA), and their respective officers, employees or agents are, individually and collectively, referred to in this clause as
'Lloyd's Register'. Lloyd's Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person
has signed a contract with the relevant Lloyd's Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.
Issued by: Lloyd's Register Quality Assurance Limited, Dubai, Festival Office Tower, Suite 2001, Dubai Festival City, Dubai
Page 1 of 2
Certificate Schedule
Certificate identity number: 10140652
Location Activities
ISO 45001:2018
Design, Development and Production of Chemicals
for the Construction Industry.
ISO 9001:2015
Design, Development and Production of Chemicals
for the Construction Industry.
Lloyd's Register Group Limited, its affiliates and subsidiaries, including Lloyd's Register Quality Assurance Limited (LRQA), and their respective officers, employees or agents are, individually and collectively, referred to in this clause as
'Lloyd's Register'. Lloyd's Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person
has signed a contract with the relevant Lloyd's Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.
Issued by: Lloyd's Register Quality Assurance Limited, Dubai, Festival Office Tower, Suite 2001, Dubai Festival City, Dubai
Page 2 of 2
4. Technical datasheet
MasterTop® 1205
Three component solvent free high build epoxy floor coating
A light etch giving the profile of medium grit The top coat can now be applied. Depending on
sandpaper is the ideal surface for the application the surface profile, type and density of the
of MasterTop 1205, this can be achieved by light MasterTop SR 2 or MasterTop SR 3 used, the
grit blasting, captive blasting or surface grinding. top coat may consume more material than the
base coat to achieve a fully sealed surface. The
After all preparation has been completed, ensure top coat must be applied within the maximum over
dust is removed from the surface. This is best coating time period i.e. 36 hours at 25°C or 24
achieved using an industrial vacuum. hours at 40°C.
MBS_CC-UAE/Top_1205_07_04/v10/04_19/v11/12_19
The technical information and application advice given in this Master Builders Solutions publication are based on
STATEMENT OF the present state of our best scientific and practical knowledge. As the information herein is of a general nature, no
RESPONSIBILITY assumption can be made as to a product's suitability for a particular use or application and no warranty as to its
accuracy, reliability or completeness either expressed or implied is given other than those required by law. The user
is responsible for checking the suitability of products for their intended use.
Field service where provided does not constitute supervisory responsibility. Suggestions made by Master Builders
NOTE Solutions either orally or in writing may be followed, modified or rejected by the owner, engineer or contractor since
they, and not Master Builders Solutions, are responsible for carrying out procedures appropriate to a specific
application.
1. SUBSTRATE PREPARATION:
1.1. Prior to starting preparation, close the area to be prepared to all traffic and other trades.
1.2. The preferred methods of substrate preparation are; captive blasting using fine shot or
surface grinding. Acid etching is not recommended.
1.3. If any part of the floor is contaminated by oil, grease or fat, the contamination shall be
removed before other forms of preparation are undertaken.
1.4. Prepare the concrete substrate using the chosen method, removing all weak or friable
laitance and concrete. The finished surface should have the texture of fine to medium
grade sandpaper.
1.5. Surface defects such as shrinkage cracks, blow holes, minor honeycombing, minor
damage to joint arrises etc. shall be filled with MasterTop 2200 thixotropic two
component epoxy surface filler or as per the Master Builders Solutions Method
Statement for Thin Section Epoxy Repairs.
1.6. When the floor preparation is complete, vacuum the area to remove all dust and debris.
2. APPLICATION PROCEDURES:
2.1. Before starting application of the coating, ensure that all materials and tools are on hand
to allow completion of the work, the floor is dry and dust free.
2.2. Ensure that the mixing equipment is adequate, with a backup mixer available in case of
a break down.
2.3. A slow speed (300-600rpm) heavy-duty electric drill or hand-held mixer fitted with a
Collomix DLX Mixing head or similar.
2.4. Several clean large volume mixing buckets.
2.5. Security of the power supply should be verified.
2.6. MasterTop 1205 can be applied by a medium pile roller or suitable paint brush.
2.7. Do not start the application if the substrate and air temperatures are less than 12°C.
Ideally the temperatures should be in the range of 18-30°C.
2.8. Do not apply when the relative humidity is greater than 90%, or if the dew point is
reached.
2.9. Do not apply in direct sunlight.
2.10. Do not expose to chemical spillage or place in direct contact with water for the first 36
hours after application.
2.11. During hot weather it is preferable to apply MasterTop 1205 in the late afternoon or
early evening, when the temperature is falling, if the temperature of the building is not
controlled.
Page 1 of 4
MS - AD - MasterTop 1205 - 09/2019
3. MATERIAL APPLICATION:
3.1. MasterTop 1205 can be applied by a medium pile roller or suitable paint brush.
4. SMOOTH FINISH:
4.1. Providing the substrate is mechanically prepared and is good quality dense
concrete no prime coat is required.
4.2. Pour the entire contents of the colour pack into the base (PTA) and then mix the
components together using a slow speed (300 - 600rpm) hand held mixer fitted with a
Collomix DLX mixing head or similar.
4.3. Mix for no less than 1 minute, before pouring this into a clean large size mixing bucket
(20 L) and then adding the MasterTop 1205 reactor (PTB) whilst continuing to mix until
a uniform colour is obtained, free of streaks or lumps of unmixed filler (minimum 2
minutes).
4.4. Apply the first coat of MasterTop 1205 to the suitably prepared substrate at minimum
rate of
0.2 L/m² depending on the surface porosity and absorption. Allow it to become tack-free
before over coating. Allow a minimum of 6 hours at 20°C before overcoating with
subsequent coats.
4.5. Inspect the surface for defects such as blow holes, pin holes etc. and fill as required
using
MasterTop 2200.
4.6. Mix the MasterTop 1205 as above in item 3.2. and apply a second coat at a coverage
rate of 0.2 L/m² ensuring the 1st coat is completely and evenly covered. Apply the
second coat of MasterTop 1205 at right angles to the first coat. Further coats can be
applied if required.
4.7. Allow to cure for 24 hours before allowing access to traffic. Full chemical cure at 7 days
(Refer to TDS).
Page 2 of 4
MS - AD - MasterTop 1205 - 09/2019
Page 3 of 4
MS - AD - MasterTop 1205 - 09/2019
Note: Any masking tape used during the application process should be removed before
the resin hardens.
STATEMENT OF RESPONSIBILITY
The technical information and application advice given in this Master Builders Solutions publication are based on the present state
of our best scientific and practical knowledge. As the information herein is of a general nature, no assumption can be made as to a
product's suitability for a particular use or application and no warranty as to its accuracy, reliability or completeness either expressed
or implied is given other than those required by law. The user is responsible for checking the suitability of products for their intended
use.
NOTE
Field service where provided does not constitute supervisory responsibility. Suggestions made by Master Builders Solutions either
orally or in writing may be followed, modified or rejected by the owner, engineer or contractor since they, and not Master Builders
Solutions, are responsible for carrying out procedures appropriate to a specific application.
Page 4 of 4
7. Job references
International Job References - MasterTop 1205
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2021/03 BU HASA INTEGRATED FIELD DEVELOPMENT PROJECT OBAID ALQUBAISI CONTRACTING Tr ABU DHABI UAE
PARKWAY INTERNATIONAL
2020/05 OFFICE & HOTEL BUILDING AT AL JADAF DUBAI ARC INTERNATIONAL UAE
CONTRACTING LLC
RUWAIS HOUSING COMPLEX EXPANSION PHASE IV CONSTRUCTION OF
2019/05 AL RYUM CONT, GEN. TRANSP LLC ADNOC UAE
CENTRAL PARK AND VILLAS COMMUNITY FACILITIES
UNITED ENGINEERING CONSTRUCTION
2019/05 DEIRA MALL C&S/MEP CONSULTANT UAE
(UNEC)
ENG. ADNAN SAFFARINI OFFICE
UNITED ENGINEERING CONSTRUCTION
2019/07 DSO LULU MALL SHOPPING CENTER ARCHITECTURAL & UAE
(UNEC)
ENGINEERING CONSULTANTS
RESIDENTIAL BUILDING ON PLOTNO. IMPZ.H ON ME AISEM COMMUNITY
2019/07 GENERAL CONSTRUCTION COMPANY NEB UAE
PRODUCTION CITY DUBAI
2019/04 DOWNTOWN DUBAI DEVELOPMENT TARGET AECOM UAE
CHINA STATE CONSTRUCTION
KEO INTERNATIONAL
2019/03 ORINTAL PEARLS ENGINEERING CORPORATION (MIDDLE UAE
CONSULTANTS
EAST) LLC
2019/01 AVENUE MALL UNITED ENGINEERING CONTRACTING UAE
2019/04 4B+G+ROOF HOTEL BUILDING DELTA WADI CONTRACTING ARCH GROUP UAE
2018/11 THE COVE PROJECT AT DUBAI CREEK HARBOR DEVELOPMENT NUROL CONTRACTIN LLC HOLFORDS AND ASSOCIATES UAE
THE ADDRESS RESIDENCE FOUNTAIN VIEWS DEVELOPMENT, DUBAI, DEWAN ARCHITECTS AND
2018/09 ARABIAN CONSTRUCTION CO. UAE
UAE ENGINEERS
2B+G+17F+R RESIDENTIAL & COMMERCIAL BUILDING ON PLOT 346-147, ENGINEERING CONSTRUCTION & NATIONAL ENGINEERING
2018/09 UAE
BUSINESS BAY, DUBAI, UAE RECONSTRUCTION CO. BUREAU
B+G+4P+HC+20 STOREY RESIDENTIAL BUILDING ON PLOT NO. AL SHAFAR NATIONAL CONTRACTING ARKIPLAN CONSULTING
2018/09 UAE
JVC11YHRG001B AT JUMEIRAH VILLAGE, DUBAI, UAE LLC ARCHITECTS AND ENGINEERS
2018/08 PROJECT: 5153328 - DUBAI SOUTH MALL, DUBAI, UAE ARABTEC CONSTRUCTION LLC ATKINS UAE
FEWA CONTRACT NO. 71E/2015 - 132/33/11KV SUBSTATION WORKS IN AL NABOODAH CONSTRUCTION GROUP FEDERAL ELECTRICITY AND
2018/04 UAE
NORTHERN EMIRATES - AJMAN, UAE LLC WATER AUTHORITY
P021.05-DXB-2012 AKOYA ARTESIA (TOWER A - G+3P+24/ TOWER B - CHINA STATE CONSTRUCTION
ENGINEERING CONSORTIUM -
2018/04 G+3P+20/ TOWER C - G+3P+19/ TOWER D - G+3P+14) ON PLOT 676-5408 - ENGINEERING CORPORATION (MIDDLE UAE
CONSULTING ENGINEERS
AL HEBIAH THIRD - DUBAI, UAE EAST) LLC
CONSTRUCTION OF AL FATTAN DOWN TOWN ON PLOT NO. 3340109
2018/04 ALI MOOSA & SONS CONTRACTING AE7 CONSULTANTS UAE
PACKAGE 2 BUILDING WORKS AT AL SATWA, DUBAI, UAE
PROJECT; (14-035-DXB) UNION CO-OPERATIVE SOCIETY - AL QUOZ, PARKWAY INTERNATIONAL NAGA ARCHITECTS DESIGNERS
2018/03 UAE
DUBAI, UAE CONTRACTING LLC & PLANNERS DUBAI
2018/02 THEMATIC DISTRICT MAIN WORKS AT EXPO 2020 SITE, DUBAI, UAE AL FUTTAIM CARILLION LLC HOPKINS ARCHITECT UAE
B+G+4P+HC+20 STOREY RESIDENTIAL BUILDING ON PLOT NO. AL SHAFAR NATIONAL CONTRACTING ARKIPLAN CONSULTING
2018/02 UAE
JVC11YHRG001B AT JUMEIRAH VILLAGE, DUBAI, UAE LLC ARCHITECTS AND ENGINEERS
International Job References - MasterTop 1205
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
PROJECT; (14-035-DXB) UNION CO-OPERATIVE SOCIETY - AL QUOZ, PARKWAY INTERNATIONAL NAGA ARCHITECTS DESIGNERS
2018/02 UAE
DUBAI, UAE CONTRACTING LLC & PLANNERS DUBAI
2017/11 PROJECT: 5153328 - DUBAI SOUTH MALL, DUBAI, UAE ARABTEC CONSTRUCTION LLC ATKINS UAE
2017/11 THEMATIC DISTRICT MAIN WORKS AT EXPO 2020 SITE, DUBAI, UAE AL FUTTAIM CARILLION LLC HOPKINS ARCHITECT UAE
CONSTRUCTION OF ROAD NOS 1 & 5 AND DRAINAGE SYSTEMS AT GALFAR ENGINEERING & CONTRACTING
2017/08 OMAN
DUQUM PORT OMAN SAOG.
PREMIER INN HOTEL B+G+8 STOREY+ GYMNASIUM + ROOF HOTEL ARCH GROUP ENGINEERING
2017/05 KHANSAHEB CIVIL ENGINEERING LLC UAE
TOWER ON PLOT NO. 326-5612 AT AL JADAF, DUBAI, UAE CONSULTING
CHINA STATE CONSTRUCTION
HAMENI TOWER (G+4P+27) RESIDENTIAL BUILDING ON PLOT NO. ENGINEERING CONSULTANTS
2017/05 ENGINEERING CORPORATION (MIDDLE UAE
JVC15SHRG001 AT JUMEIRAH VILLAGE, DUBAI, UAE GROUP
EAST) LLC
ARAB ENGINEERING BUREAU
2017/05 AL MAJED TOWER (4B+G+25+P) AT MARINA (COM 007), LUSAIL QATAR GULF CONTRACTING CO. QATAR
QATAR (AEB)
International Job References - MasterTop 1205
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2017/05 SHAZA HOTEL DOHA QATAR DOMOPAN FAITHFUL & GOULD QATAR
2B+G+17F+R RESIDENTIAL & COMMERCIAL BUILDING ON PLOT 346-147, ENGINEERING CONSTRUCTION & NATIONAL ENGINEERING
2017/04 UAE
BUSINESS BAY, DUBAI, UAE RECONSTRUCTION CO. BUREAU
RESIDENTIAL TOWER ON PLOT NO. C32 SECTOR E-12, SARAYA, ABU CIVILCO CIVIL ENGINEERING AND BAINONA CONSULTING
2017/01 UAE
DHABI, UAE CONTRACTING ENGINEERING BUREAU
2017/01 SOHAR INDEPENDENT POWER PROJECT - 175MW (CIVIL WORKS) OMAN DOUGLAS OHI LLC BLACK & VEATCH OMAN
MAIN WORKS ABRAJ QUARTIER AQ 3 & 4 AND ABRAJ QUARTIER 5 & 6 AT KEO INTERNATIONAL
2016/10 SHAPOORJI PALLONJI QATAR WLL QATAR
PEARL QATAR CONSULTANTS - QATAR
2016/09 CONSTRUCTION OF TAWAZUN SERVICE STATION IN ABU DHABI, UAE GULF ASIA CONTRACTING CO. LLC ADNOC DISTRIBUTION UAE
DESIGN, CONSTRUCTION, EQUIPMENT, FURNITURE AND OPERATIONAL SHAPOORJI PALLONJI / AL SAGER JOINT
2016/09 MINISTRY OF HEALTH KUWAIT
MAINTENANCE FOR THE NEW AL SABAH HOSPITAL, KUWAIT VENTURE
THE FIRST AVENUE MALL & HOTEL (B+G+4F+R) ON PLOT NO. 6742010 AT PIVOT ENGINEERING & GENERAL DEWAN ARCHITECTS AND
2016/08 UAE
AL HEBAIAH FIRST DUBAI - UAE CONTRACTING CO. WLL ENGINEERS
CONSOLIDATED CONTRACTORS GROUP
QPR (QATAR PRIMARY ROUTES) - DUKHAN HIGHWAY CENTRAL
2016/08 S.A.L. (OFFSHORE) (CCC) / TEYSEER KRB CONSULTANT QATAR
CONTRACT (C2010/116), DOHA, QATAR
CONTRACTING COMPANY WLL JV
TRO JB / DAR SALEH AL-QALLAF
DESIGN, CONSTRUCTION, EQUIPMENT, FURNITURE AND OPERATIONAL ALGHANIM INTERNATIONAL GEN. TRAD.
2016/08 ENGINEERING CONSULTANTS KUWAIT
MAINTENANCE FOR THE KUWAIT CANCER CENTER (KCCC) & CONT. CO. WLL
(SQC INTERNATIONAL)
International Job References - MasterTop 1205
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
PROPOSED VEHICLE DISTRIBUTION CENTERS (VDC) PHASE 2 AT SOHAR PREMIER INTERNATIONAL PROJECTS
2016/06 DESIGN UNIT ENGINEERING OMAN
FREEZONE, OMAN LLC
DICEC NEW EXHIBITION HALLS PACKAGE CP07 - 2ND ZABEEL ROAD 312 DAR AL-HANDASAH / MACE
2016/05 KHANSAHEB CIVIL ENGINEERING LLC UAE
ENGINEER'S OFFICE, DUBAI, UAE INTERNATIONAL LTD
DICEC NEW EXHIBITION HALLS PACKAGE CP07 - 2ND ZABEEL ROAD 312 DAR AL-HANDASAH / MACE
2016/02 KHANSAHEB CIVIL ENGINEERING LLC UAE
ENGINEER'S OFFICE, DUBAI, UAE INTERNATIONAL LTD
THE ADDRESS RESIDENCE FOUNTAIN VIEWS DEVELOPMENT, DUBAI, DEWAN ARCHITECTS AND
2015/12 ARABIAN CONSTRUCTION CO. UAE
UAE ENGINEERS
PROJECT 1504 - 2B+G+3 EMIRATES HOSPITAL ON PLOT NO. 342-8103 AT ARIF & BINTOAK CONSULTING
2015/12 AL SHAFAR CONTRACTING CO. L.L.C UAE
JUMEIRAH SECOND, DUBAI, UAE ARCHITECTS & ENGINEERING
Compliance Statement:
The Contractor hereby confirms that the submitted items have been reviewed in detail and are correct and in strict conformance
with the Contract Documents. (compliance statement attached)
Initiator QA/QC Manager Project Manager
Lohit Devadiga
30/06/2021
Name, Signature & Date Name, Signature & Date Name, Signature & Date
REVIEWER’S COMMENTS
07.14.21
Name, Signature and date Name, Signature and date
Comments Sheet Attached? Yes ☐ No ☐ Comments Sheet Attached? Yes ☐ No ☐
ENGINEER/ EMPLOYER’S REPRESENTATIVE A☐ B☐ C☐ D☐ R☐
14 July 2021
Note: The Engineer’s / Consultants approval shall not in any way relieve the Contractor of his obligation under the Contract. The
Contractor shall be solely responsible for the soundness and the correctness of the submitted Materials and Documents as per
the required Contract Conditions and Contract Clauses
Codes: A: No Objection B: No Objection subject to comments C: Rejected, Revise & Resubmit D: Rejected R: For Information
Page 1 of 1
Mufeed/CM AApproved as noted:
17/06/2015
Master Top 1205 and Master Top SR 3 from M/s. BASF is accepted, provided that:
1-The over all system thickness 0.5 nominal. and the finish to be Satin as specified not Gloss as submitted.
2- Manufacturer's recommendations,conditions of application and attached his Method Statement shall be
implemented.
3- the substrates must have a maximum 75% relative humidity level measurement.
4- Concrete surface preparation to be carried out by using rotary grinding machine that abrade the surfaces.
5- Application shall be by an Applicator who strictly certified by M/s.BASF.
6- This approval is limited where specified in finishing schedules.
7- Colors shall be as per client choice.
8- Mockup samples to be provided at site for final approval.
9- randomly samples from the site are subject to tests to (pull off) to verification and complying with the
project specifications.
9. Test reports
ASTM E 162 Surface Flammability
of "MasterTop 1205"
ACCREDITATION To ISO/IEC 17025 for a defined Scope of Testing by the International Accreditation Service
SPECIFICATIONS OF ORDER
Determine surface flammability in accordance with ASTM E 162-13, as per BASF CC UAE Purchase Order No.
4917040449 and Exova Warringtonfire North America Quotation No. 14-002-307,391dated July 7, 2014.
Solvent free high build two component epoxy floor coating, identified as "MasterTop 1205".
SAMPLE PREPARATION
The material was received in the proper size and number, as designated by the test standard. Prior to
testing, the samples were conditioned at a temperature of 23 ± 3°C and a relative humidity of 50 ± 5%.
Fs Q Is Observations
Rounded Average: 10
COMMENTS
There are no current, specific Federal Railroad Administration requirements cited for floor coating
materials when tested for surface flammability (ASTM E 162 test procedure). Therefore, the criterion
cited in this report are for general requirements and are listed for reference purposes only.
Note: This is an electronic copy of the report. Signatures are on file with the original report.
Note: This report and service are covered under Exova Canada Inc. Standard Terms and Conditions of Contract which
may be found on the Exova website (www.exova.com), or by calling 1-866-263-9268.
Exova
ASTM E 162-13
Surface Flammability of Materials Using a Radiant Energy Source.
As specified, four specimens, 6 x 18 inches in size, are pre-dried for 24 hours at 60°C. Section 10.1 of
ASTM E 162-13 states to then condition the specimens to "equilibrium (constant weight)" but does not
specify a definition or procedure with respect to establishing the "constant weight". Therefore, prior to
testing, the specimens are then conditioned for a minimum period of 24 hours at 50 ± 5% relative humidity
and 23 ± 3°C.
Each specimen is mounted into a holder and inclined at 30° from the vertical in front of a 12 x 18 inch
gas-fired radiant panel. The orientation of the specimen is such that ignition is forced near its upper edge
by a pilot flame, and the flame front progresses downwards.
A factor derived from the rate of progress of the flame-front and the rate of heat liberation by the material
under test is calculated as follows and then reported after rounding the average of the tests to the
nearest multiple of 5:
Is = Fs·Q
Transit authorities generally specify a maximum Is acceptance criterion of 35 for general applications,
with no flaming running or dripping allowed.